Position: Estimator (HVAC Ductwork)

Assessment Instructions

The five assessment questions below relate to the following drawings (M-300, M-110, M-200). Question
responses can be marked directly onto the drawings.

Assessment Questions

1) Identify/highlight all relevant ductwork information on Mechanical (HVAC) Specifications


(drawing M-300)

2) Identify/highlight aluminum ductwork on drawing M-110

3) Identify/highlight lined ductwork on drawing M-110

4) Indicate at least two locations of each pressure class of ductwork (+1” W.G., +2” W.G. +4” W.G.)
within the clouded area on drawing M-110 (an example has been provided in red)

5) Please indicate/highlight the CFM of the Exhaust Fan, and the manufacturer of Grilles, Diffusers,
& Registers on drawing M-200
A B C D E

REVISIONS
NO. DESCRIPTION DATE

36x14 up 3'
to AHU

+2" W.G.

HHC PRIMARY CARE


3
32x20 up 3'
to AHU 32x20 up 3'
to AHU

1620 BOSTON POST RD


MILFORD, CT
4

MECHANICAL FIRST FLOOR PLAN

PARTIAL FIRST
FLOOR SHOWN

PROJECT SCOPE AK

AREA WITHIN SCOPE OF WORK


9,697 SF

AREA NOT WITHIN SCOPE OF WORK


M-110
KEY PLAN
GRILLE, DIFFUSER AND REGISTER SCHEDULE MECHANICAL LEGEND ABBREVIATIONS

REVISIONS
NO. DESCRIPTION DATE

SEQUENCE OF OPERATION

FAN SCHEDULE

MECHANICAL DEMOLITION NOTES

AIR CONDITIONER SCHEDULE

HHC PRIMARY CARE

1620 BOSTON POST RD


TYPICAL CONDENSING UNIT SCHEDULE

MILFORD, CT
MECHANICAL GENERAL NOTES

TYPICAL CROSSOVER AT ALL LOCATIONS DETAIL

CEILING DIFFUSER CONNECTION DETAIL

FIRE DAMPER DETAIL

VAV BOX WITH ELECTRIC COIL DETAIL


AK

ROOFTOP DOWNBLAST EXHAUST DETAIL


ROOF MOUNTED CONDENSING UNIT DETAIL
CEILING DIFFUSER CONNECTION DETAIL
M-200
REVISIONS
NO. DESCRIPTION DATE
MECHANICAL (HVAC) SPECIFICATIONS

SHEET METAL DUCTWORK SCHEDULE

DUCTWORK LOCATION MATERIAL PRESSURE CLASS


SUPPLY DUCTWORK FROM AHU TO AIR TERMINAL UNITS G90 +4" W.G.
SUPPLY DUCTWORK FROM TERMINAL UNITS TO AIR OUTLETS G90 +1" W.G.
RETURN DUCTWORK FROM AHU TO AIR OUTLETS G90 +2" W.G.
EXHUAST FROM FAN TO AIR OUTLETS G90 +1" W.G.
BATHROOM EXHAUST FROM OUTLET TO MAIN TRUNK ALUMINUM +1" W.G.