‘OMAN GAS COMPANY S.A.0.C. dg yit
“Te: Tenderers a
‘Mt Tenceere
From: Naser Al Mahroo9! ate: 25 December 2018
Head of Conzacte
ourket: _ocorcezoraa61 No.of Pages: 1+2
(00¢-89-2018-nstrumpnt ir Compressor Upgrade Project In Fahud Compressor Staton
Circular No 1 »Ste Vist Program & Extension of Bid Submission
‘Ater Compliments,
Please be advises thatthe Tender Process Schedule is being revised a deta below:
‘ety ‘Gurren Date | — Ravised Date
Site Vise Date Za2R018 ‘212018
‘Giaification Reaves Giesng Date 31122018 ‘o12018
“Technical Tender Submision Date 0172019 auvin0%0
“Tender Bond Submission Date ‘suvi0%8 2rman018
[Commercial Tender Submision Date ‘suoyaie | 272019 |
‘Als tached herewt ste program along wth he flowing attaches:
1. AppenticA- Ste Vist Program
2. -Agpendic 1 = Confmation of Knowledge of Site Contons
Please confi the receipt hi ter and attendance forthe ate vit
/For Oman Gas Company 8A0.6
8) COON (6B) PHABBOON pK — Gee Ta a 199 ga ATOR yam TOAD
‘lene! veerao: Box 7m Pot CoS nse Sate fn Tg +28 Das Far&e como
APPENDIX A (SITE VISIT PROGRAM)
Please note tat ste vis scheduled a flows:
+ Day and Date of vise: Wednesday Jan 2, 2019
“+ Time of vst From 11:00 AM to 12:20 PM
‘+ Meeting locaton: Oman Gas Company ~Fahud Compressor Station
'+ Company's focal poi: Asim Farooql - Project Engineer (24468668, 99071236)
Notes:
1. Maxirum to rpresartatives rom each endere.
2, 1D. othe attentoes (siden cards) should be ecanned to Company.
3. Tenderer shall acher tthe time stated above
4. Representatives shal wear the PPE forthe ste vit.
5. Cost oft vist shal be borne by the tender
6. Tencerer hal rear their wn journey plan forthe sit vist
Indra A Composer Upp Paea Fat Compose Sne a
a Insane Al Compas Upgrade Poetin Fab Comes St
ANNEXURE 1 - CONFIRMATION OF KNOWLEDGE OF SITE CONDITIONS
‘he Chairman of Tender Commitee
Postal Coae 132
Sutnate of Oman
ear See,
We heey confi hat we have vied the Stes nd have mace enaulies, examined and satis
‘urs fly ares the nature and location of condos whch may affect ur cbgatons
ede the Contract.
‘We Shave made ensuites ae aware os tothe nature of al exatng roads or other means of
transport or communication ad a to posse interruptions terto and as fo acess to and fom the Sie,
Vie “nave made acl and independent engura/ar aware ao stars, revaling wind, ciate
conserations generally anther slr mts,
ie nave satisfied curses aves tothe sources and maans of bain adequate spe of
‘ile and unciled parsons a all materals and equipment ried fr carving cut cur ebiigstions
nde he Contact.
‘We “have consisredte sate othe pose fect on he caring out ofthe Contac tat may be
caused by any reek of emmurications or by reasons fo storms, foods or adverse weather
conan,
Wie ‘have acs urslvetare sre ato the laws and ragulatons which are appeal to the Wot fo be
‘erlonmed by us under the Contract and a have veld tat any permis, spprovae an
authoretions, Hequted, canbe obtind.
Wo “ave cbtsinedarein ostasion ofa necessary ifoeation of lars whstsoover whieh may
cifect ur exscuton of the Contact.
Statue
Peston
(Dototo as appicable)
[NOTE: Pleo note signed document of Annexure tbe attached along wth the tchniea submission