You are on page 1of 49

EXCLUSIVELY MARKETED BY

FRIDAY, 18TH JANUARY 2019


ACTUAL SITE PICTURES
UNIT AREAS
Phase Saleable Area(sq.ft.) Carpet/ Bal. Area (Sq.Mtr.)
I 630 49 / 8.27
I 940 53.06 / 10.25
I 965 56.94 / 9.58
I 1120 63.45 / 10.46
I 1200 67.51 / 11.67
I 1290 73.12 / 13.01
I 1520 79.12 / 14.99
I 1550 81.34 / 13.12
I 2586 143.74 / 11.18
II 635 33.20/ 4.75
II 825 44.5 / 4.45
II 1050 57.20 / 9.5
II 1375 75.20 / 13
II 1475 79.10 / 14.25
UNIT SIZES & LAYOUTS
Phase 1
Phase 2
Floor BSP (per sq ft)
14th
13th
2495
2605
FINAL
12th
11th
2615
2624 PRICE
10th 2634
9th
8th
2645
2655
LIST
7th 2664
6th PLC
2674
5th 2685 Corner 50
4th 2695
3rd 2704 6 Mtr road facing 25
2nd 2714 12 mtr. Road facing 50
1st 2815
GF 2995 Internal Greens facing 50
CAR PARKING
• PHASE 1 ALL UNITS – OPEN SLOT
• 635 SFT – NO SLOT
• 825 SFT – OPEN SLOT WITHOUT
MARKING
• BALANCE SIZES IN PHASE 2 – 1 CAR
PARKING SLOT WILL BE ALLOTTED
PAYMENT PLANS
Construction Linked Payment Plan
On Booking 10%
Within 30 days from booking 10%
On Excavation 20%
On Start of structure of Ground floor 10%
On Start of 2nd floor 10%
On Start of structure of 4th floor 10%
On Start of 6th floor 10%
On Start of structure of 8th floor 10%
On Start of structure of Top floor 5%
On Possession 5%+ Other charges as applicable

Special Payment Plan 50:50


On Booking 10%
Within 45 days of Booking 40%
50% of BSP +Other charges as
On Possession applicable
Phase 1 - Cheques/ Drafts to be issued in the favor of "BCC INFRASTRUCTURES
PVT LTD- ESCROW A/C NO - 01930350000011"
Phase 2 - Cheques/ Drafts to be issued in the favor of "BCC INFRASTRUCTURES
PVT LTD PHASE 2- MASTER COLLECTION ESCROW A/C NO - 01930350000124"
Rental option till offer of possession for the customer to stay in Phase-II can be
given @ Rs.50/- per sft for Towers G1 to G6 & H1, H2
Rental option till offer of possession for the customer to stay in Phase-II can be
given @ Rs.75/- per sft for Towers H3 to H5 & J1 to J4
10-90 payment plan is also applicable as per customer eligibility under PSL (loan of
less than or equal to 30 lacs). Bank will disburse 90% on 10% payment by customer.
Any Levies, Duties, GST, Other Govt Taxes shall be borne by Applicant
Price Includes of BSP, One Open Parking (Ph- 1), One Covered Parking (Ph- 2) , Fire
Fighting, External Electrification charges
EDC/ IDC @ Rs. 50 psf is charged extra
IFMS @ Rs 20 psf on Total Area, Power Back Up (1 Kva) & Dual Meter Charges are
actual payable at the time of possesion.
Club Membership is included in Phase 2 & optional in Phase 1 @ Rs. 2,00,000 /-

* Note - 1 Sq. Mtr. = 10.76 Sq. Ft.

You might also like