Professional Documents
Culture Documents
Operational Procedures
Operational Procedures
OPERATIONAL PROCEDURE
Equipment Type Switch
Equipment Code S1
Location Computer Laboratory 201
Operational Procedure
HOUSEKEEPING SCHEDULE
Qualification Computer System Station/Bldg J Building
Servicing NC II
Area/Section Practical Work Area
In-Charge
Schedule for the August, 2019
Daily Ev Wee Ever Monthl Remark
Respons ery kly y y s
ACTIVITIES ible oth 15 th
Person er Day
Da
y
Clean and free TRAINEE
Computer Laboratory /
from dust/rust /gums. TRAINER
1. Clean and check TRAINEE
Computer equipment/ /
accessories from dust TRAINER
and oil; dry and properly
laid-out/ secured/stable
3. Clean and arrange TRAINEE
working tables according /
to floor plan/lay-out; TRAINER
check stability
4. Clean and check floor, TRAINEE
walls, windows, ceilings /
• graffiti/dust/rust TRAINER
cobwebs and
outdated/unnecessary
objects/items
obstructions
• any used
materials/scraps (slugs,
stubs) spilled liquid
open cracks (floor).
5. Clean and check TRAINEE
Computer Laboratory /
ventilation and TRAINER
illumination by dusting
lamps/bulbs, replacing
non-functional lamps
and keeping exhaust
clean
6. Clean and check TRAINEE
computer set -monitor, /
CPU, keyboards, mouse TRAINER
– free, unnecessary
markings, dust; cables
and plugs are in order;
well-arranged; all items
functional
7. Clean, inspect air TRAINEE
conditioning equipment: /
• keep screen and filter TRAINER
free from dust/rust
• Check selector knobs if
in normal positions and
are functional
•
8. Clean, check and TRAINEE
maintain Tool Room /
• Free of dust, not damp TRAINER
• Tools in appropriate
positions/locations
• With visible
labels/signage
• Logbook and forms are
complete, in order and
updated
• Lights, ventilation – OK
Clean and check Rest TRAINEE
Room /
• Urinals, bowls, wash TRAINER
basins, walls and
partitions are free from
stains, dirt, oils, graffiti
and unnecessary
objects;
• Ceilings free from
cobwebs and dangling
items
• Floor is kept dry; no
broken tiles or
protruding objects
Equipped with dipper
and pails; properly
located after use Water
systems is functional: no
dripping/damaged
faucets or pipes
• Drainage system is
working, no water-
clogged areas No
offensive odor
• Lights /Ventilation – OK
9. Clean and check wash TRAINEE
area: /
• Walls/Floors- –free from TRAINER
oils, molds, broken tiles,
gums, stains or graffiti
• Drainage system is
functional
• Water system functional;
no dripping faucets or
leaking pipes
• Free from unnecessary
objects (mops, rags)
1 Clean and maintain TRAINEE
work shop surroundings /
by sweeping/ removing TRAINER
fallen leaves, branches,
debris and other refuse,
impounded water,
clearing pathways of
obstructions
1 Disposal of waste TRAINEE
materials /
(Follow waste TRAINER
segregation system)
Qualificatio
Computer System Servicing NCII
n
Area/Sectio
Electronic Area In-Charge:
n
Is air-condition cleaned?
No dust
No cobwebs
Is the whiteboard cleaned?
No stain
Remarks:
PURCHASE REQUEST