Activity ID Activity description

MOBI-01 Site Mobilisation


MOBI-03 Fencing work
MOBI-02 Establish Temporary Servicies
EARTH-03 Shoring ( I- Section Concrete pannel )
EARTH-02 Priliminary Earth Work
EARTH-04 1st Phase Excavation
EARTH-05 2nd stage Excavation & concrete panel instlation
EARTH-07 Carting Excess Excavated material
EARTH-06 Dewaterring
EARTH-08 Formation of Deep Area
EARTH-09 Compaction & Formation for Raft bed
FOUND-02 Grounding
FOUND-01 PCC Deep Area
FOUND-03 PCC below RAFT
FOUND-05 Rubberised Bitumen Coating
FOUND-06 Waterproofing & Screed Protection
FOUND-04 Vertical area water proffing
FOUND-07 Steel work for RAFT
MEP-01 Drainage pipe laying and testing (UG Drainage)
FOUND-08 Raft Slab Casting (Part A&B)
SUB-01 Retaining Wall
SUB-06 Ramp Work
SUB-02 Shear Wall & Lift Core Wall
SUB-03 steel work for column
SUB-04 Form work for column
SUB-05 Column casting For GF Slab
SUB-07 Decking Work for G.F Slab
SUB-08 Steel Work for G.F Slab
SUB-09 MEP sleves & conduits for G.F Slab
SUB-10 Ground Floor Slab Casting
SUB-11 Deshuttering
SUB-12 Ramp Side RCC wall
SUB-13 Rcc planters & side wall / upstaand
SUCO-GF-02 steel work for column/A
SUCO-GF-03 Form work for column/A
SUCO-GF-01 Shear Wall /A
SUCO-GF-04 Column casting For 1F/A Slab
SUCO-GF-05 Decking work for 1F/ASlab
SUCO-GF-07 Steel Work for 1F/A Slab
SUCO-GF-08 MEP sleves & conduits for 1.F/A Slab
SUCO-GF-09 First Floor Slab Casting[Part-A ]
SUCO-GF-10 Deshuttring PART- A
SUCO-GF-12 steel work for column
SUCO-GF-11 Shear Wall & Lift Core Wall
SUCO-GF-13 Form work for column
SUCO-GF-14 Column casting For 1F Slab
SUCO-GF-15 Decking work for 1F Slab
SUCO-GF-17 Steel Work for 1F Slab
SUCO-GF-18 MEP sleves & conduits for 1.F Slab
SUCO-GF-19 First Floor Slab Casting[Part-B ]
SUCO-GF-20 Deshuttering PART- B
SUCO-GF-16 Ramp Side RCC wall
SUCO-1F-01 steel work for column/A
SUCO-1F-02 Form work for column/A
SUCO-1F-03 Shear Wall /A
SUCO-1F-04 Column casting For 2F/A Slab
SUCO-1F-05 Decking work for 2F/ASlab
SUCO-1F-06 Steel Work for 2F/A Slab
SUCO-1F-07 MEP sleves & conduits for 2.F/A Slab
SUCO-1F-08 Second Floor Slab Casting[Part-A ]
SUCO-1F-09 Deshuttering PART- A
SUCO-1F-11 Steel work for column
SUCO-1F-12 Form work for column
SUCO-1F-10 Shear Wall & Lift Core Wall
SUCO-1F-13 Column casting For 2F Slab
SUCO-1F-14 Decking Work for 2F Slab
SUCO-1F-15 Steel Work for 2F Slab
SUCO-1F-16 MEP sleves & conduits for 2 F Slab
SUCO-1F-17 Second Floor Slab Casting [Part-B ]
SUCO-1F-18 Deshuttering PART- B
SUCO-2F-01 steel work for column/A
SUCO-2F-02 Form work for column/A
SUCO-2F-03 Shear Wall /A
SUCO-2F-04 Column casting For 3F/A Slab
SUCO-2F-05 Decking work for3F/ASlab
SUCO-2F-06 Steel Work for3F/A Slab
SUCO-2F-07 MEP sleves & conduits for 3 F/A Slab
SUCO-2F-08 ThirdFloor Slab Casting[Part-A ]
SUCO-2F-09 Third floor slab Deshuttering PART- A
SUCO-2F-11 steel work for column
SUCO-2F-10 Shear Wall
SUCO-2F-12 Form work for column
SUCO-2F-13 Column casting For 3F Slab
SUCO-2F-14 Decking Work for 3F Slab
SUCO-2F-15 Steel Work for 3F Slab
SUCO-2F-16 MEP sleves & conduits for 3F Slab
SUCO-2F-17 Third Floor Slab Casting [Part-B]
SUCO-2F-18 Deshuttering PART- B
SUCO-3F-01 steel work for column/A
SUCO-3F-02 Form work for column/A
SUCO-3F-03 Shear Wall /A
SUCO-3F-04 Column casting For 4F/A Slab
SUCO-3F-05 Decking work for 4F/ASlab
SUCO-3F-06 Steel Work for4F/A Slab
SUCO-3F-07 MEP sleves & conduits for4.F/A Slab
SUCO-3F-08 Fourth Floor Slab Casting[Part-A ]
SUCO-3F-09 Deshuttering PART- A
SUCO-3F-11 steel work for column
SUCO-3F-10 Shear Wall & Lift Core Wall
SUCO-3F-12 Form work for column
SUCO-3F-13 Column casting For 4F Slab
SUCO-3F-14 Decking Work for 4F Slab
SUCO-3F-15 Steel Work for 4F Slab
SUCO-3F-16 MEP sleves & conduits for 4F Slab
SUCO-3F-17 Fourth Floor Slab Casting [Part-B
SUCO-3F-18 Deshuttering 4 F slab PART- B
SUCO-4F-01 steel work for column/A
SUCO-4F-02 Form work for column/A
SUCO-4F-03 Shear Wall /A
SUCO-4F-04 Column casting For5F/A Slab
SUCO-4F-05 Decking work for 5F/ASlab
SUCO-4F-06 Steel Work for 5F/A Slab
SUCO-4F-07 MEP sleves & conduits for 5F/A Slab
SUCO-4F-08 Fifth Floor Slab Casting[Part-A ]
SUCO-4F-09 Deshuttering PART- A
SUCO-4F-11 steel work for column
SUCO-4F-10 Shear Wall & Lift Core Wall
SUCO-4F-12 Form work for column
SUCO-4F-13 Column casting For 5F Slab
SUCO-4F-14 Decking Work for 5.F Slab
SUCO-4F-15 Steel Work for 5.F Slab
SUCO-4F-16 MEP sleves & conduits for 5.F Slab
SUCO-4F-17 Fifth Floor Slab [Part-B]
SUCO-4F-18 Deshuttering 5F Slab PART- B
SUCO-5F-01 steel work for column/A
SUCO-5F-02 Form work for column/A
SUCO-5F-03 Shear Wall /A
SUCO-5F-04 Column casting For 6F/A Slab
SUCO-5F-05 Decking work for 6F/ASlab
SUCO-5F-06 Steel Work for 6F/A Slab
SUCO-5F-07 MEP sleves & conduits for 6 F/A Slab
SUCO-5F-08 Sixth Floor Slab Casting[Part-A ]
SUCO-5F-09 Deshuttering PART- A
SUCO-5F-11 steel work for column
SUCO-5F-10 Shear Wall & Lift Core Wall
SUCO-5F-12 Form work for column
SUCO-5F-13 Column casting For 6 F Slab
SUCO-5F-14 Decking Work for 6.F Slab
SUCO-5F-15 Steel Work for 6.F Slab
SUCO-5F-16 MEP sleves & conduits for 6.F Slab
SUCO-5F-17 Sixth Floor Slab Casting PART-B
SUCO-5F-18 Deshuttering PART- B
SUCO-6F-01 steel work for column/A
SUCO-6F-02 Form work for column/A
SUCO-6F-03 Shear Wall /A
SUCO-6F-04 Column casting For 7F/A Slab
SUCO-6F-05 Decking work for 7F/ASlab
SUCO-6F-06 Steel Work for 7F/A Slab
SUCO-6F-07 MEP sleves & conduits for 7F/A Slab
SUCO-6F-08 Seventh Floor Slab Casting[Part-A ]
SUCO-6F-09 Deshuttering PART- A
SUCO-6F-11 steel work for column
SUCO-6F-10 Shear Wall & Lift Core Wall
SUCO-6F-12 Form work for column
SUCO-6F-13 Column casting For 7F Slab
SUCO-6F-14 Decking Work for 7.F Slab
SUCO-6F-15 Steel Work for 7.F Slab
SUCO-6F-16 MEP sleves & conduits for 7.F Slab
