PROJECT: Geotechnical Investigation Works in Dhaka (BG), Khulna and Sylhet TTC
CLIENT: BETS Consulting Services Ltd. BORING LOG:
PROJECT NO: SIBD2009 BH 01
LOCATION: BGTTC, Mirpur, Dhaka
DRILLING DATE STARTED: 24-07-2020 BOREHOLE DIA: 100 mm NORTHING: 2634970.917 m
DRILLING DATE COMPLETED: 25-07-2020 FLUSHING MEDIUM: Water EASTING: 230977.803 m
PREPARED BY: Shofiul Alam Sayem DRILLING METHOD: Percussion REDUCED LEVEL: 14.845 m
CHECKED BY: Aminul Islam FIELD SUPERVISOR: Zahidul Islam Imran PERCHED WL*:2 m dated 26-07-2020
PL WC LL
SPT N blows/30cm

blows/30cm
Rock Shear Strength
(Thickness)

Type & No.

Deposition
Geological
Depth (m)

Soil Type
Level (m)
Reduced

Graphic

(USCS)
Legend

SPT N
20 40 60 80 20 40 60 80
Scale

RQD (%)
Log

TCR (%)
Grain Size
Description Undrained Shear Strength Analysis C Bulk Density
kN/m2 Mg/m5
20 40 60 80 G/SA/S/C (kN/m2) (°) 1.3 1.6 1.9 2.2
Medium stiff to stiff red and greyish
1 red fat CLAY (Alluvial Silt and Clay)
1.50 8
2 SPT1
1.95
3 3.00 12
(7.00) SPT2
3.45 CL asc
4
4.50 10
5 SPT3
4.95
6 6.00 16
SPT4
7 7.85 7.00 6.45
Stiff to very stiff greyish red,
8 greyish brown and brown silty
CLAY (Alluvial Silt and Clay)
9 9.00 9
SPT6
10 (6.00) 9.45
CL-ML asc
10.50 9
11 SPT7
10.95
12 12.00 12
SPT8
12.45
13 1.85 13.00

(1.50)
13.50 Very stiff brown Clayey SILT 16
14 SPT9 (Alluvial Silt and Clay) MH asc
0.35 14.50 13.95
15 15.00 Medium dense to dense brown silty 17
SPT10 fine SAND (Alluvial Sand)
16 15.45

16.50 14
17 SPT11
16.95
18 18.00
(7.50) 18
SPT12 SM asc
19 18.45

19.50 20
20 SPT13
19.95
21 21.00 34
SPT14
21.45
22 -7.16 22.00

(1.50)
22.50 Hard brown sandy SILT (Alluvial 37
23 SPT15 Silt and Clay) MS asc
22.95
-8.66 23.50
24 24.00 Dense brown silty fine-medium 41
SPT16 SAND (Alluvial Sand)
24.45
25
25.50 40
26 SPT17
25.95
BORING LOG SYLHET.GPJ SINGAPORE LTA AGS3.GDT 18-8-20

27 (6.95) 27.00 47 SM asd


SPT18
28 27.45

28.50 44
29 SPT19
28.95
30 30.00 47
-15.61 30.45 SPT20
31 30.45 Borehole terminated at 30.45m

32
RQD/TCR(%)

LEGEND: Standard Penetration Test (SPT) Attempted (UD*), (OD*), (PS*), (MZ*) & (DS*)
Pressuremeter Test (PMT)

Vane Shear Test (V) Undisturbed Sample (UD)


Piston Sample (PS) TCR
Open Drive Thickwall Sample (OD)
Permeability Test (PBT)
Mazier Sample (MZ)
Packer Test (PKT) Core Run (CR) RQD
Ground Instrumentation & Engineering Denison Sample (DS)
REMARKS:
*WL - Ground Water Level observed from Borehole (BGL)
Sheet 1 of 1

PROJECT: Geotechnical Investigation Works in Dhaka (BG), Khulna and Sylhet TTC
CLIENT: BETS Consulting Services Ltd. BORING LOG:
PROJECT NO: SIBD2009 BH 02
LOCATION: BGTTC, Mirpur, Dhaka
DRILLING DATE STARTED: 25-07-2020 BOREHOLE DIA: 100 mm NORTHING: 2634951.786 m
DRILLING DATE COMPLETED: 26-07-2020 FLUSHING MEDIUM: Water EASTING: 230957.206 m
PREPARED BY: Shofiul Alam Sayem DRILLING METHOD: Percussion REDUCED LEVEL: 14.718 m
CHECKED BY: Aminul Islam FIELD SUPERVISOR: Zahidul Islam Imran PERCHED WL*:0.8 m dated 27-07-2020
PL WC LL
SPT N blows/30cm

blows/30cm
Rock Shear Strength
(Thickness)

Type & No.

