You are on page 1of 244

AHMED LASHIN

A R C H I T E C T
CURRICULUM VITAE
PORTFOL IO SAMPL E
Table of Contents :

1. Briefing.
2. Work Experience.
3. Construction Drawings Projects.
4. Fitout Projects.
5. Design Projects.
6. Work Experience certificates.
Briefing

Eager to gain experience and to apply my education, skills and short experience,
with the ambition to enhance my skills to be an effective employee inside work organization.

Personal information :
• Name: Ahmed Youssry Lashin .
• Nationality: Egyptian.
• Date of birth: 30 / 11 / 1986.
• Military status: Exempted.
• Resident: Heliopolis.
Contacts :
• Mobile: +2 0100 36 40 366
• E-mail: ayzlashin@hotmail.com
ayzlashin@yahoo.com
ayzlashin@gmail.com
Education :
• 2013 – 2016 Master of Science - faculty of engineering ,Ain-Shams university , Architecture department.
• 2003 – 2008 Bachelor of Architecture - faculty of engineering , Ain-Shams university , Architecture department.
Briefing

Career Qualifications :
Master of Engineering, Architecture department, Faculty of Engineering, Ain-Shams University, Cairo, Egypt.
• Over-all grade: Very Good.
Bachelor of Engineering, Architecture department, Faculty of Engineering , Ain-Shams University, Cairo, Egypt.
• Over-all grade: Good.
• Graduation year: 2008.
• Graduation project : Virtual Reality Valley
• Graduation project grade: Very Good.
Graphic Design Diploma, YAT Learning solutions.
• Over-all grade: Very Good.
Personal skills & Competencies :
• Languages :
1- Arabic - mother tongue.
2- English - fluent.
• Professional Photographer for multiple companies & studios.
• Graphic Designer.
• Teacher Assistant at Arab Academy for Science, Technology & maritime transport.
Social skills & Competencies :
• Living & working in multicultural environments thanks to handiness in communicating & strong will to share different experiences.
• Good relational abilities of insertion in new atmospheres of job.
Briefing

Technical skills & Competencies :


1- Excellent competencies in AutoCAD .
2- Excellent competencies in 3d studio max .
3- Excellent competencies in Adobe Photoshop .
4- Good competencies in Revit Architecture.
5- Good competencies in Adobe illustrator.
6- Good competencies in Adobe in Design.
Organizational Skills & Competencies :
• Ability to coordinate between different disciplines & administrate architects and activities with an excellent use of time and budget.
Other Skills :
• Excellent presentation skills.
Work Experience

Projects Participated in at Pavilion Architects :


Project Manager & Coordinator of Al Alamein Towers.

Projects Participated in at EHAF Consulting Engineers :


Architectural Design Unit Manager for the ministry of Interiors Tactic Village, Police Stations & Administration buildings.
Design Development & Working drawings and Details for Greater Cairo Metro Line 4.
Design Development & Working drawings for Ministry of Justice Building in Riyadh - K.S.A.
Design Development & Working drawings for City Gate & Mivida Compounds In the 5th Settlement - New Cairo – Egypt.
Design Development & Working drawings for Schlumberger Oil and gas services and products Workshops.

Projects Participated in at S.A. Architects :


Developing working drawings , Designing Construction Details & b.o.q. for several architectural
projects ( villas – administration buildings - retail stores ).

Projects Participated in at Cube Consultants :


Design the New master Plan for Greater Cairo Cairo 2050 urban Project.
Working Drawings For the Renovation of the National Theater in Attaba Square, Cairo, Egypt.
Design Development , Working drawings and Details & construction supervision for the Railway Stations Project.
Construction Drawings Projects

New Al-Alamein City’s Beach Towers


Qatar’s Ministry of Electric and Water Resources
Barwa Bank H.Q.
Khoriteyat Masjid and Majlis
Tactic Village for Combat Operations
Schlumberger Egypt Workshops Project
Greater Cairo Metro Line 4 Workshops Project
Ministry of Finance in Saudi Arabia
City Gate Residential Compound
Egypt Railway Stations Project
Teegan Residential Compound
Al Alamein City Beach Towers

Client : New Urban Communities Authority


Location : Al Alamein City - Egypt
Leed Consultant : Pavilion
Scope of Work : Project Manager and Coordinator
Construction Drawings Projects

Project’s Main 3D Shot

9
Construction Drawings Projects

Project’s Elevation

Project’s Layout 10
Construction Drawings Projects
KEY PLAN / SITE LOCATION

1.0 GENERAL :
1- ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS.
2- DO NOT SCALE. USE WRITTEN DIMENSIONS.
3- ALL DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR BEFORE
CONSTRUCTION ON SITE . ANY DISCREPANCY SHALL BE REPORTED TO THE
ENGINEER FOR REMEDIAL MEASURE BEFORE COMMENCE OF RELATED WORK.

1.1 ABBREVIATIONS :
- F.F.L ( FINISHED FLOOR LEVEL )
- T.O.P ( TOP OF PARAPET )

DO3/R E 01
ELEVATOR
DOOR ID DIRECTION ELEVATOR
NUMBER
R=RIGHT
L= LIFT

ROOM FUNCTION ROOM FUNCTION

L XY 06 L.G 01

STORY LEVEL STORY LEVEL


FUNCTION SPACE ID
SPACE ID
B1 AA
AB

DS E1 B2
E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35
DR AC
DQ B3
DP 03
DO AD
AR-302-3
DN AE
DM 01
DL B4
DK AF
DJ AR-300
DI AG
DH
DG B5
DF AH
DE
DD
B6 AI
DC
EA AJ
DB B7 AK
AL
DA
B8 AM
EB AN

EC
B9 AO

ED

D1 B10

EE B11
C1
D2 B12
EF C2
B13
EG
C3
B14
D3
C4
EH

EI C5 B15
D4
B16
A21

C6
D5

A16
C7 D6
D7 A15
C8
C9 A14
C10
D8 A13
C11 A12
D9 A11
C12 A10
D10
A9
D11 A8
C13
A7
C14 D12 A6
A5
02
A4
AR-301
C15 D13
A3
A2

D14
A1
BS
D15
BR

D16 BQ
BO
BN
D17 00 24/06/2018 W.D ISSUED FOR REVIEW Team Work Aya Khaled Eng :Yasser Zaki
BM INDEX DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY
BL
D18 BK
BJ
BI
BH
BG
D19 BF
BE
BD
D20 BC

BA
BB www.ecgsa. com
BA'
D21
CT 04
AR-304-5
MAIN CONSULTANT :
D22 CA CB CC CD CE CF CG CH CI CJ CK CL CM CN CO CP CQ CR CS

Pavillion Architects S.A.E


Building 23 Mohamed Aly El Balky ,
Heliopolis Sq. Cairo, Egypt
PAVILLION ARCHITECTS
Tel:- +20226326493 Fax :- 2026326495
www.pavillionarchitects.com info@pavillionarchitects.com

E
STRUCTURE Consultant:

Engineers & Consultants

PROJECT TITLE : NORTH EDGE TOWERS


NEW ALAMEIN
PLOT (LD00)
DRAWING TITLE :
PODIUM ROOF FLOOR - GENERAL ARRANGEMENT LAYOUT

11
DRAWING NO. REVISION TEAM WORK : Sara Ahmed Esraa Sabry
Helana Safwat Rana Sherif
01 PODIUM ROOF FLOOR - GENERAL ARRANGEMENT LAYOUT LD00-AR-PD-026 00 Walaa Farag Aya Khaled

- SCALE 1:500
SCALE DATE APPROVED BY

1:500 05/09/2018 Eng. Yasser Zaki


Construction Drawings Projects

Towers Under Construction


KEY PLAN / SITE LOCATION

AC AD AE
AFAG AH AI AJAK AL AM
AM AL AK AJ AI AH AG AF AE AD AC

1.0 GENERAL :
3,325 5,175 1,985 2,265 4,250 4,250 2,265 1,985 4,250 4,250 1- ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS.
2- DO NOT SCALE. USE WRITTEN DIMENSIONS.
3- ALL DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR BEFORE
4,250 4,250 1,985 2,265 4,250 4,250 2,265 1,985 5,175 3,325 CONSTRUCTION ON SITE . ANY DISCREPANCY SHALL BE REPORTED TO THE
F.F.L +30.25 ENGINEER FOR REMEDIAL MEASURE BEFORE COMMENCE OF RELATED WORK.

470 910
4th Floor 4th Floor 4th Floor 4th Floor 1.1 ABBREVIATIONS :
- F.F.L ( FINISHED FLOOR LEVEL )

340

270

340

340

340

340
- T.O.P ( TOP OF PARAPET )

2,220

2,220

2,220

2,220

2,220
1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 2 1 F 01 E 01

3,260

3,260

3,260

3,260

3,260
3,330

1,200

1,200
F.F.L +26.65 ELEVATOR
FLAT FLAT NUMBER ELEVATOR

470 910

470 910

470 910

470 910

470 910
3 5 3 3 3 3 3 5 3 3 3 3 5 3 NUMBER
3rd Floor 3rd Floor 3rd Floor 3rd Floor

2,400

2,400
DO3/R

340

270

340

340

340

340
R=RIGHT

2,220

2,220

2,220

2,220

2,220
1 1 1 1 1 1 1 2 1 1 1 1 1 1 2 1 DOOR ID DIRECTION L= LIFT

3,260

3,260

3,260

3,260

3,260
3,330

1,070 1,200

1,070 1,200
F.F.L +23.05

910

910

910

910

910
3 5 3 3 3 3 3 5 3 3 3 3 5 3
2nd Floor 2nd Floor 2nd Floor 2nd Floor

470

270

470

470

470

470
340

340

340

340

340
F.F.L +30.25 F.F.L +30.25
4th Floor 4th Floor

F.F.L +26.65 F.F.L +26.65


3rd Floor 3rd Floor

F.F.L +23.05 F.F.L +23.05


2nd Floor 2nd Floor

A8

A8
3150
03 | 06 | 14
BEDROOM

03 | 07 | 14
BEDROOM

03 | 03 | 14
BEDROOM
3735
2360 2360

03 | 02 | 14
BEDROOM
2330

2330

D03/R

D03/L
D03/R

D03/L
D03/R
D03/L

W01

03 | 02 | 11

03 | 03 | 11
D03/R

D03/R
D03/L

D03/L

CLOSET

CLOSET
A2
03 | 07 | 11
CLOSET
03 | 06 | 11
CLOSET
A9

A9
2380 2380

2330

2330
3785

4175

4175
00 24/06/2018 W.D ISSUED FOR REVIEW Team Work Helana Safwat Eng :Yasser Zaki

03 | 02 | 13

03 | 03 | 13
BEDROOM

BEDROOM
4930 4930 INDEX DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY

M.BEDROOM

M.BEDROOM
F.F.L+ +26.65

03 | 02 | 12

03 | 03 | 12
BEDROOM

BEDROOM
03 | 06 | 13

03 | 07 | 13
M.BEDROOM

M.BEDROOM
03 | 06 | 12

03 | 07 | 12

A1
3770 3770

A10

A10

03 | 02 | 16

03 | 03 | 16
TERRACE

TERRACE
DCW

TERRACE TERRACE www.ecgsa. com


03 | 06 | 16 DCW 03 | 07 |16

MAIN CONSULTANT :

Pavillion Architects S.A.E

AM
AG

AH
AD
AC

AE

AF

AK
AJ

AL
AI
AR-304
Building 23 Mohamed Aly El Balky ,

A
AM

AK

AG

AC
Heliopolis Sq. Cairo, Egypt

AD
AH

AE
AF
AL

AJ

AI
PAVILLION ARCHITECTS Tel:- +20226326493 Fax :- 2026326495
www.pavillionarchitects.com info@pavillionarchitects.com

AR-304
E
ELEVATION FINISH LEGEND

A
STRUCTURE Consultant:

ELEVATION FINISH LEGEND CURTAIN WALL GLAZING


Engineers & Consultants

COMPOSIT PANNEL CLADDING NORTH EDGE TOWERS


CURTAIN WALL GLAZING
PROJECT TITLE :
NEW ALAMEIN
PLOT (LD00 - LD01)
SPANDREL
COMPOSIT PANNEL CLADDING DRAWING TITLE :

GRC CLADDING Tower A 2nd Floor Plan - Elevation Finishes -2

SPANDREL
DRAWING NO. REVISION TEAM WORK : Sara Ahmed Esraa Sabry
Helana Safwat Rana Sherif
GRC CLADDING LD00-LD01 00 Walaa Farag Aya Khaled

SCALE DATE APPROVED BY

1:100 24/03/2019 Eng. Ahmed Gamal

12
Construction Drawings Projects KEY PLAN / SITE LOCATION
DF DG

DE DH DI DJ DK DL DM DN DO DP
5 6 7 8 9 10 11

4,520
A10
7,950 1,400

17 16 15 14 13 12
1.0 GENERAL :
AC 1- ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS.
2- DO NOT SCALE. USE WRITTEN DIMENSIONS.
A9 3- ALL DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR BEFORE
1,995

0 CONSTRUCTION ON SITE . ANY DISCREPANCY SHALL BE REPORTED TO THE


4,25 ENGINEER FOR REMEDIAL MEASURE BEFORE COMMENCE OF RELATED WORK.
5

REFER TO (AR-B-101)
4,12
AD 1.1 ABBREVIATIONS :

3,32
2,02
- F.F.L ( FINISHED FLOOR LEVEL )

5
0
A8 - T.O.P ( TOP OF PARAPET )

MATCH LINE
R 16,993
0 18
4,25
E 01
17
16

ROOF
15
14 DO3/R
13

4,07
RF | 01 12
ELEVATOR

0
11
DOOR ID DIRECTION ELEVATOR
A7 NUMBER
0 10

5,40
8,50

5,17
0
0
4,72 R=RIGHT

5
9
8
7 3,10
0 AE L= LIFT

2,29
6 R 5,051

7,800

7,800
5

0
4
ROOM FUNCTION ROOM FUNCTION T.O.S +118.75 T.O.S +118.75
AF Top Roof floor Top Roof floor
28th floor 28th floor

