You are on page 1of 16

1 2 3 4 5 6 7 8 9

SHEET LIST SHEET LIST


Sheet Sheet LOCATION PLAN
Number Sheet Name Number Sheet Name

00-GENERAL 09-MECHANICAL
G001 COVER SHEET M100 MECHANICAL SYMBOLS HOSPITAL DRIVE
G002 SHEET INDEX MHD001 MECHANICAL BASEMENT DEMOLITION PLAN
G003 SYMBOLS / MATERIALS / ABBREVIATIONS / CODES / STREET MAP / VICINITY PLAN MHD002 HVAC BASEMENT DEMOLITION FLOOR PLAN
MHD101 HVAC SUPPLY DEMOLITION FIRST FLOOR PLAN
03-STRUCTURAL MHD102 HVAC RETURN AND EXHAUST DEMOLITION FIRST FLOOR PLAN

MICK DEAVER MEMORIAL DRIVE/MARYLAND AVENUE


three inches = one foot

SS001 STRUCTURAL GENERAL NOTES MHD103 HVAC SUPPLY DEMOLITION FIRST FLOOR MRI PLAN NO PARKING
6"

SS100 FIRST FLOOR FRAMING PLAN - AREA B MHD104 HVAC RETURN AND EXHAUST DEMOLITION FIRST FLOOR MRI PLAN NO PARKING
A SS200 SECOND FLOOR ROOF SUPPORT FRAMING PLAN - AREA B1 MPD001 MECHANICAL PIPING BASEMENT DEMOLITION PLAN
EXISTING A
SS300 SECTIONS AND DETAILS MPD002 MECHANICAL PIPING BASEMENT DEMOLITION FLOOR PLAN
BUILDING
MPD003 MECHANICAL PIPING BASEMENT DEMOLITION FLOOR PLAN
1
04a-ARCHITECTURAL DEMOLITION MPD004 MECHANICAL PIPING BASEMENT DEMOLITION FLOOR PLAN
AD100 ENLARGED BASEMENT DEMOLITION PLAN - NUCLEAR MEDICINE - DEMO WORK MPD005 MECHANICAL PIPING BASEMENT DEMOLITION FLOOR PLAN
AD101 ENLARGED FIRST FLOOR DEMOLITION PLAN - NUCLEAR MEDICINE - DEMO WORK MPD101 MECHANICAL PIPING DEMOLITION FIRST FLOOR PLAN
AD102 ENLARGED FIRST FLOOR DEMOLITION PLAN - MRI AREA - DEMO WORK MPD102 MECHANICAL PIPING DEMOLITION FIRST FLOOR MRI PLAN
PROJECT
1

AD200 BASEMENT DEMOLITION REFLECTED CEILING PLAN - DEMO WORK MH101 HVAC SUPPLY DUCT FIRST FLOOR PLAN
AREA G5 -
AD201 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN - NUCLEAR MEDICINE AREA - DEMO WORK MH102 HVAC RETURN AND EXHAUST DUCT FIRST FLOOR PLAN
FIRST FLOOR
one & one half inches = one foot

AD202 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN - MRI AREA MH103 HVAC SUPPLY DUCT FIRST FLOOR MRI PLAN
MH104 HVAC RETURN AND EXHAUST DUCT FIRST FLOOR MRI PLAN
04b-ARCHITECTURAL MH201 MECHANICAL NEW WORK ROOF PLAN 0.3mT

0.15mT

0.1mT

NO PARKING
AS100 BASEMENT FLOOR PLAN - NEW WORK MP101 MECHANICAL PIPING FIRST FLOOR PLAN
0.05mT
0

AS101 FIRST FLOOR PLAN - NEW WORK MP102 MECHANICAL PIPING FIRST FLOOR PLAN
AS200 BASEMENT REFLECTED CEILING PLAN - NEW WORK MP103 MECHANICAL PIPING FIRST FLOOR MRI PLAN
AS201 FIRST FLOOR REFLECTED CEILING PLAN - NEW WORKOVERALL PLAN MH501 MECHANICAL DETAILS
6"

AS701 ENLARGED FIRST FLOOR PLAN - NEW WORK MH502 MECHANICAL DETAILS EXISTING
BUILDING
B AS702 ENLARGED FIRST FLOOR MRI AREA - NEW WORK MH503 MECHANICAL DETAILS
1 B
AS703 ENLARGED REFLECTED CEILING FIRST FLOOR PLAN - NEW WORK MH504 MECHANICAL DETAILS
AS704 ENLARGED REFLECTED CEILING FIRST FLOOR MRI PLAN - NEW WORK MH601 MECHANICAL SCHEDULES
AS705 PARTIAL ROOF PLAN AND EQUIPMENT SCHEDULE

MONK DRIVE
2

AS706 ENLARGED EQUIPMENT FIRST FLOOR PLAN - NEW WORK 10-ELECTRCIAL


AS707 ENLARGED EQUIPMENT FIRST FLOOR MRI PLAN - NEW WORK EP100 ELECTRICAL SYMBOLS
AS708 ENLARGED SHIELDING FIRST FLOOR PLAN - NEW WORK ELD101 LIGHTING DEMOLITION FIRST FLOOR PLAN FACILITIES
AS710 ENLARGED FIRST FLOOR FINISH PLAN - NEW WORK ELD102 LIGHTING DEMOLITION FIRST FLOOR MRI PLAN TRAILER AT
AS711 ENLARGED FIRST FLOOR MRI FINISH PLAN - NEW WORK EPD001 ELECTRICAL BASEMENT DEMOLITION PLAN BASEMENT LEVEL -
AS800 VA STANDARD & ACCESSIBLE MOUNTING HEIGHTS AND CLEARANCES EPD101 ELECTRICAL DEMOLITION FIRST FLOOR PLAN BUILDING 22
AS901 PARTITION TYPES EPD102 ELECTRICAL DEMOLITION FIRST FLOOR MRI PLAN
one inch = one foot

AS909 INTERIOR DETAILS/SCHEDULES EL101 LIGHTING FIRST FLOOR PLAN


AS910 DOOR TYPES, FRAME TYPES & DETAILS EL102 LIGHTING FIRST FLOOR PLAN MRI PLAN
0

AS911 INTERIOR, CEILING, LEAD LINING AND MILLWORK DETAILS EP101 ELECTRICAL FIRST FLOOR PLAN
6"

AS930 INTERIOR DETAILS - BLOCKING, TRANSITION, MISC. EP102 ELECTRICAL FIRST FLOOR PLAN MRI PLAN
PROJECT AREAS
AS931 GUARDRAILS AND INTERIOR DETAILS EP201 ELECTRICAL NEW WORK ROOF PLAN
B1 & B2 - FIRST FLOOR
AS932 SIGNS EP300 ENLARGED ELECTRICAL SCAN ROOM PLANS
(BASEMENT AREA B
C EP500 ELECTRICAL DETAILS
BELOW) NO PARKING C
05- FIRE PROTECTION LIFE SAFETY ETD101 TELECOMMUNICATIONS DEMOLITION FIRST FLOOR PLAN
LS-101 LIFE SAFETY FIRST FLOOR PLAN ETD102 TELECOMMUNICATIONS DEMOLITION FIRST FLOOR MRI PLAN
ET101 TELECOMMUNICATIONS FIRST FLOOR PLAN
NOTE:
06-FIRE PROTECTION ET102 TELECOMMUNICATIONS FIRST FLOOR MRI PLAN
CONTRACTOR MAY NOT LOCATE A JOB TRAILER ON
three quarters inch = one foot
2

FA-101 FIRE ALARM ARRANGEMENT FIRST FLOOR PLAN EYD101 SPECIAL SYSTEMS DEMOLITION FIRST FLOOR PLAN
SITE. ADDITIONAL REQUIREMENTS TO BE COORDINATED
FP-101 FIRE PROTECTION ARRANGEMENT FIRST FLOOR PLAN EYD102 SPECIAL SYSTEMS DEMO FLOOR MRI PLAN
WITH SPECIFICATION SECTIONS 01 00 00 GENERAL
EY101 SPECIAL SYSTEMS FIRST FLOOR PLAN REQUIREMENTS AND 00 00 00 MEDICAL CENTER
EY102 SPECIAL SYSTEMS FLOOR PLANS MRI PLAN REQUIREMENTS, THE COR AND THE MEDICAL CENTER.
EL601 LIGHTING SCHEDULES
EA
ST
6" 0

11-PLUMBING ST
AD
PL100 PLUMBING SYMBOLS IU MB
OU
PD001 PLUMBING BASEMENT DEMOLITION PLAN LE
VA
PD002 PLUMBING BASEMENT DEMOLITION FLOOR PLAN RD
PD003 PLUMBING BASEMENT DEMOLITION FLOOR PLAN
PD004 PLUMBING BASEMENT DEMOLITION FLOOR PLAN
D PD005 PLUMBING BASEMENT DEMOLITION FLOOR PLAN
D
4

PD101 PLUMBING BELOW FLOOR DEMOLITION FIRST FLOOR PLAN


PLD102 PLUMBING BELOW FLOOR DEMOLITION FIRST FLOOR MRI PLAN
PL101 PIPING BELOW FLOOR FIRST FLOOR PLAN
one half inch = one foot

PL102 PLUMBING BELOW FLOOR FIRST FLOOR MRI PLAN


PPD101 PIPING ABOVE FLOOR DEMOLITION FIRST FLOOR PLAN
PPD102 PIPING ABOVE FLOOR DEMOLITION FIRST FLOOR MRI PLAN
PP101 PIPING ABOVE FLOOR FIRST FLOOR PLAN
PP102 PIPING ABOVE FLOOR FIRST FLOOR MRI PLAN OVERALL FIRST FLOOR PLAN PROJECT AREA
PL501 PLUMBING DETAILS
0

PL601 PLUMBING SCHEDULE


PL701 WASTE AND VENT RISER
PL702 DOMESTIC WATER RISER
PL703 MEDICAL GAS RISER
three eights inch = one foot

E E
4

PROJECT
AREA G5

A
O
V

O
A

A
O
V
A BLE
F I XE D T

V
PROJECT

O
MAGN ETO MA
0

V
X A XIS
Z A XIS

10mT

5mT

3mT

AREAS
0.3mT

0.15mT

O
A
V
0.1mT

0.05mT

O
V
VA
B1 & B2

A
O
V
C:\Users\hersheys\Documents\60303195 - VAMC Nuclear Medical_hersheys.rvt

8
one quarter inch = one foot

F F
0 4

Revisions: Date 100% CONSTRUCTION Drawing Title: Project Title: Project Number
CONSULTANTS: DOCUMENTS ARCHITECT/ENGINEERS SHEET INDEX RELOCATE NUCLEAR MEDICINE 589A4-13-124
16
one eighth inch = one foot

STRUCTURAL ELEC/MECH / PLUMB SHIELDING DESIGN FIRE PROTECTION HAZARD MATERIALS


KH Engineering 2380 McGee Street, Building Number
FSC MEP Engineers, LLC DTC, Inc FP&C Consultants, Inc. APEX Environmental
Group, PA Suite 200 1
Consultants, Inc.
Kansas City, MO 64108
Approved: Project Director Location HARRY S. TRUMAN MEMORIAL Drawing Number
8

15377 W. 95th Street 9225 Indian Creek Pkwy, 5930 Roe Avenue, 3770 Broadway 14955 W. 101st Terr An AECOM Company 816 561 4443

G002
Lenexa, KS 66219 Suite 300 Suite 201 Kansas City, MO 64111 Lenexa, KS 66215 VETERANS HOSPITAL
Overland Park, KS 66210 Mission, KS 66205
Date Checked Drawn
4

(c) 2016 2016.01.15 D.SULLIVAN D.HILL Dwg. 2 of 106


t: 913.825.9381 t: 913.722.3473 t: 913.236.6000 t: 816.931.3377 t: 913.338.2739
0

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

CODES & DESIGN CRITERIA INDICATION OF MATERIALS SYMBOLS GENERAL NOTES


COLUMN GRID LINES DIMENSIONS PARTITIONS
GRADE WOOD (FINISH) 1. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY. VERIFY ALL DIMENSIONS PRIOR TO START
OF WORK. IN THE EVENT OF DISCREPANCY, NOTIFY THE GOVERNMENT AND OBTAIN RESOLUTION BEFORE
EXISTING PARTITION TO BE REMOVED PROCEEDING.

EARTHWORK WOOD BLOCKING OR 2. NOTIFY THE GOVERNMENT OF ANY AND ALL DISCREPANCIES BETWEEN EXISTING CONDITIONS AND
1 2" THE CONTRACT DOCUMENTS BEFORE PROCEEDING WITH THAT PORTION OF WORK. FAILURE TO NOTIFY
FILLS FRAMING DIMENSION LINE EXISTING PARTITION TO REMAIN
THE GOVERNMENT WILL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY TO PERFORM THE WORK
AS INTENDED BY THE CONTRACT DOCUMENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL
WOOD SHIM NEW PARTITION WORK ARISING FROM SUCH FAILURE TO COORDINATE DISCREPANCIES TO THE SATISFACTION OF THE
three inches = one foot

CONCRETE - CAST A
1. GENERAL DESIGN REQUIEMENTS (ALL SUBMISSIONS): IN PLACE/PRECAST CENTER LINE GOVERNMENT.
6"

a. VA Design Documents: OR FINISHED FLOOR LINE 3 PARTITION TYPE - REFER 3. PROTECT AND PRESERVE ALL EXISTING ITEMS TO REMAIN, AND REPAIR AND/OR REPLACE ANY ITEMS
1) VA Master Construction Specifications (PG-18-1); PLYWOOD
TO AS901 & AS902 DAMAGED DURING THE COURSE OF THE WORK TO THE SATISFACTION AND APPROVAL OF THE

A
GOVERNMENT WITHOUT ADDITIONAL COST TO THE OWNER.
2) VA Design & Construction Procedures (PG-18-3);
3) VA National CAD Standards Details (PG-18-4);
TERRAZZO
DETAIL REFERENCE ELEVATION REFERENCE EXISTING FIXTURES/EQUIPMENT 4. VERIFY EXISTING DIMENSIONS, CONDITIONS AND CLEARANCES PRIOR TO THE SUBMITTAL OF SHOP DRAWINGS. A
4) VA Seismic Requirements (H-18-8); INSULATION
5. ALL SLEEVES, OPENINGS, ETC. FOR CONDUIT, PIPES, DUCTS, ETC. (OUTSIDE OF RATED CHASES), THROUGH-
5) VA Barrier Free Design Guide (PG-18-13); and BRICK
FLOOR SLABS, AND RATED PARTITIONS ARE TO BE FIRE SEALED IN ACCORDANCE WITH FIRE RATED ASSEMBLY
DETAIL NO. 1 L
6) VA Room Finishes, Door, & Hardware Schedule (PG-18-14). TO REMAIN DESIGNS, APPLICABLE CODES AND FIRE MARSHAL'S REQUIREMENTS.
7) VHA National CAD Standard Application Guide STONE METAL 1 4 A701 2 6. PROVIDE ALL BLOCKING AND ANCHORAGE AS NECESSARY FOR PROPER INSTALLATION OF NEW WORK.
A101
b. VA Design Manuals as they relate to the Construction Documents Scope: 3 7. WHERE WORK OCCURS IN AREAS WITH EXISTING FINISHES TO REMAIN, REFINISH DISTURBED AREAS TO
SHEET NO.
1

