Documents Required for CGWA NOC

1. Withdrawal upto 10 KLD


i. Consent to Operate (Consent to Establish if CTO not available) or Environmental
Clearance if applicable.
ii. Only self declaration of Certificate of water availability/non availability from
government water supplying agency.
iii. Proposal only for Roof Top rainwater harvesting / artificial recharge.
iv. Authorization letter from firm.
v. Scanned copy of application with signature and seal.

2. Withdrawal more than 10 KLD and upto 500 KLD


i. Consent to Operate (Consent to Establish if CTO not available) or Environmental
Clearance if applicable.
ii. Certificate of water availability/non availability from government water supplying
agency.
iii. Proposal for rainwater harvesting / artificial recharge. In case, the water harvesting /
artificial recharge structure is proposed to be constructed outside the area of the
industry, NOC is required from that agency/ authority where the structure is proposed.
Dimension of pond should mention in NOC.
iv. Ground water quality report of existing tube well.
v. Authorization letter from firm.
vi. Scanned copy of application with signature and seal.

3. Withdrawal more than 500 KLD


i. Consent to Operate (Consent to Establish if CTO not available) or Environmental
Clearance if applicable.
ii. Certificate of water availability/non availability from government water supplying
agency.
iii. Proposal for rainwater harvesting / artificial recharge. In case, the water harvesting /
artificial recharge structure is proposed to be constructed outside the area of the
industry, NOC is required from that agency/ authority where the structure is proposed.
Dimension of pond should mention in NOC.
iv. Comprehensive report on groundwater conditions in and around 5 km of the areas.
v. Ground water quality report of existing tube well.
vi. Authorization letter from firm.
vii. Scanned copy of application with signature and seal.