Deposition
Geological
Depth (m)

Soil Type
Level (m)
Reduced

Graphic

(USCS)
Legend

SPT N
20 40 60 80 20 40 60 80
Scale

RQD (%)
Log

TCR (%)
Grain Size
Description Undrained Shear Strength Analysis C Bulk Density
kN/m2 Mg/m5
20 40 60 80 G/SA/S/C (kN/m2) (°) 1.3 1.6 1.9 2.2
Medium stiff to stiff red and greyish
1 red Elastic SILT (Alluvial Silt and
1.50 Clay) 8
2 SPT1
1.95
(5.50)
3 3.00 MH asc
13
SPT2
3.45
4

5
9.22 5.50
6 Stiff to very stiff greyish red,
reddish brown and brown SILT with
7 traces of sand (Alluvial Silt and
Clay)
8

9 9.00 16
SPT6
10 (9.00) 9.45
ML asc
10.50 14
11 SPT7
10.95
12 12.00 11
SPT8
12.45
13
13.50 12
14 SPT9
0.22 14.50 13.95
15 15.00 Medium dense to dense brown and 15
SPT10 reddish brown silty fine SAND
15.45
16 (Alluvial Sand)
16.50 18
17 SPT11
16.95
18 18.00 22
SPT12
19 18.45

19.50 20
20 SPT13
19.95
21 21.00 26
SPT14
21.45
22 (15.00)
SM asd
22.50 37
23 SPT15
22.95
24 24.00 40
SPT16
24.45
25
25.50 46
26 SPT17
25.95
BORING LOG SYLHET.GPJ SINGAPORE LTA AGS3.GDT 18-8-20

27 27.00 43
SPT18
28 27.45

28.50 37
29 SPT19
-14.78 29.50 28.95
30 (0.95) 30.00 Hard brownish grey SILT with fine 42 ML asc
-15.73 30.45 SPT20 sand (Alluvial Silt and Clay)
31 30.45
Borehole terminated at 30.45m
32
RQD/TCR(%)

LEGEND: Standard Penetration Test (SPT) Attempted (UD*), (OD*), (PS*), (MZ*) & (DS*)
Pressuremeter Test (PMT)

Vane Shear Test (V) Undisturbed Sample (UD)


Piston Sample (PS) TCR
Open Drive Thickwall Sample (OD)
Permeability Test (PBT)
Mazier Sample (MZ)
Packer Test (PKT) Core Run (CR) RQD
Ground Instrumentation & Engineering Denison Sample (DS)
REMARKS:
*WL - Ground Water Level observed from Borehole (BGL)
Sheet 1 of 1

PROJECT: Geotechnical Investigation Works in Dhaka (BG), Khulna and Sylhet TTC
CLIENT: BETS Consulting Services Ltd. BORING LOG:
PROJECT NO: SIBD2009 BH 03
LOCATION: BGTTC, Mirpur, Dhaka
DRILLING DATE STARTED: 26-07-2020 BOREHOLE DIA: 100 mm NORTHING: 2634984.881 m
DRILLING DATE COMPLETED: 27-07-2020 FLUSHING MEDIUM: Water EASTING: 230932.625 m
PREPARED BY: Shofiul Alam Sayem DRILLING METHOD: Percussion REDUCED LEVEL: 14.826 m
CHECKED BY: Aminul Islam FIELD SUPERVISOR: Zahidul Islam Imran PERCHED WL*:0.8 m dated 28-07-2020
PL WC LL
SPT N blows/30cm

blows/30cm
Rock Shear Strength
(Thickness)

Type & No.