1) Architectural Design Manual; MATCH EXISTING FINISHES AND MATERIALS UNLESS NOTED OR DIRECTED OTHERWISE.
CONCRETE ACOUSTICAL MATERIAL TO BE REMOVED
AREA TO
2) CPM Design Manual; MASONRY UNIT
BE DETAILED DETAIL NUMBER 8. PROVIDE LINTELS OVER ALL OPENINGS IN MASONRY PARTITIONS AND WALLS FOR DOORS, WINDOWS,
3) Electrical Design Manual; OR ENLARGED DUCTWORK, ETC.
one & one half inches = one foot

TILE (CERAMIC 1
4) Fire Protection Design Manual; OR QUARRY) EXPANSION MATERIAL A101
DOORS 9. WHERE EXISTING MASONRY WALLS ARE REMOVED, OR NEW OPENINGS ARE PROVIDED WITHIN EXISTING
5) HVAC Design Manual; SHEET NUMBER MASONRY WALLS TO REMAIN, SAW CUTS SHALL BE USED FOR DEMOLITION BETWEEN THE SECTIONS OF WALL
6) Plumbing Design Manual; PLASTER, SAND, EXISTING EXISTING TO NEW
TO REMAIN, AND SECTIONS TO BE REMOVED.
7) Interior Design Manual; GYPSUM BOARD, TO REMAIN BE REMOVED 10. FOR GENERAL DEMOLITION AND REPAIR NOTES, REFER TO DEMOLITION PLANS AND DRAWINGS.
8) Sanitary Design Maual; PARTICLE BOARD SECTION REFERENCE
0

9) Site Development Design Manual; and 11. WHERE CONDUIT, PIPES, DUCTS, ETC. ARE INDICATED TO BE INSTALLED IN EXISTING WALLS AND NO
FURRING IS SHOWN, THE WALLS SHALL BE NEATLY CHASED, CONDUITS, ETC. INSTALLED, AND WALLS
10) Structural Design Manual DETAIL PATCHED TO MATCH EXISTING. IN NEW PARTITION AREAS WHERE CONDUITS, DUCTS, PIPING, ETC. PASS
NUMBER THROUGH FINISHED SPACES, ENCLOSE WITHIN PARTITION CONSTRUCTION.
c. Codes & Standards: 1 X X
6"

A701 12. THE FACE OF EVERY CONTINUOUS PARTITION SHALL BE FLUSH WITHOUT OFFSET. CHANGES IN PARTITION
1) Codes & Standards as listed in VHA Program Guide PG-18-13. DOOR SYMBOL X THICKNESS SHALL OCCUR AT CORNERS OR OTHER FEATURES WHICH INTERRUPT THE PLANE OF THE
SHEET RE: AS905
B 2) Occupational, Safety and Health Administration (OSHA) Standards. NUMBER
X X PARTITION. FACES OF CORRIDOR PARTITIONS SHALL ALIGN ALONG THEIR ENTIRE LENGTH REGARDLESS OF
CHANGES IN PARTITION THICKNESS. ALL ADJUSTMENTS ARE TO BE MADE TO THE ROOM SIDE OF THE B
3) International Building Code (IBC) CORRIDOR PARTITIONS AND AT CORNERS.
4) National Electrical Code (NEC)
ROOM IDENTIFICATION 13. ADDITIONAL PLAN INFORMATION IS SHOWN ON LARGER SCALE PLANS WHERE INDICATED BY KEYED
5) National Fire Protection Association (NFPA) Codes, with the SHEET NUMBERING REFERENCE. LARGE SCALE DRAWINGS TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS.
exception of NFPA 5000 and NFPA 900
2

6) National Standard Plumbing Code (NSPC) DISCIPLINE SERIES 14. FOR TYPICAL MOUNTING HEIGHTS OF EQUIPMENT, TOILET FIXTURES AND ACCESSORIES, SEE DRAWING
ROOM NAME AS800.
7) Safety Code for Elevators and Escalators, American Society of OFFICE
Mechanical Engineers (ASME) A 17.1
8) ASME Boiler and Pressure Vessel Code
9) ASME Code for Pressure Piping
1A100 ROOM NUMBER

WHICH DESCRIBES
AS101A 15. ALL EQUIPMENT, FIXTURES, ACCESSORIES ARE TO BE MOUNTED PER MANUFACTURER'S RECOMMENDATIONS.

10) Building Code Requirements for Reinforced Concrete, American SHEET TYPE NUMBER
12 TITLE
THE DETAIL
Concrete Institute (ACI 318-2) and Commentary (ACI 318-R2) SEQUENTIAL SHEET
1/8" = 1' - 0"
11) Energy Code for New Federal Commercial and Multi-Family High
one inch = one foot

NUMBER
Rise Residential Buildings: Final Rule. Mandatory for New Federal
AREA LETTER ON
Buildings, Department of Energy (DOE) regulations, 10 Code of SEQUENTIAL NUMBER
PLAN SHEETS
0

Federal Regulations (CFR) Parts 434 and 435.


12) The Provisions for Construction and Safety Signs. Stated in the
General Requirements Section 01010 of the VA Master MISCELLANEOUS IDENTIFICATION VICINITY PLAN
6"

Construction Specification.
13) Greening the Government through Efficient Energy Management -
Executive Order 13123. NORTH ARROW
WALL
C 14) Greening the Government through Leadership in Environmental
C
Management - Executive Order 13148.
15) Ventilation for Acceptable Indoor Air Quality - ASHRAE Standard ONE HOUR FIRE WALL LINE
CORNER GUARD CRASH/HAND/
62.1 - 2004. (IN PLAN) GUARD RAIL
TWO HOUR FIRE WALL LINE
16) Safety Standard for Refrigeration Systems - ASRAE Standard 15 - (IN PLAN)
SIGNAGE
three quarters inch = one foot

2004.
2

ONE HOUR SMOKE PARTITION VL27-24 NOMENCLATURE FOR


(IN PLAN) VL SERIES METAL
MODULAR LABORATORY
MATCH LINE
PP AUTOMATIC DOOR PUSH PLATE CABINETS
BREAK LINE
SEE PROJECT MANUAL
SITE
CR CARD READER SEE ELEC
HIDDEN OR LINE ABOVE DRAWINGS
6" 0

1 REVISION TRIANGLE & CLOUD

MEDICAL EQUIPMENT
123 REFERENCE, SEE SHEET AS721

TOILET ACCESSORIES, VL1-24


GB-2 SEE SHEET AS800 CABINET CABINET
STYLE WIDTH
D D
4
one half inch = one foot

ARCHITECTURAL ABBREVIATIONS STREET MAP


0

A& AND CC CHANNEL D DEPT DEPARTMENT F FA FIRE ALARM HH HIGH MM MIDDLE P PL PLATE SS STAIN TT TOP W WH WALL HYDRANT
@ AT C DISP CUP DISPENSER DET DETAIL/S FAP FIRE ALARM PANEL HB HOSE BIB MAN MANUAL PL PROPERTY LINE SNK SINK TAN TANGENT
AA ANODIZED ALUMINUM - NATURAL FINISH CAB CABINET DBL DOUBLE FBLKT FIRE BLANKET HD HAND DRYER MAT MATERIAL PL PLASTIC LAMINATE SCHED SCHEDULE TBD TACKBOARD WHCH WHEELCHAIR
AAC ANODIZED ALUMINUM - COLORED CANTL CANTILEVER DF DRINKING FOUNTAIN FB FACE BRICK HDCP HANDICAP MAX MAXIMUM PLBG PLUMBING SD SMOKE DAMPER TC TIME CLOCK WHTR WATER HEATER
AB ANCHOR BOLT CAP CAPACITY DIA DIAMETER FBR FACE BRICK HDR HEADER MBD MARKER BOARD PLS PLASTER SDISP SOAP DISPENSER TCAB TOWEL CABINET WP WALL PANEL
ACFL ACCESS FLOOR CAT CATEGORY DIAG DIAGONAL FD FLOOR DRAIN HDW HARDWARE MC MEDICINE CABINET PLW PLYWOOD SDR SHOWER DRAIN TDISP TISSUE DISPENSER WPR WATERPROOF
ACOUS ACOUSTICAL CBD CHALKBOARD DIFF DIFFUSER FDN FOUNDATION HM HOLLOW METAL MCU MODULAR COOLING UNIT PNL PANEL SECT SECTION TDR TRENCH DRAIN WR WASTE RECEPTACLE
AD AREA DRAIN CC CUBICLE CURTAIN DIM DIMENSION FDV FIRE DEPARTMENT VALVE HORIZ HORIZONTAL MECH MECHANICAL PR PAIR SECY SECRETARY TEL TELEPHONE WS WEATHERSTRIP
ADD ADDENDUM CCT CUBICLE CURTAIN TRACK DISP DISPENSER FE FIRE EXTINGUISHER HPT HIGHPOINT MEMB MEMBRANE PRELIM PRELIMINARY SEU SEALED EDGE UNIT TEMP TEMPERATURE WSCT WAINSCOT
ADDL ADDITIONAL CCTV CLOSED CIRCUIT TELEVISION DIST DISTRIBUTION FEC FIRE EXTINGUISHER CABINET HR HANDRAIL MET METAL PRES PLASTIC RESIN SF STORE FRONT TER TERRAZZO WSF WELDED SEAM-RESILIENT
ADJUST ADJUSTABLE CD COILING DOOR DIV DIVISION FGS FOAM GASKET SEAL HT HEIGHT MEZZ MEZZANINE PRESS PRESSURE SF SQUARE FOOT TG TONGUE & GROOVE SHEET FLOORING
three eights inch = one foot

WT WEIGHT
E ADJ ADJACENT CGRL
CG
COILING GRILLE DJT DUMMY JOINT FH FIRE HOSE HTR HEATER MFR MANUFACTURER PRIM PRIMARY SH
SHD
SHOWER
SHOWER HEAD
THRES THRESHOLD
WTR WINDOW TREATMENT
E
4

ADMIN ADMINISTRATION CORNER GUARD DN DOWN FHP FULL HEIGHT PARTITION HVAC HEATING, VENTILATING, AIR MH MANHOLE PROJ PROJECTION TPH TOILET PAPER HOLDER
AFF ABOVE FINISH FLOOR CH COAT HOOK DP DEMOUNTABLE PARTITION FHV FIRE HOSE VALVE CONDITIONING MHC MATERIAL HANDLING CONVEYOR PRV POWER ROOF VENTILATOR SHT SHEET TR TREAD WW WOOD WINDOW
AHU AIR HANDLING UNIT CI CAST IRON DPR DATA PROCESSING FIN FINISH HW HOT WATER MIL MILLIMETER PTC PAPER TOWEL CABINET SHTG SHEATHING TRANSF TRANSFORMER WWF WELDED WIRE FABRIC
ALT ALTERNATE CJT CONTROL JOINT DR DOOR FIXT FIXTURE HWD HARDWOOD MN MINIMUM PTR PRINTER SIM SIMILAR TS TUBE SECTION
ALUM ALUMINUM CL CENTER LINE DS DOWNSPOUT FL FLOOR MR MIRROR PVC POLYVINYL CHLORIDE SL SEALER TV TELEVISION
AMEND AMENDMENT CLG CEILING DW DUMBWAITER FLINE FLOW LINE I MISC MISCELLANEOUS SLNT SEALANT TYP TYPICAL
ANUN ANNUNCIATOR CLR CLEAR DWG DRAWING FLASH FLASHING
IC
ID
INTERCOM
INSIDE DIAMETER MO MASONRY OPENING Q QT QUARRY TILE
SLV SLEEVE
AP
APC
ACCESS PANEL
ARCHITECTURAL PRECAST CONCRETE
CLS
CM
CLASS DWLS DOWELS FLEX FLEXIBLE
IN INCH MONO MONOLITHIC
QS QUARTZ SURFACE
SM
SNC
SURFACE MOUNTED
SANITARY NAPKIN CABINET
UU URINAL
APROX APPROXIMATE CMU
CONSTRUCTION MANAGER
E FLG FLANGE
INSUL INSULATION MPC METAL PAN CEILING
SND SANITARY NAPKIN DISPOSER
UC UNDERCOUNTER
ARCH ARCHITECTURAL CO
CONCRETE MASONRY UNIT
CLEANOUT
E
EC
EXISTING
ELECTRIC CABINET
FLUOR
FP
FLUORESCENT
FIRE PROOFING
INT
ISO
INTERIOR
ISOLATION
MPU
MTD
MULTI-PURPOSE UNIT
MOUNTED RR RADIUS SOG SLAB ON GRADE
UCT
UFD
UNDER CUT
UNDER FLOOR DUCT
AT ACOUSTICAL CEILING TILE COPEN CASED OPENING EC EPOXY COATING FRMG FRAMING MTL METAL RA RETURN AIR SP STANDPIPE
UG UNDERGROUND
0

AUTO
AWT
AUTOMATIC
ACOUSTICAL WALL TREATMENT
COL
COMB
COLUMN
COMBINATION/COMBINED
EF
EFTR
EXHAUST FAN
EXISTING FINISH TO REMAIN
FS
FS
FULL SIZE
FLOOR SINK
J JAN JANITOR
MTR
MULL
MOTOR
MULLION
RAD
RB
RADIATION
RESILIENT BASE/RUBBER BASE
SPC SPECIMEN PASS THROUGH
CABINET
UH
UNFIN
UNIT HEATER
UNFINISHED
CONC JB JUNCTION BOX SPEC SPECIFICATIONS
B BA BUILDING ACCESSORY
CONF
CONCRETE
CONFERENCE
EIFS EXTERIOR INSULATION &
FINISH SYSTEM
FSTOP
FT
FIRESTOPPING
FOOT/FEET JST JOIST N NA NOT APPLICABLE
RD
RE
ROOF DRAIN
RELOCATE EXISTING SPR SINGLE PLY ROOF
UNO
US
UNLESS NOTED OTHERWISE
UTILITY SHELF
CONN FTG FOOTING JT JOINT NIC NOT IN CONTRACT SQ SQUARE
BBD BULLETIN BOARD CONNECT/-ED/-ION EJT EXPANSION JOINT REC RECESSED UTIL UTILITY
CONST NO NUMBER SQ YD SQUARE YARD
BC BRICK COURSES CONSTRUCTION EL ELEVATION FTR FIN TUBE RADIATION
K KO KNOCK OUT NOM NOMINAL
REF REFERENCE
BD BOARD
CONT CONTINUE/CONTINUOUS ELEC ELECTRICAL FURR FURRING REFR REFRIGERATOR SR SERVICE RECEPTOR
V VC VALVE CABINET
C:\Users\hersheys\Documents\60303195 - VAMC Nuclear Medical_hersheys.rvt

CONTR NRC NOISE REDUCTION COEFFICIENT SS SERVICE SINK


BE
BFE
BAKED ON ENAMEL
BOTTOM FOOTING ELEVATION
COORD
CONTRACT/OR
COORDINATE
ELEV
EMERG
ELEVATOR
EMERGENCY
FUT
FV
FUTURE
FIELD VERIFY LL ANGLE NT NOTE
REG
REING
REGISTER
REINFORCE/-ED/-ING SST STAINLESS STEEL VCT VINYL COMPOSITION TILE
CORR CORRIDOR LAV LAVATORY NTS NOT TO SCALE ST STREET VENT VENTILATION
8

BG BUMPER GUARD ENCL ENCLOSURE REM REMOVE


O OC VERT VERTICAL PROJECT
CP CARPET ENTR ENTRANCE G GRT LB POUND REQD REQUIRED STT STONE TILE
one quarter inch = one foot

