You are on page 1of 22

speedform

tm
sp e e d f o r m tm

HALFEN-MOMENT GROUP
The Halfen-Moment Group With headquarters in Malaysia, serving as the central hub, and being
supported by its subsidiaries in Singapore, Philippines and India together
of companies started its with invaluable partners in other markets, we have positioned ourselves
as a leading building products player with an established and extensive
operation in Malaysia, supplying network throughout Asia and the Middle East.

mechanical couplers to Long term partnerships with our customers motivate us to continuously
extend our product offering to more reinforcement and construction
construction sites, as a cost accessories. Our product range is used from small scale residential
effective alternative for projects to large development projects in infrastructure, high rise or
commercial construction. Our specialized teams are there to provide
conventional splicing. technical information and to ensure consistent and high quality solutions.

One of our first iconic projects Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global
Fortune 500 company, with an annual turnover in excess of €27 billion.
was the Petronas Towers. Thanks to CRH plc, The Halfen-Moment Group has access to financial
resources, innovative products and technical expertise from around the
Since then, the group has been world in order to support its continuous development.
expanding rapidly and today Being part of a stock quoted company, we are aware of our global, local and
the MOMENT® coupler is a well- social responsibility. Leading our business with integrity is our daily credo!

established brand in the market.

MILESTONES

1991 Incorporation
of MOMENT

1998 1999 2003 2005 2008 2010


Sole
First patent Expansion
Expansion of Expansion of MOMENT distributorship
of MOMENT of
MOMENT to MOMENT to goes Middle for FORTA
BARBREAK MOMENT
Singapore Philippines East reinforcement
coupler to India
fibre in Asia

1
HALFEN MOMEN T

QUALITY OUTSTANDING SUPPORT


Providing quality assurance & safe products through excellent Halfen-Moment Group offers additional services to you from
service, is one of the top principles of Halfen-Moment Group. technical support, statistical calculation to product installation
Being part of CRH plc., we strive to adhere to the most stringent performed by our qualified engineers & specially trained staff.
group quality policies. Our in house team is conceived daily
with quality checks to ensure the highest quality is offered. Our
quality management system is accorded by the ISO 9001 :
2008 accreditation.

Widening of
Acquisition of Participating in the
product portfolio via
MOMENT by CRH Launching of the iconic Qatar Basin
collaboration with CRH
and restructuring as complete range of project with 2.5 million
subsidiary companies:
HALFEN-MOMENT precast accessories epoxy couplers
HALFEN, ANCON supplied within the year
Group
AND PLAKA GROUP

2012 2013 2014 2015

2016
Development
of operational
excellence with
Lean 6S Safety
implementation

2
L I F T I N G A N C HO R SYST E M

CONTENTS
Lightweight, Multiple Shapes,
Variety of Applications 4

SpeedformTM Benefits 5

Technical specification 6

Performance Comparison 7

method Of Application- Pile Cap & Bases 8

Typical layouts for different pile cap


configurations 8

foundation bases 9

beam options 9

circular formwork 10

support techniques 11

The SpeedformTM Service 12

projects 13
HALFEN MOMEN T

MOMENT® speedformtm

Lightweight, Multiple Shapes, Variety Of Applications


The formwork of the future is here now!

The innovative solution to conventional formwork SpeedformTM is the result of many years of intensive research and development
overseas.The basic material consists of a steel wire mesh with a heat-shrunk layer of polyethylene applied to both sides of the
mesh.

This combination creates a material that is both light and structurally strong, making it extremely easy to handle.

SpeedformTM not only IMPROVES SITE SAFETY but also SAVES TIME, CONCRETE & LABOUR!

4
sp e e d f o r m tm

SpeedformTM Benefits

Preformed site safety


SpeedformTM is pre-formed and delivered to site ready for
assembly or it can be simply folded on site using a manual SpeedformTM can provide enhanced site safety by:
folder.
• Back-filling excavations earlier than with conventional
High Speed Formwork formwork
SpeedformTM is designed for fast assembly. No hammer, • Minimising need for workers to be in excavations
nails or saws, just tie-wire. • Reducing the heavy labour needed for conventional
formwork
Easy Installation Procedure • Eliminating the need to strip formwork
Because is it pre-formed, it is easily assembled using on
site labour.

