VERTEDERO SALIDA LABERINTO DE CLORACIÓN CAUDAL 395 LPS

Project Description
Solve For Headwater Elevation

Input Data

Discharge 0.395000 m³/s


Crest Elevation 74.6900 m
Tailwater Elevation 74.18 m
Weir Coefficient 1.84 SI
Crest Length 2.0000 m
Number Of Contractions 0

Results
Headwater Elevation 74.92 m
Headwater Height Above Crest 0.23 m
Tailwater Height Above Crest -0.51 m
Flow Area 0.45 m²
Velocity 0.87 m/s
Wetted Perimeter 2.45 m
Top Width 2.00 m

Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03]
9/11/2017 5:42:05 p. m. 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1