Introduction
The HSE Auditing is conducted to confirm whether
the construction and execution status of the HSE
management system implemented in the project site
is ;
2
Responsibility
Corporate HSE Team:
● Establish and review annually HSE Audit Procedure
● Conduct HSE Audit to Project Site
● Assign qualified personnel to conduct HSE Audit to
Project Site
● Prepare/Review the result of the Audit and discuss
with the Site Project Management
● Issue HSE Audit Findings Report
● Submit Audit Result to Division Head
● Follow-up all non-conformance items mentioned
during Audit
3
Responsibility
HSE Auditor
● Conduct HSE Audit to Project Site
● Prepare the result of the Audit and discuss with the
Site Project Management
● Issue HSE Audit Findings Report
● Submit Audit Result to Corporate HSE Manager
● Follow-up all non-conformance items mentioned
during Audit
4
Auditor Qualification
● Audit personnel shall be designated based
on his experience and training;
corresponding to the range, complexity and
specialty of work subject to audit
● Corporate HSE Manager shall designate
and send to training if necessary all HSE
Audit personnel
● All HSE Auditor should pass HSE Auditing
Training Course
5
Audit Elements
Records
HSE
Managemen
t
Site Tour System Interviews
6
Health & Safety Management System
1. HSE Plan and Procedure
➢ Establishment of HSE Policy & Target
➢ Establishment of Site HSE Plan & Procedure
➢ Risk Assessment & Job safety Analysis
➢ Permit Work to system
➢ Filling System (Documentation)
2. HSE Organization
➢ HSE Organization
➢ Responsibilities of HSE Key personnel
➢ HSE Allotment & Mob/Demob Plan
7
Health & Safety Management System
3. HSE Training
➢ HSE Training Plan & Induction
➢ Training Course & TBM
7. Emergency Preparedness
➢ ERT Organization
➢ Emergency Plan
➢ Drills
➢ Fire Fighting Facilities & Inspection
➢ Emergency Contact points & information
9
Health & Safety Implementation
● PPE ● Gas control
● Working at Height ● Color coding
● Scaffold ● Electrical safety
● Excavation & Confined ● MSDS & COSHH
Space ● Radiography
● Driving & Equipment ● Health & Medical
Control ● Hygiene
● Lifting
10
Environmental Assessment & System
11
Environmental Program
Implementation
1. Environmental Training
➢ Training Plan and record
➢ Emergency Preparedness (scenario/drill)
3. Waste Management
➢ Waste classification
➢ Waste Segregation and Storage
➢ Waste Disposal and Recording System
➢ Monitoring and Recycling
12
Environmental Program
Implementation
4. Water Quality
➢ Waste Water Disposal
➢ Sewage effluent Measurement
13
Audit Assessment
Decision Standards
G - Good Satisfactory
14
Auditing Flow Chart
Corporate HSE Establish HSE Close Site AFR
Manager Audit Procedure Corporate HSE
Team
Yes N
Deficiencies o
Corporate HSE Designate
Qualified HSE
(AFR)
Manager Follow-up
Auditor Corrected by
Site?
Submit Report to
Notify Site for Site Division Head
HSE Auditor Management
Audit (Schedule)
Corporate HSE
Manager
15
Audit Execution
Project HSE Audit
should examine site
HSE performance:
● HSE Policy
● HSE Organization
● Documentation
● Implementation
● Compliance with HSE
requirements of the Client
and Host Country
16
Discuss HSE Findings to Site
Management
● HSE Auditor should
discuss all findings to
Project Management
on the last day of Audit
● Make recommendations
● Issue target
rectification date
● Open discussion for
Site HSE improvement
17
HSE Audit Findings Report
Report should contain:
● Noted deficiencies and
hazard level
● Recommendations
● Target date of completion
● Signature of Auditor
● Acknowledgement
signature of Project
Management
● Action taken with date
● Reviewed by Corporate
HSE Manager
18
Audit Report
● HSE Auditor:
● Summarize all HSE
findings including good
points and deficiencies
● Provide evidence of site
deficiencies and good
practices (e.g. photos,
certificate, meeting/
training attendance)
● Submit to Corporate HSE
Manager
19
Summary
20