SpeedformTM (VR6) standard sheet sizes

600 X 2250 mm 900 X 2250 mm 1200 X 2250 mm 1500 X 2250 mm 1800 X 2250 mm 1875 X 2250 mm

Flexible

SpeedformTM is a versatile formworking material perfect for those radius specifications. The strength and versatility of SpeedformTM
make it the natural choice for the following applications:

• Ground beams
• Footings and bases
• Pile caps
• Construction joints (stop ends)
• Special shapes or curves
• Void formation
• Ribbed and waffle slabs
• Penetrations
• Recesses
• Temporary fencing
• Safety screens
• Other variety of applications

5
HALFEN MOMEN T

Technical specification

Dimension and Availability

Other SpeedformTM types


Standard
Item (AVAILABLE UPON REQUEST)

VR6 Standard VR4 VR8 VR10

MAIN WIRE SIZE (NOMINAL) 5.5 mm diameter 4 mm diameter 7.5 mm diameter 9.8 mm diameter

MAIN WIRE SPACING 150 mm c/c 100 mm c/c 150 mm c/c 150 mm c/c

CROSS WIRE SIZE (NOMINAL) 4 mm diameter 4 mm diameter 4 mm diameter 4 mm diameter

CROSS WIRE SPACING 75 mm c/c 100 mm c/c 75 mm c/c 75 mm c/c

WIRE SPECIFICATION High tensile steel High tensile steel of High tensile steel of High tensile steel of
of tensile tensile tensile tensile
strength 485 N/mm2 - strength 485 N/mm2 - strength 485 N/mm2 - strength 485 N/mm2 -
Non Galvanised Non Galvanised Non Galvanised Non Galvanised

GALVANISED CODE VR6G-Galvanised wire VR4G - Galvanised VR8G - Galvanised VR1OG - Galvanised

POLYETHYLENE FILM 0.12 mm thick - 0.12 mm thick - 0.12 mm thick - 0.12 mm thick -
One layer each side One layer each side One layer each side One layer each side

POLYETHYLENE COLOUR(*) Red Red Red Red

WEIGHT 2.64 kg/m2 2.62 kg/m2 3.78 kg/m2 5.69 kg/m2

STANDARD SIZE 2250 mm 2250 mm 2250 mm 2250 mm


a) Width Can be varied Can be varied Can be varied Can be varied
b) Height according to order according to order according to order according to order
requirements requirements requirements requirements

VR6 also available with two layers of 0.12 mm thick polyethylene on each side of wire mesh.
Available as VR60. (*) -Other colours are also available subject to quantity of order.

How strong is SpeedformTM ?

To demonstrate the strength of SpeedformTM as a formwork


system, a sheet of SpeedformTM was bent into a 450 mm
square x 1200 mm high form to replicate a form that would be
used for a footing. The base was restrained by wood blocks,
and three straps were used to hold the form body together.
Two reinforcing bars were inserted through opposite sides.The
inside of the form was then filled with ready mixed concrete.

As can be seen in this photograph, a minor amount of


bulging is evident on the sides, but no other distress to the
SpeedformTM is indicated. No leakage is visible, and there is no
evidence of leakage at the locations where the reinforcement
bars penetrated the sides.

As SpeedformTM is primarily intended as a sub-grade formwork


system that is backfilled on the outside of the form before the
concrete is poured, bulging of the sides will be negligible, as
the sides will be restrained by the backfill.

6
sp e e d f o r m tm

Performance Comparison

CONVENTIONAL ALUMINIUM/ ADVANTAGES OF


PERFORMANCE
speedFORMTM (TIMBER/ STEEL speedFORMTM
DIMENSIONS FORMWORK
PLYWOOD)
SPEED Faster Slower Medium • Early completion
• Saving in preliminaries cost
• Client incentives
• Less dependent on weather

INVESTMENT COST Low Low High • Low investment cost

LABOUR Lower Higher Medium • Less reliance on skilled labour


REQUIREMENT • Lower labour cost

SKILLS General Workers Skilled Carpenters & Skilled Workers • Saving in labour cost
General Workers • Availability > speed

INSTALLATION Light & easy Tedious & Time Simple but • Save time
Consuming skilled labour • Saving in labour cost
required
DEBRIS REMOVAL Not required Required Not required • Saving in debris removal cost
• Save the environment/forest

LIFTING DEVICE/ Man handled Cranage required Cranage • Smaller storage space
CRANAGE required • More working space

