You are on page 1of 1

Sr.

No Description Central DG  Multiple DGs


1 No of DGs
a Basement level 2 Numbers (2 *2500KVA) 7 Numbers (2*1010 + 3*630 + 1*500 + 1*400)

2 Area requirements
a Basement level 170 Sq.m 400 Sq.m

3 Cost
a Cost to client 5.1 Crores 1 Crores
b Cost to tenant NA 5 Crores

Common area backup as long as fuel is available. 
4 Backup duration Backup as long as fuel is available
Tenant backup as per tenant requirement.

5 System complexity Simpler System. Complex system will multiple DGs and panels.

Since no of DGs are more, space requirement is 
6 Space Requirement Less space required.
large.

Additional electrical space required in electrical 
riser for tenant cable which will be installed 
7 Electrical Riser  Less space required.
later. This can cause disturbance to existing 
tenants.

Piping for multiple DGs. Provision for multiple 
8 Fuel piping Only for 2 DGs.
UG tank as per tenant requirement.

Space to be provided only for multiple DGs. 
Space to be provided only for 2 
9 Smoke Exhaust piping Installation will happen as per tenants schedule 
DGs.
which may cost disturbance to existing tenants.

Multiple agencies will be involved in 
10 Maintenance Maintenance by building FM. Maintenance of the DGs which will be security 
issue.

Assumption
We have considered the DGs for the floors as below:
FLOOR MD IN KW load in kva DG rating % loading
GF, 10,11,12 673 842 1010 83%
13,14,15 363 453 630 72%
17,18,19 357 446 630 71%
21,22 333 417 500 83%
24,25,26 357 446 630 71%
,27,28, 220 275 400 69%

Recommandation: Considering the above factors we recommand to go by 2* 2500 KVA DG set.