变压器故障排查项目Transformer troubleshooting items

No. Troubleshooting items

输入电压
1
input voltage

电压频率
2 Voltage frequency
变压器纵锁螺杆是否紧固
3 Whether the screw of transformer longitudinal lock is fastened
变压器横锁螺杆是否紧固
4 Whether the screw of transformer transverse lock is fastened
变压器底座安装螺钉是否紧固
5 Whether the mounting screws of transformer base are tight
变压器上轭铁芯与芯柱接缝处是否有间隙和明显震动
6 Whether there is clearance and obvious vibration at the joint between iron
core and core column of upper yoke of transformer

变压器下轭铁芯与芯柱接缝处是否有间隙和明显震动
7 Whether there is clearance and obvious vibration at the joint between the
iron core and the core column of the lower yoke of the transformer
纵锁
screw of transformer
longitudinal lock

上铁轭横锁
screw of transformer
transverse lock

下铁轭横锁
screw of transformer
transverse lock
下铁轭横锁
screw of transformer
transverse lock
上铁轭与心柱接缝处
Connection between yoke core
and core pillar on transformer

变压器机柜异响的一般排除办法

准备工作:准备好维护机柜的常用工具及做好施工人员和现场相关防护措施之后
机柜下电。

排查是否是按照安装要求来固定机柜.机柜需要安装4个膨胀螺丝来固定安装指南
上有明确的要求.孔位尺寸都是标识清楚的.

变压器柜的重量毛重1010KG.净重.950KG

1.      打开前后柜门

2.      检查机柜两侧侧板螺钉是否打紧

3.      检查机柜后柜门内两侧横梁及绝缘板螺丝是否打紧

4.      检查机柜前柜门两侧内门螺丝是否打紧

5.      排除所有区域及异常之后清理好机柜内部卫生,异物,工具等,关闭前后柜
门,机柜上电。

文档最后附有照片及力矩表

备注;固定好机柜后.也是要求要全部排查一遍
General elimination of abnormal noise in transformer cabinet

Preparation: prepare the common tools for maintaining the cabinet and take
relevant protective measures for the construction personnel and the site before the
cabinet is powered off.

Check whether the cabinet is fixed according to the installation requirements. The cabinet needs to
be fixed with 4 expansion screws. There are clear requirements in the installation guide. The hole
size is clearly marked

The weight of transformer cabinet is 1010 kg gross weight. 950kg net weight

1.      1. Open the front and rear cabinet doors

2.      Check whether the side plate screws on both sides of the cabinet are tightened

3.      Check whether the screws of crossbeam and insulation board on both sides of
cabinet door are tightened

4.      Check whether the screws of the inner doors on both sides of the front cabinet
door are tightened

5.      After removing all areas and abnormalities, clean up the internal sanitation,
foreign matters, tools, etc. of the cabinet, close the front and rear cabinet doors, and
power on the cabinet.

Photo and torque table are attached at the end of the document

Note: after fixing the cabinet, it is also required to check it all


Thanks!
shooting items
Investigation results
变压器底座安装孔
Install screws on transformer
base
下铁轭与心柱接缝处
Transformer under yoke
and core column conne
上铁轭与心柱接缝处
Connection between yoke core
and core pillar on transformer
下铁轭与心柱接缝处
Transformer under yoke core
and core column connection