You are on page 1of 36

PD METER PROCEDURE

MOD. 51-14 (SINGLE CASE VERSION)

TABLE OF CONTENTS

Item Title Sheet

1. PD Meter preliminary checking 2

2. PD Meter dismounting: counter removing 8

3. PD Meter dismounting: magnetic transmission 12


dismounting /ball bearing replacement

4. PD Meter dismounting: front/rear bearing replacement 22

5. PD Meter dismounting: rotors replacement 28

6. PD Meter dismounting: timing gear replacement 31

7. PD Meter mounting 34

8. APPENDIX A – Special Tools 35


m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

9. APPENDIX B – Exploded view drawing 36

PDMSC-51-14_03-E Sheet 1 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
1. PD METER PRELIMINARY CHECKING
1) Unscrew the Outer Cover socket head screw and remove the Outer Cover

Picture 1 Outer Cover Bolts


m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

2) Check if the timing gears can rotate freely without unscrewing the rear cover socket head screws
(valid for models 12, 22, 53, 13, 14 and 24 only since on the models 51 and 11 the socket head
screws of the outer cover fix also the rear cover)

Picture 2 Timing gears

PDMSC-51-14_03-E Sheet 2 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
3) If the timing gear cannot rotate freely, unscrew the rear cover socket head screws and remove the rear
cover.

ATTENTION: Before unscrew the rear cover socket head make a sign on the position of the timing gear
immediately before removing of the rear cover for an easily reassembling of the meter (see picture 3)
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 3 Timing gear signing

Note: to help the operator in removing the rear cover the threaded holes and the previously
dismounted socket head screws can be used (see picture 4)
ATTENTION: Do not dismount timing gears in this phase to avoid losing synchronism

Picture 4 Rear cover bolts

PDMSC-51-14_03-E Sheet 3 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 5 Threaded holes and socket head screws used for rear cover removing

PDMSC-51-14_03-E Sheet 4 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)

4) Remover the sub-assembly from the body


m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 6 Sub-assembly removing and rear cover pins

Picture 7 Sub-assembly

PDMSC-51-14_03-E Sheet 5 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
5) Check rotors surfaces eliminating the scratch if necessary, front/rear bearing conditions, rear/front cover
surface, rotors’ shaft surface and remove eventual solid particles inside the meter

ATTENTION: If you need to replace the front bearing do not follow item 6 and go to item 9

6) If all is ok, mount again the rear cover (see item 3) paying attention to the rear cover pins (see picture 6),
to the coupling between rotors shaft and magnetic transmission (see pictures 8 and 9) and to the number
engraved on rear cover and outer body (see picture 10)
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 8 Rotor shaft coupling

Picture 9 Magnetic transmission coupling

PDMSC-51-14_03-E Sheet 6 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 10 Numbering code on body and covers

PDMSC-51-14_03-E Sheet 7 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)

2. PD METER DISMOUNTING: COUNTER REMOVING


7) Unscrew counter bolts
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 11 Counter bolts


8) Remove counter and relevant gasket

Picture 12 Counter and gasket counter

PDMSC-51-14_03-E Sheet 8 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
9) Unscrew reduction gear ass’y bolts and remove the same.

ATTENTION!: before removing, make a sign to be able to mount again the same in the original
position (necessary when accessories are installed on the meter)
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 13 Reduction gear ass'y

Picture 14 Reduction gear ass'y removing

PDMSC-51-14_03-E Sheet 9 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
10) Unscrew register support bolts and relevant gasket

Picture 15 Register support bolts


m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 16 Register support

PDMSC-51-14_03-E Sheet 10 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)

Picture 17 Register support gasket


m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

PDMSC-51-14_03-E Sheet 11 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
3. PD METER DISMOUNTING: MAGNETIC TRANSMISSION
DISMOUNTING /BALL BEARING REPLACEMENT
11) Block the magnetic transmission conic gear with a pliers and unscrew the nut

NOTE: do not screw the nut completely


m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 18 Magnetic transmission gear