BIT BITUMINOUS GROUT LCD LINEAR CEILING DIFFUSER ON CENTER VEST VESTIBULE
BKT BRACKET
CPT CARPET MODULE TILE EO ELECTRICAL OUTLET OD OUTSIDE DIAMETER RET RETAINING STC SOUND TRANSMISSION LOCATION
CR-1 CHAIR RAIL GA GAUGE LF LINE FIGURED STD STANDARD VIF VERIFY IN FIELD
BLDG BUILDING EP EXPLOSION PROOF OFF OFFICE REV REVERSE
CR-2 CRASH RAIL GAL GALLONS LIN LINEAR STL STEEL VR VAPOR RETARDER
BLKG BLOCKING EPDM ETHYLENE PROPYLENE OH OVERHEAD REV REVISE
CT CERAMIC TILE GALV GALVANIZED LKR LOCKER STN STONE VTR VENT THROUGH ROOF
DIENE MONOMER RF RESILIENT FLOOR
F
BLT BORROWED LITE GB GRAB BAR LLH LONG LEG HORIZONTAL OP OPERABLE PARTITION STNL STONE LEDGE W
F
CTR CENTER EQ EQUAL RFI REQUEST FOR INFORMATION
BLW BELOW GBM GRADE BEAM LLV LONG LEG VERTICAL OPER OPERATOR STOR STORAGE
CTSK COUNTERSUNK W WIDTH/WIDE
4

BM BEAM EQUIP EQUIPMENT OPNG OPENING RH ROOF HATCH


CUH CABINET UNIT HEATER GC GENERAL CONTRACTOR LMC LINEAR METAL CEILING STRUCT STRUCTURAL WCV WALL COVERING
BO BY OWNER ES END SECTION OPP OPPOSITE RM ROOM
CW CURTAIN WALL GEN GENERAL LOC LOCATION OR LOCATE STS STEEL STRUCTURE WF WIDE FLANGE
BOF BY OWNER FUTURE EWC ELECTRIC WATER COOLER ORD OVERFLOW ROOF DRAIN RO ROUGH OPENING
CW COLD WATER EXA EXHAUST AIR GENR GENERATOR LPT LOW POINT SUPV SUPERVISOR W/ WITH
RS ROUGH SLAB
BOT
BP
BOTTOM
BRICK PAVING
CYL CYLINDER EXC EXCAVATE/-ED/-ION
GL
GMU
GLASS
GLASS MASONRY UNIT
LS
LT
LAWN SPRINKLING
LIGHT
PP PAINT RSF RESILIENT SHEET FLOOR SUS[
STLW
SUSPENDED
STEEL WINDOW
W/O WITHOUT
BR BRICK EXH EXHAUST HOOD PART PARTITION RSR RISER WC WATER CLOSET
GR GRADE LTG LIGHTING PB PUSH BUTTON SW SWITCH WD WOOD
EXIST EXISTING
BRG BEARING DD GWB GYPSUM WALLBOARD LVR LOUVER
RST RESILIENT STAIR TREADS
SWD SOFTWOOD
0

BRL BRICK LEDGE DEPTH OR DEEP EXP EXPANSION PC PRECAST CONCRETE RWC RAIN WATER CONDUCTOR WDW WINDOW
DEMO DEMOLITION GYB GYPSUM BOARD LWC LINEAR WOOD CEILING PCD PAPER CUP DISPENSER SYM SYMMETRICAL WG WALL GUARD
BSMT BASEMENT EXT EXTERIOR
DEPR DEPRESSION GYPSHGT GYPSUM SHEATHING PED PEDESTAL
BTWN BETWEEN EXT-P EXTERIOR PAINT
BUR BUILT-UP ROOFING EXT-ST EXTERIOR STAIN

Revisions: Date 100% CONSTRUCTION Drawing Title: Project Title: Project Number
CONSULTANTS: DOCUMENTS ARCHITECT/ENGINEERS SYMBOLS / MATERIALS / ABBREVIATIONS / CODES / RELOCATE NUCLEAR MEDICINE 589A4-13-124
16
one eighth inch = one foot

STREET MAP / VICINITY PLAN


STRUCTURAL ELEC/MECH / PLUMB SHIELDING DESIGN FIRE PROTECTION HAZARD MATERIALS
KH Engineering 2380 McGee Street, Building Number
FSC MEP Engineers, LLC DTC, Inc FP&C Consultants, Inc. APEX Environmental
Group, PA Suite 200 1
Consultants, Inc.
Kansas City, MO 64108
Approved: Project Director Location HARRY S. TRUMAN MEMORIAL Drawing Number
8

15377 W. 95th Street 9225 Indian Creek Pkwy, 5930 Roe Avenue, 3770 Broadway 14955 W. 101st Terr An AECOM Company 816 561 4443

G003
Lenexa, KS 66219 Suite 300 Suite 201 Kansas City, MO 64111 Lenexa, KS 66215 VETERANS HOSPITAL
Overland Park, KS 66210 Mission, KS 66205
Date Checked Drawn
4

(c) 2016 2016.01.15 D.SULLIVAN D.HILL Dwg. 3 of 106


t: 913.825.9381 t: 913.722.3473 t: 913.236.6000 t: 816.931.3377 t: 913.338.2739
0

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

U T.8 T S Rb Ra R Q P Na N M La L K DEMOLITION NOTES - GENERAL


1. NOT ALL KEYNOTES APPLY TO THIS SHEET.

.5 .5 2. IN RENOVATION/DEMOLITION AREAS,
CONTRACTOR MUST NOTIFY AND RECEIVE
APPROVAL FROM THE COR OF ANY
PROPOSED EXPANSION OF DEMOLITION
DUE TO THE DISCOVERY OF UNEXPECTED
09 CONDITIONS. THIS MUST OCCUR WHEN
THE CONDITION IS DISCOVERED AND
three inches = one foot

BEFORE PROCEEDING WITH THE WORK.


6"

1
3. REMOVE ROOM IDENTIFICATION AND
A OTHER SIGNAGE FROM WALLS
A
INDICATED TO BE REMOVED/DEMOLISHED.

4. REMOVE EXISTING FLOOR FINISH FROM


ROOMS INDICATED TO BE DEMOLISHED
AND PREPARE FLOOR FOR NEW FLOOR
FINISH PER ROOM FINISH SCHEDULE.
1.6
1

5. REPAIR EXISTING WALLS (TO REMAIN)


WHERE EQUIPMENT, SIGNS, CONTROLS,
ELECTRICAL PANELS AND OTHER ITEMS
one & one half inches = one foot

ARE INDICATED TO BE REMOVED.


1.9
6. SEE MEP DEMOLITION PLANS FOR NOTES
OFFICE 2 AND ADDITIONAL DEMOLITION ITEMS,
INCLUDING ITEMS CONCEALED IN WALLS
0

B046 SUCH AS PIPING.


OFFICE OFFICE
RSCH B046A HEALTH 7. ALL WORK IN THE BASEMENT MUST OCCUR
B049
6"

COMMON PHYSICS LAB AFTER WORKING HOURS, AND THE ROOMS


ROOM B050 MUST REMAIN OPERATIONAL DURING
B B045 CONSTRUCTION. COORDINATE TIMING OF B
RELOCATE EXISTING HOOD TO FIRST FLOOR ALL BASEMENT WORK WITH THE COR.
2.7 THIS ROOM MUST REMAIN OPERATIONAL UNTIL
NEW SPACE IS COMPLETED. COORDINATE 8. ANY WORK IN CORRIDORS MUST OCCUR AT
HOOD RELOCATION WITH COR. 2.8 NIGHT OR ON WEEKENDS AND IS TO BE
2

COORDINATED WITH THE COR.


3
9. EXISTING SHIELDING SHALL REMAIN INTACT
FREEZER
NURSE WK WITHIN EXISTING WALLS DESIGNATED TO
B15A Room ST. & FILM REMAIN. REPAIR SUCH WALLS TO
FILES EQUIVALENT STATE IF EXISTING SHIELDING
B12A IS PIERCED OR OTHERWISE DISTURBED.
B005A NOTIFY THE COR AND ARCHITECT WHERE
one inch = one foot

THE SHIELDING IS DISRUPTED BY


Room LAB/THYROID READING CONSTRUCTION ACTIVITIES.
PHYSICAN NM STRESS RE: ELEC.
0

INJECTION ROOM
B14 OFFICE BREAK TEST DRAWINGS
OFFICE B10 B009 FOR WORK 10. SPRINKLERS ARE TO REMAIN OPERATIONAL
B008 B006 B005 3.7
6"

Room IN THIS DURING CONSTRUCTION, EXCEPT AS


B12
ROOM COORDINATED WITH THE COR WHEN WORK
B15 TO THE SYSTEM IS REQUIRED. RE: FP-101.
4
C ELEC. 11. RE: PROJECT MANUAL SECTION 02 83 33.13 C
CORRIDOR CORRIDOR LEAD SHIELDING REMOVAL AND DISPOSAL
B009A CORRIDOR
CBB1 CBA10 FOR DEMOLITION OF EXISTING WALLS WITH
CBA1 LEAD SHIELDING.
ELEC
three quarters inch = one foot

CARDAIC
2

OFFICE
TLT STRESS A54A ELEC 4.4
B013 TEST A54B
WAITING CHECK-IN/ADMIN. B007
OFFICE SCAN ROOM B001S
ROOM B0010 4.6
B013A B011 TLT
B001N
B001R
6" 0

5
CORRIDOR
CBB2 PATIENT LIFT MANUFACTURER TO REMOVE 5.1
EXISTING PATIENT LIFT AND INSTALL IN NEW
CT ROOM ON FIRST FLOOR 5.4
PATIENT LIFT
MANUFACTURER TO
REMOVE EXISTING SCAN ROOM
D PATIENT LIFT AND B001M D
4

SCAN ROOM HOT LAB DISHWASHER


INSTALL IN NEW CT
B001K B001H
5.5
ROOMS ON FIRST FLOOR B001A
CONTROL
one half inch = one foot

B001L

6
REMOVE PORTION OF WALL ABOVE
CEILING TO FACILITATE INSTALLATION OF 6.2
OFFICE NEW STEEL STRUCTURE ABOVE (RE:
0

STRUCT.) REMOVE ONLY PORTIONS OF


B001F WALL BELOW CEILING WHERE 6.3
ABSOLUTELY NECESSARY TO MANEUVER ELEVATOR
BEAMS INTO PROPER LOCATION. THESE LOBBY
ROOMS ARE TO REMAIN OPERATIONAL IN A58
NON-WORKING HOURS. COORDINATE
KITCHEN
SCHEDULE OF ALL WORK WITH COR. 6.7
SERVICE
B001B
ELEV.
7
three eights inch = one foot

E CART WASH ELEV. E


4

B001C

CORRIDOR
SERVICE 7.2
ELEV.
CB09 ELEV.
B001E

C009A
0

C001B

8
C:\Users\hersheys\Documents\60303195 - VAMC Nuclear Medical_hersheys.rvt

8.2
8

E
one quarter inch = one foot

BASEMENT B1
ENLARGED BASEMENT FLOOR DEMO PLAN - NUCLEAR MEDICINE -
(CONCRETE FLOOR ELEVATION - 722'-2 5/8")
DEMOLITION LEGEND
F 1
1/8" = 1'-0"
G5 F
4

INDICATES AREA WITH NO B A


NOTE: WORK IN CONTRACT
SEE EQUIPMENT AS705 AND DEMOLISH EXISTING
ROOM EQUIPMENT LISTS IN THE CONSTRUCTION G
PROJECT MANUAL FOR LISTS OF
NEW CONSTRUCTION C D
0

EQUIPMENT TO BE RE-USED AND


RELOCATED TO THE NEW
NUCLEAR MEDICINE PROJECT EXISTING CONSTRUCTION
WAREHOUSE
AREA ON THE FIRST FLOOR.
INFILL SLAB DEMOLITION

Revisions: Date 100% CONSTRUCTION Drawing Title: Project Title: Project Number
CONSULTANTS: DOCUMENTS ARCHITECT/ENGINEERS ENLARGED BASEMENT DEMOLITION PLAN - NUCLEAR RELOCATE NUCLEAR MEDICINE 589A4-13-124
16
one eighth inch = one foot

MEDICINE - DEMO WORK


STRUCTURAL ELEC/MECH / PLUMB SHIELDING DESIGN FIRE PROTECTION HAZARD MATERIALS
KH Engineering 2380 McGee Street, Building Number
FSC MEP Engineers, LLC DTC, Inc FP&C Consultants, Inc. APEX Environmental
Group, PA Suite 200 1
Consultants, Inc.
Kansas City, MO 64108
Approved: Project Director Location HARRY S. TRUMAN MEMORIAL Drawing Number
8

15377 W. 95th Street 9225 Indian Creek Pkwy, 5930 Roe Avenue, 3770 Broadway 14955 W. 101st Terr An AECOM Company 816 561 4443

AD100
Lenexa, KS 66219 Suite 300 Suite 201 Kansas City, MO 64111 Lenexa, KS 66215 VETERANS HOSPITAL
Overland Park, KS 66210 Mission, KS 66205
Date Checked Drawn
4

(c) 2016 2016.01.15 D.SULLIVAN D.HILL Dwg. 8 of 106


t: 913.825.9381 t: 913.722.3473 t: 913.236.6000 t: 816.931.3377 t: 913.338.2739
0

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
THE SECTION OF WAITING ROOM OUTSIDE OF
THE TEMPORARY WALL IS TO REMAIN
Q P OPERATIONAL DURING WORKING HOURS. Na N M La L K
SCHEDULE WITH THE COR WHEN ANY ABOVE DEMOLITION NOTES - GENERAL
CEILING WORK IS REQUIRED FOR DUCT
EXISTING INSTALLATION. COORDINATE CEILING REMOVAL 1. NOT ALL KEYNOTES APPLY TO THIS SHEET.
STOREFRONT AND REPLACEMENT PROCESS WITH COR.
TO REMAIN 2. IN RENOVATION/DEMOLITION AREAS,
CONTRACTOR MUST NOTIFY AND RECEIVE
APPROVAL FROM THE COR OF ANY

DURING CONSTRUCTION
AOV V
MAINTAIN LINE OF HALL GOWNED PROPOSED EXPANSION OF DEMOLITION

3'-0" MINIMUM CLEAR


SIGHT BETWEEN WAIT DUE TO THE DISCOVERY OF UNEXPECTED
B169
EXISTING NURSE CONDITIONS. THIS MUST OCCUR WHEN
B168
WORK B173 AND THE CONDITION IS DISCOVERED AND
three inches = one foot

EXISTING BEFORE PROCEEDING WITH THE WORK.


GOWNED WAIT B168
6"

FLOOR FINISH
THROUGHOUT THE TO REMAIN
3.7
3. REMOVE ROOM IDENTIFICATION AND

A
PROJECT.
A RE:AS710 EXISTING TV ULTRA- OTHER SIGNAGE FROM WALLS
A

O
TO REMAIN SOUND ELECT INDICATED TO BE REMOVED/DEMOLISHED.

