Process owner : MS E4 Controlled documents are

CP-122 HSE Manual Process Author: MS E41


IS O ref: 6.1.4
online. 1/11/2017
Printed hard copies only valid if
Da te issued: 1/11/2017
SP-1127 - Layout Optim isation (2.1.4.11 ) Layout of plant equipment and facilities (4.1.4.14 ) Process #:
date of print is reflected.
E
E B1JN V 1.0

SP-1127 - Layout Optimisation


(2.1.4.11 ) Layout of plant equipment
and facilities (4.1.4.14)

Project TSE:
Follow Shell DEP 80.00.10.11

Project TSE:
Determine segregation inside
and outside the facility
boundary
Confirm separation
distances using PEM

SP-1190 - 3 H2S & SO2


Management - Engineering
Design (2.1.4.14 )

Project TSE:
Confirm minimum separation
distances

End