SUCO-6F-17 Seventh Floor Slab Casting (PART-B)
SUCO-6F-18 Deshuttering PART- B
SUCO-7F-01 steel work for column/A
SUCO-7F-02 Form work for column/A
SUCO-7F-03 Shear Wall /A
SUCO-7F-04 Column casting For RF /A Slab
SUCO-7F-05 Decking work for RF/A Slab
SUCO-7F-06 Steel Work for RF/A Slab
SUCO-7F-07 MEP sleves & conduits for RF/A Slab
SUCO-7F-08 Roof Floor Slab Casting[Part-A ]
SUCO-7F-09 Deshuttering PART- A
SUCO-7F-11 steel work for column
SUCO-7F-10 Shear Wall & Lift Core Wall
SUCO-7F-12 Form work for column
SUCO-7F-13 Column casting For RF Slab
SUCO-7F-14 Decking Work for R.F Slab
SUCO-7F-15 Steel Work for R.F Slab
SUCO-7F-16 MEP sleves & conduits for R.F Slab
SUCO-7F-17 Roof Slab Casting (PART-B)
SUCO-7F-18 Deshuttering PART- B
SUCO-HC-01 steel work for column
SUCO-HC-02 Shear Wall & Lift Core Wall
SUCO-HC-03 Form work for column
SUCO-HC-05 Parapet Wall
SUCO-HC-04 Column casting
SUCO-HC-07 Swimming pool Shell
SUCO-HC-10 Pool Deck
SUCO-HC-06 Decking Work for HC Slab
SUCO-HC-09 MEP sleves & conduits for HC Slab
SUCO-HC-08 Steel Work for HC Slab
SUCO-HC-11 Helth Club Slab Casting
SUCO-HC-12 Deshuttering
SUCO-UR-03 steel work for column
SUCO-UR-02 Shear Wall & Lift Core Wall
SUCO-UR-04 Form work for column
SUCO-UR-05 Parapet Wall above HC
SUCO-UR-01 Column casting For lift m/c room
SUCO-UR-06 Decking Work for lift m/c room
SUCO-UR-08 MEP sleves & conduits for lift m/c room
SUCO-UR-07 Steel Work for lift m/c room
SUCO-UR-09 Lift m/c room Slab
BLO-B-01 cleaning
BLO-B-02 Block layout and checking
BLO-B-03 Block work in Basement
BLO-B-04 R.C.C Lintel
PLAS-B-01 Wall Plaster - Basement
PLAS-B-02 Celing Plaster-Basement
FLO-B-02 marble flooring to lift loby
A0EXAV-09 Earth filling above raft 8’’tk
FLO-B-04 Marble Wall Clading to Lift Loby
FLO-B-05 4’’ PCC with mesh
FLO-B-07 Pump/ Store room flooring
FLO-B-01 Car parking /Driveway Floor Finishing
FLO-B-03 floor finish to water tank area
FLO-B-06 Wall clading to Pump room
FLO-B-08 Thrishold
FAL-B-01 False Ceiling
PANT-B-01 Internal wall & ceiling painting
PANT-B-02 Anticarbonation painting in wall
PANT-B-03 Final internal painting
CARP-B-01 Fixing of Door Frame
CARP-B-02 Fixing of Door Shutter
A0MIS-01 Substation Trenching Work
MET-01 Aluminium (LOUVER WORK) Substation
PANT-GF-01 Transformer room painting
A0PRO-17 Dewa Inspection Substation
A0PRO-18 Sub station hand over to DEWA
BLO-GF-01 cleaning
BLO-GF-02 Block layout and checking
BLO-GF-03 Internal Block Work
BLO-GF-04 Block work- GF
A0ON-GF-08 R.C.C Lintel
PLAS-GF-02 Celing Plaster- GF
PLAS-GF-01 Wall Plaster GF
WPR-GF-02 GF- Parking W/P
WPR-GF-01 Water proof coating to Wet areas
WPR-GF-03 Vertical side w/p of wet area
FLO-GF-08 Wet area wall clading ( garbage room)
FLO-GF-06 Wet area flooring (ceramic tiles)
WPR-GF-04 Water proofing to substation slab roof
FLO-GF-02 Floor Screed for Electrical Room/gym/
FLO-GF-01 4’’ PCC with mesh
FLO-GF-03 Floor Screed for M.hall
FLO-GF-05 Floor Screed for Electricaal Sub-station
FLO-GF-04 Car parking /Driveway Floor Finishing
FLO-GF-07 Floor Screed for Gym / Shop
FLO-GF-09 Mosaic flooring to stair floor & landing area
FLO-GF-10 Floor Screed for Gen. Room
FLO-GF-11 Store and other room flooring
FLO-GF-12 mosaic step
FLO-GF-14 Marble flooring to Entrance passage
FLO-GF-15 mosaic skirting for steps
FLO-GF-13 Threshold
FLO-GF-17 Fixing Marble Steps
FLO-GF-16 Marble Wall Clading to Lift Loby
FAL-GF-01 False Ceiling
PANT-GF-02 Internal wall & ceiling painting
PANT-GF-03 Final internal painting
PANT-GF-04 Anticarbonation painting in wall
CARP-GF-01 Fixing of Door Frame
CARP-GF-02 Fixing of Door Shutter
CARP-GF-03 Fixing of Kitchen Cabinet
CARP-GF-04 Fixing of Wardrobes
MEP-GF-07 Sanitary fixing & Mixer
BLO-1F-01 Cleaning
BLO-1F-02 Block layout and checking
BLO-1F-04 Block work- 1F
BLO-1F-03 Internal Block Work
A0ON-1F-07 R.C.C Lintel
PLAS-1F-02 Celing Plaster- 1F
PLAS-1F-01 Wall Plaster - 1F
WPR-1F-02 Water proof coating to Wet areas
WPR-1F-03 Vertical side w/p of wet area
FL0-1F-10 Wet area -Ceramic Wall Clading
FL0-1F-04 Wet area- Ceramic flooring
FL0-1F-02 Floor Screed for Electrical Room
FL0-1F-01 Ceramic flooring inside room
FL0-1F-03 Ceramic tiling to balconey and terrase
FL0-1F-05 Ceramic tile to entrance loby
FL0-1F-06 Marble flooring to Corridor
FL0-1F-07 Skirting
FL0-1F-09 Corridor Wall Clading-Ceramic
FL0-1F-08 Telephone room & other room flooring
FL0-1F-11 Threshold
FAL-1F-01 1F-Baalcony False Ceiling
FAL-1F-02 False Ceiling
PANT-1F-01 Internal wall & ceiling painting
PANT-1F-02 Final internal painting
CARP-1F-01 Fixing of Door Frame
CARP-1F-02 Fixing of Door Shutter
CARP-1F-03 Fixing of Kitchen Cabinet
CARP-1F-04 Fixing of Wardrobes
MEP-1F-08 Bath Tub Fixing
MEP-1F-09 Sanitary fixing & Mixer
BLO-2F-01 clening
BLO-2F-02 Block layout and checking
BLO-2F-04 Block work- 2F
BLO-2F-03 Internal Block Work
A0ON-2F-07 R.C.C Lintel
PLAS-2F-01 Wall Plaster - 2F
PLAS-2F-02 Celing Plaster- 2F
WPR-2F-02 Water proof coating to Wet areas
WPR-2F-03 Vertical side w/p of wet area
FLO-2F-10 Wet area -Ceramic Wall Clading
FLO-2F-05 Wet area- Ceramic flooring
FLO-2F-01 Ceramic tile to entrance loby
FLO-2F-02 Floor Screed for Electrical Room
FLO-2F-03 Ceramic tile iside the room
FLO-2F-04 Ceramic tiling to balconey and terrase
FLO-2F-06 Marble flooring to Corridor
FLO-2F-07 Skirting
FLO-2F-09 Corridor Wall Clading-Ceramic
FLO-2F-08 Telephone room & other room flooring
FLO-2F-11 Threshold
FAL-2F-01 2F-Baalcony False Ceiling
FAL-2F-02 False Ceiling
PANT-2F-01 Internal wall & ceiling painting
PANT-2F-02 Final internal painting
CARP-2F-01 Fixing of Door Frame
CARP-2F-02 Fixing of Door Shutter
CARP-2F-03 Fixing of Kitchen Cabinet
CARP-2F-04 Fixing of Wardrobes
MEP-2F-08 Bath Tub Fixing
MEP-2F-09 Sanitary fixing & Mixer