V
B152 B149

V
ULTRA- 4. REMOVE EXISTING FLOOR FINISH FROM
SOUND ROOMS INDICATED TO BE DEMOLISHED
4 AND PREPARE FLOOR FOR NEW FLOOR
B160 FINISH PER ROOM FINISH SCHEDULE.
NURSE CHEST
PAT. TLT RE: ELEC
ROOM
1

WORK DRAWINGS FOR TEMPORARY PROTECT EXIST'G FLOOR, BASE AND 5. REPAIR EXISTING WALLS (TO REMAIN)
B160A FLOOR TO WALL FINISHES, UNLESS SHOWN AS
B173 B166 ELECTRICAL WHERE EQUIPMENT, SIGNS, CONTROLS,

V V O A
EXISTING DEMOLITION AND STRUCTURE DEMOLITION. FLOORING WORK IN ELECTRICAL PANELS AND OTHER ITEMS
one & one half inches = one foot

DP1 PAT. TLT


FLOOR FINISH CONTROL EXISTING SHIELDED WALL TO REMAIN RELATED WORK. DUST CORRIDOR B147 AND C1A9 MUST ARE INDICATED TO BE REMOVED.
TO REMAIN REPAIR DEMOLITION DAMAGE TO WALL B152A NO ARCHITECTURAL PARTITION OCCUR AFTER THE NULCEAR
RE:AS710 DP16 DP89 DP17 B166A AND REPAIR ANY DAMAGE TO EXISTING RE: WALL MEDICINE ROOMS ARE COMPLETE.
DEMOLITION IN THIS 6. SEE MEP DEMOLITION PLANS FOR NOTES
LEAD SHIELDING ROOM. TYPE T-1 AND ADDITIONAL DEMOLITION ITEMS,
INCLUDING ITEMS CONCEALED IN WALLS
0

HALL DP17
SUCH AS PIPING.
TEMPORARY 5' - 0" MIN. CLEAR
B169A DP101
DP89
FLOOR TO
STRUCTURE 4.4 7. ALL WORK IN THE BASEMENT MUST OCCUR
6"

DP1A
EXISTING DP89
DP97 CORRIDOR AFTER WORKING HOURS, AND THE ROOMS
DUST DP89 DP2A DP89 DP89 CATH LAB DP17 DP27
CARDIAC CONFERENCE C1A8 MUST REMAIN OPERATIONAL DURING
B PARTITION
RE: WALL
DP2
DP2 CATH LAB #1 ROOM
OFFICE BRACE END OF EXISTING
WALL UNTIL NEW WALL IS
CONSTRUCTION. COORDINATE TIMING OF B
DP2 DP1 DP1 B164 ALL BASEMENT WORK WITH THE COR.
TYPE T-1 DP8A DP29 B128 B131 DP2 IN PLACE.
DP17 DP17
DP1
DP89 DP97
4.6 8. ANY WORK IN CORRIDORS MUST OCCUR AT
PAT. TLT. DRESS EXISTING CLEAN CLOSE, LOCK, AND NIGHT OR ON WEEKENDS AND IS TO BE
2

DRESS DP17
DP17A
B179 B170 CARDIAC UTILITY & DP2 DP27 SECURE EXISTING LEAF COORDINATED WITH THE COR.
B174 CATH LAB #1
DP94
STORAGE
DP1A
DP17 OF EXISTING DOOR
DP10 9. EXISTING SHIELDING SHALL REMAIN INTACT
DP13 DP10
B128 DP23 B129 WHILE ADJACENT
DP89 10
DP89 DP89 DP1 DP1 TEMPORARY WALL IS IN WITHIN EXISTING WALLS DESIGNATED TO
DP9 DP9 AS930
DP34
DP34
DP1 DP1 DP1 DP17
PLACE. WALL TO BE 5 REMAIN. REPAIR SUCH WALLS TO
DP89 DP97 TIGHT TO DOOR WITHOUT EQUIVALENT STATE IF EXISTING SHIELDING
9 1/4"

DP17 DAMAGING DOOR. IS PIERCED OR OTHERWISE DISTURBED.


5.1 NOTIFY THE COR AND ARCHITECT WHERE
one inch = one foot

DP97 DP101 THE SHIELDING IS DISRUPTED BY


1'11- 10"
DP5 DP97 PROVIDE TEMPORARY FLOOR TO
DP1 DP1
DP29 DP2 DP89 DP17 VIEWING CATH LAB DP89
STRUCTURE DUST PARTITION WITH CONSTRUCTION ACTIVITIES.
0

DP89 AS930 DP8A DP5 AREA OFFICE LOCKABLE DOOR. RE: WALL TYPE T-1.
DP12
DP2A
DP2
B130 DP2
WHEN WORKING AT THESE NEW AND 10. SPRINKLERS ARE TO REMAIN OPERATIONAL
B165
6"

EXISTING DP99 DP27 DURING CONSTRUCTION, EXCEPT AS


PAT. RM #7 PAT. RM #8 DP89 EXISTING DOOR LOCATIONS. IN ORDER TO
DP19
COMPUTER DP89 DP96 MAINTAIN A 5'-0" MINIMUM CLEAR WIDTH IN COORDINATED WITH THE COR WHEN WORK
C121 C122 DP89 DP1 DP1
DP17 ROOM DP89
THE CORRIDIOR, THESE THREE PARTITIONS TO THE SYSTEM IS REQUIRED. RE: FP-101.
DP89 5.4
C
DP2A CANNOT BE CONCURRENTLY INSTALLED
B128
12' - 3" CORRIDOR
DP33 WITH THE PARTITION ON THE EAST SIDE OF 11. RE: PROJECT MANUAL SECTION 02 83 33.13 C
B118 DP2 DP117 LEAD SHIELDING REMOVAL AND DISPOSAL
DP34 DP1A DP98 DP98
THE CORRIDOR.
DP100 DP17 DP30 DP20
FOR DEMOLITION OF EXISTING WALLS WITH
LOCATE DOOR @ EXIST'G DP17
DP89 5'-0" MIN. CLEAR WORK IN SURGERY WAITING LEAD SHIELDING.
DP2 DP26 DP29 DP9 CORRIDOR DURING
DP89 ALARM A156 CANNOT BE CARRIED
three quarters inch = one foot

5.5
2

DP1 STATUS DP1


DEMOLITION, THEN OUT UNTIL ALL WORK ON
BOX DP26 DP1 RELOCATE TO NEW DP2
THE WEST SIDE OF THE
DP2 DP15 DP2 CORRIDOR LOCATION CORRIDOR IS COMPLETE.
DP100
STORAGE DP7
THIS ROOM TO REMAIN
B128 DP2 DP25 DP97 DP91 OPERATIONAL BY THE
DP118 HOSPITAL UNTIL THAT TIME.
DP1 DP96
PRE/POST DP31 DP8A
DP17
DP1 TANK DP89 DP5 DP89
6" 0

DP109 DP2 DP2 DP89 CORRIDOR


C131 DP89 DP19 DP2A
DP94 EQUIP DP5 PROVIDE TEMPORARY
B119 DP1A C1A11
DP89 DP1A DP89 DP2
BARRIER (T-1 SIM) TO INFILL
DP1
DP1 B122 DP7 CATH LAB DOOR DURING
DP1 OFFICE
DP89 DP6 CONSTRUCTION UNTIL NEW
DP23 DP1A 5'-0" MIN.
DP1A B124 DOOR IS INSTALLED PER
DP17 DP1
DP17 CLEAR NEW WORK PLAN
DP94
6
DP96
D DP2 CONTROL
CATH LAB #2 EXISTING PIPES AND TECH/NURSE
SURGERY
DP17
D
4

ROOM #2 CHASE TO REMAIN DP89 DP17 WAITING


WORK RM
DP28 B120 RE: AS101 AND MECH A156
DP1 B121 DP89 B123 DP33
DP2 DRAWINGS
PAT TOILET DP101
6.2
one half inch = one foot

4 LOCKERS DP17
DP1A
DP101 DP97
DP1 DP2
B128D DP34 DP34
PAT. RM #9 DP27 DP96

C123 DP8A
6.3
RESTROOM DP2 DP1
DP101
DP34 REMOVE EXISTING HIGH IMPACT
B128E DP89 DP17 DP20 CATH LAB DP32 WALL PANELS. REUSE PANELS IF PROTECT EXIST'G FLOOR,
DP9 DP17 OFFICE POSSIBLE, OTHERWISE RETURN TO
DP17 BASE AND WALL FINISHES,
0

DP11 DP1A
DP89 B125 OWNER. REPLACE WITH NEW HIGH UNLESS SHOWN AS
DP89 DP100 DP97
DP96 DP101 IMPACT PANELS TO MATCH DEMOLITION. FLOORING
DP1 DP2A DP17 DP89
EXISTING. REMOVE EXISTING WORK IN CORRIDOR C1B2
CRASH AND MODIFY FOR AND C1B3 MUST OCCUR
DP7 DP15 DP2A DP89
PAT. RM #10 SOILED REUSE/REINSTALLATION IF AFTER THE NULCEAR
PAT TOILET UTILITY POSSIBLE. MEDICINE ROOMS ARE
C124 DP95
COMPLETE.
C135 C136
EXISTING SHIELDED WALL TO REMAIN
EXISTING
REPAIR DEMOLITION DAMAGE TO WALL 6.7
three eights inch = one foot

E FLOOR
AND REPAIR ANY DAMAGE TO EXISTING PUBLIC PUBLIC
E
4

CONSULT LEAD SHIELDING TOILET TOILET


FINISH TO DEMOLITION LEGEND
REMAIN C168 C174 C175 WAITING
DP2
C176 INDICATES AREA WITH NO
WORK IN CONTRACT
7
CONSULT CONSULT DEMOLISH EXISTING
C170 C171 CONSTRUCTION
TEMPORARY NEW CONSTRUCTION
0

FLOOR TO CEILING
DUST PARTITION EXISTING CONSTRUCTION
RE: WALL TYPE T-1
7.2 INFILL SLAB DEMOLITION
ENLARGED FIRST FLOOR DEMO PLAN - NUCLEAR MEDICINE -
(CONCRETE FLOOR ELEVATION - 736'-0 5/8")
C:\Users\hersheys\Documents\60303195 - VAMC Nuclear Medical_hersheys.rvt

1
1/4" = 1'-0"
DEMOLITION NOTES DEMOLITION NOTES DEMOLITION NOTES DEMOLITION NOTES DEMOLITION NOTES DEMOLITION NOTES DEMOLITION NOTES
8

E
one quarter inch = one foot

DP1 REMOVE GYP. BD./METAL STUD WALL. DP8A REMOVE WINDOW. SEE ABATEMENT DP16 REMOVE ALUMINUM STOREFRONT AND DP25 REMOVE BUILT-IN CABINET. DP33 REMOVE PORTION OF WALL FOR NEW DOOR DP94 REMOVE COUNTER DP118 REMOVE EXISTING MEDICAL GAS VALVES.
DP1A REMOVE GYP. BD./METAL STUD WALL. SEE DRAWINGS FOR WINDOWS W/LEAD GLASS REINSTALL PER NEW WORK PLAN. DP26 REMOVE ILLUMINATED SIGN AND WIRING. OPENING PER NEW WORK PLAN. DP95 REMOVE EXIT SIGN RE: MEP.
ABATEMENT DRAWINGS FOR WALLS AND LEAD SHIELDING. DP17 REMOVE FLOOR AND BASE FINISH AND DP34 REMOVE ALL WIREWAYS JUNCTION BOXES,
DP27 REMOVE CRASH RAILS. DP96 MODIFY/REMOVE EXISTING CRASH RAIL AT
F CONTAINING LEAD SHIELDING. DP9 REMOVE GRAB BAR. PREPARE FOR NEW FLOOR AND BASE FINISH DP28 REMOVE METAL LOCKERS AND RETURN TO CONDUITS, OVERHEAD EQUIPMENT NEW AND/OR EXPANDED DOOR OPENING. G5 B1 B B2 F
4

DP2 REMOVE DOOR, FRAME, AND HARDWARE. DP10 REMOVE BENCH. PER FINISH SCHEDULE. OWNER. SUPPORTS, ETC ASSOCIATED W/CATH LAB
DP97 REMOVE WALL HUNG SHELF UNITS AND A
DP17A REMOVE EXISTING BASE FINISH. EQUIPMENT. CATH LAB EQUIPMENT RETURN TO OWNER.
DP2A REMOVE DOOR, FRAME, AND HARDWARE. DP11 REMOVE TOILET. DP29 REMOVE METAL EXPANSION JOINT COVER. REMOVED BY VA. RE: MECH. & ELEC.
SEE ABATEMENT DRAWINGS FOR DP12 REMOVE AND RELOCATE TOILET PER NEW DP19 REMOVE ELECTRICAL PANELS AND DP98 REMOVE BULLETIN BOARD.
DOORS/FRAMES/HARDWARE CONTAINING WORK PLAN. EQUIPMENT.RE: ELECTRICAL & MECHANICAL
DP30 REMOVE FIRE EXTINGUISHER AND DP89 SEE MEP DRAWINGS FOR MEP DEMOLITION, G
MOUNTING BRACKET, RETURN TO OWNER. INCLUDING CONCEALED ITEMS IN WALLS DP99 REMOVE WIFI UNIT AND RETURN TO OWNER. C D
LEAD SHIELDING. DRAWINGS.
0

DP13 REMOVE AND RELOCATE GRAB BAR PER DP31 REMOVE MEDICAL GAS MANIFOLD AND SUCH AS PIPING, CONDUIT, AND ELECTRICAL DP100 REMOVE LIGHTED SIGN.
DP5 REMOVE UPPER AND LOWER CABINETS. NEW WORK PLAN. DP20 REMOVE EXISTING CONCRETE FLOOR SLAB MONITOR. DEVICES. DP101 REMOVE DESK AND RETURN TO OWNER.
DP6 REMOVE LOWER CABINETS. DP15 REMOVE CEILING MOUNTED PRIVACY INFILL AND PREPARE FOR NEW CONCRETE
FLOOR SLAB INFILL. RE: STRUCT. DP32 REMOVE CONVEX SECUIRTY MIRROR. DP91 REMOVE TOWEL DISPENSER AND RETURN DP109 VA TO REMOVE REFRIGERATOR. WAREHOUSE
DP7 REMOVE SINK. CURTAINS. TO OWNER.
DP23 REMOVE WALL MOUNTED SHELVES. DP117 REMOVE EXISTING SECURITY CARD READER.

Revisions: Date 100% CONSTRUCTION Drawing Title: Project Title: Project Number
CONSULTANTS: DOCUMENTS ARCHITECT/ENGINEERS ENLARGED FIRST FLOOR DEMOLITION PLAN - RELOCATE NUCLEAR MEDICINE 589A4-13-124
16
one eighth inch = one foot

NUCLEAR MEDICINE - DEMO WORK


STRUCTURAL ELEC/MECH / PLUMB SHIELDING DESIGN FIRE PROTECTION HAZARD MATERIALS
KH Engineering 2380 McGee Street, Building Number
FSC MEP Engineers, LLC DTC, Inc FP&C Consultants, Inc. APEX Environmental
Group, PA Consultants, Inc. Suite 200
Kansas City, MO 64108
Approved: Project Director Location HARRY S. TRUMAN MEMORIAL Drawing Number
8

15377 W. 95th Street 9225 Indian Creek Pkwy, 5930 Roe Avenue, 3770 Broadway 14955 W. 101st Terr An AECOM Company 816 561 4443

AD101
Lenexa, KS 66219 Suite 300 Suite 201 Kansas City, MO 64111 Lenexa, KS 66215 VETERANS HOSPITAL
Overland Park, KS 66210 Mission, KS 66205
Date Checked Drawn
4

(c) 2016 2016.01.15 D.SULLIVAN D.HILL Dwg. 9 of 106


t: 913.825.9381 t: 913.722.3473 t: 913.236.6000 t: 816.931.3377 t: 913.338.2739
0

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

DEMOLITION NOTES DEMOLITION NOTES - GENERAL


DP1 REMOVE GYP. BD./METAL STUD WALL.
1. NOT ALL KEYNOTES APPLY TO THIS SHEET.
DP2 REMOVE DOOR, FRAME, AND HARDWARE.
THIS WORK MUST BE
Z Y.8 X.5 X W.6 W.4 W V COMPLETED AND ACCEPTED BY U.2 U T.8 T DP7 REMOVE SINK. 2. IN RENOVATION/DEMOLITION AREAS,
DP9 REMOVE GRAB BAR. CONTRACTOR MUST NOTIFY AND RECEIVE
VAMC PRIOR TO START OF APPROVAL FROM THE COR OF ANY
DP10 REMOVE BENCH.
DEMOLITION IN AREAS TO THE PROPOSED EXPANSION OF DEMOLITION
DP11 REMOVE TOILET. DUE TO THE DISCOVERY OF UNEXPECTED
SOUTH OF CORRIDOR G187.
DP17 REMOVE FLOOR AND BASE FINISH AND PREPARE FOR CONDITIONS. THIS MUST OCCUR WHEN
NEW FLOOR AND BASE FINISH PER FINISH SCHEDULE. THE CONDITION IS DISCOVERED AND
three inches = one foot

DP23 REMOVE WALL MOUNTED SHELVES. BEFORE PROCEEDING WITH THE WORK.
6"

.5 .5 DP25 REMOVE BUILT-IN CABINET.


