You are on page 1of 5

NOTES

CATATAN

ZINCALUMN 0.45THK
ZINCALUMN 0.45THK

REVISION 858.7973

REVISI

NO DESCRIPTION DATE
KETERANGAN TANGGAL

HANDRAIL
DIA. 25 BSP PIPE

APPROVAL DRAWING

DESCRIPTION NAME, SIGN & DATE

PLATFORM KETERANGAN NAMA, TANDA TANGAN & TANGGAL


ISIAN LEAN CONC. 1:4

HANDRAIL
DIA. 25 BSP PIPE
4" GI. PIPE

DRAWN BY
DIGAMBAR

ISIAN LEAN CONC. 1:4


4" GI. PIPE
TGL : 22-01-2021

CHECKED BY
DIPERIKSA
ISIAN LEAN CONC. 1:4

TGL : 22-01-2021
4" GI. PIPE

ISIAN LEAN CONC. 1:4


4" GI. PIPE
APPROVED BY
DISETUJUI

TGL :

4" GI. PIPE


ISIAN LEAN CONC. 1:4 PLATFORM
UNP-100x50X5THK
4.5 STAIRCASE OWNER
PEMILIK

MINAMAS PLANTATION

THE PLAZA OFFICE TOWER LT.36.


JL. M.H. THAMRIN KAV.28-30JAKARTA 10350
UNP-100x50

UNP-100x50
INDONESIA
PH:(62-21) 2992 6000 FAX:(62-21) 2992 2688

PROJECT
PROYEK

MINAMAS PLANTATION

DEPARTMENT
4.5THK DEPARTEMEN

PLATE BORDES ENGINEERING AND MILL


SERVICES
UNP-100x50
TITLE
JUDUL

SECTION DENAH MENARA API


ELEVATION (PROPOSED)

PLATFORM DRAWING NO
NO GAMBAR
SHEET
HALAMAN

EMS JKT - MENARA API - 1 1


NOTES
CATATAN

REVISION 858.7973

REVISI
9THK MS. STIFFENER
WELD ON BEAM NO DESCRIPTION
KETERANGAN
DATE
TANGGAL

M16 BOLT & NUTS


4 INCH GI.PIPE ISIAN CONC 1:4

4 INCH GI.PIPE ISIAN CONC 1:4


APPROVAL DRAWING

DESCRIPTION NAME, SIGN & DATE


KETERANGAN NAMA, TANDA TANGAN & TANGGAL

DRAWN BY
DIGAMBAR

TGL : 22-01-2021

UN
0

4 INCH GI
X5

CHECKED BY

P-1
DIPERIKSA
00

16Thk SQ PLATE
C/W 4NOS X DIA.25
P-1

00
TGL : 22-01-2021
WITH DIA 22 X 450 LONG
X5
UN

ANCHORT BOLT & NUTS


0
9THK MS. STIFF APPROVED BY
DISETUJUI

TGL :

OWNER
PEMILIK

UNP-100X50
BASE PLATE TIANG PIPA 4 INCH MINAMAS PLANTATION

THE PLAZA OFFICE TOWER LT.36.


JL. M.H. THAMRIN KAV.28-30JAKARTA 10350
INDONESIA
PH:(62-21) 2992 6000 FAX:(62-21) 2992 2688

PROJECT
PROYEK

MINAMAS PLANTATION

DEPARTMENT
DEPARTEMEN

ENGINEERING AND MILL


SERVICES

TITLE

TYPICAL BRACING & STIIFENER TO SUIT JUDUL

DENAH MENARA API


(PROPOSED)

DRAWING NO SHEET
NO GAMBAR HALAMAN

EMS JKT - MENARA API - 1 2


NOTES
CATATAN

ISIAN LEAN CONC. 1:4


UNP-100 WELD ON
STIFFENER & BOLTING

4" GI. PIPE


STAIRCASE 4.5THK
SUPPORT WITH 9THK PLATE REVISION 858.7973

REVISI

NO DESCRIPTION DATE

ISIAN LEAN CONC. 1:4

ISIAN LEAN CONC. 1:4


KETERANGAN TANGGAL

4" GI. PIPE

4" GI. PIPE


9 THK. STIFF PLATE

4NOS DIA.25
C/W M22X450 APPROVAL DRAWING
ANCHORT BOLT & NUTS
DESCRIPTION NAME, SIGN & DATE
KETERANGAN NAMA, TANDA TANGAN & TANGGAL