12) Remove the magnetic transmission conic gear with a lever

Picture 19 Removing magnetic transmission conic gear

PDMSC-51-14_03-E Sheet 12 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)

Picture 20 Removing magnetic transmission conic gear


m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

PDMSC-51-14_03-E Sheet 13 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
13) Unscrew the magnetic transmission bowl screws and remove the same

Picture 21 Magnetic transmission bowl


m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 22 Magnetic transmission bowl

PDMSC-51-14_03-E Sheet 14 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
14) remove the outer magnet ass’y

Picture 23 Outer magnet ass'y


m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

PDMSC-51-14_03-E Sheet 15 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
15) Remove magnetic transmission ball bearing using a punch and replace it
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 24 Magnetic transmission ball bearing

PDMSC-51-14_03-E Sheet 16 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)

Picture 25 Punch for magnetic transmission ball bearing removing

16) Remove the second magnetic transmission ball bearing using a punch and replace it
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 26 Punch for magnetic transmission ball bearing removing

PDMSC-51-14_03-E Sheet 17 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)

Picture 27 Magnetic transmission ball bearing


m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

PDMSC-51-14_03-E Sheet 18 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
17) Unscrew Inner magnet lid screws and remove the same

Picture 28 Inner magnet lid screws


m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 29 Inner magnet lid

PDMSC-51-14_03-E Sheet 19 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
18) Remove inner magnet ass’y

Picture 30 Inner magnet ass'y

19) Unscrew the sealing cover screws and remove the same
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 31 Sealing cover screws

PDMSC-51-14_03-E Sheet 20 of 36
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

PDMSC-51-14_03-E
Picture 32 Sealing cover
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)

Sheet 21 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
4. PD METER DISMOUNTING: FRONT/REAR BEARING
REPLACEMENT
If you need to replace the front bearing, you must remove the front cover

20) Unscrew the front cover socket head screws and remove the same
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 33 Front cover socket head screws

Picture 34 Front Cover

PDMSC-51-14_03-E Sheet 22 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
21) Remove front bearing using a punch

Picture 35 Bearing front/rear unmounting


m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

22) Mount new rear/front bearings using the special tools (see appendix A) or a press (if available)

Picture 36 Bearing mounting using special tools

PDMSC-51-14_03-E Sheet 23 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)

Picture 37 Bearing mounting using a press


23) Ream rear/front bearings using a reamer (just 0,03 mm shall be enough)
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 38 Bearings reaming

PDMSC-51-14_03-E Sheet 24 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
24) File new rear/front bearings using a file in order to make bearing and cover on the same plane

Picture 39 Bearing filing


m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

If you need to replace the rear bearings, you must remove the rear cover as per items 1 to 4

25) Block one rotor with a press and unscrew stop nut with a wrench without unscrewing the nuts completely

Picture 40 Rotor blocking

PDMSC-51-14_03-E Sheet 25 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
26) Unblock the timing gear using an hammer

Picture 41 Unblock the timing gear


27) Remove the nut and relevant timing gear
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 42 Timing gear removing

PDMSC-51-14_03-E Sheet 26 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
28) Remove the rotor. Follow items 25 to 27 for second rotors, too

Picture 43 Rotor removing


29) Replace the bearing rear (See items 21, 22, 23 and 24)
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

30) Remount the front cover only (see item 20)

31) Put again rotors into the body

32) Mount the rear cover (see item 6)

33) Synchronize the timing gears (see items 43 ÷ 49)

PDMSC-51-14_03-E Sheet 27 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
5. PD METER DISMOUNTING: ROTORS REPLACEMENT
Note: when replacing rotors the front cover must be mounted (see item 20) if previously dismounted
for bearing replacement

34) Remove the spool pipe unscrewing the spool pipe bolts
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 44 Spool pipe bolts


35) Remove the outer cover (see item 1), rear cover (see items 3 and 4)

36) Remove the timing gears and the old rotors (see items 25, 26, 27 and 28)