STORAGE Minimum High High • Saving in machinery/cranage cost


REQUIREMENT • Saving in operator cost

FORMWORK Not required Required Required • Save time


REMOVAL
ENVIRONMENTAL Environmental High rate of timber Environmental • Enhance corporate image
ACCEPTANCE friendly consumption friendly • Complies with legislation
& burning • Save the forest

SITE CLEANLINESS Neat and clean Untidy, dangerous Neat & clean • Enhance site safety
and hazardous • Enhance corporate image
• Improve productivity

CORPORATE Excellent Poor Good • Enhance corporate image


IMAGE

7
HALFEN MOMEN T

method Of Application- Pile Cap & Bases

1. Apply lean concrete


blinding after pile cap
excavation.

2. Fix reinforcement
cage and provide the
necessary spacing from
the blinding to allow for 1. 2.
the concrete cover.

3. Place SpeedformTM
around perimeter of pile
cap after strategically
securing strips of long
spacers or equivalent.

4. Backfill excavation up to
150 mm from the top of
the SpeedformTM to avoid 3. 4.
contamination.

5. Pour and vibrate the


concrete in accordance
with good concreting
practice.

6. The SpeedformTM
remains in the ground.
5.

Typical layouts for different pile cap configurations

Single Pile Double Pile Triple Pile Multiple Pile

8
sp e e d f o r m tm

foundation bases

Bases can be constructed from either L-shapes or flat strips of SpeedformTM similar to either beam or pile cap construction.
Lean concrete blinding is applied in the traditional manner, and the reinforcement cage complete with spacer blocks at the bottom
is lowered onto the blinding.

SpeedformTMFoundation
is then placed against the side of the cage and spaced off the reinforcement with strips of long spacers, bar chairs
- Bases
Foundation
Foundation
or equivalent. - Bases
- Bases
Bases can be constructed from either L-shapes or flat strips of Pecaform'"' similar to either beam or pile cap
Bases
Bases
cancan
be constructed
be constructed
from
from
either
either
L-shapes or flat
L-shapes or flat
strips
strips
of Pecaform'"' similar
of Pecaform'"' similar
to either
to either
beambeam
or pile
or pile
capcap
Backfill excavation up to 150
construction. Leanmm from the
concrete top ofis the
blinding Speedform
applied TM
to prevent
in the traditional contamination.
manner, and the reinforcement cage complete with
construction.
construction.
LeanLean
concrete
concrete
blinding
blinding
is applied
is applied
in the
in the
traditional
traditional
manner,
manner,
andand
thethe
reinforcement
reinforcement
cagecage
complete
complete
with
with
spacer blocks at the bottom is lowered onto the blinding.
spacer
spacer
blocks
blocks
at the
at the
bottom
bottom
is lowered
is lowered
ontoonto
the the
blinding.
blinding.
Pecaform"" is then placed against the side of the cage and spaced off the reinforcement with strips of long spacers,
Pecaform"" is then
Pecaform"" is then
placed
placed
against
against
thethe
sideside
of the
of the
cage
cage
andand
spaced
spaced
off the
off the
reinforcement
reinforcement
withwith
strips
strips
of long
of long
spacers,
spacers,
bar chairs or equivalent.

beam options
barbar
chairs
chairs
or equivalent.
or equivalent.
Backfill excavation up to 1 50 mm from the top of the Pecaform"' to prevent contamination.
Backfill
Backfill
excavation
excavationup to
up1to
501mm
50 mm
fromfrom
thethe
toptop
of the
of the
Pecaform"'
Pecaform"'
to prevent
to prevent
contamination.
contamination.

Ground beams can be divided into two categories:

