ACTUAL SITE PICTURES UNIT AREAS Phase Saleable Area(sq.ft.) Carpet/ Bal. Area (Sq.Mtr.) I 630 49 / 8.27 I 940 53.06 / 10.25 I 965 56.94 / 9.58 I 1120 63.45 / 10.46 I 1200 67.51 / 11.67 I 1290 73.12 / 13.01 I 1520 79.12 / 14.99 I 1550 81.34 / 13.12 I 2586 143.74 / 11.18 II 635 33.20/ 4.75 II 825 44.5 / 4.45 II 1050 57.20 / 9.5 II 1375 75.20 / 13 II 1475 79.10 / 14.25 UNIT SIZES & LAYOUTS Phase 1 Phase 2 Floor BSP (per sq ft) 14th 13th 2495 2605 FINAL 12th 11th 2615 2624 PRICE 10th 2634 9th 8th 2645 2655 LIST 7th 2664 6th PLC 2674 5th 2685 Corner 50 4th 2695 3rd 2704 6 Mtr road facing 25 2nd 2714 12 mtr. Road facing 50 1st 2815 GF 2995 Internal Greens facing 50 CAR PARKING • PHASE 1 ALL UNITS – OPEN SLOT • 635 SFT – NO SLOT • 825 SFT – OPEN SLOT WITHOUT MARKING • BALANCE SIZES IN PHASE 2 – 1 CAR PARKING SLOT WILL BE ALLOTTED PAYMENT PLANS Construction Linked Payment Plan On Booking 10% Within 30 days from booking 10% On Excavation 20% On Start of structure of Ground floor 10% On Start of 2nd floor 10% On Start of structure of 4th floor 10% On Start of 6th floor 10% On Start of structure of 8th floor 10% On Start of structure of Top floor 5% On Possession 5%+ Other charges as applicable
Special Payment Plan 50:50
On Booking 10% Within 45 days of Booking 40% 50% of BSP +Other charges as On Possession applicable Phase 1 - Cheques/ Drafts to be issued in the favor of "BCC INFRASTRUCTURES PVT LTD- ESCROW A/C NO - 01930350000011" Phase 2 - Cheques/ Drafts to be issued in the favor of "BCC INFRASTRUCTURES PVT LTD PHASE 2- MASTER COLLECTION ESCROW A/C NO - 01930350000124" Rental option till offer of possession for the customer to stay in Phase-II can be given @ Rs.50/- per sft for Towers G1 to G6 & H1, H2 Rental option till offer of possession for the customer to stay in Phase-II can be given @ Rs.75/- per sft for Towers H3 to H5 & J1 to J4 10-90 payment plan is also applicable as per customer eligibility under PSL (loan of less than or equal to 30 lacs). Bank will disburse 90% on 10% payment by customer. Any Levies, Duties, GST, Other Govt Taxes shall be borne by Applicant Price Includes of BSP, One Open Parking (Ph- 1), One Covered Parking (Ph- 2) , Fire Fighting, External Electrification charges EDC/ IDC @ Rs. 50 psf is charged extra IFMS @ Rs 20 psf on Total Area, Power Back Up (1 Kva) & Dual Meter Charges are actual payable at the time of possesion. Club Membership is included in Phase 2 & optional in Phase 1 @ Rs. 2,00,000 /-