BLO-3F-01 cleaning
BLO-3F-02 Block layout and checking
BLO-3F-03 Block work -3F
BLO-3F-04 Internal Block Work
A0ON-3F-07 R.C.C Lintel
PLAS-3F-01 Wall Plaster - 3F
PLAS-3F-02 Celing Plaster- 3F
WPR-3F-02 Water proof coating to Wet areas
WPR-3F-03 Vertical side w/p of wet area
FLO-3F-08 Wet area -Ceramic Wall Clading
FLO-3F-03 Wet area- Ceramic flooring
FLO-3F-01 Ceramic tiling to balconey and terrase
FLO-3F-02 Ceramic tile iside the room
FLO-3F-06 Floor Screed for Electrical Room
FLO-3F-04 Ceramic tile to entrance loby
FLO-3F-05 Skirting
FLO-3F-07 Telephone room & other room flooring
FLO-3F-09 Marble flooring to Corridor
FLO-3F-10 Threshold
FLO-3F-11 Corridor Wall Clading-Ceramic
FAL-3F-01 3F-Baalcony False Ceiling
FAL-3F-02 False Ceiling
PANT-3F-01 Internal wall & ceiling painting
PANT-3F-02 Final internal painting
CARP-3F-01 Fixing of Door Frame
CARP-3F-02 Fixing of Door Shutter
CARP-3F-03 Fixing of Kitchen Cabinet
CARP-3F-04 Fixing of Wardrobes
MEP-3F-08 Bath Tub Fixing
MEP-3F-09 Sanitary fixing & Mixer
BLO-4F-01 cleaning
BLO-4F-02 Block layout and checking
BLO-4F-04 Block work -4F
BLO-4F-03 Internal Block Work
A0ON-4F-07 R.C.C Lintel
PLAS-4F-01 Wall Plaster - 4F
PLAS-4F-02 Celing Plaster- 4F
WPR-4F-02 Water proof coating to Wet areas
WPR-4F-03 Vertical side w/p of wet area
FLO-4F-09 Wet area -Ceramic Wall Clading
FLO-4F-08 Wet area- Ceramic flooring
FLO-4F-02 Floor Screed for Electrical Room
FLO-4F-01 Ceramic tile to entrance loby
FLO-4F-03 Ceramic tiling to balconey and terrase
FLO-4F-05 Marble flooring to Corridor
FLO-4F-04 Ceramic tile iside the room
FLO-4F-10 Telephone room & other room flooring
FLO-4F-06 Corridor Wall Clading-Ceramic
FLO-4F-07 Skirting
FLO-4F-11 Threshold
FAL-4F-01 4F-Balcony False Ceiling
FAL-4F-02 False Ceiling
PANT-4F-01 Internal wall & ceiling painting
PANT-4F-02 Final internal painting
CARP-4F-02 Fixing of Door Frame
CARP-4F-03 Fixing of Door Shutter
CARP-4F-01 Fixing of Kitchen Cabinet
CARP-4F-04 Fixing of Wardrobes
MEP-4F-08 Bath Tub Fixing
MEP-4F-09 Sanitary fixing & Mixer
BLO-5F-01 cleaning
BLO-5F-02 Block layout and checking
BLO-5F-04 Block work -5F
BLO-5F-03 Internal Block Work
A0ON-5F-07 R.C.C Lintel
PLAS-5F-01 Wall Plaster - 5F
PLAS-5F-02 Celing Plaster- 5F
WRP-5F-02 Water proof coating to Wet areas
WRP-5F-03 Vertical side w/p of wet area
FLO-5F-10 Wet area -Ceramic Wall Clading
FLO-5F-04 Wet area- Ceramic flooring
FLO-5F-01 Floor Screed for Electrical Room
FLO-5F-03 Ceramic tile to entrance loby
FLO-5F-06 Marble flooring to Corridor
FLO-5F-05 Ceramic tile iside the room
FLO-5F-02 Ceramic tiling to balconey and terrase
FLO-5F-08 Telephone room & other room flooring
FLO-5F-07 Corridor Wall Clading-Ceramic
FLO-5F-09 Skirting
FLO-5F-11 Threshold
FAL-5F-01 5F-Balcony False Ceiling
FAL-5F-02 False Ceiling
PANT-5F-01 Internal wall & ceiling painting
PANT-5F-02 Final internal painting
CARP-5F-02 Fixing of Door Frame
CARP-5F-03 Fixing of Door Shutter
CARP-5F-01 Fixing of Kitchen Cabinet
CARP-5F-04 Fixing of Wardrobes
MEP-5F-08 Bath Tub Fixing
MEP-5F-09 Sanitary fixing & Mixer
BLO-6F-01 cleaning
BLO-6F-02 Block layout and checking
BLO-6F-03 Block work -6F
BLO-6F-04 Internal Block Work
A0ON-6F-07 R.C.C Lintel
PLAS-6F-01 Wall Plaster - 6F
PLAS-6F-02 Celing Plaster- 6F
WRP-6F-02 Water proof coating to Wet areas
WRP-6F-03 Vertical side w/p of wet area
FLO-6F-11 Wet area -Ceramic Wall Clading
FLO-6F-05 Wet area- Ceramic flooring
FLO-6F-01 Floor Screed for Electrical Room
FLO-6F-03 Ceramic tile to entrance loby
FLO-6F-04 Ceramic tile iside the room
FLO-6F-02 Ceramic tiling to balconey and terrase
FLO-6F-06 Skirting
FLO-6F-09 Marble flooring to Corridor
FLO-6F-10 Corridor Wall Clading-Ceramic
FLO-6F-07 Telephone room & other room flooring
FLO-6F-08 Threshold
FAL-6F-01 6F-Balcony False Ceiling
FAL-6F-02 False Ceiling
PANT-6F-01 Internal wall & ceiling painting
PANT-6F-02 Final internal painting
CARP-6F-01 Fixing of Door Frame
CARP-6F-02 Fixing of Door Shutter
CARP-6F-03 Fixing of Kitchen Cabinet
CARP-6F-04 Fixing of Wardrobes
MEP-6F-08 Bath Tub Fixing
MEP-6F-11 Sanitary fixing & Mixer
BLO-7F-01 cleaning
BLO-7F-02 Block layout and checking
BLO-7F-03 Block work -7F
BLO-7F-04 Internal Block Work
A0ON-7F-07 R.C.C Lintel
PLAS-7F-01 Wall Plaster - 7F
PLAS-7F-02 Celing Plaster- 7F
WRP-7F-02 Water proof coating to Wet areas
WRP-7F-03 Vertical side w/p of wet area
FLO-7F-11 Wet area -Ceramic Wall Clading
FLO-7F-06 Wet area- Ceramic flooring
FLO-7F-02 Floor Screed for Electrical Room
FLO-7F-01 Ceramic tile to entrance loby
FLO-7F-04 Skirting
FLO-7F-03 Ceramic tile iside the room
FLO-7F-05 Ceramic tiling to balconey and terrase
FLO-7F-08 Marble flooring to coridoor
FLO-7F-10 Corridor Wall Clading-Ceramic
FLO-7F-07 Telephone room & other room flooring
FLO-7F-09 Threshold
FAL-7F-01 7F-Balcony False Ceiling
FAL-7F-02 False Ceiling
PANT-7F-01 Internal wall & ceiling painting
PANT-7F-02 Final internal painting
CARP-7F-01 Fixing of Door Frame
CARP-7F-02 Fixing of Door Shutter
CARP-7F-03 Fixing of Kitchen Cabinet
CARP-7F-04 Fixing of Wardrobes
MEP-7F-08 Bath Tub Fixing
MEP-7F-12 Sanitary fixing & Mixer
BLO-HC-01 cleaning
BLO-HC-02 Block layout and checking
BLO-HC-04 Internal Block Work
BLO-HC-03 Block work -HC
A0ON-HC-10 R.C.C Lintel - HC
PLAS-HC-01 Wall Plaster - HC
A0AS-HC-02 Celing Plaster- HC
FLO-HC-07 rubber floor above screed in gym
FLO-HC-09 rubber skirting
FLO-HC-10 Graniti Ceramic tile( Steps to pool Dake Area)
FLO-HC-11 swimming pool wall clading
FLO-HC-14 Graniti Ceramic tile ( lift m/c room)
WRP-HC-02 Water proof coating to Wet areas
FLO-HC-02 White cement tiles
WRP-HC-03 Vertical side w/p of wet area
FLO-HC-04 wet area wall clading
FLO-HC-05 Ceramic flooring to swiming pool wall
A0LO-EX-02 Fixing of window sill