37) Put one new rotors into the body

Picture 45 Rotors

PDMSC-51-14_03-E Sheet 28 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
38) Mount rear cover (see item 6), put on the rotor shaft one timing gear without screwing relevant nut and
rotate by hand the rotor checking that it doesn’t touch with the body through a thickness gauge (0,1 mm)

Picture 46 Putting Timing gear on Rotor shaft


m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 47 Rotor checking

39) Remove the timing gear, the rear cover, the first rotor and put it the second one only following items 37
and 38 for second rotor, too

PDMSC-51-14_03-E Sheet 29 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
40) Put both rotors into the body

Picture 48 Both rotors


41) Mount the rear cover (see item 6)
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

42) Synchronize the timing gears (see items 43 ÷ 49)

PDMSC-51-14_03-E Sheet 30 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
6. PD METER DISMOUNTING: TIMING GEAR REPLACEMENT
Note: when replacing rotors the front cover must be mounted (see item 20) if previously dismounted
for bearing replacement

If you need to replace the timing gears or simply dismount timing gears for bearing or rotors replacement, you
need to synchronize the meter again

43) Remove the spool pipe (see item 34) if not previously removed

44) Remove the outer cover (see item 1) if not previously removed

45) Remove the old timing gears (see items 25, 26 and 27) if not previously removed

46) Mount the first timing gear (paying attention to the couple correctly the conic shaft with the conic timing
gear) and fix relevant stop nut. In order to fix stop nut properly simply block the rotor with a bar before
screwing the same
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 49 Conic shaft and timing gear

PDMSC-51-14_03-E Sheet 31 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)

Picture 50 Timing gear mounting

47) Mount the second timing gear. At the same time you have to block the rotor on which has been already
installed the first timing gear with a bar, put the thickness gauge (0,1 mm) between the rotors and press by
hand “second” rotor on the first rotor on which first timing gear was installed while screwing lock nut of
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

“second timing gear” (see pictures 51 and 52)

Picture 51 Rotor blocking through a bar

PDMSC-51-14_03-E Sheet 32 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)

Picture 52 Thickness gauge inserting and pressing by hand

48) Check that the rotors can rotate freely rotating timing gear by hand while putting through the rotors a
thickness gauge
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

Picture 53 Synchronism checking

49) In case rotors are not synchronized correctly, so rotors cannot rotate freely, repeat operation under items
47 and 48 changing thickness of the thickness gauge

PDMSC-51-14_03-E Sheet 33 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)
7. PD METER MOUNTING

50) If not previously mounted, mount the outer cover (see item 1), spool pipes (see item 34) and counter,
magnetic transmission and relevant parts (see items 7 to 14 and 17 to 19)
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

PDMSC-51-14_03-E Sheet 34 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)

8. APPENDIX A – Special Tools


m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

PDMSC-51-14_03-E Sheet 35 of 36
PD METER PROCEDURE
MOD. 51-14 (SINGLE CASE VERSION)

9. APPENDIX B – Exploded view drawing

PN Description Qty
1 Outer Body 1
2 Rear Cover 1
m - f:\archivio\documenti di origine interna\pdmsc-51-14_03-e pd meter maintenance procedure mod 51-14.doc

3 Front Cover 1
4 Bearing Rear 2
5 Bearing Front 2
8 O-Ring Rear Cover 1
9 Outer Cover 1
10 Timing Gear 2
11 Sealing Cover 1
12 Pin End Plate 4
15 Screw Magnetic Transmission 9
16 Screw Spool Pipe 8
17 Screw Cover 8
18 Screw Rear Cover 4
19 O-Ring Sealing Cover 1
20 O-Ring Spool Pipe 2
21 O-Ring Cover 2
22 O-Ring Magnetic Transmission 1
24 Magnetic Transmission Bowl 1
27 Lid Inner Magnet 1
30 Inner Magnet Ass’y 1
31 Outer Magnet Ass’y 1
34 Screw Drain/Vent 2
35 Bearing Magnetic Transmission 2
39 Gasket Drain/Vent 2
41 Stop Nut 2
42 Rotors Ass’y 2
43 Spool Pipe 2

PDMSC-51-14_03-E Sheet 36 of 36

You might also like