sp e e d f o r m tm
HALFEN-MOMENT GROUP
The Halfen-Moment Group With headquarters in Malaysia, serving as the central hub, and being
supported by its subsidiaries in Singapore, Philippines and India together
of companies started its with invaluable partners in other markets, we have positioned ourselves
as a leading building products player with an established and extensive
operation in Malaysia, supplying network throughout Asia and the Middle East.
mechanical couplers to Long term partnerships with our customers motivate us to continuously
extend our product offering to more reinforcement and construction
construction sites, as a cost accessories. Our product range is used from small scale residential
effective alternative for projects to large development projects in infrastructure, high rise or
commercial construction. Our specialized teams are there to provide
conventional splicing. technical information and to ensure consistent and high quality solutions.
One of our first iconic projects Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global
Fortune 500 company, with an annual turnover in excess of €27 billion.
was the Petronas Towers. Thanks to CRH plc, The Halfen-Moment Group has access to financial
resources, innovative products and technical expertise from around the
Since then, the group has been world in order to support its continuous development.
expanding rapidly and today Being part of a stock quoted company, we are aware of our global, local and
the MOMENT® coupler is a well- social responsibility. Leading our business with integrity is our daily credo!
MILESTONES
1991 Incorporation
of MOMENT
1
HALFEN MOMEN T
Widening of
Acquisition of Participating in the
product portfolio via
MOMENT by CRH Launching of the iconic Qatar Basin
collaboration with CRH
and restructuring as complete range of project with 2.5 million
subsidiary companies:
HALFEN-MOMENT precast accessories epoxy couplers
HALFEN, ANCON supplied within the year
Group
AND PLAKA GROUP
2016
Development
of operational
excellence with
Lean 6S Safety
implementation
2
L I F T I N G A N C HO R SYST E M
CONTENTS
Lightweight, Multiple Shapes,
Variety of Applications 4
SpeedformTM Benefits 5
Technical specification 6
Performance Comparison 7
foundation bases 9
beam options 9
circular formwork 10
support techniques 11
projects 13
HALFEN MOMEN T
MOMENT® speedformtm
The innovative solution to conventional formwork SpeedformTM is the result of many years of intensive research and development
overseas.The basic material consists of a steel wire mesh with a heat-shrunk layer of polyethylene applied to both sides of the
mesh.
This combination creates a material that is both light and structurally strong, making it extremely easy to handle.
SpeedformTM not only IMPROVES SITE SAFETY but also SAVES TIME, CONCRETE & LABOUR!
4
sp e e d f o r m tm
SpeedformTM Benefits
600 X 2250 mm 900 X 2250 mm 1200 X 2250 mm 1500 X 2250 mm 1800 X 2250 mm 1875 X 2250 mm
Flexible
SpeedformTM is a versatile formworking material perfect for those radius specifications. The strength and versatility of SpeedformTM
make it the natural choice for the following applications:
• Ground beams
• Footings and bases
• Pile caps
• Construction joints (stop ends)
• Special shapes or curves
• Void formation
• Ribbed and waffle slabs
• Penetrations
• Recesses
• Temporary fencing
• Safety screens
• Other variety of applications
5
HALFEN MOMEN T
Technical specification
MAIN WIRE SIZE (NOMINAL) 5.5 mm diameter 4 mm diameter 7.5 mm diameter 9.8 mm diameter
MAIN WIRE SPACING 150 mm c/c 100 mm c/c 150 mm c/c 150 mm c/c
WIRE SPECIFICATION High tensile steel High tensile steel of High tensile steel of High tensile steel of
of tensile tensile tensile tensile
strength 485 N/mm2 - strength 485 N/mm2 - strength 485 N/mm2 - strength 485 N/mm2 -
Non Galvanised Non Galvanised Non Galvanised Non Galvanised
GALVANISED CODE VR6G-Galvanised wire VR4G - Galvanised VR8G - Galvanised VR1OG - Galvanised
POLYETHYLENE FILM 0.12 mm thick - 0.12 mm thick - 0.12 mm thick - 0.12 mm thick -
One layer each side One layer each side One layer each side One layer each side
VR6 also available with two layers of 0.12 mm thick polyethylene on each side of wire mesh.