MR 3. REMOVE ROOM IDENTIFICATION AND
A MR
RECOVERY STORAGE CLEAN DP91 DP27 REMOVE CRASH RAILS.
OTHER SIGNAGE FROM WALLS A
MR PREP UTILITY PATIENT DP28 REMOVE METAL LOCKERS AND RETURN TO OWNER. INDICATED TO BE REMOVED/DEMOLISHED.
G185D G185B DP7 INTERVIEW/CONSULT DP33 REMOVE PORTION OF WALL FOR NEW DOOR OPENING
G185C G188
G190 CONFERENCE PER NEW WORK PLAN. 4. REMOVE EXISTING FLOOR FINISH FROM
DP89 ROOM DP88 REMOVE EXISTING CURBICLE CURTAIN TRACK ROOMS INDICATED TO BE DEMOLISHED
EXISTING AND PREPARE FLOOR FOR NEW FLOOR
DP25 G191 DP89 SEE MEP DRAWINGS FOR MEP DEMOLITION,
DASHED OUTLINE FINISH PER ROOM FINISH SCHEDULE.
MRI AREA INCLUDING CONCEALED ITEMS IN WALLS SUCH AS
AREA INDICATES PIPING, CONDUIT, AND ELECTRICAL DEVICES.
1

09 09 5. REPAIR EXISTING WALLS (TO REMAIN)


NEW NUCLEAR DP91 REMOVE TOWEL DISPENSER AND RETURN TO OWNER. WHERE EQUIPMENT, SIGNS, CONTROLS,
MEDICINE AREA DP92 REMOVE SOAP DISPENSER. ELECTRICAL PANELS AND OTHER ITEMS
one & one half inches = one foot

DP108
SOILED
UTILITY DP93 REMOVE MIRROR AND RETURN TO OWNER. ARE INDICATED TO BE REMOVED.

PAT. TLT. G189 DP108 REMOVE ROOM SIGNAGE AND COORDINATE REUSE OR
SUB-WAIT DISPOSAL AS DETERMINED BY COR. 6. SEE MEP DEMOLITION PLANS FOR NOTES
1 G185A G190A
1 AND ADDITIONAL DEMOLITION ITEMS,
INCLUDING ITEMS CONCEALED IN WALLS
0

MR SUITE SUCH AS PIPING.


G185 7. ALL WORK IN THE BASEMENT MUST OCCUR
6"

AFTER WORKING HOURS, AND THE ROOMS


NURSE
TEMPORARY FLOOR MUST REMAIN OPERATIONAL DURING
B WORK
TEMPORARY FLOOR TO CONSTRUCTION. COORDINATE TIMING OF B

6' - 0" MIN. CLEAR


TO STRUCTURE DUST

6' - 0" MIN CLEAR


G185E
EXISTING ALL BASEMENT WORK WITH THE COR.
PARTITION STRUCTURE DUST PARTITION
MRI AREA W/LOCKABLE DOOR W/LOCKABLE DOOR (RELOCATE
PASSAGE CORRIDOR DOOR AS NEEDED TO CUT AND 8. ANY WORK IN CORRIDORS MUST OCCUR AT
NIGHT OR ON WEEKENDS AND IS TO BE
2

G186 G187 FILL OPENINGS)


COORDINATED WITH THE COR.
DRINKING FOUNTAIN 9. EXISTING SHIELDING SHALL REMAIN INTACT
DP27 DP108 DP108
DP92 TO REMAIN WITHIN EXISTING WALLS DESIGNATED TO
MR CRASH REMAIN. REPAIR SUCH WALLS TO
CONTROL CART EQUIVALENT STATE IF EXISTING SHIELDING
1.6 MR
DP33
1.6 IS PIERCED OR OTHERWISE DISTURBED.
G183 HOLDING G186A
one inch = one foot

DP1 NOTIFY THE COR AND ARCHITECT WHERE


DP28 1' - 3" 3' - 10"
G184 GURNEY DP1 THE SHIELDING IS DISRUPTED BY
DP2 CONSTRUCTION ACTIVITIES.
PARK
0

DP93 F.V.
DP93
DRESS PATIENT DP7
G184A LIBRARY 10. SPRINKLERS ARE TO REMAIN OPERATIONAL
DRESSING
6"

DP89 DP2 DP11


DP9 G197C G194 DURING CONSTRUCTION, EXCEPT AS
DP88 G197 DP89
DP91
COORDINATED WITH THE COR WHEN WORK
DP1 DP1 DP9
DP1 TO THE SYSTEM IS REQUIRED. RE: FP-101.
1.9 STAFF TLT 1.9
C DP23
DP17
DP2 G194A 11. RE: PROJECT MANUAL SECTION 02 83 33.13 C
2 MR DP17 DP17 2 LEAD SHIELDING REMOVAL AND DISPOSAL
READING FOR DEMOLITION OF EXISTING WALLS WITH
DP7 DP89 DP10 PATCH AND REPAIR
DP1 LEAD SHIELDING.
G184B DP11 DP108 EXISTING GYP.
DRESS
three quarters inch = one foot

DP89 DP7 CORRIDOR


2

WALL TO MATCH
DP93 PAT. TLT DP17 G197A EXISTING, TYP. STAFF TLT G192
G197B DP88
DP2 G194B

DP92 DP91
6" 0

A O V V
FIXED TABLE DRS VIEW-3
MAGNET DRS VIEW-6
G196A ELECT
ROOM
MAGNETOM A DRS VIEW-4 DRS VIEW-5 G196D RE: ELECTRICAL
G195 DRAWINGS FOR
G182 G196B G196C
X AXIS

WORK IN THIS
ROOM. NO
ARCHITECTURAL
D D
4

DEMOLITION.
2.7 2.7
MR EQUIP
2.8 2.8
one half inch = one foot

Z AXIS G181 VIEWING/


CONSULT
10mT
G196
5mT
3 3mT
3
0

RESIDENT
VIEWING DRS VIEW-1 PAT. TLT
3.2 G196G G196F G196E

DRS VIEW-2
0.3mT
G196H
three eights inch = one foot

E E
0.15mT
4

3.6 0.1mT
0
C:\Users\hersheys\Documents\60303195 - VAMC Nuclear Medical_hersheys.rvt

ENLARGED FIRST FLOOR DEMO PLAN - MRI AREA - (CONCRETE


FLOOR ELEVATION - 736'-0 5/8")
8

1
1/4" = 1'-0" E
one quarter inch = one foot

DEMOLITION LEGEND
INDICATES AREA WITH NO
F WORK IN CONTRACT G5 F
4

DEMOLISH EXISTING
B A
CONSTRUCTION
NEW CONSTRUCTION G
C D
0

EXISTING CONSTRUCTION

INFILL SLAB DEMOLITION WAREHOUSE

Revisions: Date 100% CONSTRUCTION Drawing Title: Project Title: Project Number
CONSULTANTS: DOCUMENTS ARCHITECT/ENGINEERS ENLARGED FIRST FLOOR DEMOLITION PLAN - MRI RELOCATE NUCLEAR MEDICINE 589A4-13-124
16
one eighth inch = one foot

AREA - DEMO WORK


STRUCTURAL ELEC/MECH / PLUMB SHIELDING DESIGN FIRE PROTECTION HAZARD MATERIALS
KH Engineering 2380 McGee Street, Building Number
FSC MEP Engineers, LLC DTC, Inc FP&C Consultants, Inc. APEX Environmental
Group, PA Suite 200 1
Consultants, Inc.
Kansas City, MO 64108
Approved: Project Director Location HARRY S. TRUMAN MEMORIAL Drawing Number
8

15377 W. 95th Street 9225 Indian Creek Pkwy, 5930 Roe Avenue, 3770 Broadway 14955 W. 101st Terr An AECOM Company 816 561 4443

AD102
Lenexa, KS 66219 Suite 300 Suite 201 Kansas City, MO 64111 Lenexa, KS 66215 VETERANS HOSPITAL
Overland Park, KS 66210 Mission, KS 66205
Date Checked Drawn
4

(c) 2016 2016.01.15 D.SULLIVAN SBH Dwg. 10 of 106


t: 913.825.9381 t: 913.722.3473 t: 913.236.6000 t: 816.931.3377 t: 913.338.2739
0

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

RCP LEGEND
S Rb Ra R Q P Na N M La L K DEMOLITION NOTES 1X4 LIGHT
DP110 REMOVE PORTION OF WALL ABOVE AND BELOW CEILING TO FACILITATE FIXTURE CEILING ACCESS PANEL
INSTALLATION OF NEW STEEL STRUCTURE ABOVE (RE: STRUCT.) REMOVE
ONLY PORTIONS WHERE ABSOLUTELY NECESSARY TO MANEUVER NEW 2X2 LIGHT SMOKE DETECTOR
FIXTURE
BEAMS INTO PROPER LOCATION. THESE ROOMS ARE TO REMAIN
OPERATIONAL IN NON-WORKING HOURS. COORDINATE SCHEDULE OF ALL SPEAKER
WORK WITH COR. 2X4 LIGHT
FIXTURE WIFI ACCESS POINT
DP111 REMOVE PORTION OF CEILING, LIGHTING, DIFFUSERS, AND OTHER
09 CEILING MOUNTED DEVICES TO FACILITATE INSTALLATION OF NEW STEEL HOSPITAL COMM.
CAN LIGHT FIXTURE
STRUCTURE ABOVE (RE: STRUCT).STORE UNINSTALLED CEILING ATTENNA
three inches = one foot

COMPONENTS (GRID, CEILING TILES, DEVICES, ETC.) FOR EXIT SIGN


1 SPRINKLER HEAD
6"

REINSTALLATION WHEN WORK IS COMPLETE, AND WHEN REQUIRED TO SUPPLY DIFFUSER


KEEP THE ROOM OPERATIONAL. THESE ROOMS ARE TO REMAIN EXIST. CEILING DEVICE
OPERATIONAL DURING BUSINESS HOURS. INFILL/REPLACE WALL AFTER
A NEW BEAMS ARE INSTALLED. COORDINATE SCHEDULE OF ALL WORK
RETURN REGISTER EXIST. CEILING DEVICE
A
WITH COR. REFLECTED CEILING PLAN NOTES:
DP112 REMOVE PORTION OF CEILING, LIGHTING, DIFFUSERS, AND OTHER 1. REFER TO ELECTRICAL DRAWINGS FOR LIGHT
CEILING MOUNTED DEVICES TO FACILITATE INSTALLATION AND/OR FIXTURE LEGEND.
DEMOLITION OF PORTIONS OF MEP SYSTEMS AS REQUIRED BY THE MEP 2. REFER TO MECHANICAL DRAWINGS FOR
DRAWINGS. MINIMIZE AND RESTRICT THE EXTENT OF DEMOLISHED DIFFUSERS AND DEVICES.
CEILNG TO ONLY WHAT IS REQUIRED TO CARRY OUT THE WORK. STORE 3. REFER TO FINISH SCHEDULE FOR CEILING FINISH.
1

THE CEILING COMPONENTS (GRID, CEILNG TILES, DEVICES, ETC.) FOR


REINSTALLATION WHEN WORK IS COMPLETE, AND WHEN REQUIRED TO
KEEP THE ROOM OPERATIONAL DURING BUSINESS HOURS.
1.9 DEMOLITION NOTES - GENERAL
one & one half inches = one foot

DP113 EXISTING PATIENT LIFT AND RAILS TO BE UNINSTALLED AND RELOCATED


BY MANURFACTURER TO NEW SCAN ROOM.MANUFACTURER TO INSTALL 1. NOT ALL KEYNOTES APPLY TO THIS SHEET.
2 NEW RAILS.
DP114 PER MEP DRAWINGS, REMOVE AND RELOCATE EXISTING FUME HOOD AND 2. IN RENOVATION/DEMOLITION AREAS,
CONTRACTOR MUST NOTIFY AND RECEIVE
0

OFFICE OFFICE ASSOCIATED DUCTWORK.


APPROVAL FROM THE COR OF ANY
RSCH B046 DP115 EXISTING SURFACE MOUNTED SPRINKLER LINE WITH PLASTIC COVER IS
COMMON B049 PROPOSED EXPANSION OF DEMOLITION
TO REMAIN FUNCTIONAL DURING THE PROJECT. IN THE KITCHEN SPACES DUE TO THE DISCOVERY OF UNEXPECTED
ROOM
6"

AND ROOMS, WHERE WORK DISTURBS THE EXISTING PLASTIC COVERED CONDITIONS. THIS MUST OCCUR WHEN
OFFICE HEALTH
B045 SPRINKLER LINES AROUND THE PERIMETER OF THE ROOM AND THE CONDITION IS DISCOVERED AND
PHYSICS LAB
B B046A COLUMNS, THE JOINT BETWEEN THE COVER AND CEILING (AND AT THE BEFORE PROCEEDING WITH THE WORK. B
B050 EXISTING WALL WHERE NEEDED) IS TO RECEIVE NEW SEALANT TO MATCH
THE COLOR OF THE SPRINKLER COVER.
2.8 3. REMOVE ROOM IDENTIFICATION AND
DP116 EXISTING CART RECHARGE POWER OUTLETS TO REMAIN USABLE DURING OTHER SIGNAGE FROM WALLS
2

PROJECT. RE: ELEC. INDICATED TO BE REMOVED/DEMOLISHED.


