Professional Documents
Culture Documents
02 Total Marks: 20
SEMESTER Fall 2020
Due Date: 16-12-2020
CS403- Database Management System
Instructions
Please read the following instructions carefully before solving & submitting assignment:
It should be clear that your assignment will not get any credit if:
The assignment is submitted after due date.
The submitted assignment does not open or file corrupt.
The assignment is full or partially copied from (other student or ditto copy from handouts or internet).
Student ID is not mentioned in the assignment File or name of file is other than student ID.
The assignment is not submitted in .doc or .docx format.
Uploading instructions
Your submission must include:
Objectives
The objective of this assignment is
To be able to understand ER diagrams.
Relationship Cardinalities
Note:
Your answer must follow the below given specifications.
Font style: “Times New Roman”
Font color: “Black”
Font size: “12”
Bold for heading only.
Font in Italic is not allowed at all.
No formatting or bullets are allowed to use.
Your answer should be precise and to the point, avoid irrelevant detail.
Deadline
Your assignment must be uploaded/submitted at or before 16th December, 2020.
Question Statement:
Level 0 DFD:
Scenario:
In this technological era manually managing any system is a time-consuming task. A construction company
named “Global Construction” wants to computerize their manual system, so that they can easily and efficiently
manage their employees, clients, projects and finance. It will be beneficial for both clients and company. Company
has different employees who work on different projects. Global Construction database system will store all the
information in an organized manner by following the below business rules:
Client can visit the website, view completed projects details and client’s review/feedback about projects, places an
order by filling the order form, give review/feedback.
Manager can assign projects to employees, view assigned projects. Manger can also view placed orders, can
accept or cancel the order. He can also generate receipt; client will be able to view and download the receipt.
Employees will be able to view assigned projects, he can also update status of the project as started, partially
completed, or completed.
You are required to perform the following tasks according to above scenario.
GOOD LUCK