MOBI-03 Fencing work MOBI-02 Establish Temporary Servicies EARTH-03 Shoring ( I- Section Concrete pannel ) EARTH-02 Priliminary Earth Work EARTH-04 1st Phase Excavation EARTH-05 2nd stage Excavation & concrete panel instlation EARTH-07 Carting Excess Excavated material EARTH-06 Dewaterring EARTH-08 Formation of Deep Area EARTH-09 Compaction & Formation for Raft bed FOUND-02 Grounding FOUND-01 PCC Deep Area FOUND-03 PCC below RAFT FOUND-05 Rubberised Bitumen Coating FOUND-06 Waterproofing & Screed Protection FOUND-04 Vertical area water proffing FOUND-07 Steel work for RAFT MEP-01 Drainage pipe laying and testing (UG Drainage) FOUND-08 Raft Slab Casting (Part A&B) SUB-01 Retaining Wall SUB-06 Ramp Work SUB-02 Shear Wall & Lift Core Wall SUB-03 steel work for column SUB-04 Form work for column SUB-05 Column casting For GF Slab SUB-07 Decking Work for G.F Slab SUB-08 Steel Work for G.F Slab SUB-09 MEP sleves & conduits for G.F Slab SUB-10 Ground Floor Slab Casting SUB-11 Deshuttering SUB-12 Ramp Side RCC wall SUB-13 Rcc planters & side wall / upstaand SUCO-GF-02 steel work for column/A SUCO-GF-03 Form work for column/A SUCO-GF-01 Shear Wall /A SUCO-GF-04 Column casting For 1F/A Slab SUCO-GF-05 Decking work for 1F/ASlab SUCO-GF-07 Steel Work for 1F/A Slab SUCO-GF-08 MEP sleves & conduits for 1.F/A Slab SUCO-GF-09 First Floor Slab Casting[Part-A ] SUCO-GF-10 Deshuttring PART- A SUCO-GF-12 steel work for column SUCO-GF-11 Shear Wall & Lift Core Wall SUCO-GF-13 Form work for column SUCO-GF-14 Column casting For 1F Slab SUCO-GF-15 Decking work for 1F Slab SUCO-GF-17 Steel Work for 1F Slab SUCO-GF-18 MEP sleves & conduits for 1.F Slab SUCO-GF-19 First Floor Slab Casting[Part-B ] SUCO-GF-20 Deshuttering PART- B SUCO-GF-16 Ramp Side RCC wall SUCO-1F-01 steel work for column/A SUCO-1F-02 Form work for column/A SUCO-1F-03 Shear Wall /A SUCO-1F-04 Column casting For 2F/A Slab SUCO-1F-05 Decking work for 2F/ASlab SUCO-1F-06 Steel Work for 2F/A Slab SUCO-1F-07 MEP sleves & conduits for 2.F/A Slab SUCO-1F-08 Second Floor Slab Casting[Part-A ] SUCO-1F-09 Deshuttering PART- A SUCO-1F-11 Steel work for column SUCO-1F-12 Form work for column SUCO-1F-10 Shear Wall & Lift Core Wall SUCO-1F-13 Column casting For 2F Slab SUCO-1F-14 Decking Work for 2F Slab SUCO-1F-15 Steel Work for 2F Slab SUCO-1F-16 MEP sleves & conduits for 2 F Slab SUCO-1F-17 Second Floor Slab Casting [Part-B ] SUCO-1F-18 Deshuttering PART- B SUCO-2F-01 steel work for column/A SUCO-2F-02 Form work for column/A SUCO-2F-03 Shear Wall /A SUCO-2F-04 Column casting For 3F/A Slab SUCO-2F-05 Decking work for3F/ASlab SUCO-2F-06 Steel Work for3F/A Slab SUCO-2F-07 MEP sleves & conduits for 3 F/A Slab SUCO-2F-08 ThirdFloor Slab Casting[Part-A ] SUCO-2F-09 Third floor slab Deshuttering PART- A SUCO-2F-11 steel work for column SUCO-2F-10 Shear Wall SUCO-2F-12 Form work for column SUCO-2F-13 Column casting For 3F Slab SUCO-2F-14 Decking Work for 3F Slab SUCO-2F-15 Steel Work for 3F Slab SUCO-2F-16 MEP sleves & conduits for 3F Slab SUCO-2F-17 Third Floor Slab Casting [Part-B] SUCO-2F-18 Deshuttering PART- B SUCO-3F-01 steel work for column/A SUCO-3F-02 Form work for column/A SUCO-3F-03 Shear Wall /A SUCO-3F-04 Column casting For 4F/A Slab SUCO-3F-05 Decking work for 4F/ASlab SUCO-3F-06 Steel Work for4F/A Slab SUCO-3F-07 MEP sleves & conduits for4.F/A Slab SUCO-3F-08 Fourth Floor Slab Casting[Part-A ] SUCO-3F-09 Deshuttering PART- A SUCO-3F-11 steel work for column SUCO-3F-10 Shear Wall & Lift Core Wall SUCO-3F-12 Form work for column SUCO-3F-13 Column casting For 4F Slab SUCO-3F-14 Decking Work for 4F Slab SUCO-3F-15 Steel Work for 4F Slab SUCO-3F-16 MEP sleves & conduits for 4F Slab SUCO-3F-17 Fourth Floor Slab Casting [Part-B SUCO-3F-18 Deshuttering 4 F slab PART- B SUCO-4F-01 steel work for column/A SUCO-4F-02 Form work for column/A SUCO-4F-03 Shear Wall /A SUCO-4F-04 Column casting For5F/A Slab SUCO-4F-05 Decking work for 5F/ASlab SUCO-4F-06 Steel Work for 5F/A Slab SUCO-4F-07 MEP sleves & conduits for 5F/A Slab SUCO-4F-08 Fifth Floor Slab Casting[Part-A ] SUCO-4F-09 Deshuttering PART- A SUCO-4F-11 steel work for column SUCO-4F-10 Shear Wall & Lift Core Wall SUCO-4F-12 Form work for column SUCO-4F-13 Column casting For 5F Slab SUCO-4F-14 Decking Work for 5.F Slab SUCO-4F-15 Steel Work for 5.F Slab SUCO-4F-16 MEP sleves & conduits for 5.F Slab SUCO-4F-17 Fifth Floor Slab [Part-B] SUCO-4F-18 Deshuttering 5F Slab PART- B SUCO-5F-01 steel work for column/A SUCO-5F-02 Form work for column/A SUCO-5F-03 Shear Wall /A SUCO-5F-04 Column casting For 6F/A Slab SUCO-5F-05 Decking work for 6F/ASlab SUCO-5F-06 Steel Work for 6F/A Slab SUCO-5F-07 MEP sleves & conduits for 6 F/A Slab SUCO-5F-08 Sixth Floor Slab Casting[Part-A ] SUCO-5F-09 Deshuttering PART- A SUCO-5F-11 steel work for column SUCO-5F-10 Shear Wall & Lift Core Wall SUCO-5F-12 Form work for column SUCO-5F-13 Column casting For 6 F Slab SUCO-5F-14 Decking Work for 6.F Slab SUCO-5F-15 Steel Work for 6.F Slab SUCO-5F-16 MEP sleves & conduits for 6.F Slab SUCO-5F-17 Sixth Floor Slab Casting PART-B SUCO-5F-18 Deshuttering PART- B SUCO-6F-01 steel work for column/A SUCO-6F-02 Form work for column/A SUCO-6F-03 Shear Wall /A SUCO-6F-04 Column casting For 7F/A Slab SUCO-6F-05 Decking work for 7F/ASlab SUCO-6F-06 Steel Work for 7F/A Slab SUCO-6F-07 MEP sleves & conduits for 7F/A Slab SUCO-6F-08 Seventh Floor Slab Casting[Part-A ] SUCO-6F-09 Deshuttering PART- A SUCO-6F-11 steel work for column SUCO-6F-10 Shear Wall & Lift Core Wall SUCO-6F-12 Form work for column SUCO-6F-13 Column casting For 7F Slab SUCO-6F-14 Decking Work for 7.F Slab SUCO-6F-15 Steel Work for 7.F Slab SUCO-6F-16 MEP sleves & conduits for 7.F Slab SUCO-6F-17 Seventh Floor Slab Casting (PART-B) SUCO-6F-18 Deshuttering PART- B SUCO-7F-01 steel work for column/A SUCO-7F-02 Form work for column/A SUCO-7F-03 Shear Wall /A SUCO-7F-04 Column casting For RF /A Slab SUCO-7F-05 Decking work for RF/A Slab SUCO-7F-06 Steel Work for RF/A Slab SUCO-7F-07 MEP sleves & conduits for RF/A Slab SUCO-7F-08 Roof Floor Slab Casting[Part-A ] SUCO-7F-09 Deshuttering PART- A SUCO-7F-11 steel work for column SUCO-7F-10 Shear Wall & Lift Core Wall SUCO-7F-12 Form work for column SUCO-7F-13 Column casting For RF Slab SUCO-7F-14 Decking Work for R.F Slab SUCO-7F-15 Steel Work for R.F Slab SUCO-7F-16 MEP sleves & conduits for R.F Slab SUCO-7F-17 Roof Slab Casting (PART-B) SUCO-7F-18 Deshuttering PART- B SUCO-HC-01 steel work for column SUCO-HC-02 Shear Wall & Lift Core Wall SUCO-HC-03 Form work for column SUCO-HC-05 Parapet Wall SUCO-HC-04 Column casting SUCO-HC-07 Swimming pool Shell SUCO-HC-10 Pool Deck SUCO-HC-06 Decking Work for HC Slab SUCO-HC-09 MEP sleves & conduits for HC Slab SUCO-HC-08 Steel Work for HC Slab SUCO-HC-11 Helth Club Slab Casting SUCO-HC-12 Deshuttering SUCO-UR-03 steel work for column SUCO-UR-02 Shear Wall & Lift Core Wall SUCO-UR-04 Form work for column SUCO-UR-05 Parapet Wall above HC SUCO-UR-01 Column casting For lift m/c room SUCO-UR-06 Decking Work for lift m/c room SUCO-UR-08 MEP sleves & conduits for lift m/c room SUCO-UR-07 Steel Work for lift m/c room SUCO-UR-09 Lift m/c room Slab BLO-B-01 cleaning BLO-B-02 Block layout and checking BLO-B-03 Block work in Basement BLO-B-04 R.C.C Lintel PLAS-B-01 Wall Plaster - Basement PLAS-B-02 Celing Plaster-Basement FLO-B-02 marble flooring to lift loby A0EXAV-09 Earth filling above raft 8’’tk FLO-B-04 Marble Wall Clading to Lift Loby FLO-B-05 4’’ PCC with mesh FLO-B-07 Pump/ Store room flooring FLO-B-01 Car parking /Driveway Floor Finishing FLO-B-03 floor finish to water tank area FLO-B-06 Wall clading to Pump room FLO-B-08 Thrishold FAL-B-01 False Ceiling PANT-B-01 Internal wall & ceiling painting PANT-B-02 Anticarbonation painting in wall PANT-B-03 Final internal painting CARP-B-01 Fixing of Door Frame CARP-B-02 Fixing of Door Shutter A0MIS-01 Substation Trenching Work MET-01 Aluminium (LOUVER WORK) Substation PANT-GF-01 Transformer room painting A0PRO-17 Dewa Inspection Substation A0PRO-18 Sub station hand over to DEWA BLO-GF-01 cleaning BLO-GF-02 Block layout and checking BLO-GF-03 Internal Block Work BLO-GF-04 Block work- GF A0ON-GF-08 R.C.C Lintel PLAS-GF-02 Celing Plaster- GF PLAS-GF-01 Wall Plaster GF WPR-GF-02 GF- Parking W/P WPR-GF-01 Water proof coating to Wet areas WPR-GF-03 Vertical side w/p of wet area FLO-GF-08 Wet area wall clading ( garbage room) FLO-GF-06 Wet area flooring (ceramic tiles) WPR-GF-04 Water proofing to substation slab roof FLO-GF-02 Floor Screed for Electrical Room/gym/ FLO-GF-01 4’’ PCC with mesh FLO-GF-03 Floor Screed for M.hall FLO-GF-05 Floor Screed for Electricaal Sub-station FLO-GF-04 Car parking /Driveway Floor Finishing FLO-GF-07 Floor Screed for Gym / Shop FLO-GF-09 Mosaic flooring to stair floor & landing area FLO-GF-10 Floor Screed for Gen. Room FLO-GF-11 Store and other room flooring FLO-GF-12 mosaic step FLO-GF-14 Marble flooring to Entrance passage FLO-GF-15 mosaic skirting for steps FLO-GF-13 Threshold FLO-GF-17 Fixing Marble Steps FLO-GF-16 Marble Wall Clading to Lift Loby FAL-GF-01 False Ceiling PANT-GF-02 Internal wall & ceiling painting PANT-GF-03 Final internal painting PANT-GF-04 Anticarbonation painting in wall CARP-GF-01 Fixing of Door Frame CARP-GF-02 Fixing of Door Shutter CARP-GF-03 Fixing of Kitchen Cabinet CARP-GF-04 Fixing of Wardrobes MEP-GF-07 Sanitary fixing & Mixer BLO-1F-01 Cleaning BLO-1F-02 Block layout and checking BLO-1F-04 Block work- 1F BLO-1F-03 Internal Block Work A0ON-1F-07 R.C.C Lintel PLAS-1F-02 Celing Plaster- 1F PLAS-1F-01 Wall Plaster - 1F WPR-1F-02 Water proof coating to Wet areas WPR-1F-03 Vertical side w/p of wet area FL0-1F-10 Wet area -Ceramic Wall Clading FL0-1F-04 Wet area- Ceramic flooring FL0-1F-02 Floor Screed for Electrical Room FL0-1F-01 Ceramic flooring inside room FL0-1F-03 Ceramic tiling to balconey and terrase FL0-1F-05 Ceramic tile to entrance loby FL0-1F-06 Marble flooring to Corridor FL0-1F-07 Skirting FL0-1F-09 Corridor Wall Clading-Ceramic FL0-1F-08 Telephone room & other room flooring FL0-1F-11 Threshold FAL-1F-01 1F-Baalcony False Ceiling FAL-1F-02 False Ceiling PANT-1F-01 Internal wall & ceiling painting PANT-1F-02 Final internal painting CARP-1F-01 Fixing of Door Frame CARP-1F-02 Fixing of Door Shutter CARP-1F-03 Fixing of Kitchen Cabinet CARP-1F-04 Fixing of Wardrobes MEP-1F-08 Bath Tub Fixing MEP-1F-09 Sanitary fixing & Mixer BLO-2F-01 clening BLO-2F-02 Block layout and checking BLO-2F-04 Block work- 2F BLO-2F-03 Internal Block Work A0ON-2F-07 R.C.C Lintel PLAS-2F-01 Wall Plaster - 2F PLAS-2F-02 Celing Plaster- 2F WPR-2F-02 Water proof coating to Wet areas WPR-2F-03 Vertical side w/p of wet area FLO-2F-10 Wet area -Ceramic Wall Clading FLO-2F-05 Wet area- Ceramic flooring FLO-2F-01 Ceramic tile to entrance loby FLO-2F-02 Floor Screed for Electrical Room FLO-2F-03 Ceramic tile iside the room FLO-2F-04 Ceramic tiling to balconey and terrase FLO-2F-06 Marble flooring to Corridor FLO-2F-07 Skirting FLO-2F-09 Corridor Wall Clading-Ceramic FLO-2F-08 Telephone room & other room flooring FLO-2F-11 Threshold FAL-2F-01 2F-Baalcony False Ceiling FAL-2F-02 False Ceiling PANT-2F-01 Internal wall & ceiling painting PANT-2F-02 Final internal painting CARP-2F-01 Fixing of Door Frame CARP-2F-02 Fixing of Door Shutter CARP-2F-03 Fixing of Kitchen Cabinet CARP-2F-04 Fixing of Wardrobes MEP-2F-08 Bath Tub Fixing MEP-2F-09 Sanitary fixing & Mixer BLO-3F-01 cleaning BLO-3F-02 Block layout and