Deposition
Geological
Depth (m)

Soil Type
Level (m)
Reduced

Graphic

(USCS)
Legend

SPT N
20 40 60 80 20 40 60 80
Scale

RQD (%)
Log

TCR (%)
Grain Size
Description Undrained Shear Strength Analysis C Bulk Density
kN/m2 Mg/m5
20 40 60 80 G/SA/S/C (kN/m2) (°) 1.3 1.6 1.9 2.2
Medium stiff to stiff red silty CLAY
1 (Alluvial Silt and Clay)
1.50 6
2 SPT1
1.95
3 3.00 5
(7.00) SPT2
3.45 CL-ML asc
4
4.50 14
5 SPT3
4.95
6 6.00 8
SPT4
7 7.83 7.00 6.45

7.50 Stiff to very stiff brownish red fat 18


8 SPT5 CLAY (Alluvial Silt and Clay)
7.95
9 9.00
(4.50) 15
SPT6 CL asc
10 9.45

10.50 10
11 SPT7
3.33 11.50 10.95
12 12.00 Stiff to very stiff brown, greyish 13
SPT8 brown SILT with traces of sand
12.45
13 (Alluvial Silt and Clay)
13.50 18
(4.50) SPT9
14 ML asc
13.95
15 15.00 21
SPT10
16 -1.17 16.00 15.45

16.50 Medium dense to dense brown 24


17 SPT11 Silty fine SAND (Alluvial Sand)
16.95
18 18.00 19
SPT12
19 18.45

19.50 24
(7.50)
20 SPT13 SM asd
19.95
21 21.00 34
SPT14
21.45
22
22.50 34
23 SPT15
22.95
-8.67 23.50
24 24.00 Hard brown Sandy SILT (Alluvial 43
SPT16 Silt and Clay)
24.45
25
25.50 46
26 SPT17
25.95
BORING LOG SYLHET.GPJ SINGAPORE LTA AGS3.GDT 18-8-20

(6.00)
MS asc
27 27.00 44
SPT18
28 27.45

28.50 45
29 SPT19
-14.67 29.50 28.95
30 (0.95) 30.00 Hard brownish grey Silty CLAY 34 CL-ML asc
-15.62 30.45 SPT20 (Alluvial Silt and Clay)
31 30.45
Borehole terminated at 30.45m
32
RQD/TCR(%)

LEGEND: Standard Penetration Test (SPT) Attempted (UD*), (OD*), (PS*), (MZ*) & (DS*)
Pressuremeter Test (PMT)

Vane Shear Test (V) Undisturbed Sample (UD)


Piston Sample (PS) TCR
Open Drive Thickwall Sample (OD)
Permeability Test (PBT)
Mazier Sample (MZ)
Packer Test (PKT) Core Run (CR) RQD
Ground Instrumentation & Engineering Denison Sample (DS)
REMARKS:
*WL - Ground Water Level observed from Borehole (BGL)
Sheet 1 of 1

PROJECT: Geotechnical Investigation Works in Dhaka (BG), Khulna and Sylhet TTC
CLIENT: BETS Consulting Services Ltd. BORING LOG:
PROJECT NO: SIBD2009 BH 04
LOCATION: BGTTC, Mirpur, Dhaka
DRILLING DATE STARTED: 08-08-2020 BOREHOLE DIA: 100 mm NORTHING: 2635017.002 m
DRILLING DATE COMPLETED: 09-08-2020 FLUSHING MEDIUM: Water EASTING: 230954.890 m
PREPARED BY: Shofiul Alam Sayem DRILLING METHOD: Percussion REDUCED LEVEL: 14.628 m
CHECKED BY: Aminul Islam FIELD SUPERVISOR: Zahidul Islam Imran PERCHED WL*:2 m dated 10-08-2020
PL WC LL
SPT N blows/30cm

blows/30cm
Rock Shear Strength
(Thickness)

Type & No.

Deposition
Geological
Depth (m)

Soil Type
Level (m)
Reduced

Graphic

(USCS)
Legend

SPT N
20 40 60 80 20 40 60 80
Scale

RQD (%)
Log

TCR (%)
Grain Size
Description Undrained Shear Strength Analysis C Bulk Density
kN/m2 Mg/m5
20 40 60 80 G/SA/S/C (kN/m2) (°) 1.3 1.6 1.9 2.2
Soft red fat CLAY (Alluvial Silt and
1
(2.50)
Clay)
1.50 CH asc
4
2 SPT1
1.95
12.13 2.50
3 3.00 Stiff to very stiff red and brownish 9
SPT2 red silty CLAY (Alluvial Silt and
3.45
4 Clay)
4.50 11
5 SPT3
4.95
6 6.00 14
SPT4
7 (9.00) 6.45
CL-ML asc
7.50 16
8 SPT5
7.95
9 9.00 19
SPT6
10 9.45