FLO-HC-01 Floor Screed for Electrical / store / tel room
FLO-HC-03 Marble flooring to lift loby
FLO-HC-06 Threshold
FLO-HC-08 Corridor Wall Clading-Ceramic
FLO-HC-12 Ceramic flooring to Filter Room
FLO-HC-13 Step to pool Deck
PANT-HC-01 Lift Int .wall bitumen coating
FAL-HC-01 False Ceiling
PANT-HC-02 Internal wall & ceiling painting
PANT-HC-03 Final internal painting
PANT-HC-04 Epoxy painting to staircase
CARP-HC-01 Fixing of Door Frame
CARP-HC-02 Fixing of Door shutter
MEP-HC-12 Sanitary fixing & Mixer
BLO-UR-01 Block work-UR
PLAS-UR-01 Wall Plaster- UR
PLAS-UR-02 Celing Plaster- UR
PLAS-UR-03 Staircase wall plaster
PLAS-UR-04 Staircase Ceilling plaster
CARP-UR-01 Fixing of Door Frame
CARP-UR-02 Fixing of Door shutter
MEP-B-02 MEP -Wall Conduites
MEP-B-03 Fixing of DB Back box ,GI box
MEP-B-04 Fixing of DB
MEP-B-06 Internal wiring
MEP-B-07 Main Cable work
MEP-B-08 Switches & Sockets
MEP-B-10 Instalation of Islolater for A/C
MEP-B-09 Light Fittings
MEP-GF-01 MEP -Wall Conduites
MEP-GF-02 Fixing of DB Back box ,GI box
MEP-GF-00 Fixing of DB
MEP-GF-04 Internal wiring
MEP-GF-06 Main Cable work
MEP-GF-08 Switches & Sockets
MEP-GF-10 Instalation of Islolater for A/C
MEP-GF-09 Light Fittings
MEP-1F-01 MEP -Wall Conduites
MEP-1F-04 Fixing of DB Back box ,GI box
MEP-1F-03 Fixing of DB
MEP-1F-05 Internal wiring
MEP-1F-07 Main Cable work
MEP-1F-10 Switches & Sockets
MEP-1F-12 Instalation of Islolater for A/C
MEP-1F-11 Light Fittings
MEP-2F-01 MEP -Wall Conduites
MEP-2F-02 Fixing of DB Back box ,GI box
MEP-2F-03 Fixing of DB
MEP-2F-05 Internal wiring
MEP-2F-07 Main Cable work
MEP-2F-10 Switches & Sockets
MEP-2F-12 Instalation of Islolater for A/C
MEP-2F-11 Light Fittings
MEP-3F-02 MEP -Wall Conduites
MEP-3F-04 Fixing of DB Back box ,GI box
MEP-3F-03 Fixing of DB
MEP-3F-05 Internal wiring
MEP-3F-07 Main Cable work
MEP-3F-10 Switches & Sockets
MEP-3F-12 Instalation of Islolater for A/C
MEP-3F-11 Light Fittings
MEP-4F-01 MEP -Wall Conduites
MEP-4F-04 Fixing of DB Back box ,GI box
MEP-4F-03 Fixing of DB
MEP-4F-05 Internal wiring
MEP-4F-07 Main Cable work
MEP-4F-10 Switches & Sockets
MEP-4F-15 Instalation of Islolater for A/C
MEP-4F-14 Light Fittings
MEP-5F-01 MEP -Wall Conduites
MEP-5F-04 Fixing of DB Back box ,GI box
MEP-5F-03 Fixing of DB
MEP-5F-05 Internal wiring
MEP-5F-07 Main Cable work
MEP-5F-13 Switches & Sockets
MEP-5F-15 Instalation of Islolater for A/C
MEP-5F-14 Light Fittings
MEP-6F-01 MEP -Wall Conduites
MEP-6F-03 Fixing of DB Back box ,GI box
MEP-6F-02 Fixing of DB
MEP-6F-06 Internal wiring
MEP-6F-07 Main Cable work
MEP-6F-13 Switches & Sockets
MEP-6F-15 Instalation of Islolater for A/C
MEP-6F-14 Light Fittings
MEP-7F-01 MEP -Wall Conduites
MEP-7F-03 Fixing of DB Back box ,GI box
MEP-7F-02 Fixing of DB
MEP-7F-05 Internal wiring
MEP-7F-07 Main Cable work
MEP-7F-13 Switches & Sockets
MEP-7F-14 Light Fittings
MEP-7F-15 Instalation of Islolater for A/C
MEP-HC-01 MEP -Wall Conduites
MEP-HC-02 Fixing of DB
MEP-HC-03 Fixing of DB Back box ,GI box
MEP-UR-01 MEP Wall Conduites & instalation of DB Box
MEP-HC-06 Internal wiring
MEP-HC-08 Main Cable work
MEP-HC-16 Switches & Sockets
MEP-HC-17 Light Fittings
MEP-HC-18 Instalation of Islolater for A/C
MEP-B-01 Water supply PEX piping
MEP-B-05 Water Supply PPR piping
MEP-GF-03 Water supply PEX piping
MEP-1F-02 Water supply PEX piping
MEP-GF-05 Water Supply PPR piping
MEP-2F-04 Water supply PEX piping
MEP-3F-01 Water supply PEX piping
MEP-1F-06 Water Supply PPR piping
MEP-2F-06 Water Supply PPR piping
MEP-4F-02 Water supply PEX piping
MEP-3F-06 Water Supply PPR piping
MEP-5F-02 Water supply PEX piping
MEP-4F-06 Water Supply PPR piping
MEP-6F-04 Water supply PEX piping
MEP-5F-06 Water Supply PPR piping
MEP-7F-04 Water supply PEX piping
MEP-6F-05 Water Supply PPR piping
MEP-HC-04 Water supply PEX piping
MEP-7F-06 Water Supply PPR piping
MEP-HC-05 Water Supply PPR piping
MEP-HC-07 Above ground Drainage
MEP-GF-11 Drainage Risers
MEP-GF-12 Water supply Riser
MEP-1F-13 Drainage Risers
MEP-1F-14 Water supply Riser
MEP-GF-15 Civil work for maanhole / fic /Sand traap /etc
MEP-2F-13 Drainage Risers
MEP-2F-14 Water supply Riser
MEP-3F-13 Drainage Risers
MEP-3F-14 Water supply Riser
MEP-GF-13 Water Heater fixing
MEP-4F-11 Drainage Risers
MEP-4F-12 Water supply Riser
MEP-1F-15 Water Heater fixing
MEP-2F-15 Water Heater fixing
MEP-5F-10 Drainage Risers
MEP-5F-11 Water supply Riser
MEP-3F-15 Water Heater fixing
MEP-6F-09 Drainage Risers
MEP-6F-10 Water supply Riser
MEP-4F-13 Water Heater fixing
MEP-7F-09 Drainage Risers
MEP-7F-10 Water supply Riser
MEP-5F-12 Water Heter fixing
MEP-HC-09 Water supply Riser
MEP-HC-10 Drainage Risers
MEP-6F-12 Water Heater fixing
MEP-HC-13 Roof water supply work
MEP-7F-11 Water Heter fixing
MEP-HC-11 Water Heter fixing
MEP-HC-14 Water tank Instlation
MEP-HC-15 Pump Fitting
A0VAC-B-17 Ducting work for A/C
A0AC-GF-17 A/C unit hanging (indoor)
A0AC-1F-18 A/C unit hanging (indoor)
A0VAC-B-19 Ref. piping Work
A0AC-GF-18 Ducting work for A/C
A0AC-GF-20 Ref. piping Work
A0AC-2F-18 A/C unit hanging (indoor)
A0AC-3F-18 A/C unit hanging (indoor)
A0AC-1F-19 Ducting work for A/C
A0AC-1F-21 Ref. piping Work
A0AC-2F-19 Ducting work for A/C
A0AC-4F-18 A/C unit hanging (indoor)
A0AC-2F-21 Ref. piping Work
A0AC-GF-19 Ext.Fan Fixing
A0AC-GF-21 Air out let fixing
A0AC-3F-19 Ducting work for A/C
A0VAC-B-16 Fresh air Duct
A0AC-3F-21 Ref. piping Work
A0AC-5F-18 A/C unit hanging (indoor)
A0VAC-B-18 Ext.Fan Fixing
A0VAC-B-20 Air out let fixing
A0AC-4F-19 Ducting work for A/C
A0AC-4F-21 Ref. piping Work
A0AC-6F-18 A/C unit hanging (indoor)
A0AC-2F-20 Ext.Fan Fixing
A0AC-2F-22 Air out let fixing
A0AC-1F-20 Ext.Fan Fixing
A0AC-1F-22 Air out let fixing
A0AC-5F-19 Ducting work for A/C
A0AC-7F-18 A/C unit hanging (indoor)
