June 2018
June 2018
This need to complete as printed document, need to fill time by computer. Follow the abbreviations to fill the status.
Activity Report :
This can fill manually or computer
Appendix 1A :
Each professional staff need to submit this form to claim his/her monthly fee. But, this is very confidential form. This
can fill by manually or using computer. This includes each consultants bank details. OCYANA will arrange the payment
according to the form. Each staff will receive this form with the agreement.
Name : Mrs.M P C R Puwakdandawa Position: Site Engineer Month: May Year: 2018
Location: Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
Day
Total
……………….. Days
Activity: Construction
Supervision
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Status √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ A √ √ √ 30
Team Member Date Checked/Certified by (RE) Date Recommended by (DTL) Date Approved by-(TL) Date
`
Apartment No: 1/1, “CBM House”
No: 2A, Lake Drive,
Colombo 08, Sri Lanka
Telephone: +94 11 2690312
Facsimile: +94 11 2690566
Month: Year:
June 2018
NO. OF NO. OF
DATE ACTIVITY
HOLIDAYS WORKED DAYS
Rock filling Ramp C,Rock excavation 26+580-27+150, Slope cutting 26+580-600, 26+960-27+090,
15
28+520-560, Removing pre loading in Ramp E 0+000-030, Ramp F 0+000-026, RUC 4 laying in 1
ramp C, Embankment Filling 28+065-265, 27+930-28+06527+310-340, 27+350-373, 27+380-430,
Ramp A& B, ABC laying 28+280 -400,
Rock filling Ramp C,Rock excavation 26+580-27+150, Slope cutting 26+580-600, 26+960-27+090,
16
28+520-560, Removing pre loading in Ramp E 0+000-030, Ramp F 0+000-026, RUC 4 laying in 1
ramp C, Embankment Filling 28+065-265, 27+930-28+06527+310-340, 27+350-373, 27+380-430,
Ramp A& B, ABC laying 28+280 -400,
Rock filling Ramp C,Rock excavation 26+580-27+150, Slope cutting 26+580-600, 26+960-27+090,
28+520-560, Removing pre loading in Ramp E 0+000-030, Ramp F 0+000-026, RUC 4 laying in
17 1
ramp C, Embankment Filling 28+065-265, 27+930-28+06527+310-340, 27+350-373, 27+380-430,
Ramp A& B, ABC laying 28+280 -400,
Rock filling Ramp C,Rock excavation 26+580-27+150, Slope cutting 26+580-600, 26+960-27+090,
18
28+520-560, Removing pre loading in Ramp E 0+000-030, Ramp F 0+000-026, RUC 4 laying in 1
ramp C, Embankment Filling 28+065-265, 27+930-28+06527+310-340, 27+350-373, 27+380-430,
Ramp A& B, ABC laying 28+280 -380,
Rock filling Ramp C,Rock excavation 26+580-27+150, Slope cutting 26+580-600, 26+960-27+090,
28+520-560, Removing pre loading in Ramp E 0+000-030, Ramp F 0+000-026, RUC 4 laying in
19 1
ramp C, Embankment Filling 28+065-265, 27+930-28+06527+310-340, 27+350-373, 27+380-430,
Ramp A& B, ABC laying 28+280 -380, Ramp F 0+260 seg-3 Base concrete
Rock filling Ramp C,Rock excavation 26+580-27+150, Slope cutting 26+580-600, 26+960-27+090,
28+520-560, Removing pre loading in Ramp E 0+000-030, Ramp F 0+000-026, RUC 4 laying in
20 1
ramp C, Embankment Filling 28+065-265, 27+930-28+065, 27+310-340, 27+350-373, 27+380-430,
Ramp A& B, ABC laying 28+280 -380, BR 1 Abutment 2 concreting
Rock filling Ramp C, Rock excavation 26+580-27+150, Slope cutting 26+580-600, 26+960-
21
27+090, 28+520-560, Removing pre loading in Ramp E 0+000-030, Ramp F 0+020-040, RUC 4 1
laying in ramp C, Embankment Filling 28+065-265, 27+930-28+06527+310-340, 27+350-373,
27+380-430, Ramp A& B, ABC laying 28+280 -380, Free standing wall at 28+987 R
Rock filling Ramp C, Rock excavation 26+580-27+150, Slope cutting 26+960-27+090, 28+520-
560, top soil laying for turfing, 28+520-560,Removing pre loading in Ramp E 0+000-030, Ramp F
22 0+020-040, SGT at 0+360-370 Ramp F, Embankment Filling 28+065-265, 27+930-28+065,27+310- 1
340, 27+350-373, 27+380-430, Ramp A& B, Sub base laying Beliatta walasmulla road section, Free
standing wall at 28+987 R, End block concreting for beams. back filling for A1-BR1.