10.50 12
11 SPT7
3.13 11.50 10.95
12 12.00 Stiff to very stiff brown and reddish 11
SPT8 brown clayey SILT with sand
12.45
13 (Alluvial Silt and Clay)
13.50 12
(4.50) SPT9
14 MH asc
13.95
15 15.00 24
SPT10
16 -1.37 16.00 15.45

16.50 Medium dense to dense brown silty 23


17 SPT11 fine SAND (Alluvial Sand)
16.95
18 18.00 18
SPT12
19 18.45

19.50 24
20 SPT13
19.95
21 21.00 36
SPT14
21.45
22
22.50 37
(13.50) SPT15
23 SM asd
22.95
24 24.00 39
SPT16
24.45
25
25.50 42
26 SPT17
25.95
BORING LOG SYLHET.GPJ SINGAPORE LTA AGS3.GDT 18-8-20

27 27.00 40
SPT18
28 27.45

28.50 44
29 SPT19
-14.87 29.50 28.95
30 (0.95) 30.00 Hard brownish grey Silty CLAY with 41 CL-ML asc
-15.82 30.45 SPT20 traces of sand (Alluvial Silt and
30.45
31 Clay)
Borehole terminated at 30.45m
32
RQD/TCR(%)

LEGEND: Standard Penetration Test (SPT) Attempted (UD*), (OD*), (PS*), (MZ*) & (DS*)
Pressuremeter Test (PMT)

Vane Shear Test (V) Undisturbed Sample (UD)


Piston Sample (PS) TCR
Open Drive Thickwall Sample (OD)
Permeability Test (PBT)
Mazier Sample (MZ)
Packer Test (PKT) Core Run (CR) RQD
Ground Instrumentation & Engineering Denison Sample (DS)
REMARKS:
*WL - Ground Water Level observed from Borehole (BGL)
Sheet 1 of 1

PROJECT: Geotechnical Investigation Works in Dhaka (BG), Khulna and Sylhet TTC
CLIENT: BETS Consulting Services Ltd. BORING LOG:
PROJECT NO: SIBD2009 BH 05
LOCATION: BGTTC, Mirpur, Dhaka
DRILLING DATE STARTED: 05-08-2020 BOREHOLE DIA: 100 mm NORTHING: 2634954.355 m
DRILLING DATE COMPLETED: 06-08-2020 FLUSHING MEDIUM: Water EASTING: 230965.289 m
PREPARED BY: Shofiul Alam Sayem DRILLING METHOD: Percussion REDUCED LEVEL: 14.756 m
CHECKED BY: Aminul Islam FIELD SUPERVISOR: Zahidul Islam Imran PERCHED WL*:3 m dated 07-08-2020
PL WC LL
SPT N blows/30cm

blows/30cm
Rock Shear Strength
(Thickness)

Type & No.

Deposition
Geological
Depth (m)

Soil Type
Level (m)
Reduced

Graphic

(USCS)
Legend

SPT N
20 40 60 80 20 40 60 80
Scale

RQD (%)
Log

TCR (%)
Grain Size
Description Undrained Shear Strength Analysis C Bulk Density
kN/m2 Mg/m5
20 40 60 80 G/SA/S/C (kN/m2) (°) 1.3 1.6 1.9 2.2
Stiff to very stiff brown and red fat
1 CLAY (Alluvial Silt and Clay)
1.50 9
2 SPT1
1.95
3 3.00 12
SPT2
3.45
4
4.50 8
5 SPT3
4.95
6
(13.00)
CH asc
7
7.50 13
8 SPT5
7.95
9 9.00 10
SPT6
10 9.45

10.50 8
11 SPT7
10.95
12 12.00 9
SPT8
12.45
13 1.76 13.00
13.50 Stiff to very stiff brown and greyish 15
14 SPT9 brown clayey SILT (Alluvial Silt and
13.95
(3.00) Clay) MH asc
15 15.00 14
SPT10
16 -1.24 16.00 15.45

16.50 Medium dense to dense brown silty 20


17 SPT11 fine SAND (Alluvial Sand)
16.95
18 18.00 20
SPT12
19 18.45

19.50 24
20 SPT13
19.95
21 21.00 27
SPT14
21.45
22
22.50 28
(13.50) SPT15
23 SM asd
22.95
24 24.00 40
SPT16
24.45
25
25.50 38
26 SPT17
25.95
BORING LOG SYLHET.GPJ SINGAPORE LTA AGS3.GDT 18-8-20

