Work Program

Date:
Project: Construction of Patiya Pump Station (BJWSP) under CWASA
Client: CWASA
Contractor: M/S Zahan Enterprise.
Month October November
Description Date 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1.0 For Test Load 280 MT(TP-1)
1.1 Mobilization of Testing Equipment
1.2 Test Preparation and setup
1.3 Conducting Test
1.4 Equipment Transfer from TP-1 to TP2
2.0 For Test Load 120 MT (TP-2)
2.2 Test Preparation and setup
2.3 Conducting Test
2.4 Demobilization
3.0 For Test Load 580 MT (TP-3)
3.1 Test Preparation and setup
3.3 Conducting Test
3.4 Equipment Transfer from TP-3 to TP-4
4.0 For Test Load 580 MT (TP-4)
4.1 Test Preparation and setup
4.2 Conducting Test
4.3 Demobilization