1,98
5 L XY 06 L.G 01

5
4,52
0
8,03 2 2 2 2
A6 AG STORY LEVEL STORY LEVEL

4,18
0
25

2,26
FUNCTION SPACE ID T.O.P +115.80 T.O.P +115.80

5
5
3,72 SPACE ID
27th floor 2 27th floor

1,270

1,270
0 DCW 1
25

1
Roof floor Roof floor

2
3,13
DCW 1

4,25

3
1 1

4
,000
AH T.O.S +114.78 T.O.S +114.78

0
51 0
4,00

2,240

2,240
0
8,50
5
A5 0 DCW 1 3 3

34
25 0

,000
8,25
F.F.L +111.25 F.F.L +111.25

2,63

470 910

910
DCW 1
26th floor 26th floor

5
0

8,20
4,00 YM
4
G -- |0

4,25
|

470
01 1 1
,570
AI

0
5 ,225 12

10
3,72 12

2,220

2,220
,315
DCW 5

3,13
2 5 2

0
8,38
19
.45 3 3

0
.L+
AJ F.F.L +107.65 F.F.L +107.65
0
8,03 F.F
A4

470 910

470 910
25th floor 25th floor

2,26
0

5
0 3,95
8,75 OM
R 6,368 RO DCW 1

,48
0 DCW 1 AC |08
HV | -- D12
AK 2
1 1

7,19

4.18
12 01 7,64

2,220

2,220
1,98
5

0
D11/L

5
D01/L
D03/R 2 5 2
A3 3 3

2,67
0 D11/R

8,20
DCW 1 3,83 R

0
IDO
0
F.F.L +104.05 F.F.L +104.05

0
4,72 RR 0

1,81
CO |09 1,53

470 910

470 910
2,67
ION
24th floor 24th floor

5
IT
PT EX | 01

0
CE |01 0

7,19
M 01
OO 4 RE | 01 1,32

2,29
DR |0

2,67
5

4,25
5 BE | 01 01 M |04

0
GY | --
5,80
AL

0
0
1 1

0
01 0
4,56
DCW 1 0 1,47 01
0
D01/L
R 8,794 4.34 7,89

2,220

2,220
A2 0
D01/R 94
0
2 2

2,60
5
4,13

5,25 0
3 3

1,87

2,67
OM

0
D03/L 2,41

2,00
0

RO 0

0
ED |05 0 3,96
OM F.F.L +100.45 F.F.L +100.45

0
0
3,45 0

4,07
M.B | 01 RO 3,50 4,81

470 910

470 910
C. |06
01 D03/R
23rd floor 23rd floor

0
A1
D11/L
ELE | --

50
0 R 16,646 0

0
4,64 01 E04
3.92

270

270
0
2,81

4,25
D01/L CORRIDOR
0 3,45

1,38
AM
D03/R 0
2,77
0

0
0
3,25 1,73 0 01 | -- |03
1 1

5,45
0
D03/R 2,17

12
5,45

0
,680

2,220

2,220
EN
0

0 0
2,00 CH |02 D03/R 3,49

2,02
0 KIT | 01
2,18 5

2,38
01 D03/R 0 E05

0
2,25 3 3
60

Y
BB

5
D01/L
57

7,48
0 LO
2,00 ICE F.F.L +96.85 F.F.L +96.85
2,81

DCW 1 D02/R

0
RV |01 0

F0
1,68

470 910

470 910
88
0

SE | --
OM 0
22nd floor 22nd floor
1
T RO 2,02
5

01

4,06
SE |06 TH |03 D01/R D03/R
2,81

CLO | 01 BA | 01 ET

0
5

1,49
4,03 M D02/L E06
0

01 01 OIL |08 0
3,30

5
R 15,512 D03/L OO G.T | 01 M 0 1 1
HR .45 OO 3,09
2,81

AT |07 01
+19 . R |07
M.B | 01 ILET 8

2,220

2,220
.L I.T | --
0

F.F AIR 2
0 01 .TO |0 01 ST | A |0 5
1,81

G | 02 77
1,80 ST

1
01 2 5 2

2
5

R 1,716 ION 0 3 3

2,37
3
PT 3,76 2,35 0

4,18
CE |01 1,74

0
F.F.L +93.25 F.F.L +93.25
0
RE | 02

6
D03/L

5
W01

7
5 5
1,81

470 910

470 910
01

2,60
2,50 1,80
D01/L
21st floor 21st floor

9
10
0
5

D03/L

0
0

11
4,12
3,48

1,81
D03/L 0 D03/L
.45

21
3,45 0

5
20
+19 1,80
45

M 1 1

19
OO .L
0

02

3,17
18
DR |09 F F.F

17
R 8,522 0

3,48
R 9,773 BE | 02 5

16

0
4,03 1,20

2,220

2,220
15
01 E01 D01/R

0
14
D01/R
D02/R
4,96

13
D01/R

1,80
5

12
1,18 5
5

0 0
3 3

0
0 2,17 1,47
3,25
51,05

4,83 CORRIDOR

1,80
B7
D11/L
12

3,86
F.F.L +89.65 F.F.L +89.65
0

01 | -- |03 D01/R
5
0

0
1

470 910

470 910
D03/R
T
20th floor 20th floor
2

SE |10 E02 0 D11/L 5


60 2,41 4,12
3

CLO | 02 0
2,3 4
2,98 0
,150 D01/R
7,47

0 01 0 2.04
5
2,61

3,15 25

1,60
1,27 0
6
8

D11/L
3,32

4,25
AC
250

1 1
4,46

7
D03/R

0
21
5

8
10
5

2,72
20

A10
2,00
9
,330

2,220

2,220
19
M
F0

5 90

0
OO
10
0 2,32 5
18

0
ER
4

E03 R
3,75 3,85
11
0 IDO
17

2,72
0
3,22

AG OM 0
D03/R 2,58
16
1,00 RB |02 RR RO
90 2 5 2
2,54
3,12

3 3

0
CO |09
0

D01/R GA | --
15
1,01

0 IT AC |08 0
4,64
0
7

EN HV | --
14
3,91

EX | 01
4,250

01 1,06
CH |02 F.F.L +86.05 F.F.L +86.05
0

13
D03/R D03/R 8 01 01
KIT | 02
5

12
1,85 0
AIR 1

470 910

470 910
ST | A |0 4,25
01
19th floor 19th floor
87

7,19
M EN 0
OO 4 8,50

2,50
CH |02
0
2,45

AD ST
0 D03/L
DR |0

5
BE | 02 1,73 OM KIT | 03 0
A9

0
5

D03/L RO 01 2,02
8,430

2,00

R 30,072 01 OO
M TH |03 ION
5,17

HR BA | 03 PT 1 1
0

AT |07 OM CE |01
2.35
5

01 RO RE | 04
M.B | 02 TH |03 ET
1,68
0

BA | 02

2,220

2,220
DCW 1 01 01
OIL |08
1,46

01 G.T | 04
5

9,31
1,82

0
0

2,41 OM EN 0
5 01
RO CH |02 4,72 5
5
0

OM D03/L 4,03 TH |03 KIT | 04


0
3 3
3,95
RO
A8
R 16,405 BA | 04
2.35

ED |05 0 01
2,58
F.F.L +82.45 F.F.L +82.45
1,81

ET
3,22

M.B | 02 01
4,250

OIL |08
0

0
5

470 910

470 910
01 3
0

2,51 G.T | 03 M 5
R 2,759 F0 O
18th floor 18th floor
2,35

3,97
2,54

D03/L O
B8
0 D01/L 0 D09
T 2,41 M 01 HR 2,77
1,98

SE |06 OO AT |07 0
0
4.17

3,83
4,18

CLO | 02 HR 0 M.B | 04
5

10 AT |07 1,73
2,81
5

01
AE
5
8,760

2,5
0

01 M.B | 03 2,50
D03/R 1 1
0

D03/L D03/L 0
01 55
2,81

2,220

2,220
0
A7
25
0

3,62
1,81

2,81
2,26

D03/R 0 0
D03/R
2,35

3,14

2,00 D03/L 2 5 2
5

8,03
0
5

T
4,96

T 5
3 3
AF SE |06 SE |06
0

CLO | 03 0 3,72
5

0 4,00 CLO | 04 D03/R


3,62 01 F.F.L +78.85 F.F.L +78.85
4,320

01 0
2,00
1,20

470 910

470 910
D03/R 0
0 D03/L
17th floor 17th floor
3,13

25
3,75 0
4,34
0

B9 ION 0
2,81

00 24/06/2018 W.D ISSUED FOR REVIEW Team Work Eng :Yasser Zaki
AG OM 1,80 Aya Khaled
PT
1,84

D03/L
ROOF RO CE |01
4.17

1 1
0

D03/L T 0
4,25

ED |05 SE |10 RE | 03 4,00


INDEX DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY
0

R 1,467 RF | 01 M
5

M.B | 03 CLO | 03 01 OO
0

DR |04

2,220

2,220
01
1,19

2,61

01 BE | 04
4,13
8,575

M
0

OO 4
0

0 01 0
DR |0 2 5 2
0

2,36 25
25

BE | 03 0 OM 3 3
0

3,92 RO
01 ED |05
A6
3,91
1.19

F.F.L +75.25 F.F.L +75.25


0
1,27 M.B | 04 0
5
0

8,50

470 910

470 910
34

0 01
16th floor 16th floor
4,250

5,45

4,83 0
,000

4,00
0

8,7 0 ,000
AH
80 51
60 4,64 12,4
B10 1 1
4,25

3,13

www.ecgsa. com
0

W05 M

2,220

2,220
OO 9
DR |0
BE | 03
R 2,667 01
3 2 5 2 3
5760
F.F.L +71.65 F.F.L +71.65
MAIN CONSULTANT :

470 910

470 910
8,75
0
75 15th floor 15th floor
2,26

3,480
A5 5,3
4,250

4,18

AI
0
8,03
Pavillion Architects S.A.E
4,300

B11 W01
Building 23 Mohamed Aly El Balky ,
1,98

Heliopolis Sq. Cairo, Egypt


5

PAVILLION ARCHITECTS
AJ

4,020

4,020
R 3,497
25
R 5,386 Tel:- +20226326493 Fax :- 2026326495
4,5 www.pavillionarchitects.com info@pavillionarchitects.com
3,91

5 5
AK 5,80 0 3 3
0

E
4,300

4,72
4,25

A4 F.F.L +66.25 F.F.L +66.25


4,055

470 910

470 910
75 STRUCTURE Consultant: 14th floor 14th floor
B12 5,000 2
1 3,9
2,000

3 1

4 2

5 3

6 4

1 1
5

8 6

9 7

10
8

11
D04
9

10

0
11

2,220

2,220
0
4,64 5,25
4,46

AL A3 65 2 5 2
5

4,1 3 3
4,25

Engineers & Consultants


F.F.L +62.65 F.F.L +62.65
0

R 1,866

470 910

470 910
2,18
0
13th floor 13th floor
4,520

7,900
22

22
0
21

21

3,25
20

19

20
19
18

18

35
17

17

1 1
16

16
15

4,3
14

15
14
13

13

A2
12

12

2,220

2,220
AM 5
3,960

3 3
F.F.L +59.05 F.F.L +59.05
A1

470 910

470 910
50
4,2
PROJECT TITLE : NORTH EDGE TOWERS 12th floor 12th floor
NEW ALAMEIN
PLOT (LD00) 1 1
4,115

2,220

2,220
DRAWING TITLE :
1ST FLOOR - GENERAL ARRANGEMENT LAYOUT - ( TOWER - A) 3 2 5 2 3
F.F.L +55.45 F.F.L +55.45

470 910

470 910
DRAWING NO. REVISION TEAM WORK : Sara Ahmed Esraa Sabry 11th floor 11th floor
Helana Safwat Rana Sherif
LD00-AR-A-101 00 Walaa Farag Aya Khaled
1 1

2,220

2,220
SCALE DATE APPROVED BY
01 1ST FLOOR - GENERAL ARRANGEMENT LATOUT - (TOWER - A) 1:100 05/09/2018 Eng. Yasser Zaki 5
3 3
- SCALE 1:100
F.F.L +51.85 F.F.L +51.85

470 910

470 910
10th floor 10th floor
1 1

2,220

2,220
3 2 5 2 3
F.F.L +48.25 F.F.L +48.25

470 910

470 910
9th floor 9th floor
1 1

2,220

2,220
3 5 3
F.F.L +44.65 F.F.L +44.65

470 910

470 910
8th floor 8th floor
1 1

2,220

2,220
3 2 5 2 3
F.F.L +41.05 F.F.L +41.05

470 910

470 910
7th floor 7th floor
1 1

2,220

2,220
3 5 3
F.F.L +37.45 F.F.L +37.45

470 910

470 910
6th floor 6th floor
1 1

2,220

2,220
3 2 5 2 3
F.F.L +33.85 F.F.L +33.85

470 910

470 910
5th floor 5th floor
1 1

2,220

2,220
2
3 5 3
F.F.L +30.25 F.F.L +30.25

470 910

470 910
4th floor 4th floor
1 1

2,220

2,220
3 2 5 2 3
F.F.L +26.65 F.F.L +26.65

470 910

470 910
3rd floor 3rd floor
1 1

2,220

2,220
5

13
3 3
F.F.L +23.05 F.F.L +23.05

910

910
2nd floor 2nd floor

470

470
01 ELEVATION 01
- SCALE1:150
Construction Drawings Projects

Towers Under Construction


KEY PLAN / SITE LOCATION

D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18


B
AR-305

51000

4250 8650 4100 8500 8500 4100 4400 4250 4250

1.0 GENERAL :
2675 1305 2870 18525 250 18275 3120 1305 2675 1- ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS.

3D Shot For the Towers


2- DO NOT SCALE. USE WRITTEN DIMENSIONS.
3- ALL DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR BEFORE
CONSTRUCTION ON SITE . ANY DISCREPANCY SHALL BE REPORTED TO THE
ENGINEER FOR REMEDIAL MEASURE BEFORE COMMENCE OF RELATED WORK.
1.1 ABBREVIATIONS :
- F.F.L ( FINISHED FLOOR LEVEL )
- T.O.P ( TOP OF PARAPET )