NO. OF NO. OF
DATE ACTIVITY
HOLIDAYS WORKED DAYS
Rock filling Ramp C, Rock excavation 26+580-27+150, Slope cutting 26+960-27+090, 28+520-
560, top soil laying for turfing, 28+520-560,27+460-500,Removing pre loading in Ramp E 0+000-
030, Ramp F 0+020-040, SGT at 0+360-370 Ramp F& 0+70-0+130 Ramp C, Embankment Filling
23 1
28+065-265, 27+930-28+065,27+310-340, 27+350-373, 27+380-430, Ramp A& B, Sub base laying
Beliatta walasmulla road section, Free standing wall at 28+987 R, End block concreting for beams.
back filling for A1-BR1. shoring work BR5
Rock filling Ramp C, Rock excavation 26+580-27+150, Slope cutting 26+960-27+090, 28+520-
560, top soil laying for turfing, 28+520-560,27+460-500,Removing pre loading in Ramp E 0+000-
24 030, Ramp F 0+020-040, SGT at 0+360-370 Ramp F& 0+70-0+130 Ramp C, Embankment Filling 1
28+065-265, 27+930-28+065,27+310-340, 27+350-373, 27+380-430, Ramp A& B, Free standing
wall at 28+987 R, End block concreting for beams. back filling for A1-BR1. shoring work BR5
Rock excavation 26+580-27+150, Slope cutting 26+960-27+090, 28+520-560, top soil laying for
turfing, 28+520-560,27+460-500,Removing pre loading in Ramp E 0+000-030, Ramp F 0+020-050,
25
SGT at 0+360-370 Ramp F& 0+70-0+130 Ramp C, RUC4 laying 0+100 culvert back filling, 1
Embankment Filling 28+065-265, 27+930-28+065,27+310-340, 27+350-373, 27+380-430, Ramp
A& B, Free standing wall at 28+987 R, End block concreting for beams. back filling for A1-BR1.
Excavation work BR5, bearing plinth concreting A1-BR2.
26 Leave 1
27 Poyaday 1
Rock excavation 26+580-27+150, Slope cutting 26+960-27+090, 28+520-560, top soil laying for
turfing, 28+520-560,27+460-500,Removing pre loading in Ramp E 0+000-030, Ramp F 0+020-050,
28
SGT at 0+360-370 Ramp F& 0+70-0+130 Ramp C, RUC4 laying 0+100 Ramp F culvert back 1
filling,Free standing wall at 28+987 R, Wall & Deck concreting in 0+260 culvert at Ramp F,End
block concreting for beams. back filling for A1-BR1. Excavation work BR5, bearing plinth
concreting A1-BR2.
Rock excavation 26+580-27+150, Slope cutting 26+960-27+090, 28+520-560, top soil laying for
turfing, 28+520-560,27+460-500,Removing pre loading in Ramp E 0+000-030, Ramp F 0+020-050,
SGT at 0+360-370 Ramp F& 0+70-0+130 Ramp C, RUC4 laying 0+100 Ramp F culvert back
29 1
filling,Free standing wall at 28+987 R, Wall & Deck concreting in 0+260 culvert at Ramp F,End
block concreting for beams. Beam launcing, bearing plinth concreting & back filling for A1-BR1.
Excavation work BR5, bearing plinth concreting A1-BR2.
Rock excavation 26+580-27+150, Slope cutting 26+960-27+090, 28+520-560, top soil laying for
turfing, 28+520-560,27+460-500,Removing pre loading in Ramp E 0+000-030, Ramp F 0+020-050,
SGT at 0+360-370 Ramp F& 0+70-0+130 Ramp C, Free standing wall at 28+987 R, Wall & Deck
30 1
concreting in 0+260 culvert at Ramp F,End block concreting for beams. Beam launcing, bearing
plinth concreting & back filling for A1-BR1. Excavation work BR5, bearing plinth concreting A1-
BR2.
Total 2 28
NAME M P C R Puwakdandawa
MONTH June-18
Remunerations
Total Personnel
Actual Days Monthly Unit
Days in Months TOTAL LKR
Claimed Rate LKR
Month Units
Sub Total -
TOTAL -