GB 200 x 300 GB 200 x 300 DRAWN BY


DIGAMBAR

TGL : 22-01-2021
CONC. K-225 CONC. K-225
D10@150 c/w R8@150 D10@150 c/w R8@150

CHECKED BY
DIPERIKSA

TGL : 22-01-2021
ELEVATION SECTION
PIPA DIA.150 SCH.40-6M APPROVED BY
DISETUJUI

PIPA DIA.150 SCH.40-6M


TGL :

8D12 OWNER
PEMILIK

4NOS DIA.25
C/W M22X450 MINAMAS PLANTATION
R6-150
ANCHORT BOLT & NUTS THE PLAZA OFFICE TOWER LT.36.
JL. M.H. THAMRIN KAV.28-30JAKARTA 10350
INDONESIA
PH:(62-21) 2992 6000 FAX:(62-21) 2992 2688
GB 200 x 300

PROJECT
PROYEK

COR BETON 1:2:3 MINAMAS PLANTATION


PENUH SAMPAI DASAR
PIPA
6D10 - R6@150 DEPARTMENT
DEPARTEMEN
4" GI PIPE
ISIAN LEAN CONC 1:4 ENGINEERING AND MILL
SERVICES

DETAIL GB-200x150 KEDALAMAN TITLE


TANAH KERAS JUDUL

PLAN (PONDASI TIANG) (PIPA D150, SCH.40)


DENAH PONDASI MENARA API
(PROPOSED)

DRAWING NO SHEET
NO GAMBAR HALAMAN

DETAIL PIPA PILE EMS JKT - MENARA API - 1 3


NOTES
CATATAN

REVISION 858.7973

REVISI

NO DESCRIPTION DATE
KETERANGAN TANGGAL

APPROVAL DRAWING

DESCRIPTION NAME, SIGN & DATE


KETERANGAN NAMA, TANDA TANGAN & TANGGAL

DRAWN BY
DIGAMBAR

TGL : 22-01-2021

CHECKED BY
DIPERIKSA

TGL : 22-01-2021

APPROVED BY
DISETUJUI

TGL :

OWNER
PEMILIK

MINAMAS PLANTATION

THE PLAZA OFFICE TOWER LT.36.


JL. M.H. THAMRIN KAV.28-30JAKARTA 10350
INDONESIA
PH:(62-21) 2992 6000 FAX:(62-21) 2992 2688

PROJECT
PROYEK

MINAMAS PLANTATION

DEPARTMENT
DEPARTEMEN

ENGINEERING AND MILL


SERVICES

TITLE
JUDUL

DENAH PONDASI MENARA API


(GROUNDING DETAIL)
SECTION DRAWING NO SHEET
NO GAMBAR HALAMAN

EMS JKT - MENARA API - 1 4


NOTES
CATATAN

4.5THK PLATFORM
C/W HANDRAILING

REVISION 858.7973

REVISI

NO DESCRIPTION DATE
KETERANGAN TANGGAL

PLATFORM (PLAN)
DIA 32
HANDRAIL
APPROVAL DRAWING

DESCRIPTION NAME, SIGN & DATE


KETERANGAN NAMA, TANDA TANGAN & TANGGAL

DRAWN BY
DIGAMBAR

TGL : 22-01-2021

CHECKED BY
DIPERIKSA

TGL : 22-01-2021

ISIAN 1:4 CONC


4 INCH GI PIPE
APPROVED BY
DISETUJUI

TGL :

UNP-100 STRUCTURE
9TH STIFF PLATE
WELD ON UNP-100
ISIAN 1:4 CONC
4 INCH GI PIPE
OWNER
PEMILIK

ISIAN 1:4 CONC


4 INCH GI PIPE

DIA 32 HANDRAIL
MINAMAS PLANTATION

THE PLAZA OFFICE TOWER LT.36.


JL. M.H. THAMRIN KAV.28-30JAKARTA 10350
INDONESIA
PH:(62-21) 2992 6000 FAX:(62-21) 2992 2688

PROJECT

DIA 32 HANDRAIL PROYEK

4.5THK STAIRCASE MINAMAS PLANTATION

WELD ON UNP
C/W 9THK STIFF DEPARTMENT
DEPARTEMEN

TO SUPPORT
4 INCH GI PIPE 9TH STIFF PLATE ENGINEERING AND MILL
ISIAN 1:4 CONC C/W BOLT & NUTS SERVICES

(SEE DETAIL) TITLE


JUDUL

ISOMETRIC ISOMETRIC PLATFORM


(PROPOSED)
PLATFORM
SIDE VIEW DRAWING NO
NO GAMBAR
SHEET
HALAMAN

FRONT VIEW EMS JKT - MENARA API - 1 5