A0AC-3F-20 Ext.Fan Fixing
A0AC-3F-22 Air out let fixing
A0AC-6F-19 Ducting work for A/C
A0AC-5F-21 Ref. piping Work
A0AC-6F-21 Ref. piping Work
A0AC-4F-20 Ext.Fan Fixing
A0AC-4F-22 Air out let fixing
A0AC-HC-20 A/C unit hanging (indoor)
A0AC-7F-19 Ducting work for A/C
A0AC-7F-21 Ref. piping Work
A0AC-HC-21 Ducting work for A/C
A0AC-5F-20 Ext.Fan Fixing
A0AC-5F-22 Air out let fixing
A0AC-6F-20 Ext.Fan Fixing
A0AC-6F-22 Air out let fixing
A0AC-HC-24 Ref. piping Work
A0AC-HC-23 Ext.Fan Fixing
A0AC-HC-25 Air out let fixing
A0AC-7F-20 Ext.Fan Fixing
A0AC-7F-22 Air out let fixing
A0AC-HC-22 A/C units ( outdoor)
WPR-1F-01 Balcony W/P 1F
PAV-01 Precast Wheel Stopper
WPR-2F-01 Balcony W/P 2F
WPR-3F-01 Balcony W/P 3F
WPR-4F-01 Balcony W/P 4F
WRP-5F-01 Balcony W/P 5F
WRP-6F-01 Balcony W/P 6F
PLAS-EX-01 External roof area Plastering
WRP-7F-01 Balcony W/P 7F
PANT-EX-01 Epoxy painting to Roof
PLAS-EX-02 Airwell Plastering
PANT-EX-02 Epoxy painting to side of stair wall to S.Pool
MET-06 Balconey Rainling
PANT-EX-03 Fless Coat to Air Wall
WRP-HC-01 waterproofing to swiming pool
WRP-EX-01 Roof , Parapet wall W/P & Testing
WRP-EX-02 W/P to Air wall flr,skirt,R. rain water outlet
WRP-EX-03 Bitumen coating to External Block Wall -A
PLAS-EX-03 External elevation Plastering -A
FLO-EX-01 External elevation marble wall clading-A
MET-02 Aluminium Cladding On elevation- A
MET-04 Aluminium Claading Upper Roof Area
WRP-EX-04 Bitumen coating to External Block Wal- B
PLAS-EX-04 External elevation Plastering -B
FLO-EX-02 External elevation marble wall clading-B
MET-03 Aluminium Cladding On elevation- B
WRP-EX-05 Bitumen coating to External Block Wal-C
PLAS-EX-05 External elevation Plastering -C
FLO-EX-03 External elevation marble wall clading-C
MET-07 Aluminium Cladding On elevation- C
WRP-EX-06 Bitumen coating to External Block Wal-D
PLAS-EX-06 External elevation Plastering -D
FLO-EX-04 External elevation marble wall clading-D
MET-08 Aluminium Cladding On elevation- D
PAV-02 Fixing Kerb Stone at island & footh path
PAV-03 Fixing 60mm Paving block
PAV-04 80 mm Interlock at parking
PAV-05 Trafic line marking
A0MIS-03 Fixing of column guards
MET-05 Aluminium / door & Window
A0MIS-06 Compound Wall
MET-09 Staircase Hand Rail
MET-10 Cat ladders (For Airwel )
MET-11 Steel Pipe Gaurde (basement water side)
PR0-01 Security System
PR0-05 Gate barriers
PR0-03 Garbeg Disposal system
PR0-02 Pool Work
PRO-14 Reception counter
PR0-08 Instaltion Of Generator
PR0-09 TV system
PR0-06 Fixing of lockers
PR0-04 Sauna & Steam System
PR0-07 Lift instalation & Commissioning
PR0-11 Intercom system
PR0-10 Cradle system instalation
PR0-12 Transformar Instlation
PR0-13 Music system
TES-02 Testing & Commissioning
TES-01 Signage
TES-03 Civil Defance Inspection
TES-04 DM Inspection
TES-05 Complition certificate from DM
TES-06 P R O J E C T H A N D O V E R
SUCO-6F-15 Steel Work for 7.F Slab
SUCO-6F-16 MEP sleves & conduits for 7.F Slab
SUCO-6F-17 Seventh Floor Slab Casting (PART-B)
SUCO-6F-18 Deshuttering PART- B
SUCO-7F-01 steel work for column/A
SUCO-7F-02 Form work for column/A
SUCO-7F-03 Shear Wall /A
SUCO-7F-04 Column casting For RF /A Slab
SUCO-7F-05 Decking work for RF/A Slab
SUCO-7F-06 Steel Work for RF/A Slab
SUCO-7F-07 MEP sleves & conduits for RF/A Slab
SUCO-7F-08 Roof Floor Slab Casting[Part-A ]
SUCO-7F-09 Deshuttering PART- A
SUCO-7F-11 steel work for column
SUCO-7F-10 Shear Wall & Lift Core Wall
SUCO-7F-12 Form work for column
SUCO-7F-13 Column casting For RF Slab
SUCO-7F-14 Decking Work for R.F Slab
SUCO-7F-15 Steel Work for R.F Slab
SUCO-7F-16 MEP sleves & conduits for R.F Slab
SUCO-7F-17 Roof Slab Casting (PART-B)
SUCO-7F-18 Deshuttering PART- B
SUCO-HC-01 steel work for column
SUCO-HC-02 Shear Wall & Lift Core Wall
SUCO-HC-03 Form work for column
SUCO-HC-05 Parapet Wall
SUCO-HC-04 Column casting
SUCO-HC-07 Swimming pool Shell
SUCO-HC-10 Pool Deck
SUCO-HC-06 Decking Work for HC Slab
SUCO-HC-09 MEP sleves & conduits for HC Slab
SUCO-HC-08 Steel Work for HC Slab
SUCO-HC-11 Helth Club Slab Casting
SUCO-HC-12 Deshuttering
SUCO-UR-03 steel work for column
SUCO-UR-02 Shear Wall & Lift Core Wall
SUCO-UR-04 Form work for column
SUCO-UR-05 Parapet Wall above HC
SUCO-UR-01 Column casting For lift m/c room
SUCO-UR-06 Decking Work for lift m/c room
SUCO-UR-08 MEP sleves & conduits for lift m/c room
SUCO-UR-07 Steel Work for lift m/c room
SUCO-UR-09 Lift m/c room Slab
BLO-B-01 cleaning
BLO-B-02 Block layout and checking
BLO-B-03 Block work in Basement
BLO-B-04 R.C.C Lintel
PLAS-B-01 Wall Plaster - Basement
PLAS-B-02 Celing Plaster-Basement
FLO-B-02 marble flooring to lift loby
A0EXAV-09 Earth filling above raft 8’’tk
FLO-B-04 Marble Wall Clading to Lift Loby
FLO-B-05 4’’ PCC with mesh
FLO-B-07 Pump/ Store room flooring
FLO-B-01 Car parking /Driveway Floor Finishing
FLO-B-03 floor finish to water tank area
FLO-B-06 Wall clading to Pump room
FLO-B-08 Thrishold
FAL-B-01 False Ceiling
PANT-B-01 Internal wall & ceiling painting
PANT-B-02 Anticarbonation painting in wall
PANT-B-03 Final internal painting
CARP-B-01 Fixing of Door Frame
CARP-B-02 Fixing of Door Shutter
A0MIS-01 Substation Trenching Work
MET-01 Aluminium (LOUVER WORK) Substation
PANT-GF-01 Transformer room painting
A0PRO-17 Dewa Inspection Substation
A0PRO-18 Sub station hand over to DEWA
BLO-GF-01 cleaning
BLO-GF-02 Block layout and checking
BLO-GF-03 Internal Block Work
BLO-GF-04 Block work- GF
A0ON-GF-08 R.C.C Lintel
PLAS-GF-02 Celing Plaster- GF
PLAS-GF-01 Wall Plaster GF
WPR-GF-02 GF- Parking W/P
WPR-GF-01 Water proof coating to Wet areas
WPR-GF-03 Vertical side w/p of wet area
FLO-GF-08 Wet area wall clading ( garbage room)
FLO-GF-06 Wet area flooring (ceramic tiles)
WPR-GF-04 Water proofing to substation slab roof
FLO-GF-02 Floor Screed for Electrical Room/gym/