27 27.00 43
SPT18
28 27.45

28.50 44
29 SPT19
-14.74 29.50 28.95
30 (0.95) 30.00 Hard brownish grey silty CLAY 40 CL-ML asc
-15.69 30.45 SPT20 (Alluvial Silt and Clay)
31 30.45
Borehole terminated at 30.45m
32
RQD/TCR(%)

LEGEND: Standard Penetration Test (SPT) Attempted (UD*), (OD*), (PS*), (MZ*) & (DS*)
Pressuremeter Test (PMT)

Vane Shear Test (V) Undisturbed Sample (UD)


Piston Sample (PS) TCR
Open Drive Thickwall Sample (OD)
Permeability Test (PBT)
Mazier Sample (MZ)
Packer Test (PKT) Core Run (CR) RQD
Ground Instrumentation & Engineering Denison Sample (DS)
REMARKS:
*WL - Ground Water Level observed from Borehole (BGL)
Sheet 1 of 1

PROJECT: Geotechnical Investigation Works in Dhaka (BG), Khulna and Sylhet TTC
CLIENT: BETS Consulting Services Ltd. BORING LOG:
PROJECT NO: SIBD2009 BH 06
LOCATION: BGTTC, Mirpur, Dhaka
DRILLING DATE STARTED: 09-08-2020 BOREHOLE DIA: 100 mm NORTHING: 2635002.106 m
DRILLING DATE COMPLETED: 10-08-2020 FLUSHING MEDIUM: Water EASTING: 230940.576 m
PREPARED BY: Shofiul Alam Sayem DRILLING METHOD: Percussion REDUCED LEVEL: 14.242 m
CHECKED BY: Aminul Islam FIELD SUPERVISOR: Zahidul Islam Imran PERCHED WL*:1 m dated 11-08-2020
PL WC LL
SPT N blows/30cm

blows/30cm
Rock Shear Strength
(Thickness)

Type & No.

Deposition
Geological
Depth (m)

Soil Type
Level (m)
Reduced

Graphic

(USCS)
Legend

SPT N
20 40 60 80 20 40 60 80
Scale

RQD (%)
Log

TCR (%)
Grain Size
Description Undrained Shear Strength Analysis C Bulk Density
kN/m2 Mg/m5
20 40 60 80 G/SA/S/C (kN/m2) (°) 1.3 1.6 1.9 2.2
Medium stiff to stiff greyish brown
1 and red fat CLAY (Alluvial Silt and
1.50 Clay)
2 SPT1
1.95
3 3.00
SPT2
3.45
4
4.50
5 SPT3
4.95
6 6.00
(13.00) SPT4
6.45 CL asc
7
7.50
8 SPT5
7.95
9 9.00
SPT6
10 9.45

10.50
11 SPT7
10.95
12 12.00
SPT8
12.45
13 1.24 13.00
13.50 Stiff to very stiff brown fine sandy
14 SPT9 SILT (Alluvial Silt and Clay)
(3.00) 13.95
MS asc
15 15.00
SPT10
16 -1.76 16.00 15.45

16.50 Medium dense to dense brown


17 SPT11 Silty fine SAND (Alluvial Sand)
16.95
18 18.00
SPT12
19 18.45

19.50
20 SPT13
19.95
21 21.00
SPT14
21.45
22
22.50
23 SPT15
(14.45) 22.95 SM asd
24 24.00
SPT16
24.45
25
25.50
26 SPT17
25.95
BORING LOG SYLHET.GPJ SINGAPORE LTA AGS3.GDT 18-8-20

27 27.00
SPT18
28 27.45

28.50
29 SPT19
28.95
30 30.00
-16.21 30.45 SPT20
31 30.45 Borehole terminated at 30.45m

32
RQD/TCR(%)

LEGEND: Standard Penetration Test (SPT) Attempted (UD*), (OD*), (PS*), (MZ*) & (DS*)
Pressuremeter Test (PMT)

Vane Shear Test (V) Undisturbed Sample (UD)


Piston Sample (PS) TCR
Open Drive Thickwall Sample (OD)
Permeability Test (PBT)
Mazier Sample (MZ)
Packer Test (PKT) Core Run (CR) RQD
Ground Instrumentation & Engineering Denison Sample (DS)
REMARKS:
*WL - Ground Water Level observed from Borehole (BGL)
Sheet 1 of 1