Available as VR60. (*) -Other colours are also available subject to quantity of order.
6
sp e e d f o r m tm
Performance Comparison
SKILLS General Workers Skilled Carpenters & Skilled Workers • Saving in labour cost
General Workers • Availability > speed
INSTALLATION Light & easy Tedious & Time Simple but • Save time
Consuming skilled labour • Saving in labour cost
required
DEBRIS REMOVAL Not required Required Not required • Saving in debris removal cost
• Save the environment/forest
LIFTING DEVICE/ Man handled Cranage required Cranage • Smaller storage space
CRANAGE required • More working space
SITE CLEANLINESS Neat and clean Untidy, dangerous Neat & clean • Enhance site safety
and hazardous • Enhance corporate image
• Improve productivity
7
HALFEN MOMEN T
2. Fix reinforcement
cage and provide the
necessary spacing from
the blinding to allow for 1. 2.
the concrete cover.
3. Place SpeedformTM
around perimeter of pile
cap after strategically
securing strips of long
spacers or equivalent.
4. Backfill excavation up to
150 mm from the top of
the SpeedformTM to avoid 3. 4.
contamination.
6. The SpeedformTM
remains in the ground.
5.
8
sp e e d f o r m tm
foundation bases
Bases can be constructed from either L-shapes or flat strips of SpeedformTM similar to either beam or pile cap construction.
Lean concrete blinding is applied in the traditional manner, and the reinforcement cage complete with spacer blocks at the bottom
is lowered onto the blinding.
SpeedformTMFoundation
is then placed against the side of the cage and spaced off the reinforcement with strips of long spacers, bar chairs
- Bases
Foundation
Foundation
or equivalent. - Bases
- Bases
Bases can be constructed from either L-shapes or flat strips of Pecaform'"' similar to either beam or pile cap
Bases
Bases
cancan
be constructed
be constructed
from
from
either
either
L-shapes or flat
L-shapes or flat
strips
strips
of Pecaform'"' similar
of Pecaform'"' similar
to either
to either
beambeam
or pile
or pile
capcap
Backfill excavation up to 150
construction. Leanmm from the
concrete top ofis the
blinding Speedform
applied TM
to prevent
in the traditional contamination.
manner, and the reinforcement cage complete with
construction.
construction.
LeanLean
concrete
concrete
blinding
blinding
is applied
is applied
in the
in the
traditional
traditional
manner,
manner,
andand
thethe
reinforcement
reinforcement
cagecage
complete
complete
with
with
spacer blocks at the bottom is lowered onto the blinding.
spacer
spacer
blocks
blocks
at the
at the
bottom
bottom
is lowered
is lowered
ontoonto
the the
blinding.
blinding.
Pecaform"" is then placed against the side of the cage and spaced off the reinforcement with strips of long spacers,
Pecaform"" is then
Pecaform"" is then
placed
placed
against
against
thethe
sideside
of the
of the
cage
cage
andand
spaced
spaced
off the
off the
reinforcement
reinforcement
withwith
strips
strips
of long
of long
spacers,
spacers,
bar chairs or equivalent.
beam options
barbar
chairs
chairs
or equivalent.
or equivalent.
Backfill excavation up to 1 50 mm from the top of the Pecaform"' to prevent contamination.
Backfill
Backfill
excavation
excavationup to
up1to
501mm
50 mm
fromfrom
thethe
toptop
of the
of the
Pecaform"'
Pecaform"'
to prevent
to prevent
contamination.
contamination.