DP114 NURSE WK
3
DP120 WALL MOUNTED SPRINKLER HEAD. SPRINKLERS TYPICALLY MUST REMAIN
ST. & FILM OPERATIONAL DURING PROJECT (RE: MECH). IF SPRINKLER HEAD IS 4. REMOVE EXISTING FLOOR FINISH FROM
CORRIDOR
DP112
FILES AFFECTED/DISPLACED BY BEAM INSTALLATION ACTIVITIES ABOVE THE ROOMS INDICATED TO BE DEMOLISHED
RSCH. CBA1 WALL, THE SPRINKLER HEAD IS TO BE REINSTALLED (OR REPLACED WITH AND PREPARE FLOOR FOR NEW FLOOR
B005A
INVESTIGATOR AN IDENTICAL HEAD IF NEEDED) WHEN THE WALL THE SPRINKLER IS FINISH PER ROOM FINISH SCHEDULE.
B013 LAB/THYROID READING PHYSICAN LOCATED IS REBUILT.
CORRIDOR INJECTION ROOM OFFICE RE: ELEC. DRAWINGS 5. REPAIR EXISTING WALLS (TO REMAIN)
DP121 REMOVE, PROTECT, AND STORE EXISTING WALL MOUNTED FAN IF
one inch = one foot

NO ARCHITECTURAL WHERE EQUIPMENT, SIGNS, CONTROLS,


APPROXIMATE LOCATION OF B020 B10 B009 B008 WORK IN THIS ROOM NEEDED TO ACCOMODATE INSTALLATION OF NEW BEAMS ABOVE THE ELECTRICAL PANELS AND OTHER ITEMS
RSCH.
NEW STEEL BEAMS TO BE WALL. IF REMOVED, REINSTALL IN SAME LOCATION. ARE INDICATED TO BE REMOVED.
INVESTIGATOR
0

INSTALLED. RE: STRUCT. BREAK NM STRESS


DRAWINGS
DP112 B012 TEST
3.7
DP112 B006 6. SEE MEP DEMOLITION PLANS FOR NOTES
6"

B005 AND ADDITIONAL DEMOLITION ITEMS,


INCLUDING ITEMS CONCEALED IN WALLS
4 SUCH AS PIPING.
PHASING NOTES:
C CORRIDOR ELEC.
CORRIDOR WORK IN KITCHEN B001B, B001D, DISHWASHER B001A, OFFICE B001F, AND FOOD
7. ALL WORK IN THE BASEMENT MUST OCCUR C
CBA10 PREP/COOK B002 IS TO OCCUR BEFORE WORK IN THE REMAINING ROOMS,
CBB1 B009A AFTER WORKING HOURS, AND THE ROOMS
DP110 DP110 DP111 DP112 INCLUDING THE SCAN ROOMS.
ELEC. MUST REMAIN OPERATIONAL DURING
A54A CONSTRUCTION. COORDINATE TIMING OF
ELEC. SCAN ROOM B011 IS TO REMAIN OPERATIONAL UNTIL NEW FIRST FLOOR ROOMS
DP110
4.4 ALL BASEMENT WORK WITH THE COR.
three quarters inch = one foot

TLT SPECT/CT B120 AND SPECT/CT B123 ARE COMPLETE AND OPERATIONAL.
2

RSCH CORE CHECK-IN/ADMIN. A54B


AREA WAITING B007
OFFICE OFFICE B0010 CARDAIC 8. ANY WORK IN CORRIDORS MUST OCCUR AT
ROOM
B019
B013A B013
TLT STRESS 4.6 NIGHT OR ON WEEKENDS AND IS TO BE
B001N B001R TEST COORDINATED WITH THE COR.
DP110 SCAN ROOM
DP111 B011 DP110 B001S 9. EXISTING SHIELDING SHALL REMAIN INTACT
5 WITHIN EXISTING WALLS DESIGNATED TO
REMAIN. REPAIR SUCH WALLS TO
6" 0

DP112 DP113 DP110 DP112 EQUIVALENT STATE IF EXISTING SHIELDING


DP111 CORRIDOR 5.1 IS PIERCED OR OTHERWISE DISTURBED.
DIETETICS NOTIFY THE COR AND ARCHITECT WHERE
OFFICE DP112 DP112 CBB2 THE SHIELDING IS DISRUPTED BY
5.4 CONSTRUCTION ACTIVITIES.
B002A DP113

10. SPRINKLERS ARE TO REMAIN OPERATIONAL


D
HOT LAB 5.5 DURING CONSTRUCTION, EXCEPT AS
SCAN ROOM DISHWASHER D
4

CONTROL B001H CORRIDOR COORDINATED WITH THE COR WHEN WORK


B001K B001A TO THE SYSTEM IS REQUIRED. RE: FP-101.
B001L CBA13
SCAN ROOM
11. RE: PROJECT MANUAL SECTION 02 83 33.13
one half inch = one foot

B001M DP113 FAN


FOOD DP116 LEAD SHIELDING REMOVAL AND DISPOSAL
PREP/COOK EXISTING SPEAKER
6 FOR DEMOLITION OF EXISTING WALLS WITH
DP121
DP115 DP110 DP115 DP120 HORN TO REMAIN. LEAD SHIELDING.
B002 DP110
DP120 6.2
OFFICE ELEV. LOBBY
DP111 6.3
0

KITCHEN
B001F DP110 D054
B001D DP110

DP111 DP111
DP112 DP115 DP110

DP115 DP115
6.7
KITCHEN CART WASH
B001B B001C
ELEV
7
DP110
three eights inch = one foot

E DP110 E
4

7.2
DP115
ELEV
B001E
APPROXIMATE
C009A LOCATION OF NEW
STEEL BEAMS TO BE CORRIDOR
0

C001B INSTALLED. RE:


STRUCT. DRAWINGS CBD4 DEMOLITION LEGEND
8 INDICATES AREA WITH NO
WORK IN CONTRACT
8.2
C:\Users\hersheys\Documents\60303195 - VAMC Nuclear Medical_hersheys.rvt

DEMOLISH EXISTING
CONSTRUCTION
8

NEW CONSTRUCTION E
one quarter inch = one foot

EXISTING CONSTRUCTION
BASEMENT B1
F INFILL SLAB DEMOLITION G5 F
4

B A
00.BASEMENT DEMO REFLECTED CEILING PLAN - (CONCRETE REMOVE CEILING FOR NEW
1
FLOOR ELEVATION - 722'-2 5/8") STRUCT. STEEL INSTALLATION G
1/8" = 1'-0" RE: DEMO KEYNOTE DP111 C D
0

REMOVE CEILING FOR


MEP SYSTEMS WORK,
RE: DEMO KEYNOTE DP112 WAREHOUSE

Revisions: Date 100% CONSTRUCTION Drawing Title: Project Title: Project Number
CONSULTANTS: DOCUMENTS ARCHITECT/ENGINEERS BASEMENT DEMOLITION REFLECTED CEILING PLAN - RELOCATE NUCLEAR MEDICINE 589A4-13-124
16
one eighth inch = one foot

DEMO WORK
STRUCTURAL ELEC/MECH / PLUMB SHIELDING DESIGN FIRE PROTECTION HAZARD MATERIALS
KH Engineering 2380 McGee Street, Building Number
FSC MEP Engineers, LLC DTC, Inc FP&C Consultants, Inc. APEX Environmental
Group, PA Consultants, Inc. Suite 200
Kansas City, MO 64108
Approved: Project Director Location HARRY S. TRUMAN MEMORIAL Drawing Number
8

15377 W. 95th Street 9225 Indian Creek Pkwy, 5930 Roe Avenue, 3770 Broadway 14955 W. 101st Terr An AECOM Company 816 561 4443

AD200
Lenexa, KS 66219 Suite 300 Suite 201 Kansas City, MO 64111 Lenexa, KS 66215 VETERANS HOSPITAL
Overland Park, KS 66210 Mission, KS 66205
Date Checked Drawn
4

(c) 2016 2016.01.15 D.SULLIVAN D.HILL Dwg. 11 of 106


t: 913.825.9381 t: 913.722.3473 t: 913.236.6000 t: 816.931.3377 t: 913.338.2739
0

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

THE SECTION OF WAITING ROOM OUTSIDE OF


THE TEMPORARY WALL IS TO REMAIN RCP LEGEND
Q OPERATIONAL DURING WORKING HOURS.
P Na N M La L K
SCHEDULE WITH THE COR WHEN ANY ABOVE 1X4 LIGHT
FIXTURE CEILING ACCESS PANEL
CEILING WORK IS REQUIRED FOR DUCT
INSTALLATION. COORDINATE CEILING REMOVAL 2X2 LIGHT
AND REPLACEMENT PROCESS WITH COR. SMOKE DETECTOR
FIXTURE
EXISTING SOFFIT TO REMAIN SPEAKER
HALL 2X4 LIGHT
B169 FIXTURE WIFI ACCESS POINT
DP106
CAN LIGHT FIXTURE HOSPITAL COMM.
three inches = one foot

DP122 ATTENNA
PAT. TLT
6"

EXIT SIGN
DRESS SPRINKLER HEAD
B165 SUPPLY DIFFUSER EXIST. CEILING DEVICE
A TEMPORARY WALL TO BOTTOM
DRESS
B148 3.7 EXIST. CEILING DEVICE A
OF DECK/STRUCTURE ABOVE DP22 RETURN REGISTER
CHEST
RE: AD201 FOR SPECIFICS GOWNED B164 SEE ELEC. AND MECH. DRAWINGS FOR REFLECTED CEILING PLAN NOTES:
ROOM
WAIT WORK IN THIS ROOM (NO ARCHITECURE WORK)
B166 1. REFER TO ELECTRICAL DRAWINGS FOR LIGHT
B168 FIXTURE LEGEND.
2. REFER TO MECHANICAL DRAWINGS FOR
ULTRA- 4 DIFFUSERS AND DEVICES.
1

ULTRA- SOUND 3. REFER TO FINISH SCHEDULE FOR CEILING FINISH.


SOUND
DP106 B152 ELECT CORRIDOR
PAT. TLT
one & one half inches = one foot

NURSE B160
WORK DASHED OUTLINE PAT. TLT B149 C1A8
DP22 CONTROL
B160A
AREA INDICATES DEMOLITION NOTES - GENERAL
B173 B152A
HALL DP21 DP22
B166A NEW NUCLEAR 1. NOT ALL KEYNOTES APPLY TO THIS SHEET.
MEDICINE AREA
0

B169A 2. IN RENOVATION/DEMOLITION AREAS,


CONTRACTOR MUST NOTIFY AND RECEIVE
DP3 APPROVAL FROM THE COR OF ANY
EXISTING PROPOSED EXPANSION OF DEMOLITION
6"

DP103
CARDIAC DUE TO THE DISCOVERY OF UNEXPECTED
4.4
B CATH LAB #1 DP104
CONDITIONS. THIS MUST OCCUR WHEN
THE CONDITION IS DISCOVERED AND B
B128 EXISTING TEMPORARY WALL TO BEFORE PROCEEDING WITH THE WORK.
DP3 CARDIAC BOTTOM OF
DP3
DP3 CATH LAB #1 CATH LAB DECK/STRUCTURE ABOVE 3. REMOVE ROOM IDENTIFICATION AND
2

CONFERENCE OFFICE DP102 RE: AD201 FOR SPECIFICS OTHER SIGNAGE FROM WALLS
B128
ROOM DP3
4.6 INDICATED TO BE REMOVED/DEMOLISHED.
DRESS DRESS DP105 B164
DP3 B131
DP18
B174 B170 CLEAN DP3 4. REMOVE EXISTING FLOOR FINISH FROM
UTILITY & ROOMS INDICATED TO BE DEMOLISHED
PAT. TLT. DP24 STORAGE
10 AND PREPARE FLOOR FOR NEW FLOOR
B179 B129 FINISH PER ROOM FINISH SCHEDULE.
AS930 DP29 DP3 DP3
one inch = one foot

5. REPAIR EXISTING WALLS (TO REMAIN)


5 WHERE EQUIPMENT, SIGNS, CONTROLS,
0

ELECTRICAL PANELS AND OTHER ITEMS


11 DP29
ARE INDICATED TO BE REMOVED.
DP3 5.1
6"

AS930 DP29
6. SEE MEP DEMOLITION PLANS FOR NOTES
DP24 VIEWING CATH LAB DP102 AND ADDITIONAL DEMOLITION ITEMS,
DP3 AREA OFFICE INCLUDING ITEMS CONCEALED IN WALLS
C DP119
CORRIDOR B130 B165
SUCH AS PIPING.
C
EQUIPMENT
5.4
B118 7. ALL WORK IN THE BASEMENT MUST OCCUR
PAT. RM #8 ROOM AFTER WORKING HOURS, AND THE ROOMS
DP15
B128 DP100 MUST REMAIN OPERATIONAL DURING
C122
three quarters inch = one foot

CONSTRUCTION. COORDINATE TIMING OF


2

ALL BASEMENT WORK WITH THE COR.


DP3
DP99 8. ANY WORK IN CORRIDORS MUST OCCUR AT
5.5 NIGHT OR ON WEEKENDS AND IS TO BE
STORAGE COORDINATED WITH THE COR.
SURGERY
B128 DP22
DP100 CATH LAB WAITING 9. EXISTING SHIELDING SHALL REMAIN INTACT
EXISTING NUCLEAR OFFICE
6" 0

A156 WITHIN EXISTING WALLS DESIGNATED TO


MEDICINE AREA DP119
B124 DP102 REMAIN. REPAIR SUCH WALLS TO
TANK DP3 EQUIVALENT STATE IF EXISTING SHIELDING
IS PIERCED OR OTHERWISE DISTURBED.
B119 NOTIFY THE COR AND ARCHITECT WHERE
DP102
DP3 DP3 THE SHIELDING IS DISRUPTED BY
DP3 DP3
CATH LAB #2 CONSTRUCTION ACTIVITIES.
TECH/NURSE
B120
WORK RM
D 6 10. SPRINKLERS ARE TO REMAIN OPERATIONAL
D
4

B123 DURING CONSTRUCTION, EXCEPT AS


CORRIDOR COORDINATED WITH THE COR WHEN WORK
CONTROL
ROOM #2 DP24 DP105 C1A11 TO THE SYSTEM IS REQUIRED. RE: FP-101.
one half inch = one foot

DP99
PAT TOILET DP3 B121 EQUIP 11. RE: PROJECT MANUAL SECTION 02 83 33.13
DP3
4 B122 6.2 LEAD SHIELDING REMOVAL AND DISPOSAL
DP3 DP18 FOR DEMOLITION OF EXISTING WALLS WITH
LEAD SHIELDING.
DP3
DP3 6.3
0

DP4 DP3
LOCKERS
RESTROOM DP103
B128D DP100
B128E
CATH LAB
DP104 OFFICE
DP15
DP3 B125
DEMOLITION LEGEND
PUBLIC PUBLIC INDICATES AREA WITH NO
three eights inch = one foot

E CONSULT CONSULT CONSULT


TOILET TOILET RELOCATE EXISTING
6.7 WORK IN CONTRACT E
4

SOILED C168 C170 C171 EXIT SIGN FROM WALL


C174 C175 TO TEMPORARY DEMOLISH EXISTING
UTILITY
PAT TOILET WALL. SIGN TO REMAIN EACH SIDE OF THE CORRIDOR CEILING MAY CONSTRUCTION
C136 OPERABLE DURING ONLY BE REMOVED TO ACCOMODATE THE
C135 EXIST. CEILING TO INSTALLATION OF THE TEMPORARY FLOOR TO NEW CONSTRUCTION
CONSTRUCTION.
REMAIN. PROTECT STRUCTURE WALLS. SEE NOTES ON AD101
FROM DAMAGE DURING REGARDING THE EXTENT AND LIMITATIONS OF EXISTING CONSTRUCTION
CONSTRUCTION AND THE TEMPORARY WALLS. THE CORRIDOR IS TO 7
INSTALLATION AND REMAIN IN USE, SO BOTH TEMPORARY WALLS INFILL SLAB DEMOLITION
0

REMOVAL OF CANNOT BE IN PLACE ON BOTH SIDES


TEMPORARY WALLS SIMULTANEOUSLY, AND BOTH AREAS OF
CEILING REMOVAL CANNOT OCCUR
SIMULTANEOUSLY.
C:\Users\hersheys\Documents\60303195 - VAMC Nuclear Medical_hersheys.rvt

DEMOLITION NOTES DEMOLITION NOTES DEMOLITION NOTES


8

DP3 REMOVE ACOUSTIC CEILING, CEILING GRID, LIGHTS, DP99 REMOVE WIFI UNIT AND RETURN TO OWNER. DP106 REMOVE AND STORE CEILING TILE AND GRID. E
one quarter inch = one foot

MECHANICAL DIFFUSERS, AND OTHER CEILING DP100 REMOVE LIGHTED SIGN. REINSTALL AT COMPLETION OF NEW WORK IN
01.FIRST FLOOR REFLECTED CEILING DEMO PLAN - NUCLEAR MOUNTED EQUIPMENT. GOWNED WAIT ROOM B168.RE: AS701
DP102 REMOVE CEILING, CEILING GRID, AND ANY CEILING
MEDICINE AREA - (CONCRETE FLOOR ELEVATION - 736'-0 5/8") DP4 REMOVE GYP. BD. CEILING AND ACCESS PANEL. MOUNTED DEVICES. STORE AND SAVE, AND DP119 REMOVE EXISTING EMERGENCY LIGHTING, RE: ELEC.
1
F 1/4" = 1'-0" DP15 REMOVE CEILING MOUNTED PRIVACY CURTAINS. REINSTALL WHEN WORK IS COMPLETED IN THIS DP122 NEW OPENING IN ROOF ABOVE FOR NEW DUCT G5 B1 B B2 F
4

DP18 REMOVE ABOVE-CEILING SUPPORT STRUCTURE FOR AREA. INSTALLATION. RE: MECH. A
MEDICAL EQUIPMENT. DP103 REMOVE SOLID CEILING PANEL, HOSES, AND OTHER
DP21 REMOVE PORTION OF EXISTING LIGHT COVE ABOVE CONNECTIONS TO THE CATH EQUIPMENT.
SOFFIT.
G
DP104 REMOVE CELING MOUNTED BOOM ARM AND LIGHT.
REMOVE ASSOCIATED ABOVE CEILING STRUCTURE.
C D
0

DP22 REMOVE GYP. BD. SOFFIT ABOVE.