checking BLO-3F-03 Block work -3F BLO-3F-04 Internal Block Work A0ON-3F-07 R.C.C Lintel PLAS-3F-01 Wall Plaster - 3F PLAS-3F-02 Celing Plaster- 3F WPR-3F-02 Water proof coating to Wet areas WPR-3F-03 Vertical side w/p of wet area FLO-3F-08 Wet area -Ceramic Wall Clading FLO-3F-03 Wet area- Ceramic flooring FLO-3F-01 Ceramic tiling to balconey and terrase FLO-3F-02 Ceramic tile iside the room FLO-3F-06 Floor Screed for Electrical Room FLO-3F-04 Ceramic tile to entrance loby FLO-3F-05 Skirting FLO-3F-07 Telephone room & other room flooring FLO-3F-09 Marble flooring to Corridor FLO-3F-10 Threshold FLO-3F-11 Corridor Wall Clading-Ceramic FAL-3F-01 3F-Baalcony False Ceiling FAL-3F-02 False Ceiling PANT-3F-01 Internal wall & ceiling painting PANT-3F-02 Final internal painting CARP-3F-01 Fixing of Door Frame CARP-3F-02 Fixing of Door Shutter CARP-3F-03 Fixing of Kitchen Cabinet CARP-3F-04 Fixing of Wardrobes MEP-3F-08 Bath Tub Fixing MEP-3F-09 Sanitary fixing & Mixer BLO-4F-01 cleaning BLO-4F-02 Block layout and checking BLO-4F-04 Block work -4F BLO-4F-03 Internal Block Work A0ON-4F-07 R.C.C Lintel PLAS-4F-01 Wall Plaster - 4F PLAS-4F-02 Celing Plaster- 4F WPR-4F-02 Water proof coating to Wet areas WPR-4F-03 Vertical side w/p of wet area FLO-4F-09 Wet area -Ceramic Wall Clading FLO-4F-08 Wet area- Ceramic flooring FLO-4F-02 Floor Screed for Electrical Room FLO-4F-01 Ceramic tile to entrance loby FLO-4F-03 Ceramic tiling to balconey and terrase FLO-4F-05 Marble flooring to Corridor FLO-4F-04 Ceramic tile iside the room FLO-4F-10 Telephone room & other room flooring FLO-4F-06 Corridor Wall Clading-Ceramic FLO-4F-07 Skirting FLO-4F-11 Threshold FAL-4F-01 4F-Balcony False Ceiling FAL-4F-02 False Ceiling PANT-4F-01 Internal wall & ceiling painting PANT-4F-02 Final internal painting CARP-4F-02 Fixing of Door Frame CARP-4F-03 Fixing of Door Shutter CARP-4F-01 Fixing of Kitchen Cabinet CARP-4F-04 Fixing of Wardrobes MEP-4F-08 Bath Tub Fixing MEP-4F-09 Sanitary fixing & Mixer BLO-5F-01 cleaning BLO-5F-02 Block layout and checking BLO-5F-04 Block work -5F BLO-5F-03 Internal Block Work A0ON-5F-07 R.C.C Lintel PLAS-5F-01 Wall Plaster - 5F PLAS-5F-02 Celing Plaster- 5F WRP-5F-02 Water proof coating to Wet areas WRP-5F-03 Vertical side w/p of wet area FLO-5F-10 Wet area -Ceramic Wall Clading FLO-5F-04 Wet area- Ceramic flooring FLO-5F-01 Floor Screed for Electrical Room FLO-5F-03 Ceramic tile to entrance loby FLO-5F-06 Marble flooring to Corridor FLO-5F-05 Ceramic tile iside the room FLO-5F-02 Ceramic tiling to balconey and terrase FLO-5F-08 Telephone room & other room flooring FLO-5F-07 Corridor Wall Clading-Ceramic FLO-5F-09 Skirting FLO-5F-11 Threshold FAL-5F-01 5F-Balcony False Ceiling FAL-5F-02 False Ceiling PANT-5F-01 Internal wall & ceiling painting PANT-5F-02 Final internal painting CARP-5F-02 Fixing of Door Frame CARP-5F-03 Fixing of Door Shutter CARP-5F-01 Fixing of Kitchen Cabinet CARP-5F-04 Fixing of Wardrobes MEP-5F-08 Bath Tub Fixing MEP-5F-09 Sanitary fixing & Mixer BLO-6F-01 cleaning BLO-6F-02 Block layout and checking BLO-6F-03 Block work -6F BLO-6F-04 Internal Block Work A0ON-6F-07 R.C.C Lintel PLAS-6F-01 Wall Plaster - 6F PLAS-6F-02 Celing Plaster- 6F WRP-6F-02 Water proof coating to Wet areas WRP-6F-03 Vertical side w/p of wet area FLO-6F-11 Wet area -Ceramic Wall Clading FLO-6F-05 Wet area- Ceramic flooring FLO-6F-01 Floor Screed for Electrical Room FLO-6F-03 Ceramic tile to entrance loby FLO-6F-04 Ceramic tile iside the room FLO-6F-02 Ceramic tiling to balconey and terrase FLO-6F-06 Skirting FLO-6F-09 Marble flooring to Corridor FLO-6F-10 Corridor Wall Clading-Ceramic FLO-6F-07 Telephone room & other room flooring FLO-6F-08 Threshold FAL-6F-01 6F-Balcony False Ceiling FAL-6F-02 False Ceiling PANT-6F-01 Internal wall & ceiling painting PANT-6F-02 Final internal painting CARP-6F-01 Fixing of Door Frame CARP-6F-02 Fixing of Door Shutter CARP-6F-03 Fixing of Kitchen Cabinet CARP-6F-04 Fixing of Wardrobes MEP-6F-08 Bath Tub Fixing MEP-6F-11 Sanitary fixing & Mixer BLO-7F-01 cleaning BLO-7F-02 Block layout and checking BLO-7F-03 Block work -7F BLO-7F-04 Internal Block Work A0ON-7F-07 R.C.C Lintel PLAS-7F-01 Wall Plaster - 7F PLAS-7F-02 Celing Plaster- 7F WRP-7F-02 Water proof coating to Wet areas WRP-7F-03 Vertical side w/p of wet area FLO-7F-11 Wet area -Ceramic Wall Clading FLO-7F-06 Wet area- Ceramic flooring FLO-7F-02 Floor Screed for Electrical Room FLO-7F-01 Ceramic tile to entrance loby FLO-7F-04 Skirting FLO-7F-03 Ceramic tile iside the room FLO-7F-05 Ceramic tiling to balconey and terrase FLO-7F-08 Marble flooring to coridoor FLO-7F-10 Corridor Wall Clading-Ceramic FLO-7F-07 Telephone room & other room flooring FLO-7F-09 Threshold FAL-7F-01 7F-Balcony False Ceiling FAL-7F-02 False Ceiling PANT-7F-01 Internal wall & ceiling painting PANT-7F-02 Final internal painting CARP-7F-01 Fixing of Door Frame CARP-7F-02 Fixing of Door Shutter CARP-7F-03 Fixing of Kitchen Cabinet CARP-7F-04 Fixing of Wardrobes MEP-7F-08 Bath Tub Fixing MEP-7F-12 Sanitary fixing & Mixer BLO-HC-01 cleaning BLO-HC-02 Block layout and checking BLO-HC-04 Internal Block Work BLO-HC-03 Block work -HC A0ON-HC-10 R.C.C Lintel - HC PLAS-HC-01 Wall Plaster - HC A0AS-HC-02 Celing Plaster- HC FLO-HC-07 rubber floor above screed in gym FLO-HC-09 rubber skirting FLO-HC-10 Graniti Ceramic tile( Steps to pool Dake Area) FLO-HC-11 swimming pool wall clading FLO-HC-14 Graniti Ceramic tile ( lift m/c room) WRP-HC-02 Water proof coating to Wet areas FLO-HC-02 White cement tiles WRP-HC-03 Vertical side w/p of wet area FLO-HC-04 wet area wall clading FLO-HC-05 Ceramic flooring to swiming pool wall A0LO-EX-02 Fixing of window sill FLO-HC-01 Floor Screed for Electrical / store / tel