You are on page 1of 4

EVALUATION OF TECHNICAL AND ADMINISTRATION PROPOSAL

Bidder: CONSORTIUM PT WIJAYA KARYA (Persero) Tbk - PT WIJAYA KARYA REKAYASA KONSTRUKSI

We have found some deviations in your Bid Proposal, there are not listed in Schedule 3.2, example (see Table below), then, these
deviations are unlisted.

BID DOCUMENT REFERENCE


NO. DOCUMENTS BIDDER PROPOSED BIDDER RESPONSE
PART/SECTIONS/SUB- REQUIREMENTS DEVIATION
SECTION/CLAUSE
1 IDENTIFICATION OF BIDDER
Clause 1.3.(iv) Gas Engine Pilot Fuel <= 5% No indication Utilization of pilot fuel is
approx. 1%
2 COMPLETENESS & RESPONSIVENESS
TECHNICAL AND ADMINISTRATION
PROPOSAL (ENVELOPE-I)
Clause 9.2.1.(ii) Bid Security for EPC Yes/No The submitted bid security is
and O&M Correct in accordance with ITB Para
Wording 14. The conditions for
forfeiting are the same as
listed in Para 14.4.
Exactly same wording has
been adopted by the
consortium and accepted by
PLN for bid securities for past
and other on-going tenders.

-1- Kupang Gas Engine Power Plant (Peaker) 40 MW


BID DOCUMENT REFERENCE BIDDER RESPONSE
NO. DOCUMENTS REQUIREMENTS BIDDER PROPOSED
PART/SECTIONS/SUB-SECTION/CLAUSE DEVIATION
9.2.1.( Qualification Profile
xiii) (Schedule 5)

Memberl - OECD Company Not found Please find attached


b. At least one (1) EPC contract “ReferenceList – EPC
Projects.pdf”
a. within 10 years Not found Please find attached
“ReferenceList – EPC
Projects.pdf”

a. EPC Contract for Thermal Not found Please find attached


Power Plant project with plant “ReferenceList – EPC
capacity minimum 90 MW Projects.pdf”
b. Satisfaction letter from the Not found Please find attached
user for 2 years operation “Reference Letter – Atlas.pdf”.

Kupang Gas Engine Power Plant (Peaker) 40 MW


BID DOCUMENT REFERENCE
NO. DOCUMENTS BIDDER BIDDER RESPONSE
PART/SECTIONS/SUB-
REQUIREMENTS PROPOSED
SECTION/CLAUSE DEVIATION
Clause 8.6.3.(a) Main Transformer Proposed

d. capacity >= 50 MVA Not found Please see document from PT CG

c. within 10 years Not found Please see document from PT CG

d. Statement letter of Not found Please see document from PT CG


satisfactory operation
Clause 8.6.3.(c) Instrument and Control
(DCIS) Propose

a. proposed MC system Not found Woodward Power Solutions GmbH


(DCIS) (Merk)

Kupang Gas Engine Power Plant (Peaker) 40 MW


BID DOCUMENT REFERENCE
NO. DOCUMENTS REQUIREMENTS BIDDER PROPOSED BIDDER RESPONSE
PART/SECTIONS/SUB- DEVIATION
SECTION/CLAUSE
b. from OECD Country Not found Germany

e. one (1) unit of equipment Not found Please find attached


/component of the type and “Reference List – Woodward
size similar to that proposed Power Station Solutions.pdf”
with ratings the same as or
higher
e. than those
Statement letterspecified
of Not found Please find attached “MAN
satisfactory operation Reference Letter-DCIS-
for 2 years Thika.pdf”
Clause 9.2.1.(xv) Vendor List including it's
supporting
letter from manufacturer
(Schedule 5.3)
supporting letter Not found Please find attached “Support
Letter Indonesia ABB.pdf”

ABB - Yes Please find attached “Support


'CG power System - Not Letter Indonesia ABB.pdf”
found
Alstom/UNINDO - Not found
f. Instrument and Control Not found Woodward Power Solutions
(DCIS) GmbH
supporting letter Not found Please find attached “Support
Letter Indonesia
Woodward.pdf”

Kupang Gas Engine Power Plant (Peaker) 40 MW