Beam Beam
Beam options
options
options
Suspended Beams
Ground (on piled
beams can befoundation)
divided into two categories: Ground Bearing Beams
Ground
Ground
beams
beams
cancan
be divided
be divided
into
into
twotwo
categories:
categories:
Suspended Beams (on piled foundation)
D on which
DD
The ground
Suspended
Suspended Beams the(on
Beams piled
(on piled
beam foundation)
is foundation) should
constructed These are founded in the bearing strata. Therefore,
be capableThe of safelyonsupporting
ground which the the
beam weight of the wet
is constructed should be capable
aofthinoflayer
safelyofsupporting
sand may the
beweight
used of the wet concrete
asconcrete
blinding to bed-
TheTheground
ground
on which
on which
the the
beambeam
is constructed
is constructedshould
should
be capable
be capableof safely
safely
supporting
supporting thethe
weight
weight
of the
of the
wetwet concrete
concrete
during
during
during
during construction.
construction.
construction.
construction.
OnlyOnly
Only
nominal
Only
nominal
nominal
nominal
surface
surface
surface
surface
compaction
compaction is in
compactionis required
required
is required the
andand
and a thin
Speedform
a thin
a thin
layer
TM layer of sand blinding to level the
layer . Unless
of sand
of sand supported
blinding
blinding
to levelindependently,
to level
the the
compactionformation
isand and bed-in
required and the beam
abeam
thin layer soffit
of sandmay be necessary.
formation
formation
and bed-in
bed-in
the the
beam soffitsoffit
may maybe be blinding
necessary.
necessary. SpeedformTM relies on backfill to counteract the pressure
to level the formation and bed-in the beam soffit may be exerted by the concrete pour. Suitable spacers attached
IIII II Ground
Ground
GroundBearing
Bearing Beams
BearingBeams
Beams
necessary. to the reinforcement cage ensure the beam profile is
These are founded in the bearing strata. Therefore, a thin layer of sand may be used as blinding to bed-in the Pecaform"'.
These
These
are are
founded
founded
in the
in the
bearing
bearing
strata.
strata.
Therefore,
Therefore, a thin
a thin
layer
layer
of sand maintained.
of sand
maymay
be used
be used
as blinding
as blinding
to bed-in
to bed-in
the the
Pecaform"'.
Pecaform"'.
Unless supported independently, Pecaform... relies on backfill to counteract the pressure exerted by the concrete pour.
Unless
Unless
supported
supported
independently,
independently, Pecaform
Pecaform
... relies
... relies
on backfill
on backfill
to counteract
to counteract
the the
pressure
pressure
exerted
exerted
by the
by the
concrete
concrete
pour.
pour.
Suitable spacers attached to the reinforcement cage ensure the beam profile is maintained.
Suitable
Suitable
spacers
spacers
attached
attachedto the
to the
reinforcement
reinforcement cage cage
ensure
ensure
the the
beambeam
profile
profile
is maintained.
is maintained.
Backfill
Backfill
150
SpeedformTM
L-Shaped
L-Shapes above blinding
L-Shapes
L-Shapes
above
above
blinding
blinding
9
Change the above Yellow Colour outline to Orange.
Change the above Yellow Colour outline to Orange.
Change the above Yellow Colour outline to Orange.
HALFEN MOMEN T
circular formwork
Speedform™ can be used to surround large diameter bored pile cages in poor ground conditions. Any radius can be easily formed
using either standard or cut-to-size units, and can be pre-formed to fit the pile cage.
Speedform™ is also suitable for manhole casing formwork or circular bases can be produced using composite units to suit varying
diameters and depths, for instant site assembly against the reinforcement cage.
It also can also be used for construction above the ground of large diameter r.c. bases using tensioned straps for support during
the concrete pour. This enables the units to be struck and re-used for other bases.
10
sp e e d f o r m tm
support techniques
Girders
• SpeedformTM� VR6
• Tie rods and locking nails
Construction Joints
11
HALFEN MOMEN T
Our Service
Using SpeedformTM is simple and easy. We conduct briefing and seminars at our premises or yours, where users learn to calculate
configurations and costs of using SpeedformTM.
2. a) Soil type
b) Water table level
3. Construction method and program for earthworks, piling, pile caps, ground beams, ground slabs, basement walls, etc.
Halfen-Moment Group offers an unrivalled service. Form the initial enquiry to on-site support we are at hand to assist in the
installation of SpeedformTM, as well as offer advice on the techniques and procedures required to achieve the best results.