room FLO-HC-03 Marble flooring to lift loby FLO-HC-06 Threshold FLO-HC-08 Corridor Wall Clading-Ceramic FLO-HC-12 Ceramic flooring to Filter Room FLO-HC-13 Step to pool Deck PANT-HC-01 Lift Int .wall bitumen coating FAL-HC-01 False Ceiling PANT-HC-02 Internal wall & ceiling painting PANT-HC-03 Final internal painting PANT-HC-04 Epoxy painting to staircase CARP-HC-01 Fixing of Door Frame CARP-HC-02 Fixing of Door shutter MEP-HC-12 Sanitary fixing & Mixer BLO-UR-01 Block work-UR PLAS-UR-01 Wall Plaster- UR PLAS-UR-02 Celing Plaster- UR PLAS-UR-03 Staircase wall plaster PLAS-UR-04 Staircase Ceilling plaster CARP-UR-01 Fixing of Door Frame CARP-UR-02 Fixing of Door shutter MEP-B-02 MEP -Wall Conduites MEP-B-03 Fixing of DB Back box ,GI box MEP-B-04 Fixing of DB MEP-B-06 Internal wiring MEP-B-07 Main Cable work MEP-B-08 Switches & Sockets MEP-B-10 Instalation of Islolater for A/C MEP-B-09 Light Fittings MEP-GF-01 MEP -Wall Conduites MEP-GF-02 Fixing of DB Back box ,GI box MEP-GF-00 Fixing of DB MEP-GF-04 Internal wiring MEP-GF-06 Main Cable work MEP-GF-08 Switches & Sockets MEP-GF-10 Instalation of Islolater for A/C MEP-GF-09 Light Fittings MEP-1F-01 MEP -Wall Conduites MEP-1F-04 Fixing of DB Back box ,GI box MEP-1F-03 Fixing of DB MEP-1F-05 Internal wiring MEP-1F-07 Main Cable work MEP-1F-10 Switches & Sockets MEP-1F-12 Instalation of Islolater for A/C MEP-1F-11 Light Fittings MEP-2F-01 MEP -Wall Conduites MEP-2F-02 Fixing of DB Back box ,GI box MEP-2F-03 Fixing of DB MEP-2F-05 Internal wiring MEP-2F-07 Main Cable work MEP-2F-10 Switches & Sockets MEP-2F-12 Instalation of Islolater for A/C MEP-2F-11 Light Fittings MEP-3F-02 MEP -Wall Conduites MEP-3F-04 Fixing of DB Back box ,GI box MEP-3F-03 Fixing of DB MEP-3F-05 Internal wiring MEP-3F-07 Main Cable work MEP-3F-10 Switches & Sockets MEP-3F-12 Instalation of Islolater for A/C MEP-3F-11 Light Fittings MEP-4F-01 MEP -Wall Conduites MEP-4F-04 Fixing of DB Back box ,GI box MEP-4F-03 Fixing of DB MEP-4F-05 Internal wiring MEP-4F-07 Main Cable work MEP-4F-10 Switches & Sockets MEP-4F-15 Instalation of Islolater for A/C MEP-4F-14 Light Fittings MEP-5F-01 MEP -Wall Conduites MEP-5F-04 Fixing of DB Back box ,GI box MEP-5F-03 Fixing of DB MEP-5F-05 Internal wiring MEP-5F-07 Main Cable work MEP-5F-13 Switches & Sockets MEP-5F-15 Instalation of Islolater for A/C MEP-5F-14 Light Fittings MEP-6F-01 MEP -Wall Conduites MEP-6F-03 Fixing of DB Back box ,GI box MEP-6F-02 Fixing of DB MEP-6F-06 Internal wiring MEP-6F-07 Main Cable work MEP-6F-13 Switches & Sockets MEP-6F-15 Instalation of Islolater for A/C MEP-6F-14 Light Fittings MEP-7F-01 MEP -Wall Conduites MEP-7F-03 Fixing of DB Back box ,GI box MEP-7F-02 Fixing of DB MEP-7F-05 Internal wiring MEP-7F-07 Main Cable work MEP-7F-13 Switches & Sockets MEP-7F-14 Light Fittings MEP-7F-15 Instalation of Islolater for A/C MEP-HC-01 MEP -Wall Conduites MEP-HC-02 Fixing of DB MEP-HC-03 Fixing of DB Back box ,GI box MEP-UR-01 MEP Wall Conduites & instalation of DB Box MEP-HC-06 Internal wiring MEP-HC-08 Main Cable work MEP-HC-16 Switches & Sockets MEP-HC-17 Light Fittings MEP-HC-18 Instalation of Islolater for A/C MEP-B-01 Water supply PEX piping MEP-B-05 Water Supply PPR piping MEP-GF-03 Water supply PEX piping MEP-1F-02 Water supply PEX piping MEP-GF-05 Water Supply PPR piping MEP-2F-04 Water supply PEX piping MEP-3F-01 Water supply PEX piping MEP-1F-06 Water Supply PPR piping MEP-2F-06 Water Supply PPR piping MEP-4F-02 Water supply PEX piping MEP-3F-06 Water Supply PPR piping MEP-5F-02 Water supply PEX piping MEP-4F-06 Water Supply PPR piping MEP-6F-04 Water supply PEX piping MEP-5F-06 Water Supply PPR piping MEP-7F-04 Water supply PEX piping MEP-6F-05 Water Supply PPR piping MEP-HC-04 Water supply PEX piping MEP-7F-06 Water Supply PPR piping MEP-HC-05 Water Supply PPR piping MEP-HC-07 Above ground Drainage MEP-GF-11 Drainage Risers MEP-GF-12 Water supply Riser MEP-1F-13 Drainage Risers MEP-1F-14 Water supply Riser MEP-GF-15 Civil work for maanhole / fic /Sand traap /etc MEP-2F-13 Drainage Risers MEP-2F-14 Water supply Riser MEP-3F-13 Drainage Risers MEP-3F-14 Water supply Riser MEP-GF-13 Water Heater fixing MEP-4F-11 Drainage Risers MEP-4F-12 Water supply Riser MEP-1F-15 Water Heater fixing MEP-2F-15 Water Heater fixing MEP-5F-10 Drainage Risers MEP-5F-11 Water supply Riser MEP-3F-15 Water Heater fixing MEP-6F-09 Drainage Risers MEP-6F-10 Water supply Riser MEP-4F-13 Water Heater fixing MEP-7F-09 Drainage Risers MEP-7F-10 Water supply Riser MEP-5F-12 Water Heter fixing MEP-HC-09 Water supply Riser MEP-HC-10 Drainage Risers MEP-6F-12 Water Heater fixing MEP-HC-13 Roof water supply work MEP-7F-11 Water Heter fixing MEP-HC-11 Water Heter fixing MEP-HC-14 Water tank Instlation MEP-HC-15 Pump Fitting A0VAC-B-17 Ducting work for A/C A0AC-GF-17 A/C unit hanging (indoor) A0AC-1F-18 A/C unit hanging (indoor) A0VAC-B-19 Ref. piping Work A0AC-GF-18 Ducting work for A/C A0AC-GF-20 Ref. piping Work A0AC-2F-18 A/C unit hanging (indoor) A0AC-3F-18 A/C unit hanging (indoor) A0AC-1F-19 Ducting work for A/C A0AC-1F-21 Ref. piping Work A0AC-2F-19 Ducting work for A/C A0AC-4F-18 A/C unit hanging (indoor) A0AC-2F-21 Ref. piping Work A0AC-GF-19 Ext.Fan Fixing A0AC-GF-21 Air out let fixing A0AC-3F-19 Ducting work for A/C A0VAC-B-16 Fresh air Duct A0AC-3F-21 Ref. piping Work A0AC-5F-18 A/C unit hanging (indoor) A0VAC-B-18 Ext.Fan Fixing A0VAC-B-20 Air out let fixing A0AC-4F-19 Ducting work for A/C A0AC-4F-21 Ref. piping Work A0AC-6F-18 A/C unit hanging (indoor) A0AC-2F-20 Ext.Fan Fixing A0AC-2F-22 Air out let fixing A0AC-1F-20 Ext.Fan Fixing A0AC-1F-22 Air out let fixing A0AC-5F-19 Ducting work for A/C A0AC-7F-18 A/C unit hanging (indoor) A0AC-3F-20 Ext.Fan Fixing A0AC-3F-22 