DP24 REMOVE WALL MOUNTED TV/MONITOR SUPPORT DP105 REMOVE EXISITNG CEILING MOUNTED RAILS FOR
ARM. CATH EQUIPMENT. REMOVE ASSOCIATED ABOVE WAREHOUSE
CEILING STRUCTURE.
DP29 REMOVE METAL EXPANSION JOINT COVER.

Revisions: Date 100% CONSTRUCTION Drawing Title: Project Title: Project Number
CONSULTANTS: DOCUMENTS ARCHITECT/ENGINEERS FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN - RELOCATE NUCLEAR MEDICINE 589A4-13-124
16
one eighth inch = one foot

NUCLEAR MEDICINE AREA - DEMO WORK


STRUCTURAL ELEC/MECH / PLUMB SHIELDING DESIGN FIRE PROTECTION HAZARD MATERIALS
KH Engineering 2380 McGee Street, Building Number
FSC MEP Engineers, LLC DTC, Inc FP&C Consultants, Inc. APEX Environmental
Group, PA Consultants, Inc. Suite 200
Kansas City, MO 64108
Approved: Project Director Location HARRY S. TRUMAN MEMORIAL Drawing Number
8

15377 W. 95th Street 9225 Indian Creek Pkwy, 5930 Roe Avenue, 3770 Broadway 14955 W. 101st Terr An AECOM Company 816 561 4443

AD201
Lenexa, KS 66219 Suite 300 Suite 201 Kansas City, MO 64111 Lenexa, KS 66215 VETERANS HOSPITAL
Overland Park, KS 66210 Mission, KS 66205
Date Checked Drawn
4

(c) 2016 2016.01.15 D.SULLIVAN D.HILL Dwg. 12 of 106


t: 913.825.9381 t: 913.722.3473 t: 913.236.6000 t: 816.931.3377 t: 913.338.2739
0

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

DEMOLITION NOTES
DEMOLITION NOTES - GENERAL
DP3 REMOVE ACOUSTIC CEILING, CEILING GRID, LIGHTS, MECHANICAL DIFFUSERS, 1. NOT ALL KEYNOTES APPLY TO THIS SHEET.
AND OTHER CEILING MOUNTED EQUIPMENT.
Z Y.8 X.5 X W.6 W.4 W V U.2 U T.8 T DP4 REMOVE GYP. BD. CEILING AND ACCESS PANEL. 2. IN RENOVATION/DEMOLITION AREAS,
DP15 REMOVE CEILING MOUNTED PRIVACY CURTAINS. CONTRACTOR MUST NOTIFY AND RECEIVE
APPROVAL FROM THE COR OF ANY
DP107 REMOVE CEILING MOUNTED NURSE CALL LIGHT. PROPOSED EXPANSION OF DEMOLITION
DUE TO THE DISCOVERY OF UNEXPECTED
.5 CONDITIONS. THIS MUST OCCUR WHEN
MR THE CONDITION IS DISCOVERED AND
three inches = one foot

MR CLEAN BEFORE PROCEEDING WITH THE WORK.


STORAGE
6"

RECOVERY MR PREP UTILITY MODIFY EXISTING CEILING


G185B TO ACCOMODATE NEW 3. REMOVE ROOM IDENTIFICATION AND
G185D G185C G188 WORK PER NEW WORK
A EXIST PLANS. CONFERENCE OTHER SIGNAGE FROM WALLS
INDICATED TO BE REMOVED/DEMOLISHED. A
ROOM
PATIENT EXISTING G191 4. REMOVE EXISTING FLOOR FINISH FROM
EXIST
INTERVIEW/CONSULT MRI AREA ROOMS INDICATED TO BE DEMOLISHED
G190 09 AND PREPARE FLOOR FOR NEW FLOOR
FINISH PER ROOM FINISH SCHEDULE.
PAT. TLT. SOILED
1

UTILITY SUB-WAIT DASHED OUTLINE 5. REPAIR EXISTING WALLS (TO REMAIN)


G185A WHERE EQUIPMENT, SIGNS, CONTROLS,
G189 G190A AREA INDICATES
ELECTRICAL PANELS AND OTHER ITEMS
one & one half inches = one foot

EXIST NEW NUCLEAR 1 ARE INDICATED TO BE REMOVED.


MEDICINE AREA
6. SEE MEP DEMOLITION PLANS FOR NOTES
MR SUITE EXIST EXIST
AND ADDITIONAL DEMOLITION ITEMS,
G185 INCLUDING ITEMS CONCEALED IN WALLS
0

SUCH AS PIPING.
NURSE
EXIST
WORK 7. ALL WORK IN THE BASEMENT MUST OCCUR
EXISTING PASSAGE AFTER WORKING HOURS, AND THE ROOMS
6"

G185E
MRI AREA G186 MUST REMAIN OPERATIONAL DURING
B EXIST CORRIDOR CONSTRUCTION. COORDINATE TIMING OF
B
ALL BASEMENT WORK WITH THE COR.
G187 EXIST
8. ANY WORK IN CORRIDORS MUST OCCUR AT
EXIST NIGHT OR ON WEEKENDS AND IS TO BE
2

EXIST
COORDINATED WITH THE COR.
MR CRASH
CONTROL CART 9. EXISTING SHIELDING SHALL REMAIN INTACT
MR 1.6 WITHIN EXISTING WALLS DESIGNATED TO
G183 HOLDING G186A REMAIN. REPAIR SUCH WALLS TO
EQUIVALENT STATE IF EXISTING SHIELDING
G184 DP3
PATIENT IS PIERCED OR OTHERWISE DISTURBED.
DP107 DP4
DRESSING NOTIFY THE COR AND ARCHITECT WHERE
one inch = one foot

EXIST THE SHIELDING IS DISRUPTED BY


GURNEY DP3 G197
STAFF TLT CONSTRUCTION ACTIVITIES.
PARK
0

STAFF
DRESS G194A
G184A DP3 LOCKERS 10. SPRINKLERS ARE TO REMAIN OPERATIONAL
G197C 1.9
6"

G194 DURING CONSTRUCTION, EXCEPT AS


COORDINATED WITH THE COR WHEN WORK
TOILET 2 TO THE SYSTEM IS REQUIRED. RE: FP-101.

C G197B 11. RE: PROJECT MANUAL SECTION 02 83 33.13 C


DRESS LEAD SHIELDING REMOVAL AND DISPOSAL
CORRIDOR FOR DEMOLITION OF EXISTING WALLS WITH
MR G197A STAFF TLT LEAD SHIELDING.
READING DP4 G192
G194B
three quarters inch = one foot
2

G184B DP107 DP107 DP3

ELECT

DRS VIEW-3 G195


MAGNET DRS VIEW-6
G196A
6" 0

ROOM DRS VIEW-4 DRS VIEW-5 G196D


G182 G196B G196C RE: ELECTRICAL
DRAWINGS FOR
WORK IN THIS
ROOM. NO
ARCHITECTURAL
DEMOLITION.
2.7
D MR EQUIP D
4

G181 VIEWING/
2.8
CONSULT
one half inch = one foot

G196
3
RESIDENT
VIEWING DRS VIEW-1 PAT. TLT
3.2 G196G G196F
0

G196E

DRS VIEW-2
G196H

3.6
three eights inch = one foot

E E
4

FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - MRI AREA -


(CONCRETE FLOOR ELEVATION - 736'-0 5/8")
1
1/4" = 1'-0"
0
C:\Users\hersheys\Documents\60303195 - VAMC Nuclear Medical_hersheys.rvt

DEMOLITION LEGEND
8

E
one quarter inch = one foot

INDICATES AREA WITH NO


WORK IN CONTRACT
F DEMOLISH EXISTING G5 F
4

CONSTRUCTION B A
NEW CONSTRUCTION

EXISTING CONSTRUCTION G
C D
0

INFILL SLAB DEMOLITION


WAREHOUSE

Revisions: Date 100% CONSTRUCTION Drawing Title: Project Title: Project Number
CONSULTANTS: DOCUMENTS ARCHITECT/ENGINEERS FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN - RELOCATE NUCLEAR MEDICINE 589A4-13-124
16
one eighth inch = one foot

MRI AREA
STRUCTURAL ELEC/MECH / PLUMB SHIELDING DESIGN FIRE PROTECTION HAZARD MATERIALS
KH Engineering 2380 McGee Street, Building Number
FSC MEP Engineers, LLC DTC, Inc FP&C Consultants, Inc. APEX Environmental
Group, PA Consultants, Inc. Suite 200
Kansas City, MO 64108
Approved: Project Director Location HARRY S. TRUMAN MEMORIAL Drawing Number
8

15377 W. 95th Street 9225 Indian Creek Pkwy, 5930 Roe Avenue, 3770 Broadway 14955 W. 101st Terr An AECOM Company 816 561 4443

AD202
Lenexa, KS 66219 Suite 300 Suite 201 Kansas City, MO 64111 Lenexa, KS 66215 VETERANS HOSPITAL
Overland Park, KS 66210 Mission, KS 66205
Date Checked Drawn
4

(c) 2016 2016.01.15 Checker Author Dwg. 13 of 106


t: 913.825.9381 t: 913.722.3473 t: 913.236.6000 t: 816.931.3377 t: 913.338.2739
0

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

T.8 T S Rb Ra R Q P Na N M La L K GENERAL NOTES


1. NOT ALL KEYNOTES APPLY TO THIS
SHEET.

1 1 2. ALL WORK IN THE BASEMENT MUST OCCUR


AFTER WORKING HOURS, AND THE ROOMS
MUST REMAIN OPERATIONAL DURING
CONSTRUCTION. COORDINATE TIMING OF
three inches = one foot

ALL BASEMENT WORK WITH THE COR.


6"

3. ANY WORK IN CORRIDORS MUST OCCUR AT


NIGHT OR ON WEEKENDS AND IS TO BE
A COORDINATED WITH THE COR. A
1.6

1.9
1.9
2 2
1
one & one half inches = one foot

OFFICE OFFICE
RSCH B046
COMMON B049
ROOM
OFFICE HEALTH
0

B045 PHYSICS LAB


B046A
2.7 B050
2.8 2.8
6"

B 3 3 B
NURSE WK CORRIDOR
FREEZER Room ST. & FILM
FILES CBA1
2

B15A B12A
READING PHYSICAN B005A
LAB/THYROID ROOM OFFICE
INJECTION
Room B009 B008
Room B10 NM STRESS
B14
BREAK TEST
B15 RE: ELEC. DRAWINGS
3.7 OFFICE B006 B005 NO ARCHITECTURAL 3.7
one inch = one foot

B12 WORK IN THIS ROOM

4 4
0

ELEC.
APPROXIMATE LOCATION OF NEW STEEL CORRIDOR
B009A
6"

BEAMS TO BE INSTALLED ABOVE. RE:


CBA10
STRUCT. AND RCP DRAWINGS
ELEC
SCAN ROOM
C 4.4 B011
TLT
A54A ELEC 4.4 C
B007 CARDAIC A54B
OFFICE OFFICE CHECK-IN/ADMIN.
WAITING STRESS
4.6 B013A B013 ROOM B0010 TEST
4.6
TLT
three quarters inch = one foot
2

B001N B001S
B001R 5
5.1
WHERE WALLS ARE CORRIDOR 5.1
REMOVED OR OTHERWISE
MODIFIED TO ALLOW CBB2
5.4 INSTALLATION OF NEW
5.4
6" 0

STEEL STRUCTURE,
REBUILD AND RESTORE DISHWASHER
5.5 WALLS TO MATCH 5.5
B001A
EXISTING CONSTRUCTION
AND FINISHES. RE: RCPs CONTROL SCAN ROOM
HOT LAB CORRIDOR
B001L B001K COLOR TO MATCH
B001H EXISTING ADJACENT CBA13
SCAN ROOM
TILE WALLS
D 6
B001M
6 D
4

18F
6.2 6.2
one half inch = one foot

OFFICE
6,3
B001F 6.3
KITCHEN 18F
RESTORE WALL , FINISH ELEV. LOBBY
B001D AND COLOR TO MATCH
EXISTING IN CORRIDOR. D054
RE: RCPs
0

6.7 KITCHEN
CART WASH 6.7
B001C
B001B
7 ELEV
7

7.2 7.2
three eights inch = one foot

E B001E
ELEV
E
4

CORRIDOR
APPROXIMATE CBD4
7.6 C009A LOCATION OF NEW
STEEL BEAMS TO BE
C001B INSTALLED ABOVE
RE: STRUCT. AND RCP
8
DRAWINGS
8.2
0

00.BASEMENT- NEW WORK (CONCRETE FLOOR ELEVATION - 722'-2


C:\Users\hersheys\Documents\60303195 - VAMC Nuclear Medical_hersheys.rvt

5/8")
1
1/8" = 1'-0"
8

E
one quarter inch = one foot

BASEMENT B1
F G5 F
4

B A

G
C D
0

WAREHOUSE

Revisions: Date 100% CONSTRUCTION Drawing Title: Project Title: Project Number
CONSULTANTS: DOCUMENTS ARCHITECT/ENGINEERS BASEMENT FLOOR PLAN - NEW WORK RELOCATE NUCLEAR MEDICINE 589A4-13-124
16
one eighth inch = one foot

STRUCTURAL ELEC/MECH / PLUMB SHIELDING DESIGN FIRE PROTECTION HAZARD MATERIALS


KH Engineering 2380 McGee Street, Building Number
FSC MEP Engineers, LLC DTC, Inc FP&C Consultants, Inc. APEX Environmental
Group, PA Consultants, Inc. Suite 200
Kansas City, MO 64108
Approved: Project Director Location HARRY S. TRUMAN MEMORIAL Drawing Number
8

15377 W. 95th Street 9225 Indian Creek Pkwy, 5930 Roe Avenue, 3770 Broadway 14955 W. 101st Terr An AECOM Company 816 561 4443

AS100
Lenexa, KS 66219 Suite 300 Suite 201 Kansas City, MO 64111 Lenexa, KS 66215 VETERANS HOSPITAL
Overland Park, KS 66210 Mission, KS 66205
Date Checked Drawn
4

(c) 2016 2016.01.15 D.SULLIVAN D.HILL Dwg. 14 of 106


t: 913.825.9381 t: 913.722.3473 t: 913.236.6000 t: 816.931.3377 t: 913.338.2739
0

