Time Motion Study in Determination of Time Standard ... - CORE
Time Motion Study in Determination of Time Standard ... - CORE
Abstract— Time and Motion Study is rarely used in the Total cycle time is means of the combine effect of cycle
industry nowadays. In this study, the company that involve in time in all business processes from the time needed until
the rice based company.. This study using this type of study reach satisfaction. In short, the total cycle time is defined
method in order to increase production and identify any comprehensively. It include all business process cycle time,
improvement that could be made through identifying the
and it focus on a single process. This study is execute in a
process that involving manpower as the main reason and state
the time standard in order to achieve the objectives of
rice based company in Sabah which is it is one of the rice
increasing the production and decreasing the cost. This study processing factory. This factory involved variety main
is using systematic observation, interview with discussion and process that involved motion that influence operation time.
stopwatch time study. Statistically Fit and Production Time and motion study impact the whole production rate of
Modeler software is used to test the data and make the company. Time and motion study is a method in order
improvements. By stating the time standard for the process to determine the actual time needed to complete task.
involving manpower, production rate increase and the cost
will be less. Other than that, proposal for improvement could Problem Statement
be made in order to enhance the effort to achieve the main
objective of any business organization in the world.
Time and motion study is the important aspect in business
Keywords: Time and Motion Study, to determine the production rate. Another factor’s that
Ergonomics,Productivity, Manpower Factor, Time Standard effect the production rate is raw material, operation cost,
work force and others. All this factors will effect differently
to each other. Even though, time is the most influence
I. INTRODUCTION element this rate. Whether the motion time or the
production rate, this element is taken care in any
transaction in a company. In this study, the rice company is
T he important thing in order to determine the success
and performance of a company. This happen because,
time is the measurement tools the level of company’s
settling down the grading and packaging process. It
involved both the machine and manpower. In the process of
performance. The measurement of the product or service manpower has no time standard stated because as we know,
successful would be known through the time study and time manpower process will be influence by many factors. Not as
standard by work sampling and workers complaint [1]. It the machine that had been set and produced as what we
shows that time is the most important thing in determining wish to. When there is no time standard, any task could be
company’s performance and develop the operation level of finished out of planned. In this study, the process that
the company. Time is defined as a component that used in involved manpower in packaging process is determined and
measurement system to arrange events, compare duration studied. While, a time standard is determined to know the
time of an event and measure the motion of work element. time needed the process could be finished. In business, both
Time is the huge thing in religion, philosophy and science, of these elements are important to execute the maximum
but it is define in a situation without controversy, that could profitable production rate. Hence, with the application of
be avoid consistently because it suits all kind of field [2]. Time and Motion Study the changes and improvement
could be seen especially in cost and production matter.
Research Background
Research Objective
Abdul Talib Bon, PhD is with the Faculty of Technology Management, The objectives in this study was to identify work, time
Universiti Tun Hussein Onn Malaysia, 86400 Batu Pahat, Johor, Malaysia
(corresponding author phone: +6012-7665756; fax: +607-4541245; e-mail: standard to work which involves manpower in rice
talibon@gmail.com. packaging process and see changes which occurred on cost
Dayanni Daim, Is undergraduate research assistant with the Faculty of and company production after Time and Motion Study
Technology Management, Universiti Tun Hussein Onn Malaysia, 86400 Batu
Pahat, Johor, Malaysia
takes place.
or to determine the index production index for the
individual or group work, each section, or entire factory [4].
II LITERATURE REVIEW
Interview and Discussion: Interviews will be conducted via In completing this research and to achieve each objective, it
two methods of face and telephone conversations. In this is important to analyze the data. The main thing that is
method, information about the work or movement involving focused in this chapter is to identify the result of research
humans will be identified. This list is based on the work findings researchers to achieve the objectives of the study
involved in the process that has registered the company. conducted. There are several ways to analyze data using
software such as SPSS, Microsoft Excel or Minitab
Stopwatch Time Study: Study time using the stopwatch is software. However, in this research cases, Stat Fit and
measuring work to determine the policy guidance for future software Pro Model used to achieve the objectives of
improvements. This method requires direct observation analyzing the data.
using a stopwatch. It is also to analyze the more specific
process through which qualified workers in an effort to Data Collection
identify the most efficient in terms of time. Moreover, this
method measures the time required to process the work is Data collection is intended to determine the data needed to
completed using the best way. Time measured using the develop process design. The data collected describe how the
stopwatch. There are various types stopwatches that can be operations process, when, where and how each job is
used include, snapback, continuous, digital and computer. executed. Data collected as much as possible in between 32
However, the stopwatch snapback used in this study times within a month based on systematic observation,
because it more easily and have a quick response in the study time using the stopwatch and process flow charts,
record. In taking the time to use the stopwatch snapback data is included:
type, hours of work initiated at the beginning of the cycle
on the first element of work, and read simultaneously and (i) Flow chart for each process
will again be empty after a full cycle. This allows time for (ii) Information operations in detail for each process
each element inserted directly into the form without (iii) Production time
counting study time. (iv) Movement from one process to another process
Data Analyze: After data collection is carried out, the next Work Process
step are analyze the data carefully for each work process.
Analyzing data is based on observations and interviews, Based on observations made systematic studies of the area,
and all the data involves work has been recorded. we can know that there are seven key processes in the
Experiments carried out on all the facts and the data were production of rice ready in the package containing 5kg and
recorded using charts and graphs which are produced using 10kg.The description of each work process and sub process
software Stat Fit and Pro Model. specified in Table 1. The process begin with workers
loading the raw materials in the sacks of rice in the lift and
Stat Fit Software: Stat Fit statistics are matched with data then go into a processing tank and ended with a pack of
obtained for the most appropriate analytical distribution. rice ready for delivery to customers.
Operating software is kept intuition, which will assist in the
extensive files. Features 'Auto Fit' is automatically match a Production Time
continuous distribution, resulting in comparisons between
distribution types, and to measure the absolute acceptance
of each distribution. Function 'Export' is the distribution
that has been translated to match a more specific form for
the selected software simulation. In this study, the software
used is Pro Model. Characteristic result of using this
software includes a descriptive statistic, budget parameters,
good test match, graphical analysis, conversion to product
simulations and more.
Avg Time Per Entry
ra n
an
an
an
ih a
sa
pan
se s
p an
n ta
pa
ku
e rs
pr o
ung
ha
n yim
y im
yim
mb
ng
em
en
mb
en
pe
pe
pe
gp
rp
ip
pe
s in
ian
gk
s to
an
s in
me
ag
ta n
gud
me
bah
Conclusion