Beam Beam
Beam options
options
options
Suspended Beams
Ground (on piled
beams can befoundation)
divided into two categories: Ground Bearing Beams
Ground
Ground
beams
beams
cancan
be divided
be divided
into
into
twotwo
categories:
categories:
Suspended Beams (on piled foundation)
D on which
DD
The ground
Suspended
Suspended Beams the(on
Beams piled
(on piled
beam foundation)
is foundation) should
constructed These are founded in the bearing strata. Therefore,
be capableThe of safelyonsupporting
ground which the the
beam weight of the wet
is constructed should be capable
aofthinoflayer
safelyofsupporting
sand may the
beweight
used of the wet concrete
asconcrete
blinding to bed-
TheTheground
ground
on which
on which
the the
beambeam
is constructed
is constructedshould
should
be capable
be capableof safely
safely
supporting
supporting thethe
weight
weight
of the
of the
wetwet concrete
concrete
during
during
during
during construction.
construction.
construction.
construction.
OnlyOnly
Only
nominal
Only
nominal
nominal
nominal
surface
surface
surface
surface
compaction
compaction is in
compactionis required
required
is required the
andand
and a thin
Speedform
a thin
a thin
layer
TM layer of sand blinding to level the
layer . Unless
of sand
of sand supported
blinding
blinding
to levelindependently,
to level
the the
compactionformation
isand and bed-in
required and the beam
abeam
thin layer soffit
of sandmay be necessary.
formation
formation
and bed-in
bed-in
the the
beam soffitsoffit
may maybe be blinding
necessary.
necessary. SpeedformTM relies on backfill to counteract the pressure
to level the formation and bed-in the beam soffit may be exerted by the concrete pour. Suitable spacers attached
IIII II Ground
Ground
GroundBearing
Bearing Beams
BearingBeams
Beams
necessary. to the reinforcement cage ensure the beam profile is
These are founded in the bearing strata. Therefore, a thin layer of sand may be used as blinding to bed-in the Pecaform"'.
These
These
are are
founded
founded
in the
in the
bearing
bearing
strata.
strata.
Therefore,
Therefore, a thin
a thin
layer
layer
of sand maintained.
of sand
maymay
be used
be used
as blinding
as blinding
to bed-in
to bed-in
the the
Pecaform"'.
Pecaform"'.
Unless supported independently, Pecaform... relies on backfill to counteract the pressure exerted by the concrete pour.
Unless
Unless
supported
supported
independently,
independently, Pecaform
Pecaform
... relies
... relies
on backfill
on backfill
to counteract
to counteract
the the
pressure
pressure
exerted
exerted
by the
by the
concrete
concrete
pour.
pour.
Suitable spacers attached to the reinforcement cage ensure the beam profile is maintained.
Suitable
Suitable
spacers
spacers
attached
attachedto the
to the
reinforcement
reinforcement cage cage
ensure
ensure
the the
beambeam
profile
profile
is maintained.
is maintained.

Backfill

f,sof,so Backfill 150


f,so
150
PecaformTM
Backfill
Backfill
Backfill
• SpeedformTM
PecaformTM
PecaformTM
Speedform TM ••
U-Shapes L-Shapes
U-Shapes
U-Shapes
U-Shapes
Spacers
Excavated Spacers
Spacers
Spacers
Profile Sand
Sand
Sand
Sand
.. . .. . Blinding Fixing Pin

L-Shapes below blinding


U-Shapes L-Shapes
L-Shapes
L-Shapes below
below
below blinding
blinding
blinding

Backfill
150
SpeedformTM

L-Shaped

Blinding Fixing Pin

L-Shapes above blinding


L-Shapes above blinding
L-Shapes
L-Shapes
above
above
blinding
blinding

9
Change the above Yellow Colour outline to Orange.
Change the above Yellow Colour outline to Orange.
Change the above Yellow Colour outline to Orange.
HALFEN MOMEN T

circular formwork

Speedform™ can be used to surround large diameter bored pile cages in poor ground conditions. Any radius can be easily formed
using either standard or cut-to-size units, and can be pre-formed to fit the pile cage.

Speedform™ is also suitable for manhole casing formwork or circular bases can be produced using composite units to suit varying
diameters and depths, for instant site assembly against the reinforcement cage.

It also can also be used for construction above the ground of large diameter r.c. bases using tensioned straps for support during
the concrete pour. This enables the units to be struck and re-used for other bases.

‘Faster, easier and


cheaper! Extra benefits at
no extra cost!’

10
sp e e d f o r m tm

support techniques

Girders

For beams and footings up to and including 1.5 m in depth,


where the SpeedformTM formwork is required to be re-used
several times, the fastest and easiest technique is the girder
system.This consists of a system of tie rods and girders
strategically placed to give rigidity to the system during
concreting. A simple locking mechanism at each end of the tie
rod is designed to lock or unlock the girder and SpeedformTM
with great ease and speed.The SpeedformTM girder system for
foundation formworking consists of:

• SpeedformTM� VR6
• Tie rods and locking nails

The SpeedformTM foundation formworking system represents


the most economical alternative to conventional formwork.