F 01 E 01
ELEVATOR
FLAT FLAT NUMBER ELEVATOR
DP DP NUMBER

DO3/R

2775

3025
3500
R=RIGHT

4250

4250
DCW DCW DOOR ID DIRECTION L= LIFT
DCW DCW

DCW DCW
ROOM FUNCTION ROOM FUNCTION

DO M.BEDROOM M.BEDROOM BEDROOM


DO 02 04 06 02 C 01
BEDROOM BEDROOM BEDROOM
DCW 29 | 04 | 12 29 | 03 | 12 29 | 03 | 13 DCW

5105

3475

3425
29 | 03 | 14
R29083 29 | 04 | 13 29 | 04 | 14

3255
STORY LEVEL STORY LEVEL

3175

4990
5330
5350
3955 3970 4240 4200 3970 3955
FLAT NUMBER CORE

4250

4250
R29083
D03/R D03/R D03/R D03/R ROOM ID SPACE ID
6715 5690 5690 6715

1225
DN DN
D03/R D03/R

5700
D03/L
3155 4160 4850 3240 4160 3155
D03/R
ROOM SCHEDULE

1695
G.TOILET D03/R D03/R G.TOILET
BATHROOM BATHROOM

2900

1695

1695

2765
1815

1695

1695

1815
1900

1900
TERRACE RECEPTION RECEPTION TERRACE
29 | 04 | 09 02 | 01 | 08 1490 02 | 03 | 08 29 | 03 | 09
29 | 04 | 15 29 | 04 | 06 29 | 03 | 06 29 | 03 | 15 ID ROOM

4545

4545
DM DM
F04 CORRIDOR F03 01 CORRIDOR
29 | C | 01

D01/R

D01/R
02 06

2350

2350
1580

1580
8700 24700 01 8700

2240
AR-415 AR-010
AR-412 02 IT ROOM

8800

8800
DL 20
D02/R D01/L
D02/R
3060 20 DL 03 SERVICE LOBBY
19 3150 19

1100
22 21 20 19 18 17 16 15 14 13 12
18 18
04 ELECTRIC ROOM

6025

6025
17

kitchenette
17 4 4

kitchenette
16 ELECTRIC ROOM 5 16 6640

2880

2890
5

4515

4515
3150
15 6
29 | C | 04 E01
6 15

4250

4250
DCW 1 DCW 1
05 GARBAGE ROOM

3845
STAIR CORRIDOR STAIR 7 14

4090
14
13 8
7
IT ROOM 8 13
12 9 29 | C1 | 02 29 | C | 01 29 | C1 | 01 29 | C | 02 9 12
11 10
3980 10 11
3265 12
11
10
10 11
1 2 3 4 5 6 7 8 9 10
3265
06 RECEPTION
13 9

DK DK

34000

34000
12680
07 KITCHEN
14 8

7480

800
E02

1500

250
1280
15 7
2750 07

250
16 6
3980 AR-010

4280
17 5
01 800
AR-010
18
19
4
3 2250
08 BATHROOM
11 10
SERVICE ROOM 20 2
SERVICE LOBBY GARBAGE ROOM 10 11

4280
12 9 9 12
21 1
09 G.TOILET
13 8 8 13
29 | C | 18 29 | C | 03 29 | C | 05

4250

4250
DCW 1 DCW 1

3845
14 22
A 14 A

kitchenette
7

kitchenette
7

4515

4515
E03

2550
2720

2890
AR-304 15 6 6 15 AR-304
6665 SERVICE
16 5 5 16 6650 10 M.BATHROOM

5795

5795
4 3980 3150 2200 3750 3800 4
17
FIRE 17
18 18
19 D02/L D01/L D02/R 19
11 CLOSET
DJ 20 D01/R 20
DJ

8800

8800
F.F.L+122.05 M.BED ROOM
F01 F02
12

D01/R
8690 24700 8700

2350

2350
1580

1580
04

D01/L
03 CORRIDOR
AR-010 29 | C | 01
AR-010
13 BED ROOM
DI DI

4545

4545
RECEPTION BATHROOM 1490 RECEPTION 14 BED ROOM

1815
BATHROOM

1695
TERRACE G.TOILET 29 | 01 | 08 TERRACE
29 | 01 | 06 G.TOILET

1900

1900
29 | 02 | 06

2765

1815

1815

2765
29 | 02 | 08

1695
29 | 01 | 15 29 | 02 | 15

1695

1695

1695
29 | 01 | 09
Grid1 5700 3155 4160 3240
D03/L
1490
D03/L
3240 4160 3155 29 | 02 | 09 5700 15 TERRACE
DH D03/R D03/L DH 16 TERRACE

750

750
6685 5670 5675 6715

1225

1225
D03/R D03/R

D03/R D03/L D03/R 17 TERRACE


DG 3955 3970 4240 4240 3970 3955 DG 18 SERVICE ROOM

3500

3500
BEDROOM

5350
M.BEDROOM BEDROOM

5350
BEDROOM M.BEDROOM BEDROOM

5240

5240
3190
3210
29 | 01 | 13 29 | 01 | 12 29 | 02 | 13

3450

3475
DCW 29 | 01 | 14 29 | 02 | 12 29 | 02 | 14 DCW 19 MACHINE ROOM
DF DF
DCW DCW

DCW DCW
4250

4250
DCW DCW

3500
2775

2775
DE 05
AR-010 DE

2675 1305 3120 18275 250 18275 3120 1305 2675

4250 8650 4100 8500 8500 4100 4400 4250 4250

51000

B
AR-305

D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18

01 19TH - DUPLEX 1 FLOOR - GENERAL ARRANGEMENT LAYOUT 00 24/06/2018 W.D ISSUED FOR REVIEW Team Work EsraaSabry Eng :Yasser Zaki
- SCALE1:100 INDEX DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY

FLOOR FINISHES SCHEDULE WALL FINISHES SCHEDULE CEILING SCHEDULE PAINT PLASTER SCHEDULE SKIRTING SCHEDULE TILES PLASTER SCHEDULE DOORS SCHEDULE CURTAIN WALL DOORS SCHEDULE

FINISHES PLASTER FINISHES PLASTER WIDTH HEIGHT WIDTH HEIGHT


ROOM AREA (m2) ROOM FINISH TYPE AREA (m2) ROOM FINISHES TYPE AREA (m2) ROOM FINISH TYPE ROOM LENGTH (m) ROOM FINISH TYPE ID QUANTITY ID QUANTITY www.ecgsa. com
TYPE AREA (m2) TYPE AREA (m2) (m) (m) (m) (m)
Porcelain tiles; Porcelain for walls 60 x 30 Moisture Plastic paint resistant to BEDROOM HPL 132.964 Porcelain for walls 60 x 30
BATHROOM 81.12 BATHROOM 335.76 BATHROOM resistant gypsum 81.08 BEDROOM 377.23 BATHROOM 335.76 D01/L 1.100 2.200 3 DCW 1.500 2.175 16
40 x 40 cm cm board moisture cm
Plastic paint resistant to Moisture Plastic paint resistant to MAIN CONSULTANT :
BEDROOM H.P.L floor 149.64 BEDROOM 377.23 BEDROOM resistant gypsum 147.36 CLOSET 76.92 CLOSET HPL 26.480 CORRIDOR Granite and wall paper 291.36 D01/R 1.100 2.200 3 DCW 1 1.450 2.175 4
moisture board moisture
CLOSET H.P.L floor 21.24 CLOSET
Plastic paint resistant to
76.92 CLOSET
Moisture ELEC.ROOM Porcelain 14.980 627.12 m² 20 Pavillion Architects S.A.E
moisture resistant gypsum 20.08 ELEC.ROOM Paint anti humidity 50.51 D02/L 1.000 2.200 3
board Building 23 Mohamed Aly El Balky ,
Heliopolis Sq. Cairo, Egypt
Granite tiles; Moisture EXTERNAL GARBAGE PAVILLION ARCHITECTS
CORRIDOR 143.24 CORRIDOR Granite and wall paper 291.36 CORRIDOR resistant gypsum 138.01 Paint exterior 78.36 Porcelain 15.000 BLOCK WALL SCHEDULE D02/R 1.000 2.200 5
60 x 60 cm board ELEVATION ROOM Tel:- +20226326493 Fax :- 2026326495
www.pavillionarchitects.com info@pavillionarchitects.com
Porcelain tiles; Moisture GARBAGE I.T.ROOM Porcelain 10.720
ELEC.ROOM 15.66 ELEC.ROOM Paint anti humidity 50.51 ELEC.ROOM 15.34 Paint anti humidity 50.32 THICKNESS (m) Area (m2) D03/L 0.900 2.200 10
60 x 60 cm resistant paint ROOM

E
GARBAGE Porcelain tiles; EXTERNAL GARBAGE Moisture M.BEDROOM HPL 66.320
14.96 Paint exterior 78.36 14.64 I.T.ROOM Paint anti humidity 36.54 0.120 1,051.44 D03/R 0.900 2.200 10
ROOM 60 x 60 cm ELEVATION ROOM resistant paint STRUCTURE Consultant:
Porcelain tiles; GARBAGE Moisture Plastic paint resistant to RECEPTION Marble 145.264 34
I.T.ROOM 9.06 Paint anti humidity 50.32 I.T.ROOM 8.58 M.BEDROOM 185.40 0.250 469.04
60 x 60 cm ROOM resistant paint moisture
Moisture Plastic paint resistant to SERVICE
M.BEDROOM H.P.L floor 106.76 I.T.ROOM Paint anti humidity 36.54 M.BEDROOM resistant gypsum 104.20 RECEPTION 424.17 Porcelain 13.550 1,520.48 m²
board moisture LOBBY

Towers Under Construction 14


Engineers & Consultants
Porcelain tiles; Plastic paint resistant to Moisture SERVICE SERVICE
RECEPTION 220.00 M.BEDROOM 185.40 RECEPTION resistant gypsum 184.84 Paint anti humidity 47.27 Porcelain 12.240
60 x 60 cm moisture board LOBBY ROOM
PROJECT TITLE : NORTH EDGE TOWERS
SERVICE Porcelain tiles; Plastic paint resistant to SERVICE Moisture SERVICE TERRACE Marble 164.306 NEW ALAMEIN
15.87 RECEPTION 424.17 14.97 Paint anti humidity 41.51
LOBBY 60 x 60 cm moisture LOBBY resistant paint ROOM PLOT (LD00)
SERVICE Porcelain tiles; SERVICE SERVICE Moisture Plastic paint resistant to 601.824 m
10.83 Paint anti humidity 47.27 10.56 TERRACE 21.40 DRAWING TITLE :
ROOM 60 x 60 cm LOBBY ROOM resistant paint moisture
Porcelain tiles; SERVICE Moisture 1,389.63 m² LD01-AR-19th-Duplex-C4
TERRACE 347.38 Paint anti humidity 41.51 TERRACE 143.04
60 x 60 cm ROOM resistant paint
1,135.76 m² Plastic paint resistant to 882.70 m²
TERRACE 21.40
moisture DRAWING NO. REVISION TEAM WORK : Sara Ahmed Esraa Sabry
Helana Safwat Rana Sherif
2,016.75 m² LD01-AR-C4-119 01 Walaa Farag Aya Khaled

SCALE DATE APPROVED BY

1:100 06/03/2019 Eng. Ahmed Gamal


Construction Drawings Projects
KEY PLAN / SITE LOCATION
B9 B10 B11 B12 CEILING LIGHTING FIXTURE
B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12

WALL LIGHTING FIXTURE


58,100

3,550 4,250 4,250 4,250 4,325 8,425 8,425 4,325 4,250 4,250 4,300 3,500

W05
DCW 1 DCW 1

3,625
DCW 1 DCW 1

3,625
W05 D16 D16 W05

SPOT
BM BM

4,325

4,325
DCW 1 DCW 1
D03/R D03/L

BL D03/R D03/L BL
D03/R D03/R D03/L D03/L

4,250

4,250
D03/L D03/R

BK BK
D03/L D03/R D03/L D03/R

D01/L D01/R

4,735

4,735
HATCH CEILING FINISH
D03/R D03/L
DCW 1 DCW 1

D01/R

D01/L
D03/R D03/L

D03/L D03/R
D02/R
BJ
D01/L
D03/L D03/R D02/R
22 21 20 19 18 17 16 15 14 13 12
D03/L D03/R
BJ
DCW 1 DCW 1

3,690

3,690
D03/R D03/L

11 1 2 3 4 5 6 7 8 9 10 11
12 10

BI BI
13 9

41,250

41,250
14 8
15 7
16 6
17 5
18 4

3,690
19 3
D03/L 20 2 D03/R

3,690
21 1
22
DCW 1 DCW 1

BH D03/R D03/L D02/L D01/L D02/R D02/R D03/R D03/L BH


D03/R D03/L

D03/L D03/R

D01/R
D01/L
DCW 1 DCW 1
D03/L D03/R

4,885

4,885
D01/R D01/L

PAINT AT LEVEL +3.26


D03/R D03/L D03/R D03/L

BG BG
D03/R D03/L

4,175

4,175
BM
D03/L D03/L D03/R D03/R

BF
D03/L D03/R

D03/L D03/R
BF
DCW 1 DCW 1

4,250

4,250
BE BE

GYPSUM BOARD AT LEVEL +2.78

3,625

3,625
W05 D16 DCW 1 DCW 1 D16 W05

DCW 1 DCW 1

3,550 4,250 4,250 4,250 4,325 8,425 8,425 4,325 4,250 4,250 4,300 3,500

58,100

B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12

GYPSUM BOARD AT LEVEL +2.58


HEAT RESISTANT FALSE 1.0 GENERAL :
CEILING AT LEVEL +2.58 1- ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS.
2- DO NOT SCALE. USE WRITTEN DIMENSIONS.
3- ALL DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR BEFORE
CONSTRUCTION ON SITE . ANY DISCREPANCY SHALL BE REPORTED TO THE
HATCH FLOOR FINISH ENGINEER FOR REMEDIAL MEASURE BEFORE COMMENCE OF RELATED WORK.