Air out let fixing A0AC-6F-19 Ducting work for A/C A0AC-5F-21 Ref. piping Work A0AC-6F-21 Ref. piping Work A0AC-4F-20 Ext.Fan Fixing A0AC-4F-22 Air out let fixing A0AC-HC-20 A/C unit hanging (indoor) A0AC-7F-19 Ducting work for A/C A0AC-7F-21 Ref. piping Work A0AC-HC-21 Ducting work for A/C A0AC-5F-20 Ext.Fan Fixing A0AC-5F-22 Air out let fixing A0AC-6F-20 Ext.Fan Fixing A0AC-6F-22 Air out let fixing A0AC-HC-24 Ref. piping Work A0AC-HC-23 Ext.Fan Fixing A0AC-HC-25 Air out let fixing A0AC-7F-20 Ext.Fan Fixing A0AC-7F-22 Air out let fixing A0AC-HC-22 A/C units ( outdoor) WPR-1F-01 Balcony W/P 1F PAV-01 Precast Wheel Stopper WPR-2F-01 Balcony W/P 2F WPR-3F-01 Balcony W/P 3F WPR-4F-01 Balcony W/P 4F WRP-5F-01 Balcony W/P 5F WRP-6F-01 Balcony W/P 6F PLAS-EX-01 External roof area Plastering WRP-7F-01 Balcony W/P 7F PANT-EX-01 Epoxy painting to Roof PLAS-EX-02 Airwell Plastering PANT-EX-02 Epoxy painting to side of stair wall to S.Pool MET-06 Balconey Rainling PANT-EX-03 Fless Coat to Air Wall WRP-HC-01 waterproofing to swiming pool WRP-EX-01 Roof , Parapet wall W/P & Testing WRP-EX-02 W/P to Air wall flr,skirt,R. rain water outlet WRP-EX-03 Bitumen coating to External Block Wall -A PLAS-EX-03 External elevation Plastering -A FLO-EX-01 External elevation marble wall clading-A MET-02 Aluminium Cladding On elevation- A MET-04 Aluminium Claading Upper Roof Area WRP-EX-04 Bitumen coating to External Block Wal- B PLAS-EX-04 External elevation Plastering -B FLO-EX-02 External elevation marble wall clading-B MET-03 Aluminium Cladding On elevation- B WRP-EX-05 Bitumen coating to External Block Wal-C PLAS-EX-05 External elevation Plastering -C FLO-EX-03 External elevation marble wall clading-C MET-07 Aluminium Cladding On elevation- C WRP-EX-06 Bitumen coating to External Block Wal-D PLAS-EX-06 External elevation Plastering -D FLO-EX-04 External elevation marble wall clading-D MET-08 Aluminium Cladding On elevation- D PAV-02 Fixing Kerb Stone at island & footh path PAV-03 Fixing 60mm Paving block PAV-04 80 mm Interlock at parking PAV-05 Trafic line marking A0MIS-03 Fixing of column guards MET-05 Aluminium / door & Window A0MIS-06 Compound Wall MET-09 Staircase Hand Rail MET-10 Cat ladders (For Airwel ) MET-11 Steel Pipe Gaurde (basement water side) PR0-01 Security System PR0-05 Gate barriers PR0-03 Garbeg Disposal system PR0-02 Pool Work PRO-14 Reception counter PR0-08 Instaltion Of Generator PR0-09 TV system PR0-06 Fixing of lockers PR0-04 Sauna & Steam System PR0-07 Lift instalation & Commissioning PR0-11 Intercom system PR0-10 Cradle system instalation PR0-12 Transformar Instlation PR0-13 Music system TES-02 Testing & Commissioning TES-01 Signage TES-03 Civil Defance Inspection TES-04 DM Inspection TES-05 Complition certificate from DM TES-06 P R O J E C T H A N D O V E R SUCO-6F-15 Steel Work for 7.F Slab SUCO-6F-16 MEP sleves & conduits for 7.F Slab SUCO-6F-17 Seventh Floor Slab Casting (PART-B) SUCO-6F-18 Deshuttering PART- B SUCO-7F-01 steel work for column/A SUCO-7F-02 Form work for column/A SUCO-7F-03 Shear Wall /A SUCO-7F-04 Column casting For RF /A Slab SUCO-7F-05 Decking work for RF/A Slab SUCO-7F-06 Steel Work for RF/A Slab SUCO-7F-07 MEP sleves & conduits for RF/A Slab SUCO-7F-08 Roof Floor Slab Casting[Part-A ] SUCO-7F-09 Deshuttering PART- A SUCO-7F-11 steel work for column SUCO-7F-10 Shear Wall & Lift Core Wall SUCO-7F-12 Form work for column SUCO-7F-13 Column casting For RF Slab SUCO-7F-14 Decking Work for R.F Slab SUCO-7F-15 Steel Work for R.F Slab SUCO-7F-16 MEP sleves & conduits for R.F Slab SUCO-7F-17 Roof Slab Casting (PART-B) SUCO-7F-18 Deshuttering PART- B SUCO-HC-01 steel work for column SUCO-HC-02 Shear Wall & Lift Core Wall SUCO-HC-03 Form work for column SUCO-HC-05 Parapet Wall SUCO-HC-04 Column casting SUCO-HC-07 Swimming pool Shell SUCO-HC-10 Pool Deck SUCO-HC-06 Decking Work for HC Slab SUCO-HC-09 MEP sleves & conduits for HC Slab SUCO-HC-08 Steel Work for HC Slab SUCO-HC-11 Helth Club Slab Casting SUCO-HC-12 Deshuttering SUCO-UR-03 steel work for column SUCO-UR-02 Shear Wall & Lift Core Wall SUCO-UR-04 Form work for column SUCO-UR-05 Parapet Wall above HC SUCO-UR-01 Column casting For lift m/c room SUCO-UR-06 Decking Work for lift m/c room SUCO-UR-08 MEP sleves & conduits for lift m/c room SUCO-UR-07 Steel Work for lift m/c room SUCO-UR-09 Lift m/c room Slab BLO-B-01 cleaning BLO-B-02 Block layout and checking BLO-B-03 Block work in Basement BLO-B-04 R.C.C Lintel PLAS-B-01 Wall Plaster - Basement PLAS-B-02 Celing Plaster-Basement FLO-B-02 marble flooring to lift loby A0EXAV-09 Earth filling above raft 8’’tk FLO-B-04 Marble Wall Clading to Lift Loby FLO-B-05 4’’ PCC with mesh FLO-B-07 Pump/ Store room flooring FLO-B-01 Car parking /Driveway Floor Finishing FLO-B-03 floor finish to water tank area FLO-B-06 Wall clading to Pump room FLO-B-08 Thrishold FAL-B-01 False Ceiling PANT-B-01 Internal wall & ceiling painting PANT-B-02 Anticarbonation painting in wall PANT-B-03 Final internal painting CARP-B-01 Fixing of Door Frame CARP-B-02 Fixing of Door Shutter A0MIS-01 Substation Trenching Work MET-01 Aluminium (LOUVER WORK) Substation PANT-GF-01 Transformer room painting A0PRO-17 Dewa Inspection Substation A0PRO-18 Sub station hand over to DEWA BLO-GF-01 cleaning BLO-GF-02 Block layout and checking BLO-GF-03 Internal Block Work BLO-GF-04 Block work- GF A0ON-GF-08 R.C.C Lintel PLAS-GF-02 Celing Plaster- GF PLAS-GF-01 Wall Plaster GF WPR-GF-02 GF- Parking W/P WPR-GF-01 Water proof coating to Wet areas WPR-GF-03 Vertical side w/p of wet area FLO-GF-08 Wet area wall clading ( garbage room) FLO-GF-06 Wet area flooring (ceramic tiles) WPR-GF-04 Water proofing to substation slab roof FLO-GF-02 Floor Screed for Electrical Room/gym/ FLO-GF-01 4’’ PCC with mesh FLO-GF-03 Floor Screed for M.hall FLO-GF-05 Floor Screed for Electricaal Sub-station FLO-GF-04 Car parking /Driveway Floor Finishing FLO-GF-07 Floor Screed for Gym / Shop FLO-GF-09 Mosaic flooring to stair floor & landing area FLO-GF-10 Floor Screed for Gen. Room FLO-GF-11 Store and other room flooring FLO-GF-12 mosaic step FLO-GF-14 Marble flooring to Entrance passage FLO-GF-15 mosaic skirting for steps FLO-GF-13 Threshold FLO-GF-17 Fixing Marble Steps FLO-GF-16 Marble Wall Clading to Lift Loby FAL-GF-01 False Ceiling PANT-GF-02 Internal wall & ceiling painting PANT-GF-03 Final internal painting PANT-GF-04 Anticarbonation painting in wall CARP-GF-01 Fixing of Door Frame CARP-GF-02 Fixing of Door Shutter CARP-GF-03 Fixing of Kitchen Cabinet CARP-GF-04 Fixing of Wardrobes MEP-GF-07 Sanitary fixing & Mixer BLO-1F-01 Cleaning BLO-1F-02 Block layout and checking BLO-1F-04 Block work- 1F BLO-1F-03 Internal Block Work A0ON-1F-07 R.C.C Lintel PLAS-1F-02 Celing Plaster- 1F PLAS-1F-01 Wall Plaster - 1F WPR-1F-02 Water proof coating to Wet areas WPR-1F-03 Vertical side w/p of wet area FL0-1F-10 Wet area -Ceramic Wall Clading FL0-1F-04 Wet area- Ceramic flooring FL0-1F-02 Floor Screed for Electrical Room FL0-1F-01 Ceramic flooring inside room FL0-1F-03 Ceramic tiling to balconey and terrase FL0-1F-05 Ceramic tile to entrance loby FL0-1F-06 Marble flooring to Corridor FL0-1F-07 Skirting FL0-1F-09 Corridor Wall Clading-Ceramic FL0-1F-08 Telephone room & other room flooring FL0-1F-11 Threshold FAL-1F-01 1F-Baalcony False Ceiling FAL-1F-02 False Ceiling PANT-1F-01 Internal wall & ceiling painting PANT-1F-02 Final internal painting CARP-1F-01 Fixing of Door Frame CARP-1F-02 Fixing of Door Shutter CARP-1F-03 Fixing of Kitchen Cabinet CARP-1F-04 Fixing of Wardrobes MEP-1F-08 Bath Tub Fixing MEP-1F-09 Sanitary fixing & Mixer BLO-2F-01 clening BLO-2F-02 Block layout and checking BLO-2F-04 Block work- 2F BLO-2F-03 Internal Block Work A0ON-2F-07 R.C.C Lintel PLAS-2F-01 Wall Plaster - 2F PLAS-2F-02 Celing Plaster- 2F WPR-2F-02 Water proof coating to Wet areas WPR-2F-03 Vertical side w/p of wet area FLO-2F-10 Wet area -Ceramic Wall Clading FLO-2F-05 Wet area- Ceramic flooring FLO-2F-01 Ceramic tile to entrance loby FLO-2F-02 Floor Screed for Electrical Room FLO-2F-03 Ceramic tile iside the room FLO-2F-04 Ceramic tiling to balconey and terrase FLO-2F-06 Marble flooring to Corridor FLO-2F-07 Skirting FLO-2F-09 Corridor Wall Clading-Ceramic FLO-2F-08 Telephone room & other room flooring FLO-2F-11 Threshold FAL-2F-01 2F-Baalcony False Ceiling FAL-2F-02 False Ceiling PANT-2F-01 Internal wall & ceiling painting PANT-2F-02 Final internal painting CARP-2F-01 Fixing of Door Frame CARP-2F-02 Fixing of Door Shutter CARP-2F-03 Fixing of Kitchen Cabinet CARP-2F-04 Fixing of Wardrobes MEP-2F-08 Bath Tub Fixing MEP-2F-09 Sanitary fixing & Mixer BLO-3F-01 cleaning BLO-3F-02 Block layout and checking BLO-3F-03 Block work -3F BLO-3F-04 Internal Block Work A0ON-3F-07 R.C.C Lintel PLAS-3F-01 Wall Plaster - 3F PLAS-3F-02 Celing Plaster- 3F WPR-3F-02 Water proof coating to Wet areas WPR-3F-03 Vertical side w/p of wet area FLO-3F-08 Wet area -Ceramic Wall Clading FLO-3F-03 Wet area- Ceramic flooring FLO-3F-01 Ceramic tiling to balconey and terrase FLO-3F-02 Ceramic tile iside the room FLO-3F-06 Floor Screed for Electrical Room FLO-3F-04 Ceramic tile to entrance loby FLO-3F-05 Skirting FLO-3F-07 Telephone room & other room flooring FLO-3F-09 Marble flooring to Corridor FLO-3F-10 Threshold FLO-3F-11 Corridor Wall Clading-Ceramic FAL-3F-01 3F-Baalcony False Ceiling FAL-3F-02 False Ceiling PANT-3F-01 Internal wall & ceiling painting PANT-3F-02 Final internal painting CARP-3F-01 Fixing of Door Frame CARP-3F-02 Fixing of Door Shutter CARP-3F-03 Fixing of Kitchen Cabinet CARP-3F-04 Fixing of Wardrobes MEP-3F-08 Bath Tub Fixing MEP-3F-09 Sanitary fixing & Mixer BLO-4F-01 cleaning BLO-4F-02 Block layout and checking BLO-4F-04 Block work -4F BLO-4F-03 Internal Block Work A0ON-4F-07 R.C.C Lintel PLAS-4F-01 Wall Plaster - 4F PLAS-4F-02 Celing Plaster- 4F WPR-4F-02 Water proof coating to Wet areas WPR-4F-03 Vertical side w/p of wet area FLO-4F-09 Wet area -Ceramic Wall Clading FLO-4F-08 Wet area- Ceramic flooring FLO-4F-02 Floor Screed for Electrical Room FLO-4F-01 Ceramic tile to entrance loby FLO-4F-03 Ceramic tiling to balconey and terrase FLO-4F-05 Marble flooring to Corridor FLO-4F-04 Ceramic tile iside the room FLO-4F-10 Telephone room & other room flooring FLO-4F-06 Corridor Wall Clading-Ceramic FLO-4F-07 Skirting FLO-4F-11 Threshold FAL-4F-01 4F-Balcony False Ceiling FAL-4F-02 False Ceiling PANT-4F-01 Internal wall & ceiling painting PANT-4F-02 Final internal painting CARP-4F-02 Fixing of Door Frame CARP-4F-03 Fixing of Door Shutter CARP-4F-01 Fixing of Kitchen Cabinet CARP-4F-04 Fixing of Wardrobes MEP-4F-08 Bath Tub Fixing MEP-4F-09 Sanitary fixing & Mixer BLO-5F-01 cleaning BLO-5F-02 Block layout and checking BLO-5F-04 Block work -5F BLO-5F-03 Internal Block Work A0ON-5F-07 R.C.C Lintel PLAS-5F-01 Wall Plaster - 5F PLAS-5F-02 Celing Plaster- 5F WRP-5F-02 Water proof coating to Wet areas WRP-5F-03 Vertical side w/p of wet area FLO-5F-10 Wet area -Ceramic Wall Clading FLO-5F-04 Wet area- Ceramic flooring FLO-5F-01 Floor Screed for Electrical Room FLO-5F-03 Ceramic tile to entrance loby FLO-5F-06 Marble flooring to Corridor FLO-5F-05 Ceramic tile iside the room FLO-5F-02 Ceramic tiling to balconey and terrase FLO-5F-08 Telephone room & other room flooring FLO-5F-07 Corridor Wall Clading-Ceramic FLO-5F-09 Skirting FLO-5F-11 Threshold FAL-5F-01 5F-Balcony False Ceiling FAL-5F-02 False Ceiling PANT-5F-01 Internal wall & ceiling painting PANT-5F-02 Final