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

X.5 X W.6 W.4 W V U.2 U T.8 T S Rb Ra R Q P Na


N M La L K

.5 .5 1
AS702
MR STORAGE
MR PREP
G185C
G185B MRI DRESS
OFFICE
PROJECT
G188
G190-A
MRI CONFERENCE ROOM
AREA G5 LOCKER ROOM
(STAFF, SHARED)
TLT
B143
(SHARED)
G191
EXISTING OFFICE
B137
B113
09
PA WORK AREA
G190

1 1
three inches = one foot

PAT. TLT.
G185A SOILED UTILITY
6"

G189 STAFF BREAK ROOM


MR SUITE B144
G185
(SHARED) (SHARED)
LIMIT OF
A
PAT. INTERVIEW STAFF WORK PAT. TLT. EXISTING OFFICE
(SHARED)

A
(SHARED) RECEPT./SCHEDULING ADMIN.
H.A.C. B109 B110 B130 PAT. INTERVIEW
CLEAN SUPPLIES/ STOR. B138
WORK AREA B104 B105
B112 B133 B134

CORRIDOR CHECK-IN/SCHEDULING CHECK OUT


PASSAGE G187 EXIST ELECTRICAL
G186 B144A

1.6 CRASH CART


G186A
MR HOLDING
G184
LIMIT OF RADIOLOGY CORRIDOR PUBLIC CORRIDOR
CIRCULATION OFFICE
WORK AREA B106 B116
1

GURNEY PARK IMAGING ENTRY


G184A
G197C G197A LIBRARY
G194
B116A 1.9
one & one half inches = one foot

STAFF TLT (SHARED)


MR READING
G184B
G194A
(SHARED)
PAT. TLT.
B131
2
WAITING
STAFF WORK
ADMIN B112A
B135
ADMIN OFFICE G197
SHARED DRS VIEW
G197B STAFF TLT CT SCAN ROOM
B107A
G194B B107

VVOA
0

CARDIOLOGY WAITING
CONTROL CONTROL CONTROL B145
B132A B136A B139A

AOVV
CORRIDOR
DRS VIEW-3

VVOA
G192

VVOA
DRS VIEW-6
G196A ELECT
DRS VIEW-4 DRS VIEW-5 G196D
6"

VVOA
G195
G196B G196C
CT SCAN ROOM

B
RAD. EXAM ROOM
2.7 B
B108 RAD. EXAM ROOM R/F EXAM ROOM B139
B132 B136
BONE DENSITY
MR EQUIP
G181
VIEWING/ CONSULT CT CONTROL
B108A
PAT. TLT
B136B
B146 2.8
G196
SOILED UTILITY
B128
3
2

CLEAN LINENS CRASH CART CRASH CART


ALCOVE ALCOVE
B129
B167A B167B
3.2 RESIDENT VIEWING
G196G
DRS VIEW-1
G196F
PAT. TLT
G196E
NEW OPENINGS IN ROOF ABOVE FOR
DRS VIEW-2
CORRIDOR INSTALLATION OF NEW DUCTWORK TO NEW
G196H
B167
AHU-26 AND EF-46 ON ROOF. RE: MECH. &
3.6 STRUCT.
AOVV
one inch = one foot

SUB-WAIT
FUTURE ELEVATOR
DRESS B154
C-1 PAT. TOILET DRESS
PAT. TLT B164
DRS VIEWING ROOM B148
3.7 B175A
3.7
0

B165
B176A IR PROCEDURE ROOM PATIENT PREP
GOWNED WAIT CHEST ROOM

VVOA
GURNEY PARK B176 B172
B168 B166
G193A HALL
6"

B169
ELECT

4 VENDOR EQ.
ULTRA- SOUND
B160
B149
4
ULTRA- SOUND
B176D
IR CONTROL PAT. TLT
B152 CORRIDOR
PROJECT AREAS
C

V VOA
C
B176B NURSE WORK B160A PAT. TLT C1A8

STAIR B173
CONTROL
B166A
B152A B1 & B2
1-1
HALL
PRE-POST HOLDING
B169A
B175
VESTIBULE

4.4 FUTURE ELEVATOR


LOBBY
G153
CORRIDOR
PET/CT CONTROL
NURSE
4.4
three quarters inch = one foot

G151 B130 NM STRESS


2

B169B B164
B131
106 SF
544 SF 81 SF
4.6 SOILED HOLD SPECT/CT HOT WAIT
171 SF
4.6
G150 PAT. TLT. B126
SCRUB/GOWN B179
B176C 124 SF
67 SF PET/CT
B129

5.1 ADMIN / CONTROL 417 SF ALCOVE


B118D
NM READ/VIEWING
5
B174
A156C
6" 0

PET/CT HOT WAIT 8 SF


106 SF 189 SF
MEDS PREP B119 HOT LAB
CORRIDOR CORRIDOR C132
101 SF
WHEEL CHAIR WAITING
ROOM
B165 5.1
5.4 G159 C101
B128
CORRIDOR
B118C
154 SF

PAT. RM #5 PAT. RM #6 PAT. RM #7 PAT. RM #8


PET/CT EQUIP
B127
53 SF
GURNEY WAIT 97 SF 5.4
C119 C120 C121 C122 PAT. HOT TLT. & DRESS B132
SUPPLY ALCOVE
5.5 EQUIP. PARK
G152
B170

66 SF
94 SF
B118B 38 SF

22 SF
5.5
D BED #1 BED #2 NOURISH CORRIDOR
TREADMILL
D
4

A156B
G127 G128 C118 B118 CORRIDOR
NM PHYSICIAN OFFICE C1A11 161 SF
572 SF
PRE/POST C169
BED #3 CRASH CART ALCOVE
C131
G129 124 SF B118A
one half inch = one foot

6 PAT. RM #4
C117
22 SF 6
PACU PAT. RM #9 SPECT/CT CONTROL SPECT/CT THYROID UPTAKE
C123 B120 B122 A156A
B123
G126 PAT TOILET
6.2
NURSE STATION 4 325 SF 142 SF 321 SF 93 SF
C129
6.3 EQUIPMENT
C112
TECH OFFICE
C168
BED #4 111 SF
PAT. DOSE ROOM
B121
6.3
0

G130
PAT. RM #3
122 SF
C116

NURSE STATION PAT. RM #10


G117 C124
(SHARED)

6.7 NURSE STATION


G134 NURSE STATION PAT TOILET
SOILED UTILITY
C136 (SHARED) CONSULT 6.7
CONSULT CONSULT C171
BED #5 C130 C135
C168 C170 PUBLIC TOILET
G131 PUBLIC TOILET
PAT. RM #2
C174 C175

7 C115
7
three eights inch = one foot

E PRE/POST LIMIT OF CORRIDOR


E
4

7.2 C133
WORK AREA
5

CORRIDOR
7.2
C169
BED #6
G132
PAT. RM #1
WAITING
C114
C176
1
?

FROZEN SECTION LAB


C111 PAT. RM #14 PAT. RM #13 PAT. RM #11 AS701
C128 C127 C125

STORAGE ELECTRICAL
Room
C137 C146
6 EXAM EXAM RECEPT
(SHARED)
0

H.A.C. C167 C172 C173


TOILET SOILED UTILITY
C113
G119 G125 PACU/OR STORAGE SHAFT
CLEAN UTILITY
G124
G118 C165A
8
GURNEY PARK
G161
RE: ELEC. DRAWINGS 8.2
C:\Users\hersheys\Documents\60303195 - VAMC Nuclear Medical_hersheys.rvt

CORRIDOR
NO ARCHITECTURAL
CORRIDOR
3
WORK IN THIS ROOM
8

CORRIDOR
C177
E
one quarter inch = one foot

EXISTING CORRIDOR
G154
C134
(SHARED)
STAFF TOILET Room Room
C189 C103 C102 Room

F URO PROCED
STAFF WORKROOM COMM
C101H
G5 B1 B B2 F
4

C184
GFCI C181 C105
A
Room
C104A

G
01.FIRST FLOOR - NEW WORK (CONCRETE FLOOR ELEVATION - C D
0

736'-0 5/8")
1
1/8" = 1'-0"
WAREHOUSE

Revisions: Date 100% CONSTRUCTION Drawing Title: Project Title: Project Number
CONSULTANTS: DOCUMENTS ARCHITECT/ENGINEERS FIRST FLOOR PLAN - NEW WORK RELOCATE NUCLEAR MEDICINE 589A4-13-124
16
one eighth inch = one foot

STRUCTURAL ELEC/MECH / PLUMB SHIELDING DESIGN FIRE PROTECTION HAZARD MATERIALS


KH Engineering 2380 McGee Street, Building Number
FSC MEP Engineers, LLC DTC, Inc FP&C Consultants, Inc. APEX Environmental
Group, PA Consultants, Inc. Suite 200
Kansas City, MO 64108
Approved: Project Director Location HARRY S. TRUMAN MEMORIAL Drawing Number
8

15377 W. 95th Street 9225 Indian Creek Pkwy, 5930 Roe Avenue, 3770 Broadway 14955 W. 101st Terr An AECOM Company 816 561 4443

AS101
Lenexa, KS 66219 Suite 300 Suite 201 Kansas City, MO 64111 Lenexa, KS 66215 VETERANS HOSPITAL
Overland Park, KS 66210 Mission, KS 66205
Date Checked Drawn
4

(c) 2016 2016.01.15 D.SULLIVAN D.HILL Dwg. 15 of 106


t: 913.825.9381 t: 913.722.3473 t: 913.236.6000 t: 816.931.3377 t: 913.338.2739
0

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

RCP LEGEND
1X4 LIGHT
FIXTURE CEILING ACCESS PANEL

2X2 LIGHT SMOKE DETECTOR


T S Rb
Rb Ra R Q P Na N M La L K FIXTURE
SPEAKER
2X4 LIGHT
FIXTURE WIFI ACCESS POINT
HOSPITAL COMM.
CAN LIGHT FIXTURE
three inches = one foot

1 ATTENNA
6"

EXIT SIGN
SPRINKLER HEAD
SUPPLY DIFFUSER EXIST. CEILING DEVICE
A EXIST. CEILING DEVICE A
RETURN REGISTER
REFLECTED CEILING PLAN NOTES:
1. REFER TO ELECTRICAL DRAWINGS FOR LIGHT
FIXTURE LEGEND.
1.6 2. REFER TO MECHANICAL DRAWINGS FOR
DIFFUSERS AND DEVICES.
1

3. REFER TO FINISH SCHEDULE FOR CEILING FINISH.

1.9
one & one half inches = one foot

R REINSTALL CEILING FOR NEW


STRUCT. STEEL INSTALLATION
RE: DEMO KEYNOTE DP112

2 REINSTALL CEILING FOR MEP


SYSTEMS WORK,
RE: DEMO KEYNOTE DP113
0

OFFICE OFFICE
RSCH B046
COMMON B049

AOVV
ROOM
6"

INSTALL NEW GYP HEALTH


OFFICE
BD CEILING TO B045 PHYSICS LAB
B MATCH EXISTING B046A
B
2.7 WHERE FUME HOOD B050
AND DUCT ABOVE 2.8
WAS REMOVED.
2

READING PHYSICAN
3
ROOM OFFICE NURSE WK CORRIDOR
FREEZER
B009 B008 ST. & FILM
B15A RSCH. CBA1
FILES
INVESTIGATOR LAB/THYROID
INJECTION B005A
B013
CORRIDOR B10
one inch = one foot

APPROXIMATE LOCATION OF B020 GENERAL NOTES


Room RSCH. READING
NEW STEEL BEAMS TO BE INVESTIGATOR ROOM PHYSICAN NM STRESS
0

BREAK RE: ELEC. DRAWINGS 1. NOT ALL KEYNOTES APPLY TO THIS


INSTALLED. RE: STRUCT. B15
B012 OFFICE TEST NO ARCHITECTURAL 3.7 SHEET.
DRAWINGS B009 B006 WORK IN THIS ROOM
6"

B008 B005
2. ALL WORK IN THE BASEMENT MUST OCCUR
4 AFTER WORKING HOURS, AND THE ROOMS
CORRIDOR MUST REMAIN OPERATIONAL DURING
C CBB1
CORRIDOR
CONSTRUCTION. COORDINATE TIMING OF C
CBA10 ALL BASEMENT WORK WITH THE COR.
ELEC.
3. ANY WORK IN CORRIDORS MUST OCCUR AT
A54A
SCAN ROOM CARDAIC ELEC. 4.4 NIGHT OR ON WEEKENDS AND IS TO BE
three quarters inch = one foot

RSCH CORE TLT


2

11
WAITING
AS911
STRESS COORDINATED WITH THE COR.
AREA B011 CHECK-IN/ADMIN. A54B
OFFICE OFFICE ROOM B007 TEST

12
AS911
4.6 B019
B013A B013 B001N
B0010
B001S
4.6
TLT
B001R

5.1 5
6" 0

CORRIDOR 5.1
DIETETICS SCAN ROOM
OFFICE CBB2 5.4
B001M
B002A REINSTALL EXISTING
5.5 CEILING, LIGHT FIXTURES, REINSTALL EXISTING
DIFFUSERS, AND OTHER CEILING, LIGHT FIXTURES, 5.5
D CEILING MOUNTED SCAN ROOM DISHWASHER D
4

DIFFUSERS, AND OTHER


DEVICES CONTROL B001K B001A CEILING MOUNTED DEVICES
B001L HOT LAB
one half inch = one foot

FOOD B001H FAN


PREP/COOK
6
B002
6.2
6,3 6.3 AS911
OFFICE ELEVATOR 6.3
0

10
B001F LOBBY
KITCHEN A58
B001D
6.7
CART WASH
B001C 7
three eights inch = one foot

E E
4

7.2 7.2
KITCHEN CORRIDOR
B001B CB09
B001E
APPROXIMATE
7.6 C009A LOCATION OF NEW
STEEL BEAMS TO BE
0

C001B INSTALLED. RE:


STRUCT. DRAWINGS
8
8.2 8.2
C:\Users\hersheys\Documents\60303195 - VAMC Nuclear Medical_hersheys.rvt

E
one quarter inch = one foot

BASEMENT B1
F G5 F
4

B A

00.BASEMENT REFLECTED CEILING PLAN - NEW WORK (CONCRETE G


1
FLOOR ELEVATION - 722'-2 5/8") C D
0

1/8" = 1'-0"

WAREHOUSE

Revisions: Date 100% CONSTRUCTION Drawing Title: Project Title: Project Number
CONSULTANTS: DOCUMENTS ARCHITECT/ENGINEERS BASEMENT REFLECTED CEILING PLAN - NEW WORK RELOCATE NUCLEAR MEDICINE 589A4-13-124
16
one eighth inch = one foot

STRUCTURAL ELEC/MECH / PLUMB SHIELDING DESIGN FIRE PROTECTION HAZARD MATERIALS


KH Engineering 2380 McGee Street, Building Number
FSC MEP Engineers, LLC DTC, Inc FP&C Consultants, Inc. APEX Environmental
Group, PA Suite 200 1
Consultants, Inc.
Kansas City, MO 64108
Approved: Project Director Location HARRY S. TRUMAN MEMORIAL Drawing Number
8

15377 W. 95th Street 9225 Indian Creek Pkwy, 5930 Roe Avenue, 3770 Broadway 14955 W. 101st Terr An AECOM Company 816 561 4443

AS200
Lenexa, KS 66219 Suite 300 Suite 201 Kansas City, MO 64111 Lenexa, KS 66215 VETERANS HOSPITAL
Overland Park, KS 66210 Mission, KS 66205
Date Checked Drawn
4

(c) 2016 2016.01.15 D.SULLIVAN D.HILL Dwg. 16 of 106


t: 913.825.9381 t: 913.722.3473 t: 913.236.6000 t: 816.931.3377 t: 913.338.2739
0

1 2 3 4 5 6 7 8 9

You might also like