1.1 ABBREVIATIONS :
PORCELAIN TILES: 60 X 60 cm - F.F.L ( FINISHED FLOOR LEVEL )
- T.O.P ( TOP OF PARAPET )
PORCELAIN TILES: 40 X 40 cm
F 01 E 01
H.P.L FLOORS
RECEPTION ELEVATOR
15 | 05 | 06 FLAT FLAT NUMBER ELEVATOR
MARBLE NUMBER
BL
DO3/R
R=RIGHT
DOOR ID DIRECTION L= LIFT
TWIN BED DOUBLE BED
ROOM FUNCTION

02 01 06
TERRACE
15 | 05 | 15 STORY LEVEL
FLAT TYPE

0.80
0.80

0.80
1 ELECTRICAL SOCKET

ROOM ID
1 USB

1 WALL LIGHT
1 DEF.
1 ELECTRICAL SOCKET.

0.80

0.80

0.80
Elevation Elevation
D1-01
T5-02 RECEPTION DINING ROOM SCHEDULE
BK
ID ROOM

G. TOILET
01 CORRIDOR
15 | 05 | 09 D03/R
BEDROOM BEDROOM
15 | 05 | 14 15 | 05 | 13 02 IT ROOM
03 SERVICE LOBBY

0.80

0.80
I WALL LIGHT
2 ELECTRICAL SOCKET

1 USB
1 NETWORK

1.50
1 ELECTRICAL SOCKET

0.80

0.80
Elevation Elevation
04 ELECTRIC ROOM
D03/L

T.V LIVING 05 GARBAGE ROOM


D01/L

D03/L 06 RECEPTION

1.20
07 KITCHEN

0.80
D03/R
Elevation Elevation

08 BATHROOM
BJ D03/L D03/R
WARDROBE DRESSER
09 G.TOILET
KITCHEN
15 | 05 | 07 M.BEDROOM
15 | 05 | 12 10 M.BATHROOM
2 CHANDELIER
1 TERRACE LIGHT

BATHROOM 11 CLOSET

0.90
15 | 05 | 08
Elevation

12 M.BED ROOM
KITCHEN BATHROOM
CLOSET
D03/L
15 | 05 | 11
13 BED ROOM
M.BATHROOM
15 | 05 | 10
14 BED ROOM
D4-01 D2-01 15 TERRACE
T5-02 T5-02 D3-01
T5-02
BUFFET OFFICE 16 TERRACE

01 TYPE 05 - FURNITURE LAYOUT 02 TYPE 05 - PERSPECTIVE 17 TERRACE


- SCALE 1:50 -
18 SERVICE ROOM
19 MACHINE ROOM
B9 B10 B11 B12 B9 B10 B11 B12
W05 W05

490
BM BM

600
600

BL BL

21x600=12,600
13,580
00 24/06/2018 W.D ISSUED FOR REVIEW Team Work Helana Safwat Eng :Yasser Zaki
INDEX DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY
540 5x600=3,000 545 TERRACE
4,085 15 | 05 | 15

RECEPTION
15 | 05 | 06
D1-02 D1-01
T5-02 T5-02 www.ecgsa. com
195

BK BK
200 400x3=1,200

G. TOILET
15 | 05 | 09
MAIN CONSULTANT :
1,595

D03/R
335 400x5==2,000 335 D03/R BEDROOM
2,670 BEDROOM
15 | 05 | 14 15 | 05 | 13 Pavillion Architects S.A.E
Building 23 Mohamed Aly El Balky ,
Heliopolis Sq. Cairo, Egypt
PAVILLION ARCHITECTS Tel:- +20226326493 Fax :- 2026326495
www.pavillionarchitects.com info@pavillionarchitects.com
D03/L D03/L

E
D01/L

D01/L

D03/L D03/L
STRUCTURE Consultant:

170
490

D03/R D03/R
142 3x400=1,200 142
1,485
225

BJ D03/L D03/R
BJ D03/L D03/R
5x400=2,000

KITCHEN BATHROOM Engineers & Consultants


2,340

15 | 05 | 07 15 | 05 | 08 M.BEDROOM
7x400=2,800

15 | 05 | 12 NORTH EDGE TOWERS


PROJECT TITLE :
3,255

NEW ALAMEIN
360 7x400=2,800 365 PLOT (LD00-LD01)
3,525
170

370 3x400=1,200 370


DRAWING TITLE :

D03/L D03/L TOWER B - TYPE 05


M.BATHROOM CLOSET (15th FLOOR)
1,940
230

15 | 05 | 10 15 | 05 | 11 PATTERN , CEILING AND FURNITURE LAYOUT


275 5x400=2,000 275
D4-02 D2-02 D4-01 D2-01 2,550 DRAWING NO. REVISION TEAM WORK : Sara Ahmed Esraa Sabry

T5-02 T5-02 D3-02 D3-01 Helana Safwat Rana Sherif


T5-02 T5-02 LD00-AR-B-T5-01 00
T5-02 T5-02 Walaa Farag Aya Khaled

15
SCALE DATE APPROVED BY
03 TYPE 05 - CEILING LAYOUT 04 TYPE 05 - FLOOR PATTERN LAYOUT 1:50 12/09/2018 Eng. Yasser Zaki
- SCALE 1:50 - SCALE 1:50
Construction Drawings Projects

16
Interior Design Presentation
Ministry of Electric and Water Resources

Client : Qatary Ministry of Electric and water resources


Location : lusail - Doha - Qatar
Leed Consultant : EHAF
Scope of Work : Working drawings and coordination as a senior architect
Construction Drawings Projects

A 01-10-2017 ISSUE FOR APPROVAL

REV. DATE DESCRIPTION BY

U.D.D STAMP MUNICIPALITY STAMP

Enquiry No. : --------------- Application No : N/2017/0002775


CONSULTANT REG. No : 99/M GRADE : A CONSULTANT REG. No : 000000 GRADE : A
CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :

TECHNICAL MANAGER : Shereif Ahmed TECHNICAL MANAGER

REGISTRATION No. : 6120 REGISTRATION No :

57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 /
99
FAX : (974) 402037 66
P.O. BOX1876, DOHA-QATAR
www.ehaf .com
CONSULTING ENGINEERS
PROJECT
QEWC TOWERS ( KAHRAB TOWER )
LUSAIL CITY - MARINA COM 53
LOCATION:
LUSAIL CITY - MARINA COM 53
CLIENT:
QATAR ELECTRICITY & WATER CO.
03/08/2017
DATE: JOB NO.:
0321
TITLE:

PERSPECTIVES
NIGHT PERSPECTIVE AERIAL PERSPECTIVE
GR-006-00
DRAWING NO.: SCALE:
@A1

DRAWN BY: DESIGNED BY: CHECKED BY:


M.S./S.M. H.O./M.A. O.M.
CAD FILE: REGISTRATION No. : REGISTRATION No. :
4265 3881
REVISION

18
SIGNATURE SIGNATURE

A
Construction Drawings Projects
N 402975.5278
E 230941.1565
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

C
Y1.2

B
Y1.1 Y.4

Y.3 N 403121.4988
E 230892.5049

5000
Planter Y.2 Planter

SHADE ABOVE Y.1


SHADE ABOVE

Q
AR-203-00

Planter 1 X.8

W.wall
BASEMENT PARKING
P ENTRANCE

42000
PL.
5000 X.7

47000
PL. DN
DN
PL.
N
W.FEATURE PL. Planter PL.
X.6
W.wall
PL. PL.
PL.

X.8 PL.

W.wall
PL.
Planter
PL. Planter PL.

M
PODIUM PARKING X.5
PL.
ENTRANCE
PL. X.7
TOWER-1 T1.3 PL.

T1.4
ENTRANCE
PL.

PL.

T1.2
L PL.
X.4

1.0m
PL.
W.wall
10000 T1.5
X.6
T1.1
TOWER-2
K
ENTRANCE T2.7
Planter T2.9
T1.6 X.5
15000 R2.3 T2.10

1.0m
Planter T2.6
R2.4 T2.7
J
T1.7 R2.2 NOTES:

TOWER-1
4
Planter
X.4
3
1 2

C1.1 T2.6
C2.1 T2.5
QND= +3.00 M ( + 0.00 M ROAD LEVEL )
T1.7 C1.1
T2.8
PL. R2.1
H T2.4
T1.6
3
4
T2.5
T2.3
2
1

C2.1
T2.7 T2.4
T1.1
G T2.3
T1.5
T2.6 T2.2

TOWER-2
1.0m

T1.2
F
1.0m

T1.4 T2.1
T1.3 T2.2

PODIUM ROOF
T2.5
1.0m

PL.

T2.4 T2.1
E C2.2 00 X.3
1 2
3
4
15 0
T2.3

R2.5
00
T2.10 10 0 A 01-10-2017 ISSUE FOR APPROVAL
X.2
D C2.2
T2.2
PL.
0 DESCRIPTION
50 0 REV. DATE BY

URE
R2.6
T2.1 R2.8

W.FEAT
X.1
T2.8 R2.7 U.D.D STAMP MUNICIPALITY STAMP
C Planter PL.
T2.9
X.3

PL.
W.FEATURE

B SHADE ABOVE
1.0m

PL. X.2 RE
TU
RETAIL ENTRANCE W
.F
EA

PL.

A
RETAIL PARKING DNDN X.1
ENTRANCE
Planter
AREA STATEMENT
10000

Planter Planter

A
Y.4
5000

Planter Planter
Planter
N 403036.6818
E 231073.3011 1 Y.3

D Y1.1
Y1.2 AR-201-00
-
MAIN ENTRANCE
Y.2 N 403219.8104
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Y.1 19 20 21 E 231012.2602
Enquiry No. : --------------- Application No : N/2017/0002775
99/M A 000000 A
SITE DEVELOPMENT PLAN
CONSULTANT REG. No : GRADE : CONSULTANT REG. No : GRADE :

1 CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :


GR-001-00
1 : 500

TECHNICAL MANAGER : Shereif Ahmed TECHNICAL MANAGER

REGISTRATION No. : 6120 REGISTRATION No :

57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 /
99
FAX : (974) 402037 66
P.O. BOX1876, DOHA-QATAR
www.ehaf .com
CONSULTING ENGINEERS
PROJECT
QEWC TOWERS ( KAHRAB TOWER )
LUSAIL CITY - MARINA COM 53
LOCATION:
LUSAIL CITY - MARINA COM 53
CLIENT:
QATAR ELECTRICITY & WATER CO.
03/08/2017
DATE: JOB NO.:
0321
TITLE:

SITE DEVELOPMENT PLAN / POLICY PLAN &


AREA STATEMENT
GR-001-00
DRAWING NO.: SCALE:
1 : 500 @A1

DRAWN BY: DESIGNED BY: CHECKED BY:


M.S./S.M. H.O./M.A. O.M.
CAD FILE: REGISTRATION No. : REGISTRATION No. :
4265 3881
POLICY PLAN REVISION SIGNATURE SIGNATURE

19
A
Construction Drawings Projects

30

Project’s Cover Sheet


20
Construction Drawings Projects

N 403121.4988
E 230892.5049

N 402975.5278 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
E 230941.1565 Y1.2
Y1.1

B
Y.4

C Y.3 900
0

5000
9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000
0
900
Y.2

VENT. 1800 6000 3500 3500 6000 1800 17525


0 STAIR-07 VENT.
SHAFT 900
Y.1 EQUIPMENT SHAFT
MECH. VENT. VENT. MECH. STORE
VENT. STAIR-06 SHAFT SHAFT MECH. RM. VENT.
MECH. RM.
1795

PLENUM PLENUM

1800
SHAFT

4900
SHAFT
LOBBY LOBBY
Q VENT. MECH.

1800
2500

SHAFT PLENUM
7950 6300 2650 1050 7950 1050 7950 1050 7950 1050 5300 325 24175 5150 1050 7950 8625 5800 4345 14805 2650 5300

X.8
MECH. RM.

630
9400

6000

7950

DRIVEWAY

7950
MECH. RM.

0
7950 1050 7950 1050 7950 1050 7950 1050 8900 7950 7950 7950
R
15 00

142
R

00
MECH.
15

R
00

15

15
VENT.

5
R PLENUM

21
00
3

R
P SHAFT

775

00

900
42000

0
AR-508-01
5000 X.7

47000
7950

7950

7950
9000

530
MECH. RM.

795

0
3300

0
00

105
15

1050

1050

900
N

0
R

0
ELECT.

545
7950 1050 7950 1050 7950 1050 7950 1050 7950 950 7950 7950 7950 RM. X.6

12400
DIESEL

5875
TANK

795
UP

531
7950

7950

0
7950
9000

0
DRIVEWAY
DRIVEWAY X.8

5400 5400 TOTAL NUMBER OF PARKING = 294 + 6 H.C =300


R

725
15
2

900
00

375
1150
800

265

180

0
2200 9300 4000 1680 MECH.
VENT. VENT.

0
2275

2275

0
CONTROL PLENUM X.5
AR-302-00 SHAFT SHAFT

5055
EXHAUST RM.

11275
SHAFT VENT. VENT.

1800

1800
SHAFT SHAFT

7950
VENT. SHAFT

594
7950

8825
MECH. RM.
9000

7950
SHAFT MECH. RM. VENT. VENT. X.7 EXHAUST

5
SHAFT

1800

1800
T1.3 SHAFT SHAFT SHAFT
4000 4700 8925 8775
-5.85 FFL GENERATOR

14300
T1.4 VENT. VENT. 4100
2650 1200

3650

MECH. RM. STORE STORE STORE ROOM

2230

2350

900
1500 5700 2600 SHAFT 5400 5250 SHAFT

250
VENT.

2650 800

0
1200

L T1.2 SHAFT
00

0
SHAFT 45
1 X.4

R
6335 6535 10750 0
TELECOM 100

34

180
STORE

3150
STORE VENT.

3500
MECH. RM.

00
2775 ROOM-T1

0
SHAFT
AR-302-00

925
10000 STORE
6000

CORR.

210
T1.5 VENT.
GSM X.6
7950

0
3335 SHAFT
9000

7950

3000

7950
SHAFT 2300 ROOM -T1

279

160
STORE ELECT.
RM. UP VENT.

00
13650

0
SHAFT

7950

180
T1.1
3
6335 5025
00

CCTV VENT.

105
0
180
25

0
ROOM
5975 UP SHAFT

00
STORE
K
900

R 1200

250
775
AR-303-00 795
0
172.21°
3105

700

0
3050 VENT.

