Evidence Plan

Competency Standards: Computer Systems and Servicing

Unit of Competency: Set-up Computer Networks


Ways in which evidence will be collected:

Third Party Report


Portfolio
QuestioningDemonstration &

Written
QuestioningObservation and
(tick the column)

The evidence must show that the trainee….

 Cable routes are determined and planned in accordance with


network design and actual installation site.

 Network materials necessary to complete the work are


identified and obtained in accordance with established
procedures and checked against systems requirements

 Tools, equipment and testing devices needed to carry out


the installation work are obtained in accordance with
established procedures and checked for correct operation
and safety

 Appropriatepersonal protective equipment is used and OHS


policies and procedures are followed

 Copper cable splicing is performed based on Electronic


Industries Alliance/Telecommunications Industry Association
(EIA/TIA) standards

 Network cables and cable raceway areinstalled in


accordance with established procedures and installation
requirements
 Installation work is performed and is checked to ensure no
unnecessary damage has occurred and complies with
requirements
.
 OHS standards and 5S principles are followed according to
enterprise requirements

 Excess components and materials are disposed of based on


WEEE directives and 3Rs waste management program

 Network connectivity of each terminal is checked in


accordance with network design.
 Any fault or problem in the networksystem is diagnosed and
remedied in line with the standard operating procedures.
 Network interface card (NIC) settings are configured in
accordance with network design.
 Communication checking between terminals are carried out
in accordance with OS network configuration guides
 Unplanned events or conditions are responded to in
accordance with established procedures
 Client Device systems settings are configured in accordance
with manufacturers’ instructions and end-user preferences
 Local area network (LAN) port is configured in accordance
with manufacturers’ instructions and network design
 Wide area network (WAN) port is configured in accordance
with manufacturers’ instructions and network design
 Wireless settings are configured in accordance
manufacturers’ instructions, network design and end-user
preferences
 Security/Firewall/Advance settings are configured in
accordance with manufacturers’ instructions and end-user
preferences
 Final inspections are undertaken to ensure that the
configuration done on the computer networks conforms
with the manufacturer’s instruction/manual
 Computer networks are checked to ensure safe
operation.
 Reports are prepared and completed according to
company requirements.
 * Assembled Computer Hardware
 * Installed operating system and drivers for
peripherals/devices
 * Installed application software
 * Conducted testing and documentation

NOTE: * Critical Aspects of Competency