SpeedformTM formwork be delivered to site pre-formed and/cut to size. The standard of 2.25 m can be cut in multiples of 150 mm
while the widths are cut in multiples of 75 mm. Larger sizes can be made on request.
12
sp e e d f o r m tm
projects
DEMC Women’s & Children’s Hospital, Shah Alam, Malaysia Jimah East Power Plant, Selangor, Malaysia
Menara Tradewinds Square, Kuala Lumpur, Malaysia Pusat Latihan Polis Kuala Lumpur, Malaysia
Contractor: Bauer
(Malaysia) Sdn Bhd
13
HALFEN MOMEN T
notes
14
www.halfen-moment.com
malaysia india
Halfen Moment Sdn. Bhd. Halfen Moment India Pvt. Ltd.
28 Jalan Anggerik Mokara 31/59, Kota Kemuning, 6, Girikunj, Devdarshan Society, Dongripada,
40460 Shah Alam, Selangor, Malaysia GB Road, Thane 400607, India
T : +603 5122 4182 F : +603 5122 4184 T : +9122 2500 7092 F : +9122 2500 7093
E : info@halfen-moment.com E : hmin@halfen-moment.com
singapore Philippines
Halfen-Moment Pte. Ltd. Halfen-Moment Inc.
9 Tractor Road, Singapore 627970 Unit 1810 Hanston Square, San Miguel Avenue,
T : +65 6266 6802 F : +65 6266 6980 Ortigas City Pasig City, Philippines
E : hmsg@halfen-moment.com Telefax : +63 2321 5663
E : hmph@halfen-moment.com
DISCLAIMER: The construction applications and details provided in this literature are indicative only. In every case, project working details should be entrusted to
appropriately qualified and experienced persons.
Whilst every care has been exercised in the preparation of this document to ensure that any advice, recommendations or information is accurate, no liability or responsibility
of any kind is accepted in respect of Halfen-Moment Group.
With a policy of continuous product development Halfen-Moment Group reserves the right to modify product design and specification without due notice.
Up to
18sqm per SPEEDFORM
Man Hour!
SUB-STRUCTURE HIGH-SPEED FORMWORK
INSTALLATION PROCEDURES
1 Install rebar cage.
MALAYSIA
HALFEN MOMENT SDN BHD
28 Jalan Anggerik Mokara 31/59,
Kota Kemuning, Seksyen 31
40460 Shah Alam
Selangor, Malaysia.
T : +603 5122 4182
F : +603 5122 4184
E : info@halfen-moment.com
INDIA
HALFEN MOMENT INDIA PVT LTD.
No 601, Presidential Plaza,
Off LBS Marg, Ghatkopar – West,
Mumbai 400 086, India
T : +9122 2500 7092
F : +9122 2500 7093
E : hmin@halfen-moment.com
PHILIPPINES
HALFEN-MOMENT, INC.
U-1810 Hanston Square San Miguel Ave,
Ortigas Center Pasig City, 1605 Philippines
T : +632 321 5663
F : +632 321 5663
E : hmph@halfen-moment.com
www.halfen-moment.com
Disclaimer: Any technical advice/support or drawings provided by us in whatever form is given to the best of our knowledge and for general use only
and shall be considered non binding information.
Speedform Installation Guidelines
Prepared By: Document No. HMMY-EN-P12
Mohamad Sahril Samdin Revision No. 00
Reviewed By: Release Date 15June16
Page 1 of 4
Reviewer
Name Function Date
Speedform Installation Guidelines
Prepared By: Document No. HMMY-EN-P12
Mohamad Sahril Samdin Revision No. 00
Reviewed By: Release Date 15June16
Page 2 of 4
1.0 TITLE
SPEEDFORM INSTALLATION GUIDELINES.
2.0 PURPOSE
As a guidelines for installing Speedform.
3.0 SCOPE
Installation Method.
4.0 MATERIAL/EQUIPMENT
Designed
Speedform Spacer
Iron wire
5.0 PROCEDURE
Step 1: Levelling Speedform