7675
50 STORE
MECH. RM. 3750 DRIVEWAY T2.7
23

35 STORE SHAFT
00

STORE MALE 0

10825

1575
477
MECH. TOILET X.5 T2.9
14

50 8875
T1.6 STAIR-01 0
00

PLENUM 265

560
47 00
7950
9000

MECH. RM.

7925
24 A 01-10-2017 ISSUE FOR APPROVAL

0
15000 R2.3 T2.10
25

SERVICE
00

CORR.

580
155.73° RACK

4650
LIFT T2.6
38

ROOM T2.7

0
R2.4

7950
SERVICE
00

MECH. RM. SMOKE


GARBAGE LIFT T1.7 DESCRIPTION
STOP R2.2 REV. DATE BY
1050

RM. 00
J LOBBY 39
11

00 GARBAGE
30
00

STORE

3575

3575
STORE STORE RM.
LIFT PIT 9400 8675 U.D.D STAMP MUNICIPALITY STAMP
11 00

1 °

500
STORE X.4
00

.79
12

LIFT PIT MALE


142 ELECT. MALE 8875

933

0
00
3000

VENT. PRAYER T2.6

800
53 TOILET & C1.1 C2.1
29

3250
7950

SERVICES RM.
9000

0
SHAFT ROOM
00

AR-301-00
4

0
ABLUTIONC1.1
17

CORRIDOR ENTRANCE T2.5

775
T1.7
00

5300

5300
VENT. SERVICE IDF RM.
6045

LOBBY
1800

SHAFT LIFT MECH. RM.


19

-5.85 FFL T2.8

2650
12 -5.85 FFL AR-303-00
00

VENT. SMOKE 3.5


0° R2.1
2100

STOP
31250

SHAFT
1050

9 5
119

1425
H T2.4

1350
LOBBY CORR.

795

410
STAIR-02 T1.6
14

3200
VENT. SECURITY

0
00

LOBBY
1800

RM. PRAYER

540
52

SHAFT
T2.5
22

FEMALE
00

RM. LOBBY
00 85

5000

0
00

VENT. TOILET 23 47 630


0
1800

SHAFT RETAIL 12 FIRE

2650
C2.1 T2.3
7950

410
54

FIGHTING
9000

STAIR-03 SERVICE

105
7950

7950
00
00

STORE

439
0
30 LOBBY 110

0
VENT. LIFT

0
330
2650 1100
T2.7 0
230
0

300
320
2500

5
LOADING T2.4
14

SHAFT GARBAGE
T1.1 97

0
00

0
SECURITY 2500
.7 RM. 0 SERVICE
3100

9° RM. STORE JANITOR 490 LIFT


FEMALE ELECT. 0
PRAYER 690
1355

795
300
G RM.
R 2500

530

530
1
MECH. RM.

280
2425
7375

ROOM CORR.

0
0
JANITOR T1.5 T2.3

800
1835

STORE -5.85 FFL


6000

0
STORE PANORAMIC

0
0
UNPACKING 5520 3010 PRAYER ELEVATOR T2.6 690 T2.2
AR-302-00
5475

5300

5300
STORE

6100
6000

ENTRANCE STORE
5300

RM. LOBBY
3000

LOBBY
3625

775
R 10 3900 CORR.
T1.2
1125

MECH. 00

265
2255

LOADING
2000

F PLENUM

20080
975

975
--------------- N/2017/0002775

0
2650
195

RECEIVING T1.4 STORE Enquiry No. : Application No :


FEMALE CORR.
STORE

2650

580
3460

TOILET & 2600 TOILET T2.1


T1.3 90 0

600
T2.2

0
ABLUTION LOBBY JANITOR 6
99/M A 000000 A
6250

300
LOADING MECH. CONSULTANT REG. No : GRADE : CONSULTANT REG. No : GRADE :
1800 1400

0
STORE SHAFT
AREA CORR. T2.5 PLENUM

0
4030
7950
9000

7950

7950
RETAIL 13
2
0 5
7500

690 226 IDF RM. CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :
3800

RECEIVING DISABLED SHAFT

470
4
LOBBY

480
TOILET SERVICE
8600

0
AR-302-00 LIFT 0

0
T2.4 FIRE 320

280
STORE

770
-5.85 FFL T2.1
R 738 FIGHTING 0

0
MECH. RM. AR-303-00 0 500

0
SERVICE 630

330
LOBBY
3100

X.3
1250

E 00

1270

1270
1475

C2.2
150
6800

LIFT LIFT

0
STORE
LIFT

2650
STAIR-04
590 2650

T2.3 LOBBY
2215

R DRIVER
12 TOILET LIFT 00 0
00 28 945
7950
9300

2650

7950
R2.5
0 MECH. RM.
300 T2.10

900
00
100

540
2650

0
GSM

0
ROOM -T2 X.2
00

R2
R
1200

00

20

1060
D C2.2
1735
12

00
10

T2.2
Shereif Ahmed

298
R
00

0
TELECOM TECHNICAL MANAGER : TECHNICAL MANAGER
R

7950 1050 7950 1050 7950 2650 3030 2650 970 7950 1000 7950

10
ROOM-T2
ETS ROOM
REGISTRATION No. : 6120 REGISTRATION No :
0
500
7950
9000

7940
DRIVEWAY DRIVEWAY R2.6

900
T2.1 R2.8
57 AL-JAZEERA ST.,

0
2650 775 4200 4200 21775 5300 750 7950 1045 7950 1050 7950 1875 6700
X.1 BIN-MAHMOUD / BEHZAD
00 T2.8 R2.7
R 10 BUILDING, 6th FLOOR
1300

C PR.S 00 TEL : (974) 402037 77 / 88 /


R 3000 5425 3100 STAIR-05 10 T2.9 99
FAX : (974) 402037 66
R
3
3200

3650

X.3 P.O. BOX1876, DOHA-QATAR


4700

POTABLE GARBAGE
MECH. RM. 2650 950 7950 1250 5300 3600 7950 775 5300 3410
RM. www.ehaf .com
CONSULTING ENGINEERS
WATER GARBAGE SMOKE 5175
TANK RM. STOP SERVICE
AR-303-00
7950
9300

LOBBY LIFT DRIVEWAY

6690
1500

5800
-5.85 FFL PROJECT
QEWC TOWERS ( KAHRAB TOWER )
2650

FIRE TANK FIRE TANK 0


P.W. PUMP
PUMP 490
RM. ELECT. 8175 7950 1050 7950 1050 7950 1050 7950 3470 2650 3365 LOBBY
8300

5050

ROOM
7250
7100

RM.

LUSAIL CITY - MARINA COM 53


CORR.
1050

B
6000

3300 5025 STAIR-08


POTABLE FIRE TANK MECH. RM. X.2
00

WATER
-5.85 FFL
65

TANK
R

LOCATION:
LUSAIL CITY - MARINA COM 53
2000 31200
7950
9000

500MM HIGH BLOCK


0

MECH. RM.
4650
410

UPDSTAND
R1

LV ROOM
TRANSFORMER
CLIENT:
QATAR ELECTRICITY & WATER CO.
ROOM MV ROOM VENT. -5.85 FFL
A X.1
DN
UP VENT. VENT. SHAFT
2525

VENT. VENT. VENT. SHAFT


VENT. 1 SHAFT SHAFT SHAFT SHAFT SHAFT
-3.45 FFL
5600
1800

1800
03/08/2017
SHAFT
DATE: JOB NO.:
0321
AR-509-01 VENT. VENT.
VENT. 1800 1175 1900 5500 SHAFT 6700 SHAFT 1900 1800 VENT.
SHAFT 36100 17500 4000 SHAFT
10000

TITLE:
Y.4

BASEMENT-1 FLOOR OVERALL PLAN


5000

Y.3
N 403036.6818
E 231073.3011

AR-103-00
DRAWING NO.: SCALE:
Y1.2 Y.2 1 : 300 @A1
1 D 2
Y1.1
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Y.1
19 20 21 DRAWN BY: DESIGNED BY: CHECKED BY:

N 403220.0950
M.S./S.M. H.O./M.A. O.M.

1 BASEMENT-1 FLOOR OVERALL PLAN A E 231012.1653 CAD FILE: REGISTRATION No. :


4265
REGISTRATION No. :
3881
REVISION
AR-103-00
1 : 300 SIGNATURE SIGNATURE

21
Construction Drawings Projects

N 403121.4988
E 230892.5049

N 402975.5278 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
E 230941.1565 Y1.2
Y1.1

B
Y.4

C Y.3

5000
Planter Planter
Y.2
PARKING

SHADE ABOVE Y.1


SHADE ABOVE
STEEL METAL GRATING

Q
AR-203-00
PARKING
1 X.8
Planter

W.wall 4
AR-508-01
P
PL.

42000
5000 X.7

47000
PL. PARKING
PARKING

DN
UP
PL.
N
W.FEATURE PL. PARKING
Planter PL.
X.6
RAMP TO BASEMENT W.wall
WATER FEATURE PL. PL.
PL.

X.8
PL. TOTAL NUMBER OF PARKING = 80
W.wall
PL.
Planter
PL. Planter PL.

M
X.5
PL. 2
PL. AR-302-00
STEEL METAL GRATING
X.7 PL.
T1.3 1 PL.
T1.4 AR-507-01 PL.

L T1.2 PL.
PL. PL.
X.4

10000
1 W.wall

T1.5 DN
UP
AR-302-00 X.6

EXIT W.FEATURE
CORR.
T1.1 3
K ? AR-303-00
RECEPTION
AREA STAIR-09 T2.7
Planter MALE
TOILET
X.5
RETAIL 10 T2.9
T1.6 A 01-10-2017 ISSUE FOR APPROVAL
CORR. FIRE
15000
FIGHTING SERVICE R2.3 TOWER-2 MAIN ENTRANCE T2.10
DISABLED
LOBBY
T1-ZA-06
STAIR-01 LIFT CORR. Planter T2.6
TOILET
SERVICE R2.4 DESCRIPTION
LIFT T1.7 REV. DATE BY
CORR.
R2.2
J STORE TOWER-1
RETAIL 09
T1-ZA-05 ?
T1-ZA-03 LIFT RETAIL 08 U.D.D STAMP MUNICIPALITY STAMP
1 2
3
4
Planter GARBAGE
RM.
LOBBY
STORE
X.4 TOWER-2 MAIN ENTRANCE
T1-ZA-04 ELECT. RECEPTION
T1-ZA-02
RM.
C1.1 & LOUNGE C2.1
SERVICE
C1.1 ? T2.5
4
LIFT
T1.7
FIRE T1-ZA-01 IDF RM. ENTRANCE
EXIT
FIGHTING LOBBY
CORR.
T2.8
STAIR-02
LOBBY AR-303-00
H PL. F&B 01 WATER
METER
R2.1 FCC.RM
T2.4
T1.6 RETAIL 07 RWS LO.PR
FEMALE CH.W
4
TOILET RETAIL 06
3
2
1

STAIR-03 T2.3

AR-202-00
STAIR-10
C2.1 PR.S FIRE

1
CORR. VENT. FIGHTING SERVICE
P.S CHUTE SHAFT
FROM P1 TO GF
T2.7 LOBBY LIFT
T1.1 GARBAGE ELECT. SERVICE
WATER RM. RM. LIFT
FROM GF TO B1
METER
T2-ZB-02
G
T1.5 CORR. T2-ZB-01
PANORAMIC
F&B 02 T2-ZA-03
AR-204-00

F&B 04 ELEVATOR FROM GF TO B1


T2.6 T2.2
1 FROM B1 TO GF
T2-ZA-01
T2-ZA-02

TOWER-2
T1.2 LIFT

F 1 T1.4
LOBBY
T2-ZB-03
Enquiry No. : --------------- Application No : N/2017/0002775
T2-ZB-04
AR-302-00
99/M A
FROM B1 TO GF
T1.3
STAIR-11
T2-ZA-04
CORR.
T2.1 CONSULTANT REG. No : GRADE : CONSULTANT REG. No : 000000 GRADE : A
DISABLED SHAFT

2
T2-ZA-05
T2.5
PL.
FROM GF TO P1 TOILET
T2-ZA-06
SHAFT CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :
RETAIL 05
PR.S
AR-302-00 MALE FEMALE IDF RM.
SERVICE TOILET TOILET
RETAIL 04 FIRE
T2.4 FIGHTING
LIFT
LIFT LOBBY
E F&B 03 SERVICE C2.2 00 X.3
CORR. LIFT F.F STAIR-04
150
4
LO.PR
4
3
1 2

WATER
METER T2.3 SHAFT SHAFT
ENTRANCE
LOBBY
AR-303-00
STAIR-12 R2.5
MALE T2.10 00
TOILET 100
RETAIL 03
X.2
D T2.2 C2.2
F&B 05
TECHNICAL MANAGER : Shereif Ahmed TECHNICAL MANAGER

PL.
RETAIL 02
DISABLED
ENTRANCE
LOBBY
CORR. TOILET REGISTRATION No. : 6120 REGISTRATION No :
CORR.
RETAIL 01
0
500

TURE
FEMALE R2.6
TOILET
T2.1 R2.8 57 AL-JAZEERA ST.,
? PARKING BIN-MAHMOUD / BEHZAD

W.FEA
Planter T2.8 R2.7
X.1 BUILDING, 6th FLOOR
STAIR-05 TEL : (974) 402037 77 / 88 /
C
Planter PL. 99
FAX : (974) 402037 66
GARBAGE
RM.
W.FEATURE
X.3
T2.9
3 P.O. BOX1876, DOHA-QATAR
www.ehaf .com
AR-303-00 CONSULTING ENGINEERS
SERVICE
LOBBY LIFT
PL. PROJECT

W.FEATURE
STORE

SECURITY PLANTER
MAIN ENTRANCE LANDSCAPE
FEATURES QEWC TOWERS ( KAHRAB TOWER )
LUSAIL CITY - MARINA COM 53
RM.
B SHADE ABOVE
PL. Planter 3 2 1
X.2
R E
TU
EA LOCATION:
STEEL METAL GRATING

PL.
W
.F
LUSAIL CITY - MARINA COM 53
CLIENT:
A
DN
UP X.1
QATAR ELECTRICITY & WATER CO.
2
Planter
03/08/2017
DATE: JOB NO.:
0321
RAMP TO BASEMENT
AR-509-01 PARKING
10000

Planter Planter
TITLE:

GROUND FLOOR OVERALL PLAN


Y.4
Planter Planter
5000

Planter
Y.3
N 403036.6818
E 231073.3011
1
AR-104-00
DRAWING NO.: SCALE:
MAIN ENTRANCE
Y.2
1 : 300 @A1
Y1.2 AR-201-00

1 D 2
Y1.1
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Y.1
19 20 21
N 403220.0950 DRAWN BY:
E 231012.1653
M.S./S.M.
DESIGNED BY:
H.O./M.A.
CHECKED BY:
O.M.