internal painting CARP-5F-02 Fixing of Door Frame CARP-5F-03 Fixing of Door Shutter CARP-5F-01 Fixing of Kitchen Cabinet CARP-5F-04 Fixing of Wardrobes MEP-5F-08 Bath Tub Fixing MEP-5F-09 Sanitary fixing & Mixer BLO-6F-01 cleaning BLO-6F-02 Block layout and checking BLO-6F-03 Block work -6F BLO-6F-04 Internal Block Work A0ON-6F-07 R.C.C Lintel PLAS-6F-01 Wall Plaster - 6F PLAS-6F-02 Celing Plaster- 6F WRP-6F-02 Water proof coating to Wet areas WRP-6F-03 Vertical side w/p of wet area FLO-6F-11 Wet area -Ceramic Wall Clading FLO-6F-05 Wet area- Ceramic flooring FLO-6F-01 Floor Screed for Electrical Room FLO-6F-03 Ceramic tile to entrance loby FLO-6F-04 Ceramic tile iside the room FLO-6F-02 Ceramic tiling to balconey and terrase FLO-6F-06 Skirting FLO-6F-09 Marble flooring to Corridor FLO-6F-10 Corridor Wall Clading-Ceramic FLO-6F-07 Telephone room & other room flooring FLO-6F-08 Threshold FAL-6F-01 6F-Balcony False Ceiling FAL-6F-02 False Ceiling PANT-6F-01 Internal wall & ceiling painting PANT-6F-02 Final internal painting CARP-6F-01 Fixing of Door Frame CARP-6F-02 Fixing of Door Shutter CARP-6F-03 Fixing of Kitchen Cabinet CARP-6F-04 Fixing of Wardrobes MEP-6F-08 Bath Tub Fixing MEP-6F-11 Sanitary fixing & Mixer BLO-7F-01 cleaning BLO-7F-02 Block layout and checking BLO-7F-03 Block work -7F BLO-7F-04 Internal Block Work A0ON-7F-07 R.C.C Lintel PLAS-7F-01 Wall Plaster - 7F PLAS-7F-02 Celing Plaster- 7F WRP-7F-02 Water proof coating to Wet areas WRP-7F-03 Vertical side w/p of wet area FLO-7F-11 Wet area -Ceramic Wall Clading FLO-7F-06 Wet area- Ceramic flooring FLO-7F-02 Floor Screed for Electrical Room FLO-7F-01 Ceramic tile to entrance loby FLO-7F-04 Skirting FLO-7F-03 Ceramic tile iside the room FLO-7F-05 Ceramic tiling to balconey and terrase FLO-7F-08 Marble flooring to coridoor FLO-7F-10 Corridor Wall Clading-Ceramic FLO-7F-07 Telephone room & other room flooring FLO-7F-09 Threshold FAL-7F-01 7F-Balcony False Ceiling FAL-7F-02 False Ceiling PANT-7F-01 Internal wall & ceiling painting PANT-7F-02 Final internal painting CARP-7F-01 Fixing of Door Frame CARP-7F-02 Fixing of Door Shutter CARP-7F-03 Fixing of Kitchen Cabinet CARP-7F-04 Fixing of Wardrobes MEP-7F-08 Bath Tub Fixing MEP-7F-12 Sanitary fixing & Mixer BLO-HC-01 cleaning BLO-HC-02 Block layout and checking BLO-HC-04 Internal Block Work BLO-HC-03 Block work -HC A0ON-HC-10 R.C.C Lintel - HC PLAS-HC-01 Wall Plaster - HC A0AS-HC-02 Celing Plaster- HC FLO-HC-07 rubber floor above screed in gym FLO-HC-09 rubber skirting FLO-HC-10 Graniti Ceramic tile( Steps to pool Dake Area) FLO-HC-11 swimming pool wall clading FLO-HC-14 Graniti Ceramic tile ( lift m/c room) WRP-HC-02 Water proof coating to Wet areas FLO-HC-02 White cement tiles WRP-HC-03 Vertical side w/p of wet area FLO-HC-04 wet area wall clading FLO-HC-05 Ceramic flooring to swiming pool wall A0LO-EX-02 Fixing of window sill FLO-HC-01 Floor Screed for Electrical / store / tel room FLO-HC-03 Marble flooring to lift loby FLO-HC-06 Threshold FLO-HC-08 Corridor Wall Clading-Ceramic FLO-HC-12 Ceramic flooring to Filter Room FLO-HC-13 Step to pool Deck PANT-HC-01 Lift Int .wall bitumen coating FAL-HC-01 False Ceiling PANT-HC-02 Internal wall & ceiling painting PANT-HC-03 Final internal painting PANT-HC-04 Epoxy painting to staircase CARP-HC-01 Fixing of Door Frame CARP-HC-02 Fixing of Door shutter MEP-HC-12 Sanitary fixing & Mixer BLO-UR-01 Block work-UR PLAS-UR-01 Wall Plaster- UR PLAS-UR-02 Celing Plaster- UR PLAS-UR-03 Staircase wall plaster PLAS-UR-04 Staircase Ceilling plaster CARP-UR-01 Fixing of Door Frame CARP-UR-02 Fixing of Door shutter MEP-B-02 MEP -Wall Conduites MEP-B-03 Fixing of DB Back box ,GI box MEP-B-04 Fixing of DB MEP-B-06 Internal wiring MEP-B-07 Main Cable work MEP-B-08 Switches & Sockets MEP-B-10 Instalation of Islolater for A/C MEP-B-09 Light Fittings MEP-GF-01 MEP -Wall Conduites MEP-GF-02 Fixing of DB Back box ,GI box MEP-GF-00 Fixing of DB MEP-GF-04 Internal wiring MEP-GF-06 Main Cable work MEP-GF-08 Switches & Sockets MEP-GF-10 Instalation of Islolater for A/C MEP-GF-09 Light Fittings MEP-1F-01 MEP -Wall Conduites MEP-1F-04 Fixing of DB Back box ,GI box MEP-1F-03 Fixing of DB MEP-1F-05 Internal wiring MEP-1F-07 Main Cable work MEP-1F-10 Switches & Sockets MEP-1F-12 Instalation of Islolater for A/C MEP-1F-11 Light Fittings MEP-2F-01 MEP -Wall Conduites MEP-2F-02 Fixing of DB Back box ,GI box MEP-2F-03 Fixing of DB MEP-2F-05 Internal wiring MEP-2F-07 Main Cable work MEP-2F-10 Switches & Sockets MEP-2F-12 Instalation of Islolater for A/C MEP-2F-11 Light Fittings MEP-3F-02 MEP -Wall Conduites MEP-3F-04 Fixing of DB Back box ,GI box MEP-3F-03 Fixing of DB MEP-3F-05 Internal wiring MEP-3F-07 Main Cable work MEP-3F-10 Switches & Sockets MEP-3F-12 Instalation of Islolater for A/C MEP-3F-11 Light Fittings MEP-4F-01 MEP -Wall Conduites MEP-4F-04 Fixing of DB Back box ,GI box MEP-4F-03 Fixing of DB MEP-4F-05 Internal wiring MEP-4F-07 Main Cable work MEP-4F-10 Switches & Sockets MEP-4F-15 Instalation of Islolater for A/C MEP-4F-14 Light Fittings MEP-5F-01 MEP -Wall Conduites MEP-5F-04 Fixing of DB Back box ,GI box MEP-5F-03 Fixing of DB MEP-5F-05 Internal wiring MEP-5F-07 Main Cable work MEP-5F-13 Switches & Sockets MEP-5F-15 Instalation of Islolater for A/C MEP-5F-14 Light Fittings MEP-6F-01 MEP -Wall Conduites MEP-6F-03 Fixing of DB Back box ,GI box MEP-6F-02 Fixing of DB MEP-6F-06 Internal wiring MEP-6F-07 Main Cable work MEP-6F-13 Switches & Sockets MEP-6F-15 Instalation of Islolater for A/C MEP-6F-14 Light Fittings MEP-7F-01 MEP -Wall Conduites MEP-7F-03 Fixing of DB Back box ,GI box MEP-7F-02 Fixing of DB MEP-7F-05 Internal wiring MEP-7F-07 Main Cable work MEP-7F-13 Switches & Sockets MEP-7F-14 Light Fittings