PROJECT: Geotechnical Investigation Works in Dhaka (BG), Khulna and Sylhet TTC
CLIENT: BETS Consulting Services Ltd. BORING LOG:
PROJECT NO: SIBD2009 BH 07
LOCATION: BGTTC, Mirpur, Dhaka
DRILLING DATE STARTED: 06-08-2020 BOREHOLE DIA: 100 mm NORTHING: 2635008.553 m
DRILLING DATE COMPLETED: 07-08-2020 FLUSHING MEDIUM: Water EASTING: 230948.519 m
PREPARED BY: Shofiul Alam Sayem DRILLING METHOD: Percussion REDUCED LEVEL: 14.437 m
CHECKED BY: Aminul Islam FIELD SUPERVISOR: Zahidul Islam Imran PERCHED WL*:1 m dated 08-08-2020
PL WC LL
SPT N blows/30cm

blows/30cm
Rock Shear Strength
(Thickness)

Type & No.

Deposition
Geological
Depth (m)

Soil Type
Level (m)
Reduced

Graphic

(USCS)
Legend

SPT N
20 40 60 80 20 40 60 80
Scale

RQD (%)
Log

TCR (%)
Grain Size
Description Undrained Shear Strength Analysis C Bulk Density
kN/m2 Mg/m5
20 40 60 80 G/SA/S/C (kN/m2) (°) 1.3 1.6 1.9 2.2
Medium stiff to stiff red, brownish
1 red and greyish red fat CLAY with
1.50 traces of fine sand (Alluvial Silt and 7
2 SPT1 Clay)
1.95
3 3.00 3
SPT2
3.45
4
4.50 8
5 SPT3
4.95
6 6.00 11
(13.00) SPT4
6.45 CH asc
7
7.50 14
8 SPT5
7.95
9 9.00 14
SPT6
10 9.45

10.50 6
11 SPT7
10.95
12 12.00 7
SPT8
12.45
13 1.44 13.00
13.50 Stiff brown clayey SILT (Alluvial Silt 14
14 SPT9 and Clay)
(3.00) 13.95
MH asc
15 15.00 15
SPT10
16 -1.56 16.00 15.45

16.50 Medium dense to dense brown silty 20


17 SPT11 fine SAND (Alluvial Sand)
16.95
18 18.00 18
SPT12
19 18.45

19.50 22
20 SPT13
19.95
21 21.00 34
SPT14
21.45
22
22.50 31
(13.50) SPT15
23 MS asd
22.95
24 24.00 42
SPT16
24.45
25
25.50 35
26 SPT17
25.95
BORING LOG SYLHET.GPJ SINGAPORE LTA AGS3.GDT 18-8-20

27 27.00 38
SPT18
28 27.45

28.50 40
29 SPT19
-15.06 29.50 28.95
30 (0.95) 30.00 Hard brownish grey lean CLAY 34 CL asc
-16.01 30.45 SPT20 with traces of fine sand (Alluvial Silt
30.45
31 and Clay)
Borehole terminated at 30.45m
32
RQD/TCR(%)

LEGEND: Standard Penetration Test (SPT) Attempted (UD*), (OD*), (PS*), (MZ*) & (DS*)
Pressuremeter Test (PMT)

Vane Shear Test (V) Undisturbed Sample (UD)


Piston Sample (PS) TCR
Open Drive Thickwall Sample (OD)
Permeability Test (PBT)
Mazier Sample (MZ)
Packer Test (PKT) Core Run (CR) RQD
Ground Instrumentation & Engineering Denison Sample (DS)
REMARKS:
*WL - Ground Water Level observed from Borehole (BGL)
0 5 10 15 20 25 30 35 40 45 50 55 60 65
BH 05 02
BH BH 01 BH 03 BH 04
15 BH 06 BH 07

10

5
Reduced Level

-5

-10

-15
AGS3 LITHOLOGY SITEMAP SYLHET.GPJ SINGAPORE LTA AGS3.GDT 18-8-20

-20

BH 03

BH 02

BH 05 BH 06

BH 07

BH 01 BH 04

SUBSURFACE SECTION
Client: BETS Consulting Services Ltd.
GIE PTE LTD Project: Geotechnical Investigation works in BGTTC, Dhaka
Project Location: Technical Training Center, (BG) Mirpur, Dhaka.