A CAD FILE: REGISTRATION No. : REGISTRATION No. :

1 GROUND FLOOR OVERALL PLAN 4265 3881


REVISION SIGNATURE SIGNATURE
AR-104-00
1 : 300
A

22
Construction Drawings Projects

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Y1.2
Y1.1 Y.4

Y.3

5000
Y.2

Y.1

Q
AR-203-00

1 X.8

5000 X.7

47000
N

X.6

X.8

M 2
X.5
AR-302-00

X.7
T1.3
T1.4

L T1.2
X.4
NURSING
FEMALE ROOM
TOILET

T1.5 JANITOR
DN DN
UP X.6
1
AR-302-00
3
T1.1
AR-303-00
K
OPEN TO
BELOW T2.7 A 01-10-2017 ISSUE FOR APPROVAL
STORE 2
X.5 T2.9
T1.6 DISABLED STAIR-01 AR-507-01
CORR. FIRE STAIR-09
TOILET
FIGHTING SHAFT RETAIL 11 +6.95 FFL REV. DATE DESCRIPTION BY
15000 R2.3 T2.10
LOBBY
SERVICE T2.6
CORR.
CORR.
SERVICE LIFT R2.4 U.D.D STAMP MUNICIPALITY STAMP
LIFT T1.7
GARBAGE R2.2
J PR.S
RM. TOWER-1 GARBAGE
MEP
LIFT RM. RETAIL 10
STORE

1
LOBBY
STORE X.4
+6.95 FFL ELECT.
RM. C1.1 C2.1
VOID
AR-301-00 C1.1 T2.5
T1.7 MALE
SERVICE
STAIR-02 IDF RM. TOILET
LIFT
RETAIL 09 T2.8
SHAFT STORE
WATER R2.1
H METER T2.4
CORR.
T1.6
FACILTY
STORE
?
MECH. RM. MANAGEMENT
4 T2.3

AR-202-00
C2.1 FIRE +6.95 FFL
AR-303-00
RETAIL 01
T2.7
CHUTE
STAIR-03
FIGHTING
LOBBY 1
T1.1 GARBAGE SERVICE
RM. LIFT
WATER ELECT.
STAIR-10
METER RM.
G
T1.5 CORR.
MAIN
AR-204-00

CORRIDOR
+6.95 FFL T2.6 T2.2
1 +6.95 FFL ATRIUM Enquiry No. : --------------- Application No : N/2017/0002775
TOWER-2
T1.2 LOBBY LIFT CONSULTANT REG. No : 99/M GRADE : A CONSULTANT REG. No : 000000 GRADE : A
F LOBBY
T1.4
+6.95 FFL CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :
T1.3 T2.1
CORR.

T2.5 DISABLED
RETAIL 07
TOILET

2 IDF RM.

4
RETAIL 06 STAIR-11 SERVICE FEMALE
AR-302-00 T2.4 LIFT
MALE TOILET
TOILET

E STAIR-12 SERVICE AR-303-00 LIFT X.3


LIFT
C2.2 00
150
LIFT
LOBBY
STORE
T2.3 STAIR-04
LIFT
RETAIL 02 CORR. WATER
METER

R2.5
MALE

CORR.
TOILET RETAIL T2.10 TECHNICAL MANAGER : Shereif Ahmed TECHNICAL MANAGER

X.2
D
RETAIL 05
C2.2
REGISTRATION No. : 6120 REGISTRATION No :
T2.2
RETAIL 04
DISABLED
RETAIL 03 TOILET
57 AL-JAZEERA ST.,
NURSING 0 BIN-MAHMOUD / BEHZAD
ROOM R2.6 500 BUILDING, 6th FLOOR
FEMALE
R2.8 TEL : (974) 402037 77 / 88 /
TOILET T2.1
99
FAX : (974) 402037 66
X.1 P.O. BOX1876, DOHA-QATAR
T2.8 R2.7 www.ehaf .com
C
STAIR-05 T2.9
CONSULTING ENGINEERS
GARBAGE
X.3 3 PROJECT
RM.
SMOKE
STOP
LOBBY
SERVICE
LIFT
AR-303-00 QEWC TOWERS ( KAHRAB TOWER )
+6.95 FFL
LUSAIL CITY - MARINA COM 53
B LOCATION:
X.2
LUSAIL CITY - MARINA COM 53
CLIENT:
QATAR ELECTRICITY & WATER CO.
03/08/2017
DATE: JOB NO.:
A X.1 0321
TITLE:

PODIUM-1 FLOOR OVERALL PLAN


Y.4
5000

AR-105-00
DRAWING NO.: SCALE:
Y.3 1 : 300 @A1

1 DRAWN BY: DESIGNED BY: CHECKED BY:


Y1.2 Y.2
Y1.1
AR-201-00 M.S./S.M. H.O./M.A. O.M.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 CAD FILE: REGISTRATION No. : REGISTRATION No. :
Y.1
4265 3881
REVISION
PODIUM-1 FLOOR OVERALL PLAN
SIGNATURE SIGNATURE
1 A
AR-105-00
1 : 300

23
Construction Drawings Projects

2
T1.5 AR-302-00 T1.4

T1.6 T1.3

DISABLED TOILET
T1.7 T1.2
MEP MEP

400
OFFICE-04 TOI.
VENT.

1050
SHAFT
+36.40 FFL CH.W
LOBBY

2140

2200
TOI.
CHUTE OFFICE-01

1050
1800 +36.40 FFL

MEP
CORR. PANTRY
GARBAGE RM. CORR.

1550

1400
2200 2500 3000 4200

1300 1600 PR.S 6


2200 2400 A 01-10-2017 ISSUE FOR APPROVAL
T.LOBBY AR-501-01

1200

1200
CORR. TOI.
6

2500
T1-ZA-04 T1-ZA-08 +36.40 FFL
REV. DATE DESCRIPTION BY
AR-501-01 PANTRY
TOI. SHAFT SMOKE STOP LOBBY STAIR-01
1600

2600
U.D.D STAMP MUNICIPALITY STAMP

PR.S
SERVICE LIFT
T1-ZA-03 TOWER-1 LIFT T1-ZA-07

5700
STAIR-02
LOBBY
5700

SHAFT
T1.1 T1.1

10100
1 SERVICE LIFT
SHAFT 1
AR-302-00 +36.40 FFL AR-302-00
2700
T1-ZA-02 T1-ZA-06 PR.S
+36.30 SSL 1200

SHAFT PANTRY

1600
1600 2200

1200
+36.40 FFL SMOKE STOP LOBBY
TOI.
T1-ZA-01 T1-ZA-05
2500

TOI. T.LOBBY

1100

1200
2400
PR.S 1300
CORR.

SHAFT 2200 4200


Enquiry No. : --------------- Application No : N/2017/0002775
ELECT. RM.
99/M A 000000 A
1400

1400

CORR. CONSULTANT REG. No : GRADE : CONSULTANT REG. No : GRADE :

1700
PANTRY 3800 2700

CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :


1800
P.S
TOI.
1050

LOBBY 1200
IDF RM.
WATER METER
1900

1900
TOI.
1100
400

MEP MEP OFFICE-02


+36.40 FFL
T1.2 OFFICE-03 C1.1 T1.7
+36.40 FFL
TECHNICAL MANAGER : Shereif Ahmed TECHNICAL MANAGER

REGISTRATION No. : 6120 REGISTRATION No :

57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL : (974) 402037 77 / 88 /
99
FAX : (974) 402037 66
P.O. BOX1876, DOHA-QATAR
www.ehaf .com
CONSULTING ENGINEERS
PROJECT
QEWC TOWERS ( KAHRAB TOWER )
LUSAIL CITY - MARINA COM 53
LOCATION:
LUSAIL CITY - MARINA COM 53
T1.3 T1.6
CLIENT:
QATAR ELECTRICITY & WATER CO.
09/07/2017
DATE: JOB NO.:
0321
TITLE:

TOWER-1 2ND FLOOR PLAN


1 TOWER-1 2ND FLOOR PLAN T1.4 T1.5
AR-T1-102-00
DRAWING NO.: SCALE:
1 : 100 @A1
AR-T1-102-00
1 : 100 2
AR-302-00 DRAWN BY: DESIGNED BY: CHECKED BY:
M.S./S.M. H.O./M.A. O.M.
CAD FILE: REGISTRATION No. : REGISTRATION No. :
4265 3881
REVISION SIGNATURE SIGNATURE

24
Construction Drawings Projects

X.4 T2.7 T2.6 T2.5 T2.4 T2.3 T2.2 T2.1 X.3 PROJECT NAME AND LOCATION
18 19
QEWC TOWERS
LUSAIL CITY - MARINA COM 53
4
AR-303-00
( KAHRAB TOWER )
54000
NORTH PIN NO.
69060093
10500 5800 8000 4100 4100 8000 5800 7700
Kib PLANING
lah NO.

KEY PLAN

TOWER-2
TOWER-2 OFFSET LINE
OFFSET LINE
17
DN

DN

DN

DN

R2.5
DN

Y.3 R2.4
DN DN

16
°
.00

35
35

.0
F.H.C


WD13 WD13

100

ELEC.
WD05 WD04
AC01 0°
5.0
4400 1600 7600 3200 10

Y.2 3

810

810
SD07

1800
1800
3000 4000 3000
AR-303-00 1600 MECH.

1200

1200
BY
R2.3
2000

3050
TENANT F.H.C

1550

1550
AC01

650
650
R2.6

1125

1125
700 800 150 1100 1000 1500 650

AC01 SD01 2000 2300

TOI.
BY BY

1200

1200
+101.85

2100
2100
F.F.L TENANT TENANT
PANTRY CORR. 1600 4500
TOI.

3200

1150

1150
WD04
AC01
+63.35
F.F.L
AC01
AC01
3
15 AR-303-00

1700
1700
1200

1200
1300
2800 800 2300
800
WASH TOI. AC01 AC01 TOI. WASH
30.00°

30.00°
1200

1200
PG

1100
WASH TOI. AC01
ELEC.
MECH. AC01 TOI. WASH

1200

1200
AC01 4900 AC01
Y.1

1175

1175
TOI. TOI.

3200
2100 1000 2800
PANTRY CORR. CORR. PANTRY
1350

1200

1200
TOI. AC01 TOI. JANUARY
Rev-00 DETAILED DESIGN H.O/M.A O.M M.I
2018

R2.2 R2.7
1400 1700 SD07
650 1500 650 3300

1125

1125

400
ISSUE DESCRIPTION DATE DRAWN CHECK. QA/QC
2100

SD07

1100
SD01
GARBAGE 9
2050 1050 OWNER
2850

1200

1200
CHUTE
BY
AR-504-01 BY
+63.35 AC01
TENANT
2050 TENANT
F.F.L

1300
AC01

750
815

810
SD06
4400 7600 4400
F.H.C AC01
WD04 WD05

14 ELEC.

WD13 WD13 PROJECT MANAGEMENT\ CONSTRUCTION MANAGEMENT

°
.00
35

35
.0

F.H.C

C2.1 C2.2 LEAD CONSULTANT

R2.8 57 AL-JAZEERA ST., BIN-


MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL: (+974) 4020 37 77 / 88 /
99 FAX : (+974) 4020 37 66
P.O BOX1876, DOHA, QATAR.
W W W .EHAF.COM

R2.1 PROJECT DESCRIPTION

3 BASEMENTS+ GROUND + 6 PODIUM +


TOWER-1 ( 21 FLOORS + ROOF + MECH ) +
13 TOWER-2 ( 37 FLOORS + ROOF + MECH )

DRAWING TITLE

J 10500 5800 8000 4100 4100 8000 5800 7700


TOWER-2 9TH FLOOR PLAN

DRAWING NO.: PART


54000

AR-T2-109-00 --
DRAWN BY: CHECKED BY: STAGE: REVISION:
4 H.O/M.A/E.P/S.M/A.A O.M WD
Rev-00
AR-303-00
H G 9TH FLOOR PLAN
F E D C
VERIFIED BY: APPROVED BY: PLOT DATE:

1 TOWER-2 Designer H.H JAN.2018

1 : 100 @A1
SCALE: PROJECT NO.:
AR-T2-109-00
1 : 100
FILE NAME:
321
AR-T2-109-00

25
Construction Drawings Projects

13 14 15 16 17 18 19 HIGHEST POINT
+199.50 m SSL

MC1

7100
T2_PARAPET
+192.40 m SSL
190.15
T.O.P.
T2_UPPER ROOF

5250
22100
ELEVATION FINISHES +187.15 m SSL

CODE DESCRIPTION
ROOF
183.70 T2_MECH. FLOOR

4750
BELOW MECHANICAL
T.O.P.
MC1 METAL CLADDING PANEL
ROOM +182.40 m FFL

MC2 PERFORATED METAL SCREEN MECHANICAL MACHINE T2_ROOF FLOOR

5000
CORR. CORR.
MC3 PERFORATED METAL SCREEN ( MASHRABIYA ) ROOM RM
ROOF ROOF +177.40 m FFL
CW1 DOUBLE GLAZING UNITIZED PANEL TOWER-2 T2_37th FLOOR