FLO-GF-01 4’’ PCC with mesh
FLO-GF-03 Floor Screed for M.hall
FLO-GF-05 Floor Screed for Electricaal Sub-station
FLO-GF-04 Car parking /Driveway Floor Finishing
FLO-GF-07 Floor Screed for Gym / Shop
FLO-GF-09 Mosaic flooring to stair floor & landing area
FLO-GF-10 Floor Screed for Gen. Room
FLO-GF-11 Store and other room flooring
FLO-GF-12 mosaic step
FLO-GF-14 Marble flooring to Entrance passage
FLO-GF-15 mosaic skirting for steps
FLO-GF-13 Threshold
FLO-GF-17 Fixing Marble Steps
FLO-GF-16 Marble Wall Clading to Lift Loby
FAL-GF-01 False Ceiling
PANT-GF-02 Internal wall & ceiling painting
PANT-GF-03 Final internal painting
PANT-GF-04 Anticarbonation painting in wall
CARP-GF-01 Fixing of Door Frame
CARP-GF-02 Fixing of Door Shutter
CARP-GF-03 Fixing of Kitchen Cabinet
CARP-GF-04 Fixing of Wardrobes
MEP-GF-07 Sanitary fixing & Mixer
BLO-1F-01 Cleaning
BLO-1F-02 Block layout and checking
BLO-1F-04 Block work- 1F
BLO-1F-03 Internal Block Work
A0ON-1F-07 R.C.C Lintel
PLAS-1F-02 Celing Plaster- 1F
PLAS-1F-01 Wall Plaster - 1F
WPR-1F-02 Water proof coating to Wet areas
WPR-1F-03 Vertical side w/p of wet area
FL0-1F-10 Wet area -Ceramic Wall Clading
FL0-1F-04 Wet area- Ceramic flooring
FL0-1F-02 Floor Screed for Electrical Room
FL0-1F-01 Ceramic flooring inside room
FL0-1F-03 Ceramic tiling to balconey and terrase
FL0-1F-05 Ceramic tile to entrance loby
FL0-1F-06 Marble flooring to Corridor
FL0-1F-07 Skirting
FL0-1F-09 Corridor Wall Clading-Ceramic
FL0-1F-08 Telephone room & other room flooring
FL0-1F-11 Threshold
FAL-1F-01 1F-Baalcony False Ceiling
FAL-1F-02 False Ceiling
PANT-1F-01 Internal wall & ceiling painting
PANT-1F-02 Final internal painting
CARP-1F-01 Fixing of Door Frame
CARP-1F-02 Fixing of Door Shutter
CARP-1F-03 Fixing of Kitchen Cabinet
CARP-1F-04 Fixing of Wardrobes
MEP-1F-08 Bath Tub Fixing
MEP-1F-09 Sanitary fixing & Mixer
BLO-2F-01 clening
BLO-2F-02 Block layout and checking
BLO-2F-04 Block work- 2F
BLO-2F-03 Internal Block Work
A0ON-2F-07 R.C.C Lintel
PLAS-2F-01 Wall Plaster - 2F
PLAS-2F-02 Celing Plaster- 2F
WPR-2F-02 Water proof coating to Wet areas
WPR-2F-03 Vertical side w/p of wet area
FLO-2F-10 Wet area -Ceramic Wall Clading
FLO-2F-05 Wet area- Ceramic flooring
FLO-2F-01 Ceramic tile to entrance loby
FLO-2F-02 Floor Screed for Electrical Room
FLO-2F-03 Ceramic tile iside the room
FLO-2F-04 Ceramic tiling to balconey and terrase
FLO-2F-06 Marble flooring to Corridor
FLO-2F-07 Skirting
FLO-2F-09 Corridor Wall Clading-Ceramic
FLO-2F-08 Telephone room & other room flooring
FLO-2F-11 Threshold
FAL-2F-01 2F-Baalcony False Ceiling
FAL-2F-02 False Ceiling
PANT-2F-01 Internal wall & ceiling painting
PANT-2F-02 Final internal painting
CARP-2F-01 Fixing of Door Frame
CARP-2F-02 Fixing of Door Shutter
CARP-2F-03 Fixing of Kitchen Cabinet
CARP-2F-04 Fixing of Wardrobes
MEP-2F-08 Bath Tub Fixing
MEP-2F-09 Sanitary fixing & Mixer
BLO-3F-01 cleaning
BLO-3F-02 Block layout and checking
BLO-3F-03 Block work -3F
BLO-3F-04 Internal Block Work
A0ON-3F-07 R.C.C Lintel
PLAS-3F-01 Wall Plaster - 3F
PLAS-3F-02 Celing Plaster- 3F
WPR-3F-02 Water proof coating to Wet areas
WPR-3F-03 Vertical side w/p of wet area
FLO-3F-08 Wet area -Ceramic Wall Clading
FLO-3F-03 Wet area- Ceramic flooring
FLO-3F-01 Ceramic tiling to balconey and terrase
FLO-3F-02 Ceramic tile iside the room
FLO-3F-06 Floor Screed for Electrical Room
FLO-3F-04 Ceramic tile to entrance loby
FLO-3F-05 Skirting
FLO-3F-07 Telephone room & other room flooring
FLO-3F-09 Marble flooring to Corridor
FLO-3F-10 Threshold
FLO-3F-11 Corridor Wall Clading-Ceramic
FAL-3F-01 3F-Baalcony False Ceiling
FAL-3F-02 False Ceiling
PANT-3F-01 Internal wall & ceiling painting
PANT-3F-02 Final internal painting
CARP-3F-01 Fixing of Door Frame
CARP-3F-02 Fixing of Door Shutter
CARP-3F-03 Fixing of Kitchen Cabinet
CARP-3F-04 Fixing of Wardrobes
MEP-3F-08 Bath Tub Fixing
MEP-3F-09 Sanitary fixing & Mixer
BLO-4F-01 cleaning
BLO-4F-02 Block layout and checking
BLO-4F-04 Block work -4F
BLO-4F-03 Internal Block Work
A0ON-4F-07 R.C.C Lintel
PLAS-4F-01 Wall Plaster - 4F
PLAS-4F-02 Celing Plaster- 4F
WPR-4F-02 Water proof coating to Wet areas
WPR-4F-03 Vertical side w/p of wet area
FLO-4F-09 Wet area -Ceramic Wall Clading
FLO-4F-08 Wet area- Ceramic flooring
FLO-4F-02 Floor Screed for Electrical Room
FLO-4F-01 Ceramic tile to entrance loby
FLO-4F-03 Ceramic tiling to balconey and terrase
FLO-4F-05 Marble flooring to Corridor
FLO-4F-04 Ceramic tile iside the room
FLO-4F-10 Telephone room & other room flooring
FLO-4F-06 Corridor Wall Clading-Ceramic
FLO-4F-07 Skirting
FLO-4F-11 Threshold
FAL-4F-01 4F-Balcony False Ceiling
FAL-4F-02 False Ceiling
PANT-4F-01 Internal wall & ceiling painting
PANT-4F-02 Final internal painting
CARP-4F-02 Fixing of Door Frame
CARP-4F-03 Fixing of Door Shutter
CARP-4F-01 Fixing of Kitchen Cabinet
CARP-4F-04 Fixing of Wardrobes
MEP-4F-08 Bath Tub Fixing
MEP-4F-09 Sanitary fixing & Mixer
BLO-5F-01 cleaning
BLO-5F-02 Block layout and checking
BLO-5F-04 Block work -5F
BLO-5F-03 Internal Block Work
A0ON-5F-07 R.C.C Lintel
PLAS-5F-01 Wall Plaster - 5F
PLAS-5F-02 Celing Plaster- 5F
WRP-5F-02 Water proof coating to Wet areas
WRP-5F-03 Vertical side w/p of wet area
FLO-5F-10 Wet area -Ceramic Wall Clading
FLO-5F-04 Wet area- Ceramic flooring
FLO-5F-01 Floor Screed for Electrical Room
FLO-5F-03 Ceramic tile to entrance loby
FLO-5F-06 Marble flooring to Corridor
FLO-5F-05 Ceramic tile iside the room
FLO-5F-02 Ceramic tiling to balconey and terrase
FLO-5F-08 Telephone room & other room flooring
FLO-5F-07 Corridor Wall Clading-Ceramic
FLO-5F-09 Skirting
FLO-5F-11 Threshold
FAL-5F-01 5F-Balcony False Ceiling
FAL-5F-02 False Ceiling
PANT-5F-01 Internal wall & ceiling painting