MEP-7F-15 Instalation of Islolater for A/C MEP-HC-01 MEP -Wall Conduites MEP-HC-02 Fixing of DB MEP-HC-03 Fixing of DB Back box ,GI box MEP-UR-01 MEP Wall Conduites & instalation of DB Box MEP-HC-06 Internal wiring MEP-HC-08 Main Cable work MEP-HC-16 Switches & Sockets MEP-HC-17 Light Fittings MEP-HC-18 Instalation of Islolater for A/C MEP-B-01 Water supply PEX piping MEP-B-05 Water Supply PPR piping MEP-GF-03 Water supply PEX piping MEP-1F-02 Water supply PEX piping MEP-GF-05 Water Supply PPR piping MEP-2F-04 Water supply PEX piping MEP-3F-01 Water supply PEX piping MEP-1F-06 Water Supply PPR piping MEP-2F-06 Water Supply PPR piping MEP-4F-02 Water supply PEX piping MEP-3F-06 Water Supply PPR piping MEP-5F-02 Water supply PEX piping MEP-4F-06 Water Supply PPR piping MEP-6F-04 Water supply PEX piping MEP-5F-06 Water Supply PPR piping MEP-7F-04 Water supply PEX piping MEP-6F-05 Water Supply PPR piping MEP-HC-04 Water supply PEX piping MEP-7F-06 Water Supply PPR piping MEP-HC-05 Water Supply PPR piping MEP-HC-07 Above ground Drainage MEP-GF-11 Drainage Risers MEP-GF-12 Water supply Riser MEP-1F-13 Drainage Risers MEP-1F-14 Water supply Riser MEP-GF-15 Civil work for maanhole / fic /Sand traap /etc MEP-2F-13 Drainage Risers MEP-2F-14 Water supply Riser MEP-3F-13 Drainage Risers MEP-3F-14 Water supply Riser MEP-GF-13 Water Heater fixing MEP-4F-11 Drainage Risers MEP-4F-12 Water supply Riser MEP-1F-15 Water Heater fixing MEP-2F-15 Water Heater fixing MEP-5F-10 Drainage Risers MEP-5F-11 Water supply Riser MEP-3F-15 Water Heater fixing MEP-6F-09 Drainage Risers MEP-6F-10 Water supply Riser MEP-4F-13 Water Heater fixing MEP-7F-09 Drainage Risers MEP-7F-10 Water supply Riser MEP-5F-12 Water Heter fixing MEP-HC-09 Water supply Riser MEP-HC-10 Drainage Risers MEP-6F-12 Water Heater fixing MEP-HC-13 Roof water supply work MEP-7F-11 Water Heter fixing MEP-HC-11 Water Heter fixing MEP-HC-14 Water tank Instlation MEP-HC-15 Pump Fitting A0VAC-B-17 Ducting work for A/C A0AC-GF-17 A/C unit hanging (indoor) A0AC-1F-18 A/C unit hanging (indoor) A0VAC-B-19 Ref. piping Work A0AC-GF-18 Ducting work for A/C A0AC-GF-20 Ref. piping Work A0AC-2F-18 A/C unit hanging (indoor) A0AC-3F-18 A/C unit hanging (indoor) A0AC-1F-19 Ducting work for A/C A0AC-1F-21 Ref. piping Work A0AC-2F-19 Ducting work for A/C A0AC-4F-18 A/C unit hanging (indoor) A0AC-2F-21 Ref. piping Work A0AC-GF-19 Ext.Fan Fixing A0AC-GF-21 Air out let fixing A0AC-3F-19 Ducting work for A/C A0VAC-B-16 Fresh air Duct A0AC-3F-21 Ref. piping Work A0AC-5F-18 A/C unit hanging (indoor) A0VAC-B-18 Ext.Fan Fixing A0VAC-B-20 Air out let fixing A0AC-4F-19 Ducting work for A/C A0AC-4F-21 Ref. piping Work A0AC-6F-18 A/C unit hanging (indoor) A0AC-2F-20 Ext.Fan Fixing A0AC-2F-22 Air out let fixing A0AC-1F-20 Ext.Fan Fixing A0AC-1F-22 Air out let fixing A0AC-5F-19 Ducting work for A/C A0AC-7F-18 A/C unit hanging (indoor) A0AC-3F-20 Ext.Fan Fixing A0AC-3F-22 Air out let fixing A0AC-6F-19 Ducting work for A/C A0AC-5F-21 Ref. piping Work A0AC-6F-21 Ref. piping Work A0AC-4F-20 Ext.Fan Fixing A0AC-4F-22 Air out let fixing A0AC-HC-20 A/C unit hanging (indoor) A0AC-7F-19 Ducting work for A/C A0AC-7F-21 Ref. piping Work A0AC-HC-21 Ducting work for A/C A0AC-5F-20 Ext.Fan Fixing A0AC-5F-22 Air out let fixing A0AC-6F-20 Ext.Fan Fixing A0AC-6F-22 Air out let fixing A0AC-HC-24 Ref. piping Work A0AC-HC-23 Ext.Fan Fixing A0AC-HC-25 Air out let fixing A0AC-7F-20 Ext.Fan Fixing A0AC-7F-22 Air out let fixing A0AC-HC-22 A/C units ( outdoor) WPR-1F-01 Balcony W/P 1F PAV-01 Precast Wheel Stopper WPR-2F-01 Balcony W/P 2F WPR-3F-01 Balcony W/P 3F WPR-4F-01 Balcony W/P 4F WRP-5F-01 Balcony W/P 5F WRP-6F-01 Balcony W/P 6F PLAS-EX-01 External roof area Plastering WRP-7F-01 Balcony W/P 7F PANT-EX-01 Epoxy painting to Roof PLAS-EX-02 Airwell Plastering PANT-EX-02 Epoxy painting to side of stair wall to S.Pool MET-06 Balconey Rainling PANT-EX-03 Fless Coat to Air Wall WRP-HC-01 waterproofing to swiming pool WRP-EX-01 Roof , Parapet wall W/P & Testing WRP-EX-02 W/P to Air wall flr,skirt,R. rain water outlet WRP-EX-03 Bitumen coating to External Block Wall -A PLAS-EX-03 External elevation Plastering -A FLO-EX-01 External elevation marble wall clading-A MET-02 Aluminium Cladding On elevation- A MET-04 Aluminium Claading Upper Roof Area WRP-EX-04 Bitumen coating to External Block Wal- B PLAS-EX-04 External elevation Plastering -B FLO-EX-02 External elevation marble wall clading-B MET-03 Aluminium Cladding On elevation- B WRP-EX-05 Bitumen coating to External Block Wal-C PLAS-EX-05 External elevation Plastering -C FLO-EX-03 External elevation marble wall clading-C MET-07 Aluminium Cladding On elevation- C WRP-EX-06 Bitumen coating to External Block Wal-D PLAS-EX-06 External elevation Plastering -D FLO-EX-04 External elevation marble wall clading-D MET-08 Aluminium Cladding On elevation- D PAV-02 Fixing Kerb Stone at island & footh path PAV-03 Fixing 60mm Paving block PAV-04 80 mm Interlock at parking PAV-05 Trafic line marking A0MIS-03 Fixing of column guards MET-05 Aluminium / door & Window A0MIS-06 Compound Wall MET-09 Staircase Hand Rail MET-10 Cat ladders (For Airwel ) MET-11 Steel Pipe Gaurde (basement water side) PR0-01 Security System PR0-05 Gate barriers PR0-03 Garbeg Disposal system PR0-02 Pool Work PRO-14 Reception counter PR0-08 Instaltion Of Generator PR0-09 TV system PR0-06 Fixing of lockers PR0-04 Sauna & Steam System PR0-07 Lift instalation & Commissioning PR0-11 Intercom system PR0-10 Cradle system instalation PR0-12 Transformar Instlation PR0-13 Music system TES-02 Testing & Commissioning TES-01 Signage TES-03 Civil Defance Inspection TES-04 DM Inspection TES-05 Complition certificate from DM TES-06 P R O J E C T H A N D O V E R