4100
LIFT
OFFICE-01
CW2 SPANDREL PANEL UNITIZED CURTAIN WALL LOBBY OFFICE-03 +173.30 m FFL
SYSTEM T2_36th FLOOR

3850
CW3 DOUBLE GLAZED STICK SYSTEM OFFICE-01
LOUNGE OFFICE-03 +169.45 m FFL

ALV-1 POWDER COATED ALUMINUM LOUVERS. TOWER-2 T2_35th FLOOR

3850
OFFICE-01 LOUNGE LIFT
COLOUR PER ARCHITECT. LOBBY
OFFICE-03 +165.60 m FFL
T2_34th FLOOR

3850
MC1 OFFICE-01 LOUNGE OFFICE-03
? +161.75 m FFL
TOWER-2 T2_33rd FLOOR

3850
OFFICE-01 LIFT OFFICE-03
CW1 LOUNGE LOBBY +157.90 m FFL
TOWER-2 T2_32nd FLOOR

3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +154.05 m FFL
TOWER-2 T2_31st FLOOR

3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +150.20 m FFL

CW2 TOWER-2 T2_30th FLOOR

3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +146.35 m FFL
TOWER-2 T2_29th FLOOR

3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +142.50 m FFL
TOWER-2 T2_28th FLOOR

3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +138.65 m FFL
2 3 4 5 6 7 8 9 10 11 12 TOWER-2 T2_27th FLOOR

3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +134.80 m FFL
TOWER-2 T2_26th FLOOR

3850
OFFICE-01 LIFT OFFICE-03
LOUNGE LOBBY +130.95 m FFL
TOWER-2 T2_25th FLOOR

3850
OFFICE-01 LIFT OFFICE-03
126.40 LOUNGE LOBBY +127.10 m FFL
T.O.P.
T1_UPPER ROOF TOWER-2 T2_24th FLOOR

3850
OFFICE-01 LIFT OFFICE-03
+123.40 m SSL LOUNGE LOBBY +123.25 m FFL

MECHANICAL ELECT.
TOWER-2 T2_23rd FLOOR
T1_MECH. FLOOR

3850
LIFT
4750

STORE PR.S ROOM RM. OFFICE-01 OFFICE-03


LOUNGE LOBBY +119.40 m FFL
+118.65 m FFL
TOWER-2 T2_22nd FLOOR

3850
OFFICE-01 LIFT OFFICE-03
T1_ROOF FLOOR MACHINE ELECT. LOUNGE LOBBY +115.55 m FFL
5000

ROOM RM.
+113.65 m SSL 113.30 GSM PR.S 113.30 TOWER-2 T2_21st FLOOR
T.O.P. T.O.P.

3850
OFFICE-01 LIFT OFFICE-03 A 01-10-2017 ISSUE FOR APPROVAL
T1_21st FLOOR TOWER-1 ELECT.
LOUNGE LOBBY +111.70 m FFL
4100

CEO \ GM LIFT RM.


PR.S
+109.55 m FFL OFFICE LOBBY REFUGE LOUNGE T2_20th FLOOR

3850
AREA OFFICE-01
T1_20th FLOOR TOWER-1 IT +107.85 m FFL REV. DATE DESCRIPTION BY
ELECT.
3850

AUDITOR LIFT SECTION


PR.S RM.
+105.70 m FFL LOBBY HEAD TOWER-2 MECHANICAL
TOWER-1 LIFT ROOM U.D.D STAMP MUNICIPALITY STAMP

6000
T1_19th FLOOR SECRETARY LIFT FINANCIAL MECHANICAL LOBBY T2_19th FLOOR
3850

ELECT. MACHINE ETS ROOM


PR.S LOBBY ROOM
+101.85 m FFL RM. ACCOUNTS RM +101.85 m FFL
RECRUITMENT
T1_18th FLOOR ADMINSTRATOR TOWER-1
ELECT. SECTION
T2_18th FLOOR
3850

3850
\ LIFT
PR.S RM. OFFICE-01 OFFICE-03
+98.00 m FFL COORDINATOR LOBBY HEAD +98.00 m FFL
T1_17th FLOOR TOWER-1 TOWER-2 T2_17th FLOOR
3850

3850
LIFT ELECT. LIFT
PR.S OFFICE-02 OFFICE-01 OFFICE-03
+94.15 m FFL OFFICE-04 LOBBY RM. LOBBY +94.15 m FFL
T1_16th FLOOR TOWER-1 TOWER-2 T2_16th FLOOR
3850

3850
LIFT ELECT. LIFT
PR.S OFFICE-02 OFFICE-01 OFFICE-03
+90.30 m FFL OFFICE-04 LOBBY RM. LOBBY +90.30 m FFL

177400
T1_15th FLOOR TOWER-1 TOWER-2 T2_15th FLOOR.
3850

3850
LIFT ELECT. LIFT
PR.S OFFICE-02 OFFICE-01 OFFICE-03
+86.45 m FFL OFFICE-04 LOBBY RM. LOBBY +86.45 m FFL
T1_14th FLOOR TOWER-1 TOWER-2 T2_14th FLOOR
3850

3850
LIFT ELECT. LIFT OFFICE-03
PR.S OFFICE-02 OFFICE-01
+82.60 m FFL OFFICE-04 LOBBY RM. LOBBY +82.60 m FFL
T1_13th FLOOR TOWER-1 CW2 CW2 TOWER-2 T2_13th FLOOR
3850

3850
LIFT ELECT. OFFICE-01 LIFT OFFICE-03
PR.S OFFICE-02
+78.75 m FFL OFFICE-04 LOBBY RM. CW1 LOBBY +78.75 m FFL
T1_12th FLOOR TOWER-1 TOWER-2 T2_12th FLOOR
3850

3850
LIFT ELECT. LIFT
+74.90 m FFL OFFICE-04 PR.S
LOBBY RM.
OFFICE-02 CW1 OFFICE-01
LOBBY
OFFICE-03
+74.90 m FFL
Enquiry No. : --------------- Application No : N/2017/0002775
T1_11th FLOOR TOWER-1 TOWER-2 T2_11th FLOOR
MC1
3850

3850
99/M A
LIFT ELECT. LIFT
+71.05 m FFL OFFICE-04 PR.S
LOBBY RM.
OFFICE-02 OFFICE-01 LOBBY
OFFICE-03
+71.05 m FFL CONSULTANT REG. No : GRADE : CONSULTANT REG. No : 000000 GRADE : A
T1_10th FLOOR TOWER-1 TOWER-2 T2_10th FLOOR CONSULTANT STAMP & SIGNATURE : SUB-CONSULTANT STAMP & SIGNATURE :
3850

3850
LIFT ELECT. LIFT OFFICE-03
PR.S OFFICE-02 OFFICE-01
+67.20 m FFL OFFICE-04 LOBBY RM. LOBBY +67.20 m FFL
T1_9th FLOOR TOWER-1 TOWER-2 T2_9th FLOOR
3850

3850
PR.S LIFT ELECT. LIFT OFFICE-03
OFFICE-02 OFFICE-01
+63.35 m FFL OFFICE-04 LOBBY RM. LOBBY +63.35 m FFL
T1_8th FLOOR TOWER-1 TOWER-2 T2_8th FLOOR
3850

3850
PR.S LIFT ELECT. LIFT OFFICE-03
OFFICE-02 OFFICE-01
+59.50 m FFL OFFICE-04 LOBBY RM. LOBBY +59.50 m FFL
T1_7th FLOOR TOWER-1 TOWER-2 T2_7th FLOOR
LIFT
3850

3850
ELECT. LIFT OFFICE-03
PR.S OFFICE-02 OFFICE-01
+55.65 m FFL OFFICE-04 LOBBY RM. LOBBY +55.65 m FFL
MC1
T1_6th FLOOR TOWER-1
ELECT.
TOWER-2 T2_6th FLOOR
3850

3850
PR.S LIFT OFFICE-02 OFFICE-01 LIFT OFFICE-03
+51.80 m FFL OFFICE-04 LOBBY RM. LOBBY +51.80 m FFL
T1_5th FLOOR TOWER-1 TOWER-2 T2_5th FLOOR TECHNICAL MANAGER : Shereif Ahmed TECHNICAL MANAGER
3850

3850
PR.S LIFT ELECT. MC1 LIFT OFFICE-03
OFFICE-02 OFFICE-01
+47.95 m FFL OFFICE-04 LOBBY RM. LOBBY +47.95 m FFL
T1_4th FLOOR TOWER-1 TOWER-2 T2_4th FLOOR REGISTRATION No. : 6120 REGISTRATION No :
3850

LIFT

3850
PR.S ELECT. LIFT
OFFICE-02 OFFICE-01 OFFICE-03
+44.10 m FFL OFFICE-04 LOBBY RM. LOBBY +44.10 m FFL
TOWER-1
T1_3rd FLOOR LIFT
TOWER-2 T2_3rd FLOOR 57 AL-JAZEERA ST.,
3850

ELECT.

3850
PR.S OFFICE-02 LIFT BIN-MAHMOUD / BEHZAD
+40.25 m FFL OFFICE-04 LOBBY RM. OFFICE-01 LOBBY OFFICE-03 +40.25 m FFL BUILDING, 6th FLOOR
T1_2nd FLOOR TOWER-1 TOWER-2 T2_2nd FLOOR TEL : (974) 402037 77 / 88 /
3850

3850
PR.S
LIFT ELECT.
PANORAMIC
LIFT 99
FAX : (974) 402037 66
+36.40 m FFL OFFICE-04 RM. OFFICE-02 OFFICE-01 OFFICE-03 +36.40 m FFL
LOBBY ELEVATOR LOBBY P.O. BOX1876, DOHA-QATAR
www.ehaf .com
1st FLOOR 1st FLOOR
CONSULTING ENGINEERS
TOWER-2
ELECT. OFFICE-02
3850

3850
PR.S LIFT ?
+32.55 m FFL OFFICE-04 RM. ? +32.55 m FFL
OUTDOOR ? LOBBY
AREA
5520

PROJECT
QEWC TOWERS ( KAHRAB TOWER )
6th PODIUM TOWER-1 TOWER-2 BUSSINESS 6th PODIUM
29.55 MALE STORE PR.S LIFT LIFT ELECT. FOOD LIFT LOUNGE
3850

3850
GYMNASIUM LIFT COURT LOBBY LIFT CENTER
+28.70 m FFL T.O.P. LOBBY RM. LOBBY CORR. 03 +28.70 m FFL

LUSAIL CITY - MARINA COM 53


5th PODIUM LIFT TOWER-1 PODIUM-05 TOWER-2 5th PODIUM
PR.S LIFT ELECT. VOID PODIUM-04 LIFT
3470
3850

3850
STORE LIFT OFFICE & FEMALE LIFT OFFICE-03
RM. OFFICE & CORR. CORR.
+24.85 m FFL MECH. RM. LOBBY PARKING
PARKING
TOILET LOBBY +24.85 m FFL
4th PODIUM TOWER-1 PODIUM-04 TOWER-2 4th PODIUM
PR.S ELECT. VOID PODIUM-03
3450
3850

3850
LIFT OFFICE & FEMALE LIFT
+21.00 m FFL
STORE RM. OFFICE & CORR. OFFICE-03
+21.00 m FFL LOCATION:
LUSAIL CITY - MARINA COM 53
MECH. RM. LOBBY PARKING TOILET LOBBY
PARKING
3rd PODIUM TOWER-1 PODIUM-03 TOWER-2 3rd PODIUM
PR.S ELECT. PODIUM-02
3450

3450

3450
3850

3850
STORE LIFT OFFICE & VOID FEMALE LIFT
MECH. RM. OFFICE & CORR. OFFICE-03
+17.15 m FFL LOBBY RM. PARKING
PARKING
TOILET LOBBY +17.15 m FFL
2nd PODIUM TOWER-1 2nd PODIUM CLIENT:
QATAR ELECTRICITY & WATER CO.
PR.S PODIUM-02 TOWER-2
ELECT. FEMALE
3450

3450

3450
STORE
3850

3850
LIFT OFFICE & VOID LIFT OFFICE-03
MECH. RM. RM. TOILET CORR.
+13.30 m FFL LOBBY PARKING LOBBY +13.30 m FFL

01/10/17
ELECT.
DATE: JOB NO.:
0321
TOWER-1 TOWER-2
RM. LIFT
LIFT MAIN
5950

5950

5950
6350

6350
1st PODIUM RETAIL 01 STORE PR.S LOBBY RETAIL 11 CORRIDOR
ATRIUM MAIN LOBBY LOBBY RETAIL 1st PODIUM
CORRIDOR
+6.95 m FFL +6.95 m FFL
TITLE:

OVERALL SECTION
TOWER-1 TOWER-2
GARBAGE LIFT ELECT. RETAIL 10 PANORAMIC LIFT
6000

6000

6000
6350

6350
ELEVATOR
F&B 01 CORR. RM. LOBBY RM. VOID RECEPTION LOBBY F&B 05 GROUND FLOOR
& LOUNGE
+0.60 m FFL
ROAD LV (0.00)

AR-301-00
+0.00 m SSL DRAWING NO.: SCALE:
VENT. LIFT PIT ELECT. ENTRANCE 1 : 400 @A1
6030
6000

6000
6450

6450
SHAFT STORE STORE LIFT PIT SERVICES RM. PANORAMIC LOBBY CORR. STORE CORR. BASEMENT-1
CORRIDOR ELEVATOR -5.85 m FFL
DRAWN BY: DESIGNED BY: CHECKED BY:

OVERALL SECTION
CORR.
MANAGER ARCHIVE PR.S STORE
TOWER-1
STORE BASEMENT-2 M.S./S.M. H.O./M.A. O.M.
4100

4100

4100

ELECT.
4500

4500
LIFT CORR. STORE
1 LOBBY RM.
CORR. -10.35 m FFL
CAD FILE: REGISTRATION No. : REGISTRATION No. :
AR-301-00
1 : 400 PR.S STORE TOWER-1 STORE ELECT. BASEMENT-3
4265 3881
3600