PANT-5F-02 Final internal painting
CARP-5F-02 Fixing of Door Frame
CARP-5F-03 Fixing of Door Shutter
CARP-5F-01 Fixing of Kitchen Cabinet
CARP-5F-04 Fixing of Wardrobes
MEP-5F-08 Bath Tub Fixing
MEP-5F-09 Sanitary fixing & Mixer
BLO-6F-01 cleaning
BLO-6F-02 Block layout and checking
BLO-6F-03 Block work -6F
BLO-6F-04 Internal Block Work
A0ON-6F-07 R.C.C Lintel
PLAS-6F-01 Wall Plaster - 6F
PLAS-6F-02 Celing Plaster- 6F
WRP-6F-02 Water proof coating to Wet areas
WRP-6F-03 Vertical side w/p of wet area
FLO-6F-11 Wet area -Ceramic Wall Clading
FLO-6F-05 Wet area- Ceramic flooring
FLO-6F-01 Floor Screed for Electrical Room
FLO-6F-03 Ceramic tile to entrance loby
FLO-6F-04 Ceramic tile iside the room
FLO-6F-02 Ceramic tiling to balconey and terrase
FLO-6F-06 Skirting
FLO-6F-09 Marble flooring to Corridor
FLO-6F-10 Corridor Wall Clading-Ceramic
FLO-6F-07 Telephone room & other room flooring
FLO-6F-08 Threshold
FAL-6F-01 6F-Balcony False Ceiling
FAL-6F-02 False Ceiling
PANT-6F-01 Internal wall & ceiling painting
PANT-6F-02 Final internal painting
CARP-6F-01 Fixing of Door Frame
CARP-6F-02 Fixing of Door Shutter
CARP-6F-03 Fixing of Kitchen Cabinet
CARP-6F-04 Fixing of Wardrobes
MEP-6F-08 Bath Tub Fixing
MEP-6F-11 Sanitary fixing & Mixer
BLO-7F-01 cleaning
BLO-7F-02 Block layout and checking
BLO-7F-03 Block work -7F
BLO-7F-04 Internal Block Work
A0ON-7F-07 R.C.C Lintel
PLAS-7F-01 Wall Plaster - 7F
PLAS-7F-02 Celing Plaster- 7F
WRP-7F-02 Water proof coating to Wet areas
WRP-7F-03 Vertical side w/p of wet area
FLO-7F-11 Wet area -Ceramic Wall Clading
FLO-7F-06 Wet area- Ceramic flooring
FLO-7F-02 Floor Screed for Electrical Room
FLO-7F-01 Ceramic tile to entrance loby
FLO-7F-04 Skirting
FLO-7F-03 Ceramic tile iside the room
FLO-7F-05 Ceramic tiling to balconey and terrase
FLO-7F-08 Marble flooring to coridoor
FLO-7F-10 Corridor Wall Clading-Ceramic
FLO-7F-07 Telephone room & other room flooring
FLO-7F-09 Threshold
FAL-7F-01 7F-Balcony False Ceiling
FAL-7F-02 False Ceiling
PANT-7F-01 Internal wall & ceiling painting
PANT-7F-02 Final internal painting
CARP-7F-01 Fixing of Door Frame
CARP-7F-02 Fixing of Door Shutter
CARP-7F-03 Fixing of Kitchen Cabinet
CARP-7F-04 Fixing of Wardrobes
MEP-7F-08 Bath Tub Fixing
MEP-7F-12 Sanitary fixing & Mixer
BLO-HC-01 cleaning
BLO-HC-02 Block layout and checking
BLO-HC-04 Internal Block Work
BLO-HC-03 Block work -HC
A0ON-HC-10 R.C.C Lintel - HC
PLAS-HC-01 Wall Plaster - HC
A0AS-HC-02 Celing Plaster- HC
FLO-HC-07 rubber floor above screed in gym
FLO-HC-09 rubber skirting
FLO-HC-10 Graniti Ceramic tile( Steps to pool Dake Area)
FLO-HC-11 swimming pool wall clading
FLO-HC-14 Graniti Ceramic tile ( lift m/c room)
WRP-HC-02 Water proof coating to Wet areas
FLO-HC-02 White cement tiles
WRP-HC-03 Vertical side w/p of wet area
FLO-HC-04 wet area wall clading
FLO-HC-05 Ceramic flooring to swiming pool wall
A0LO-EX-02 Fixing of window sill
FLO-HC-01 Floor Screed for Electrical / store / tel room
FLO-HC-03 Marble flooring to lift loby
FLO-HC-06 Threshold
FLO-HC-08 Corridor Wall Clading-Ceramic
FLO-HC-12 Ceramic flooring to Filter Room
FLO-HC-13 Step to pool Deck
PANT-HC-01 Lift Int .wall bitumen coating
FAL-HC-01 False Ceiling
PANT-HC-02 Internal wall & ceiling painting
PANT-HC-03 Final internal painting
PANT-HC-04 Epoxy painting to staircase
CARP-HC-01 Fixing of Door Frame
CARP-HC-02 Fixing of Door shutter
MEP-HC-12 Sanitary fixing & Mixer
BLO-UR-01 Block work-UR
PLAS-UR-01 Wall Plaster- UR
PLAS-UR-02 Celing Plaster- UR
PLAS-UR-03 Staircase wall plaster
PLAS-UR-04 Staircase Ceilling plaster
CARP-UR-01 Fixing of Door Frame
CARP-UR-02 Fixing of Door shutter
MEP-B-02 MEP -Wall Conduites
MEP-B-03 Fixing of DB Back box ,GI box
MEP-B-04 Fixing of DB
MEP-B-06 Internal wiring
MEP-B-07 Main Cable work
MEP-B-08 Switches & Sockets
MEP-B-10 Instalation of Islolater for A/C
MEP-B-09 Light Fittings
MEP-GF-01 MEP -Wall Conduites
MEP-GF-02 Fixing of DB Back box ,GI box
MEP-GF-00 Fixing of DB
MEP-GF-04 Internal wiring
MEP-GF-06 Main Cable work
MEP-GF-08 Switches & Sockets
MEP-GF-10 Instalation of Islolater for A/C
MEP-GF-09 Light Fittings
MEP-1F-01 MEP -Wall Conduites
MEP-1F-04 Fixing of DB Back box ,GI box
MEP-1F-03 Fixing of DB
MEP-1F-05 Internal wiring
MEP-1F-07 Main Cable work
MEP-1F-10 Switches & Sockets
MEP-1F-12 Instalation of Islolater for A/C
MEP-1F-11 Light Fittings
MEP-2F-01 MEP -Wall Conduites
MEP-2F-02 Fixing of DB Back box ,GI box
MEP-2F-03 Fixing of DB
MEP-2F-05 Internal wiring
MEP-2F-07 Main Cable work
MEP-2F-10 Switches & Sockets
MEP-2F-12 Instalation of Islolater for A/C
MEP-2F-11 Light Fittings
MEP-3F-02 MEP -Wall Conduites
MEP-3F-04 Fixing of DB Back box ,GI box
MEP-3F-03 Fixing of DB
MEP-3F-05 Internal wiring
MEP-3F-07 Main Cable work
MEP-3F-10 Switches & Sockets
MEP-3F-12 Instalation of Islolater for A/C
MEP-3F-11 Light Fittings
MEP-4F-01 MEP -Wall Conduites
MEP-4F-04 Fixing of DB Back box ,GI box
MEP-4F-03 Fixing of DB
MEP-4F-05 Internal wiring
MEP-4F-07 Main Cable work
MEP-4F-10 Switches & Sockets
MEP-4F-15 Instalation of Islolater for A/C
MEP-4F-14 Light Fittings
MEP-5F-01 MEP -Wall Conduites
MEP-5F-04 Fixing of DB Back box ,GI box
MEP-5F-03 Fixing of DB
MEP-5F-05 Internal wiring
MEP-5F-07 Main Cable work
MEP-5F-13 Switches & Sockets
MEP-5F-15 Instalation of Islolater for A/C
MEP-5F-14 Light Fittings
MEP-6F-01 MEP -Wall Conduites
MEP-6F-03 Fixing of DB Back box ,GI box
MEP-6F-02 Fixing of DB
MEP-6F-06 Internal wiring
MEP-6F-07 Main Cable work
MEP-6F-13 Switches & Sockets
MEP-6F-15 Instalation of Islolater for A/C
MEP-6F-14 Light Fittings
MEP-7F-01 MEP -Wall Conduites
MEP-7F-03 Fixing of DB Back box ,GI box
MEP-7F-02 Fixing of DB
MEP-7F-05 Internal wiring
MEP-7F-07 Main Cable work
MEP-7F-13 Switches & Sockets
MEP-7F-14 Light Fittings
