AFRA CORPORATION LTD.


PROJECT: WESTERN BANGLADESH BRIDGE IMPROVEMENT PROJECT. (PW-06N) METHOD OF BORING: Rotary

CLIENT: Roads & Highways Department (RHD) BORING GROUND: Dry Land

CONTRACTOR: Concord Pragatee Consortium Ltd. DATE OF STARTING: 22.11.2020

BRIDGE NAME : Debok Bazar LOCATION: Abutment-01 DATE OF COMPLETION: 26.11.2020

BORE HOLE NAME: BH-01 (06N-07-A1) BOREHOLE DEPTH: 46.0 m

INCLINATION: Vertical Bore Hole water level (after 24 hours): m MSL DIA OF BORING: 100mm

BTM Coordinate & EGL of the refference BM: BTM Coordinate & EGL of the refference Bore hole:

N=707981.837 E=448467.439 RL= 13.463 m MSL N= 707998.096 E= 448535.662 RL= 8.21 m MSL

Setting of hammer blows on Auto trip hammer: 22 blows/min Sample Index: Undisturbed Disturbed
Blow Count
UDS Sample No.

Layer Thickness
Type of Sample

Standard Penetration Resistance


DS Sample No.

Graphic Log
300
Depth(m)

150mm 150mm 150mm (SPT) Curve


Description of mm
(m)
RL

Strata Materials

S P T (N)
Blows per300 mm
75mm

75mm

75mm

75mm
75mm

75mm

10

30
40

60
70

90
20

50

80
0
0.0
DS-01 1.0 7.2 1.0 Grayish Soft Sandy Silt 1 0 1 1 1 1 4
1.0 4

DS-02 2.0 6.2 1 1 1 2 1 2 6 2.0 6

Grayish Loose Silty 3.0 6


DS-03 3.0 5.2 3.0 1 1 1 2 1 2 6
Sand
4.0 7
DS-04 4.0 4.2 1 2 2 2 1 2 7
5.0 11
DS-05 5.0 3.2 2 2 2 2 2 5 11
6.0 14

DS-06 6.0 2.2 2 2 3 4 3 4 14 7.0 11

DS-07 7.0 1.2 2 3 3 3 3 2 11 8.0 16

9.0 14
DS-08 8.0 0.2 2 3 3 4 4 5 16
10.0 16

DS-09 9.0 -0.8 4 3 3 4 3 4 14 11.0


15
DS-10 10.0 -1.8 2 4 4 4 4 4 16 12.0

13.0 22
DS-11 11.5 -3.3 2 3 3 4 4 4 15
14.0
DS-12 13.0 -4.8 3 3 4 6 5 7 22 18
Depth (m)

Grayish Medium Dense 15.0


21.0
Silty Sand
DS-13 14.5 -6.3 3 3 4 4 5 5 18 16.0 21

DS-14 16.0 -7.8 3 4 4 5 6 6 21 17.0


16
18.0
DS-15 17.5 -9.3 3 3 4 4 4 4 16
19.0 19

DS-16 19.0 -10.8 3 4 5 5 4 5 19


20.0
19
DS-17 20.5 -12.3 3 3 4 4 5 6 19 21.0

22.0 21
DS-18 22.0 -13.8 4 4 5 5 5 6 21
23.0
DS-19 23.5 -15.3 4 5 5 7 7 8 27 27
24.0
DS-20 25.0 -16.8 4 5 5 6 6 6 23 25.0 23

Page 1 of 2
Page 2 of 2

AFRA CORPORATION LTD.


PROJECT: WESTERN BANGLADESH BRIDGE IMPROVEMENT PROJECT. (PW-06N) METHOD OF BORING: Rotary

CLIENT: Roads & Highways Department (RHD) BORING GROUND: Dry Land

CONTRACTOR: Concord Pragatee Consortium Ltd. DATE OF STARTING: 22.11.2020

BRIDGE NAME : Debok Bazar LOCATION: Abutment-01 DATE OF COMPLETION: 26.11.2020

BORE HOLE NAME: BH-01 (06N-07-A1) BOREHOLE DEPTH: 46.0 m

INCLINATION: Vertical Bore Hole water level (after 24 hours): m MSL DIA OF BORING: 100mm

BTM Coordinate & EGL of the refference BM: BTM Coordinate & EGL of the refference Bore hole:

N=707981.837 E=448467.439 RL= 13.463 m MSL N= 707998.096 E= 448535.662 RL= 8.21 m MSL

Setting of hammer blows on Auto trip hammer: 22 blows/min Sample Index: Undisturbed Disturbed

Blow Count
UDS Sample No.

Layer Thickness
Type of Sample

Standard Penetration Resistance


DS Sample No.

Graphic Log
Depth(m)

300 (SPT) Curve


Description of 150mm 150mm 150mm
(m)

mm
RL

Strata Materials

S P T (N)
Blows per300 mm
75mm

75mm

75mm

75mm
75mm

75mm

20
30
40
50
60
70

90
10

80
0
25.0

DS-21 26.5 -18.3 5 6 6 7 7 9 29 26.5 29

DS-22 28.0 -19.8 5 6 6 8 8 9 31 28.0 31


Grayish Medium Dense
6.0
to Dense Silty Sand
DS-23 29.5 -21.3 5 5 8 9 8 10 35
29.5 35

DS-24 31.0 -22.8 6 8 8 10 11 14 43


31.0 43

DS-25 32.5 -24.3 13 15 12 15 15 8 50


32.5 50/258mm

DS-26 34.0 -25.8 16 22 20 20 10 50


34.0 50/195mm
Grayish Very Dense Silty
6.0
Sand with Gravel
DS-27 35.5 -27.3 15 18 23 27 50
35.5 50/148mm

DS-28 37.0 -28.8 11 7 8 12 14 16 50


37.0 50/88mm
Depth (m)

DS-29 38.5 -30.3 13 13 16 18 16 50


38.5 50/210mm

DS-30 40.0 -31.8 12 16 15 18 17 50


40.0 50/220mm

DS-31 41.5 -33.3 12 15 17 20 13 50 50/205mm


Grayish Very Dense Silty 41.5
9.0
Sand
DS-32 43.0 -34.8 11 11 13 16 17 4 50
43.0
50/145mm

DS-33 44.5 -36.3 13 14 17 25 8 50


44.5
50/155mm

DS-34 46.0 -37.8 10 12 18 22 10 50 50/200mm


46.0

Terminated for Hard Soil

Page 2 of 2