Progressive Backfill Method

SpeedformTM is supplied in U-Shapes for beams and pre­


formed strips for footings to form the required profiles. These
are assembled on the blinding, wired together, and lined
up. Placing approximately 200 mm of backfill against the
SpeedformTM stabilises the material prior to the concrete pour.

Backfilling should continue together with the concrete pour to


counteract the increasing pressure on the SpeedformTM as the
level of the concrete pour rises. Backfilling is required up to
within 150 mm from the top of the beams and footings to avoid
contamination.

Spacing timbers are recommended to maintain the beam width,


but once the pour reaches the top of the SpeedformTM these
should be removed to allow vibrating and surface finishing of
the concrete.

Construction Joints

SpeedformTM is a suitable material for construction joints.


Depending on the depth of concrete to be retained, support
methods may vary.

Massive foundations such as those used for high rise buildings


have many construction joints.

SpeedformTM provides a tearproof formworking membrane


which allows starter bars to be fixed in position without drilling.
The timber joist bracing for the SpeedformTM will also act as a
support for the reinforcement.

11
HALFEN MOMEN T

The SpeedformTM Service

Our Service

Using SpeedformTM is simple and easy. We conduct briefing and seminars at our premises or yours, where users learn to calculate
configurations and costs of using SpeedformTM.

1. a) General foundation layout of project


b) Beams schedule showing sizes and levels
c) Column sizes at foundation level
d) Pile cap sizes and levels

2. a) Soil type
b) Water table level

3. Construction method and program for earthworks, piling, pile caps, ground beams, ground slabs, basement walls, etc.

Halfen-Moment Group offers an unrivalled service. Form the initial enquiry to on-site support we are at hand to assist in the
installation of SpeedformTM, as well as offer advice on the techniques and procedures required to achieve the best results.

SpeedformTM formwork be delivered to site pre-formed and/cut to size. The standard of 2.25 m can be cut in multiples of 150 mm
while the widths are cut in multiples of 75 mm. Larger sizes can be made on request.

12
sp e e d f o r m tm

projects

Contractor: Johawaki Contractor: Bauer


Construction Sdn Bhd (Malaysia) Sdn Bhd

DEMC Women’s & Children’s Hospital, Shah Alam, Malaysia Jimah East Power Plant, Selangor, Malaysia

Contractor: Bauer Contractor: Johawaki


(Malaysia) Sdn Bhd Construction Sdn Bhd

Menara Tradewinds Square, Kuala Lumpur, Malaysia Pusat Latihan Polis Kuala Lumpur, Malaysia

Contractor: Bauer
(Malaysia) Sdn Bhd

Menara TA One, Kuala Lumpur, Malaysia

13
HALFEN MOMEN T

notes

14
www.halfen-moment.com

malaysia india
Halfen Moment Sdn. Bhd. Halfen Moment India Pvt. Ltd.
28 Jalan Anggerik Mokara 31/59, Kota Kemuning, 6, Girikunj, Devdarshan Society, Dongripada,
40460 Shah Alam, Selangor, Malaysia GB Road, Thane 400607, India
T : +603 5122 4182 F : +603 5122 4184 T : +9122 2500 7092 F : +9122 2500 7093
E : info@halfen-moment.com E : hmin@halfen-moment.com

singapore Philippines
Halfen-Moment Pte. Ltd. Halfen-Moment Inc.
9 Tractor Road, Singapore 627970 Unit 1810 Hanston Square, San Miguel Avenue,
T : +65 6266 6802 F : +65 6266 6980 Ortigas City Pasig City, Philippines
E : hmsg@halfen-moment.com Telefax : +63 2321 5663
E : hmph@halfen-moment.com

DISCLAIMER: The construction applications and details provided in this literature are indicative only. In every case, project working details should be entrusted to
appropriately qualified and experienced persons.
Whilst every care has been exercised in the preparation of this document to ensure that any advice, recommendations or information is accurate, no liability or responsibility
of any kind is accepted in respect of Halfen-Moment Group.
With a policy of continuous product development Halfen-Moment Group reserves the right to modify product design and specification without due notice.
Up to
18sqm per SPEEDFORM
Man Hour!
SUB-STRUCTURE HIGH-SPEED FORMWORK

Key Benefits: Application for:


• No more tedious, slow &
expensive carpentry
works.
• Speed and productivity
(each worker can install an
average 18m2/hr). Circular pile-caps
• Ideal for pile-cap with
little working space.
• Ideal for pile-cap with
close spacing to other
pile-caps.
SPEEDFORM
• No need to wait 1 day for
Pile-caps & ground beams Pile-caps with
concrete to cure before close spacing to
demoulding. CBP WALL
other pile-cap
• No need to strike
formwork.
• Ideal for circular and
irregular shape.