MEP-7F-15 Instalation of Islolater for A/C
MEP-HC-01 MEP -Wall Conduites
MEP-HC-02 Fixing of DB
MEP-HC-03 Fixing of DB Back box ,GI box
MEP-UR-01 MEP Wall Conduites & instalation of DB Box
MEP-HC-06 Internal wiring
MEP-HC-08 Main Cable work
MEP-HC-16 Switches & Sockets
MEP-HC-17 Light Fittings
MEP-HC-18 Instalation of Islolater for A/C
MEP-B-01 Water supply PEX piping
MEP-B-05 Water Supply PPR piping
MEP-GF-03 Water supply PEX piping
MEP-1F-02 Water supply PEX piping
MEP-GF-05 Water Supply PPR piping
MEP-2F-04 Water supply PEX piping
MEP-3F-01 Water supply PEX piping
MEP-1F-06 Water Supply PPR piping
MEP-2F-06 Water Supply PPR piping
MEP-4F-02 Water supply PEX piping
MEP-3F-06 Water Supply PPR piping
MEP-5F-02 Water supply PEX piping
MEP-4F-06 Water Supply PPR piping
MEP-6F-04 Water supply PEX piping
MEP-5F-06 Water Supply PPR piping
MEP-7F-04 Water supply PEX piping
MEP-6F-05 Water Supply PPR piping
MEP-HC-04 Water supply PEX piping
MEP-7F-06 Water Supply PPR piping
MEP-HC-05 Water Supply PPR piping
MEP-HC-07 Above ground Drainage
MEP-GF-11 Drainage Risers
MEP-GF-12 Water supply Riser
MEP-1F-13 Drainage Risers
MEP-1F-14 Water supply Riser
MEP-GF-15 Civil work for maanhole / fic /Sand traap /etc
MEP-2F-13 Drainage Risers
MEP-2F-14 Water supply Riser
MEP-3F-13 Drainage Risers
MEP-3F-14 Water supply Riser
MEP-GF-13 Water Heater fixing
MEP-4F-11 Drainage Risers
MEP-4F-12 Water supply Riser
MEP-1F-15 Water Heater fixing
MEP-2F-15 Water Heater fixing
MEP-5F-10 Drainage Risers
MEP-5F-11 Water supply Riser
MEP-3F-15 Water Heater fixing
MEP-6F-09 Drainage Risers
MEP-6F-10 Water supply Riser
MEP-4F-13 Water Heater fixing
MEP-7F-09 Drainage Risers
MEP-7F-10 Water supply Riser
MEP-5F-12 Water Heter fixing
MEP-HC-09 Water supply Riser
MEP-HC-10 Drainage Risers
MEP-6F-12 Water Heater fixing
MEP-HC-13 Roof water supply work
MEP-7F-11 Water Heter fixing
MEP-HC-11 Water Heter fixing
MEP-HC-14 Water tank Instlation
MEP-HC-15 Pump Fitting
A0VAC-B-17 Ducting work for A/C
A0AC-GF-17 A/C unit hanging (indoor)
A0AC-1F-18 A/C unit hanging (indoor)
A0VAC-B-19 Ref. piping Work
A0AC-GF-18 Ducting work for A/C
A0AC-GF-20 Ref. piping Work
A0AC-2F-18 A/C unit hanging (indoor)
A0AC-3F-18 A/C unit hanging (indoor)
A0AC-1F-19 Ducting work for A/C
A0AC-1F-21 Ref. piping Work
A0AC-2F-19 Ducting work for A/C
A0AC-4F-18 A/C unit hanging (indoor)
A0AC-2F-21 Ref. piping Work
A0AC-GF-19 Ext.Fan Fixing
A0AC-GF-21 Air out let fixing
A0AC-3F-19 Ducting work for A/C
A0VAC-B-16 Fresh air Duct
A0AC-3F-21 Ref. piping Work
A0AC-5F-18 A/C unit hanging (indoor)
A0VAC-B-18 Ext.Fan Fixing
A0VAC-B-20 Air out let fixing
A0AC-4F-19 Ducting work for A/C
A0AC-4F-21 Ref. piping Work
A0AC-6F-18 A/C unit hanging (indoor)
A0AC-2F-20 Ext.Fan Fixing
A0AC-2F-22 Air out let fixing
A0AC-1F-20 Ext.Fan Fixing
A0AC-1F-22 Air out let fixing
A0AC-5F-19 Ducting work for A/C
A0AC-7F-18 A/C unit hanging (indoor)
A0AC-3F-20 Ext.Fan Fixing
A0AC-3F-22 Air out let fixing
A0AC-6F-19 Ducting work for A/C
A0AC-5F-21 Ref. piping Work
A0AC-6F-21 Ref. piping Work
A0AC-4F-20 Ext.Fan Fixing
A0AC-4F-22 Air out let fixing
A0AC-HC-20 A/C unit hanging (indoor)
A0AC-7F-19 Ducting work for A/C
A0AC-7F-21 Ref. piping Work
A0AC-HC-21 Ducting work for A/C
A0AC-5F-20 Ext.Fan Fixing
A0AC-5F-22 Air out let fixing
A0AC-6F-20 Ext.Fan Fixing
A0AC-6F-22 Air out let fixing
A0AC-HC-24 Ref. piping Work
A0AC-HC-23 Ext.Fan Fixing
A0AC-HC-25 Air out let fixing
A0AC-7F-20 Ext.Fan Fixing
A0AC-7F-22 Air out let fixing
A0AC-HC-22 A/C units ( outdoor)
WPR-1F-01 Balcony W/P 1F
PAV-01 Precast Wheel Stopper
WPR-2F-01 Balcony W/P 2F
WPR-3F-01 Balcony W/P 3F
WPR-4F-01 Balcony W/P 4F
WRP-5F-01 Balcony W/P 5F
WRP-6F-01 Balcony W/P 6F
PLAS-EX-01 External roof area Plastering
WRP-7F-01 Balcony W/P 7F
PANT-EX-01 Epoxy painting to Roof
PLAS-EX-02 Airwell Plastering
PANT-EX-02 Epoxy painting to side of stair wall to S.Pool
MET-06 Balconey Rainling
PANT-EX-03 Fless Coat to Air Wall
WRP-HC-01 waterproofing to swiming pool
WRP-EX-01 Roof , Parapet wall W/P & Testing
WRP-EX-02 W/P to Air wall flr,skirt,R. rain water outlet
WRP-EX-03 Bitumen coating to External Block Wall -A
PLAS-EX-03 External elevation Plastering -A
FLO-EX-01 External elevation marble wall clading-A
MET-02 Aluminium Cladding On elevation- A
MET-04 Aluminium Claading Upper Roof Area
WRP-EX-04 Bitumen coating to External Block Wal- B
PLAS-EX-04 External elevation Plastering -B
FLO-EX-02 External elevation marble wall clading-B
MET-03 Aluminium Cladding On elevation- B
WRP-EX-05 Bitumen coating to External Block Wal-C
PLAS-EX-05 External elevation Plastering -C
FLO-EX-03 External elevation marble wall clading-C
MET-07 Aluminium Cladding On elevation- C
WRP-EX-06 Bitumen coating to External Block Wal-D
PLAS-EX-06 External elevation Plastering -D
FLO-EX-04 External elevation marble wall clading-D
MET-08 Aluminium Cladding On elevation- D
PAV-02 Fixing Kerb Stone at island & footh path
PAV-03 Fixing 60mm Paving block
PAV-04 80 mm Interlock at parking
PAV-05 Trafic line marking
A0MIS-03 Fixing of column guards
MET-05 Aluminium / door & Window
A0MIS-06 Compound Wall
MET-09 Staircase Hand Rail
MET-10 Cat ladders (For Airwel )
MET-11 Steel Pipe Gaurde (basement water side)
PR0-01 Security System
PR0-05 Gate barriers
PR0-03 Garbeg Disposal system
PR0-02 Pool Work
PRO-14 Reception counter
PR0-08 Instaltion Of Generator
PR0-09 TV system
PR0-06 Fixing of lockers
PR0-04 Sauna & Steam System
PR0-07 Lift instalation & Commissioning
PR0-11 Intercom system
PR0-10 Cradle system instalation
PR0-12 Transformar Instlation
PR0-13 Music system
TES-02 Testing & Commissioning
TES-01 Signage
TES-03 Civil Defance Inspection
TES-04 DM Inspection
TES-05 Complition certificate from DM
TES-06 P R O J E C T H A N D O V E R