TRAINING ACTIVITY MATRIX

COMPUTER SYSTEMS SERVICING NC II


FACILITIES,
VENUE
TRAINING ACTIVITY TRAINEES TOOLS & DATE REMARKS
(Work Station)
EQUIPMENT
I. Preliminaries

a. Prayer Clanor, Nazarene D. 1. PC Unit CSS Room June 6, 2022 All 20


/laptop trainees
b. National Anthem Amora, Arsen A. 2. LCD projector 8:00am to attended the
3. LCD Screen 12:00am activity
c. Energizers Marie Carmelie P. 4. PPT
Dayag
d. Motivation Trainer

e. Orientation or
Training
Induction
Program

f. Pre-test

Date Developed: Document No.


Computer Systems Servicing
NCII May 3, 2022
Validated by:
Page
Developed by:
DLCS Set-Up Computer Network 1 of 7
MARIE CARMELIE P. DAYAG
FACILITIES,
VENUE
TRAINING ACTIVITY TRAINEES TOOLS & DATE REMARKS
(Work Station)
EQUIPMENT
II. Training Proper
Assemble computer Amorin, Antoignette  PC Unit /laptop
hardware Blay, Godly B. WORK June 6-10, The trainees
 LCD projector
Amora, Arsen D. STATION 1 2022 had
Abis, Obama D.  LCD Screen (Mon-Fri) performed
 PPT Install 8:00am to the given
Prepare installer Basco, Jay P. Computer 5:00pm activities and
 Screw Driver
Batul, Abdulah E. Systems and (40hours) had passed
Dayag Kien D.  Set Antistatic Networks this unit of
Clanor, Nazarene D.  wrist strap competency.
 Antistatic mat
Install operating Cubos, Angelica S. They all
 Wire striper
system and drivers for Datu, Raya D. moved to the
Dela Cruz, Cecelia P.  Tweezers next unit of
peripherals/devices
Leron Kaye T.  Soldering Iron competency.
 Compressed air
Install application Lucero, collee J.
 Multi-tester
software Josol, James P.
Palao, Jumer A.  Parts organizer
Masinger, Jimalyn B.  Cable ties
 Flash light
Conduct testing and  Cable
Torres, Fitzy L.
Date Developed: Document No.
Computer Systems Servicing
NCII May 3, 2022
Validated by:
Page
Developed by:
DLCS Set-Up Computer Network 2 of 7
MARIE CARMELIE P. DAYAG
documentation Pavia, Marlon J. raceway/duct
Reyes, Yohan L.
 Clamps
Tan, James V.
Picture 7  Fasteners
...
 Insulators
 terminal box

FACILITIES,
VENUE
TRAINING ACTIVITY TRAINEES TOOLS & DATE REMARKS
(Work Station)
EQUIPMENT
Amorin, Antoignette
Install Network Cables
Date Developed: Document No.
Computer Systems Servicing
NCII May 3, 2022
Validated by:
Page
Developed by:
DLCS Set-Up Computer Network 3 of 7
MARIE CARMELIE P. DAYAG
Blay, Godly B. PRACTICAL June 13-17, All trainees
 Client Personal
Amora, Arsen D. Computer WORK 2022 had made it
Abis, Obama D. STATION 2 to the next
Picture 7  Wireless Router
... Basco, Jay P. 8:00-12AM unit of
 Switch Hub/Patch Set-up 1:00-5:00PM competency.
Batul, Abdulah E. Panel Computer (Mon-Fri)
Set Network
Dayag Kien D.  Client Operating Networks (40hours)
Configuration
Clanor, Nazarene D. System
Cubos, Angelica S.  Windows Server All trainees
Datu, Raya D. Operating System had made it
 Side cutter pliers to the next
Set Dela Cruz, Cecelia P. unit of
 Side Cutter Plier
router/WiFi/Wireless Leron Kaye T. competency.
access point/repeater Lucero, collee J.  Long Nose Pliers
configuration Josol, James P.  Crimping Tool
Palao, Jumer A.  Flat Screw Driver
 Philip Screw Driver
Inspect and test the Masinger, Jimalyn B.
Torres, Fitzy L.  Punch Down Tool
configured computer
networks Pavia, Marlon J.  Lan Tester
Reyes, Yohan L.
Tan, James V.
FACILITIES,
VENUE
TRAINING ACTIVITY TRAINEES TOOLS & DATE REMARKS
(Work Station)
EQUIPMENT

Date Developed: Document No.


