You are on page 1of 1

(2) Periodical check table (including operation check) [once a half year / once a year]

(Copy and use a form in the end of this manual when the table becomes full, and
file them.)

Check mark 0: Normal,


/::" : Normal after rework or repair
(Example of filling up)
Date checked Installation
completed on
'02.06.14
Inspector
service
engineer name
0000 '
Check Items

a. Confirm tightness of
fixing screws in
mechanical sections and
connecting screws in the
0
terminal board.
(Re-tiqhten if loosened.)
b. Confirm connecting and
wire wearing conditions at
connecting wire mounting
0
points and wire bases
c. Confirm operating
conditions of switches,
and displayed state of 0
LEOs and indicators.
d. Confirm that warning
labels and other
indication labels are not
dirty or detached. 0
Clean if they become
dirty.
e. Items to be dealt with,
and item to be informed.

Table 5.2 Periodical Check Table (2)

5-4

You might also like