“4 mee fe3 CLARIFICATION NOTES TO THE PRICE LIST CODES
3.4 When, in the codes, a star (*) I indicated, the relevant description shall be read in conjunction
With the other descriptions of the further digits of the same code,
3.2. When, In the above codes, “nn” is used, the description will refer to a progressive number.
4 SPECIAL PREAMBLE TO PRICES AND METHOD OF MEASUREMENTS FOR
PIPING ACTIVITIES — CODES MD, MF, MH, Ml, MJ, MK, ML, MO, MS, MT, MV, MX
2) The Prices for piping include also the cost for
4. Consumables and welding material necessary for the execution of the works, such as:
‘ll types of welding electrodes, welding rods and welding wires
Welding and cutting gases
Soldering and bracing materials
Pickling and passivating pastes
il, naphtha, craphitized grease/oil, Vaseline, paraffin, Teflon tapes. rags and string
Drils, hacksaw blades, grinding wheel disks
Materials required to carry out the NDT (films for radiographs, radiograph developer, dye
penetrants, etc.)
= Material for protection of fabricated piping ends
= All other consumables and welding materials not specifically indicated
= All other material required for preservation, as per relevant specication issued by
2. Office space st SUBCONTRACTOR's profabrication workshops fer CONTRACTOR’s
supervision personnal including internet connection, when distance betwoen,
SUBCONTRACTOR’ prefabrication workshop and construction SITE is over 30 Km.
3. Execution of Positive Material identification (PMI) on material and relevant colour coding
application in accordance with TECHNICAL DOCUMENTATION,
4. Execution of all necessary actives in order to fully comply with PED requirements, it
applicable. It is however elariied that SUBCONTRACTOR is not the “Manufacturer” with
reference to PED,
5. A maximum nan recoverable left-over of 2% on overall pipes length is allowed. Sections loss
than 1/2 (half) metre long, will be considered leftover i they cannot be used to fabricate
spools. However SUBCONTRACTOR must oplimize spooling in order to minimize the
‘number of pipe to pipe welds.
6. Spooling of isometrics taking into consideration the layout of supports, transport and handling
operations, and adjustments during installation. The SUBCONTRACTOR shall foresee fit field
‘welds for 150 mm of extra length in the three directions.
7. Rehanaling of taoricated spools for their completion upon arrival of missing materials, it any.