Skin wall for sheet piling


Pile-caps with little working
space (etc, close to CBP wall)

INSTALLATION PROCEDURES
1 Install rebar cage.

2 Install Speedform and


wire tie to rebar cage.
3
Back fill with soil.
4
5 Ready for casting of Skin wall for CBP piling
concrete

SPEEDFORM STANDARD SIZE (width x length)


600 x 2250mm 900 x 2250mm 1200 x 2250mm 1500 x 2250mm 1800 x 2250mm 1875 x 2250mm
SINGAPORE
HALFEN-MOMENT PTE LTD
No. 9, Tractor Road,
Singapore 627970
T : +65 6266 6802
F : +65 6266 6980
E : hmsg@halfen-moment.com

MALAYSIA
HALFEN MOMENT SDN BHD
28 Jalan Anggerik Mokara 31/59,
Kota Kemuning, Seksyen 31
40460 Shah Alam
Selangor, Malaysia.
T : +603 5122 4182
F : +603 5122 4184
E : info@halfen-moment.com

INDIA
HALFEN MOMENT INDIA PVT LTD.
No 601, Presidential Plaza,
Off LBS Marg, Ghatkopar – West,
Mumbai 400 086, India
T : +9122 2500 7092
F : +9122 2500 7093
E : hmin@halfen-moment.com

PHILIPPINES
HALFEN-MOMENT, INC.
U-1810 Hanston Square San Miguel Ave,
Ortigas Center Pasig City, 1605 Philippines
T : +632 321 5663
F : +632 321 5663
E : hmph@halfen-moment.com

www.halfen-moment.com

Disclaimer: Any technical advice/support or drawings provided by us in whatever form is given to the best of our knowledge and for general use only
and shall be considered non binding information.
Speedform Installation Guidelines
Prepared By: Document No. HMMY-EN-P12
Mohamad Sahril Samdin Revision No. 00
Reviewed By: Release Date 15June16
Page 1 of 4

Reviewer
Name Function Date
Speedform Installation Guidelines
Prepared By: Document No. HMMY-EN-P12
Mohamad Sahril Samdin Revision No. 00
Reviewed By: Release Date 15June16
Page 2 of 4

1.0 TITLE
SPEEDFORM INSTALLATION GUIDELINES.

2.0 PURPOSE
As a guidelines for installing Speedform.

3.0 SCOPE
Installation Method.

4.0 MATERIAL/EQUIPMENT
Designed
Speedform Spacer
Iron wire

5.0 PROCEDURE
Step 1: Levelling Speedform

1. Install spacer using iron wire at frame.


* Recommended spacer spacing = 300mm

2. Designed Speedform attach to frame


and install using iron wire.
3. Fix reinforcement cage and provide
the necessary spacing from the
blinding to allow for concrete cover.
* 100 mm minimum overlap Speedform
side to side.
Speedform Installation Guidelines
Prepared By: Document No. HMMY-EN-P12
Mohamad Sahril Samdin Revision No. 00
Reviewed By: Release Date 15June16
Page 3 of 4

Step 2: Backup and Concrete

4. Place Speedform around perimeter of pile


cap after strategically securing strips of
long spacers or equivalent.
5. Backfill excavation up to 150mm from the
top of the Speedform to avoid
contamination.
*150 mm minimum overlap from top to
bottom Speedform.

6. Pour and vibrate the concrete in


accordance with good concreting practice.

7. The Speedform remains in the Ground


Speedform Installation Guidelines
Prepared By: Document No. HMMY-EN-P12
Mohamad Sahril Samdin Revision No. 00
Reviewed By: Release Date 15June16
Page 4 of 4

6.0 SAFETY PRECAUTIONS


To follow Health & Safety rules and regulations.

7.0 DOCUMENTS/ RECORD


Records shall be maintained as per control of records.

Document Revision History


Description of change Justification of
Date Rev. Para# By
change
15/6/2016 00 All New New Sahril