2. California Bearing Ratio (CBR) Test 3. Premix Coring Test 4. Final Joint Inspection with Local Authorities.
Drainage
1. Flow Test 2. Final Joint Inspection with Local Authorities.
Water Reticulation
1. Material Inspection (QT3)
2. Pressure & Leakage Test for Water Reticulation Pipe (QT4a) 3. Pressure & Leakage Test for Communication Pipe (QT4b) (For Landed Properties) 4. Final Joint Inspection with Air Selangor (QT6a)
Sewerage Reticulation
1. CCTV Test [Intermediate Inspection of Sewerage Work(PDC 7)]