Professional Documents
Culture Documents
NO FM-QCC-004
REV. NO 01
CHECK SHEET INSPECTION REV. DATE 17 January, 2019
Customer : PT. MEDCO E&P RIMAU Part No. : 10 Inspection by : Sofyan Doni / Firman Ibnu
Job No. : 20000271 Dwg No. : - Inspection Report : Finish Good
Quantity : 1 pcs Material : ASTM A105/N Heat Number : 203
ft
+1,0mm,
ID Bore Diameter VC 221,5mm -0,0mm
+3,0mm,
B Flange Thickness VC 55,6mm -0,0mm
NOTE :
Measuring tool used : Inspected by Reviewed by
-V = Visual - HG = Height Gauge -SR = Steel Ruller
- VC = Vernier Caliper - BP = Bevel Protactor
- UT = Ultrasonic Thickness
Date : Date :
DOC. NO FM-QCC-004
REV. NO 01
CHECK SHEET INSPECTION REV. DATE 17 January, 2019
Customer : PT. MEDCO E&P RIMAU Part No. : 10 Inspection by : Sofyan Doni / Firman Ibnu
Job No. : 20000271 Dwg No. : - Inspection Report :
Quantity : 1 pcs Material : ASTM A105/N
ft
+1,0mm,
ID Bore Diameter VC 221,5mm -0,0mm
+3,0mm,
B Flange Thickness VC 39,7mm -0,0mm
NOTE :
Measuring tool used : Inspected by Reviewed by
-V = Visual - HG = Height Gauge -SR = Steel Ruller
- VC = Vernier Caliper - BP = Bevel Protactor
- UT = Ultrasonic Thickness
Date : Date :