Computer Systems Servicing
NCII May 3, 2022
Validated by:
Page
Developed by:
DLCS Set-Up Computer Network 4 of 7
MARIE CARMELIE P. DAYAG
Amorin, Antoignette
Set-Up User Access Blay, Godly B. WORK June 20-24, Only 18 out
 Client Personal
Amora, Arsen D. Computer STATION 3 2022 0f 20 trainees
Picture 7
... Abis, Obama D. had
 Wireless Router 8:00-12AM
Basco, Jay P. Set-up performed
Batul, Abdulah E.  Switch Hub/Patch Computer 1:00-5:00PM the given
Panel Servers
Dayag Kien D. activities,
 Client Operating (Mon-Fri) passed the
Clanor, Nazarene D. System written tests
Configure Network
 Windows Server (40 hours)
Services Cubos, Angelica S. and passed
Datu, Raya D. Operating System this unit of
Dela Cruz, Cecelia P.  Side cutter pliers competency.
Leron Kaye T.  Side Cutter Plier They moved
Lucero, collee J. on to the last
 Long Nose Pliers
Josol, James P. competency.
 Crimping Tool
Performing Testing, Palao, Jumer A.  Flat Screw Driver The 2
Documentation and Masinger, Jimalyn B.  Philip Screw Driver trainees will
Pre-deployment Torres, Fitzy L. have to
 Punch Down Tool
Practices Pavia, Marlon J. perform the
Reyes, Yohan L.  Lan Tester demos.
Tan, James V.

FACILITIES,
TRAINING VENUE
TRAINEES TOOLS & DATE REMARKS
ACTIVITY (Work Station)
EQUIPMENT
Date Developed: Document No.
Computer Systems Servicing
NCII May 3, 2022
Validated by:
Page
Developed by:
DLCS Set-Up Computer Network 5 of 7
MARIE CARMELIE P. DAYAG
Amorin, Antoignette
Plan and prepare for Blay, Godly B. WORK June 20-24, The 18
maintenance and Amora, Arsen D. STATION 4 2022 trainees had
Picture 7
repair... Abis, Obama D. successfully
Maintain and 8:00-12AM completed
Basco, Jay P. Repair 1:00-5:00PM the program.
Batul, Abdulah E. Computer (Mon-Fri)
Maintain computer
Dayag Kien D. Systems and (40 hours) The 2
systems and networks
Clanor, Nazarene D. Networks trainees will
have to
Diagnose faults of Cubos, Angelica S. undergo all
computer systems and Datu, Raya D. the activities
networks Dela Cruz, Cecelia P. and should
Leron Kaye T. finish all the
competencies
Rectify/correct defects Lucero, collee J. before
in computer systems Josol, James P. he/she will
and networks Palao, Jumer A. given his
Masinger, Jimalyn B. cert. of
Inspect and test the training
computer systems and Torres, Fitzy L. The 2
networks Pavia, Marlon J. trainees will
Reyes, Yohan L. have to
Tan, James V. undergo all
the activities
and should
Date Developed: Document No. finish all the
Computer Systems Servicing
NCII May 3, 2022
Validated by:
Page
Developed by:
DLCS Set-Up Computer Network 6 of 7
MARIE CARMELIE P. DAYAG
III. Assessment and Evaluation
a. Work Sheets
b. Forms
Picture 7
... c. Pencil/Pen All trainees
d. Client Personal had
Computer completed
the program,
e. Wireless Router took the
Institutional
Institutional f. Switch June 28-29, institutional
(All trainees) Assessment
Assessment Hub/Patch Panel 2022 assessment
area
(passed and
g. Client Operating had finally
System completed
the program
h. Windows Server
Operating System of CSS NC II

Prepared by:

MARIE CARMELIE P. DAYAG


Trainer

May 3, 2022

Date Developed: Document No.


Computer Systems Servicing
NCII May 3, 2022
Validated by:
Page
Developed by:
DLCS Set-Up Computer Network 7 of 7
MARIE CARMELIE P. DAYAG

You might also like