3600

3600
4000

4000
LIFT RM. CORR. STORE
STORE
STORE LOBBY CORR. -14.35 m FFL
REVISION SIGNATURE SIGNATURE

26
13 14 15 16 17 18 19
HIGHEST POINT
+199.50 m SSL
1 ELEVATION-01
AR-201-00
1 : 300 T2_PARAPET
+192.40 m SSL

T2_UPPER ROOF
+187.15 m SSL

ELEVATION FINISHES
T2_MECH. FLOOR
CODE DESCRIPTION +182.40 m FFL
MC1 METAL CLADDING PANEL
MC2 PERFORATED METAL SCREEN
T2_ROOF FLOOR
MC3 PERFORATED METAL SCREEN ( MASHRABIYA )
+177.40 m FFL
CW1 DOUBLE GLAZING UNITIZED PANEL
CW2 SPANDREL PANEL UNITIZED CURTAIN WALL T2_37th FLOOR
SYSTEM +173.30 m FFL
CW3 DOUBLE GLAZED STICK SYSTEM
T2_36th FLOOR
ALV-1 POWDER COATED ALUMINUM LOUVERS. +169.45 m FFL
COLOUR PER ARCHITECT.
T2_35th FLOOR
+165.60 m FFL

T2_34th FLOOR
+161.75 m FFL

T2_33rd FLOOR
+157.90 m FFL

T2_32nd FLOOR
+154.05 m FFL
CW2
T2_31st FLOOR
+150.20 m FFL

T2_30th FLOOR
+146.35 m FFL

T2_29th FLOOR
+142.50 m FFL

T2_28th FLOOR
CW1
+138.65 m FFL

2 3 4 5 6 7 8 9 10 11 12 T2_27th FLOOR
+134.80 m FFL

T2_26th FLOOR
+130.95 m FFL

T2_25th FLOOR
+127.10 m FFL

T1_UPPER ROOF T2_24th FLOOR


+123.40 m SSL +123.25 m FFL

T2_23rd FLOOR
T1_MECH. FLOOR

4750
+119.40 m FFL
+118.65 m FFL

T2_22nd FLOOR
+115.55 m FFL

5000
T1_ROOF FLOOR
+113.65 m SSL CW2
T2_21st FLOOR
+111.70 m FFL
T1_21st FLOOR

4100
+109.55 m FFL
T2_20th FLOOR
+107.85 m FFL
T1_20th FLOOR

3850
+105.70 m FFL

T1_19th FLOOR ALV-1 T2_19th FLOOR

3850
+101.85 m FFL +101.85 m FFL
MC1
T1_18th FLOOR T2_18th FLOOR

3850
+98.00 m FFL MC1 +98.00 m FFL
Construction Drawings Projects

T1_17th FLOOR T2_17th FLOOR

3850
+94.15 m FFL +94.15 m FFL

T1_16th FLOOR T2_16th FLOOR

3850
+90.30 m FFL +90.30 m FFL

T1_15th FLOOR T2_15th FLOOR.

3850
+86.45 m FFL +86.45 m FFL

T1_14th FLOOR MC1 T2_14th FLOOR

3850
+82.60 m FFL +82.60 m FFL

T1_13th FLOOR CW1 T2_13th FLOOR

3850
+78.75 m FFL +78.75 m FFL

T1_12th FLOOR T2_12th FLOOR

3850
+74.90 m FFL +74.90 m FFL

T1_11th FLOOR MC1 T2_11th FLOOR

3850
+71.05 m FFL +71.05 m FFL

T1_10th FLOOR T2_10th FLOOR

3850
+67.20 m FFL +67.20 m FFL

T1_9th FLOOR T2_9th FLOOR

3850
+63.35 m FFL +63.35 m FFL

T1_8th FLOOR T2_8th FLOOR

3850
+59.50 m FFL +59.50 m FFL

T1_7th FLOOR T2_7th FLOOR

3850
+55.65 m FFL +55.65 m FFL

T1_6th FLOOR T2_6th FLOOR

3850
+51.80 m FFL +51.80 m FFL

T1_5th FLOOR T2_5th FLOOR


3850
+47.95 m FFL +47.95 m FFL

T1_4th FLOOR T2_4th FLOOR


3850

+44.10 m FFL +44.10 m FFL

T1_3rd FLOOR MC3 T2_3rd FLOOR


3850

+40.25 m FFL +40.25 m FFL

MC3
T1_2nd FLOOR T2_2nd FLOOR
3850

+36.40 m FFL +36.40 m FFL


MC3

1st FLOOR
3850

+32.55 m FFL

6th PODIUM
3850

+28.70 m FFL

MC3
5th PODIUM
3850

+24.85 m FFL

4th PODIUM
3850

+21.00 m FFL

3rd PODIUM
3850

+17.15 m FFL

MC3
2nd PODIUM
3850

+13.30 m FFL
6350

1st PODIUM
+6.95 m FFL

CW3
GROUND FLOOR
6350

+0.60 m FFL
ROAD LV (0.00)
+0.00 m SSL
600
A

REV.

DATE:

TITLE:
99

CLIENT:
PROJECT

REVISION

A
CAD FILE:
LOCATION:

DRAWN BY:
Enquiry No. :
U.D.D STAMP

DRAWING NO.:
www.ehaf .com
DATE

REGISTRATION No. :

M.S./S.M.
01-10-2017

57 AL-JAZEERA ST.,

FAX : (974) 402037 66


TECHNICAL MANAGER :

BUILDING, 6th FLOOR


CONSULTANT REG. No :

BIN-MAHMOUD / BEHZAD

TEL : (974) 402037 77 / 88 /

09/07/2017
P.O. BOX1876, DOHA-QATAR
99/M
---------------

6120
CONSULTANT STAMP & SIGNATURE :

Shereif Ahmed

AR-201-00
AGRADE :

SIGNATURE
4265
DESIGNED BY:
H.O./M.A.
SCALE:

REGISTRATION No. :
MUNICIPALITY STAMP
ISSUE FOR APPROVAL

JOB NO.:
DESCRIPTION

Application No :

REGISTRATION No :
TECHNICAL MANAGER

ELEVATION-1 OVERALL
CONSULTANT REG. No :

1 : 300
QATAR ELECTRICITY & WATER CO.
CONSULTING ENGINEERS

SIGNATURE
LUSAIL CITY - MARINA COM 53

3881
O.M.
0321

CHECKED BY:
000000

@A1
LUSAIL CITY - MARINA COM 53
N/2017/0002775

REGISTRATION No. :
QEWC TOWERS ( KAHRAB TOWER )
BY

SUB-CONSULTANT STAMP & SIGNATURE :


AGRADE :

27
19 18 17 16 15 14 13
HIGHEST POINT
+199.50 m SSL 1 ELEVATION-03
MC1
AR-203-00 ELEVATION FINISHES
1 : 300
T2_PARAPET
+192.40 m SSL CODE DESCRIPTION
MC1 METAL CLADDING PANEL
MC2 PERFORATED METAL SCREEN
T2_UPPER ROOF MC3 PERFORATED METAL SCREEN ( MASHRABIYA )
+187.15 m SSL
CW1 DOUBLE GLAZING UNITIZED PANEL
CW2 SPANDREL PANEL UNITIZED CURTAIN WALL
T2_MECH. FLOOR SYSTEM
+182.40 m FFL
CW3 DOUBLE GLAZED STICK SYSTEM

ALV-1 POWDER COATED ALUMINUM LOUVERS.


T2_ROOF FLOOR COLOUR PER ARCHITECT.
+177.40 m FFL

T2_37th FLOOR
+173.30 m FFL

T2_36th FLOOR
+169.45 m FFL

T2_35th FLOOR
+165.60 m FFL

T2_34th FLOOR
+161.75 m FFL

T2_33rd FLOOR
+157.90 m FFL

T2_32nd FLOOR
+154.05 m FFL

T2_31st FLOOR
+150.20 m FFL

T2_30th FLOOR
+146.35 m FFL

T2_29th FLOOR
+142.50 m FFL

T2_28th FLOOR
+138.65 m FFL

T2_27th FLOOR 12 11 10 9 8 7 6 5 4 3 2
+134.80 m FFL

T2_26th FLOOR
+130.95 m FFL

T2_25th FLOOR
+127.10 m FFL

T2_24th FLOOR T1_UPPER ROOF


+123.25 m FFL +123.40 m SSL

T2_23rd FLOOR
T1_MECH. FLOOR
+119.40 m FFL MC2 +118.65 m FFL

T2_22nd FLOOR
+115.55 m FFL
T1_ROOF FLOOR
+113.65 m SSL
T2_21st FLOOR
+111.70 m FFL CW1
T1_21st FLOOR
+109.55 m FFL
T2_20th FLOOR MC1
+107.85 m FFL
CW1 T1_20th FLOOR
+105.70 m FFL
ALV-1
T2_19th FLOOR T1_19th FLOOR
+101.85 m FFL +101.85 m FFL

MC1
T2_18th FLOOR T1_18th FLOOR
+98.00 m FFL +98.00 m FFL
Construction Drawings Projects

T2_17th FLOOR MC2 T1_17th FLOOR


+94.15 m FFL +94.15 m FFL

T2_16th FLOOR T1_16th FLOOR


+90.30 m FFL +90.30 m FFL

T2_15th FLOOR. T1_15th FLOOR


+86.45 m FFL +86.45 m FFL

T2_14th FLOOR T1_14th FLOOR


+82.60 m FFL +82.60 m FFL

T2_13th FLOOR T1_13th FLOOR


+78.75 m FFL +78.75 m FFL

T2_12th FLOOR T1_12th FLOOR


+74.90 m FFL +74.90 m FFL

T2_11th FLOOR T1_11th FLOOR


+71.05 m FFL +71.05 m FFL

T2_10th FLOOR T1_10th FLOOR


+67.20 m FFL +67.20 m FFL

T2_9th FLOOR T1_9th FLOOR


+63.35 m FFL +63.35 m FFL

T2_8th FLOOR T1_8th FLOOR


+59.50 m FFL +59.50 m FFL

T2_7th FLOOR T1_7th FLOOR


+55.65 m FFL MC2 +55.65 m FFL

T2_6th FLOOR T1_6th FLOOR


+51.80 m FFL +51.80 m FFL

T2_5th FLOOR CW1 T1_5th FLOOR


+47.95 m FFL +47.95 m FFL

T2_4th FLOOR T1_4th FLOOR


+44.10 m FFL MC1 ? MC1 +44.10 m FFL
CW1

T2_3rd FLOOR T1_3rd FLOOR


+40.25 m FFL +40.25 m FFL

T2_2nd FLOOR CW1 T1_2nd FLOOR


+36.40 m FFL +36.40 m FFL

1st FLOOR 1st FLOOR


+32.55 m FFL +32.55 m FFL

6th PODIUM
+28.70 m FFL

5th PODIUM
+24.85 m FFL

CW1 4th PODIUM


+21.00 m FFL

3rd PODIUM
+17.15 m FFL
MC1
2nd PODIUM
+13.30 m FFL

1st PODIUM
+6.95 m FFL

GROUND FLOOR
+0.60 m FFL
ROAD LV (0.00)
+0.00 m SSL
A

REV.

DATE:

TITLE:
99

CLIENT:
PROJECT

REVISION

A
CAD FILE:
LOCATION:

DRAWN BY:
Enquiry No. :
U.D.D STAMP

DRAWING NO.:
www.ehaf .com
DATE

REGISTRATION No. :

M.S./S.M.
01-10-2017

57 AL-JAZEERA ST.,

FAX : (974) 402037 66


TECHNICAL MANAGER :

BUILDING, 6th FLOOR


CONSULTANT REG. No :

BIN-MAHMOUD / BEHZAD

TEL : (974) 402037 77 / 88 /

09/07/2017
P.O. BOX1876, DOHA-QATAR
99/M
---------------

6120
CONSULTANT STAMP & SIGNATURE :

Shereif Ahmed

AR-203-00
AGRADE :

SIGNATURE
4265
DESIGNED BY:
H.O./M.A.
SCALE:

REGISTRATION No. :
MUNICIPALITY STAMP
ISSUE FOR APPROVAL

JOB NO.:
DESCRIPTION

Application No :

REGISTRATION No :
TECHNICAL MANAGER

ELEVATION-3 OVERALL
CONSULTANT REG. No :

1 : 300
QATAR ELECTRICITY & WATER CO.
CONSULTING ENGINEERS

SIGNATURE
LUSAIL CITY - MARINA COM 53

3881
O.M.
0321

CHECKED BY:
000000

@A1
LUSAIL CITY - MARINA COM 53
N/2017/0002775

REGISTRATION No. :
QEWC TOWERS ( KAHRAB TOWER )
BY

SUB-CONSULTANT STAMP & SIGNATURE :


AGRADE :

28
Barwa Bank H.Q.

Client : Barwa Group


Location : lusail - Doha - Qatar
Leed Consultant : EHAF
Scope of Work : Working drawings and Coordination as a senior architect.
Construction Drawings Projects
PROJECT NAME AND
LOCATION

BARWA BANK HQ TOWER


MARINA COM-02, LUSAIL CITY - QATAR

NORTH PIN NO.


69060005
PLANNING NO.
13-2015-00295
KEY PLAN

GENERAL NOTES :
-THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
CONSULTANTS.
-IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
-UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
FACES AND LEVELS ARE IN METERS.
-ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
CONSTRUCTION SPECIFICATION).
-FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
-ALL EXTERNAL FINISHES TO BE WATER PROOF.
-FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
-FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
-DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
AFFECTING THE WORKS AT JOB SITE
-FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO
MANUFACTURING.
-ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
FLOATING MACHINE BASE TO ABSORB VIBRATION.
-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
RELATED TO THE SHEET
-ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
DRAWINGS.
-THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
START MANUFACTURING

O FOR DC1 APPROVAL 27 JUN. 2016


ISSUE DESCRIPTION DATE CHECKED QA / QC

ISSUED FOR DC1 APPROVAL


OWNER
P.O. BOX 2778,
DOHA - QATAR
TEL: 8008555
TEL: (974) 4410 0888
www.barwabank.com

LEAD CONSULTANT
MARINA PLAZA, LEVEL 10
OFFICE 1004-1006
DUBAI MARINA, DUBAI,
UAE
P.O. BOX 112955
TEL: 971 4382 5200
www.perkinswill.com

LOCAL CONSULTANT
57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
BUILDING, 6TH FLOOR
P.O. BOX 1876, DOHA-QATAR
TEL: (974) 402037 77 / 88 / 99
FAX: (974) 40203766
www.ehaf.com
MEP CONSULTANT
SUITE 1704, ABDULLA BIN
DARWISH BUILDING
AL SALAM STREET
P.O. BOX 109870
ABU DHABI, UAE
TEL: +971 (0)2 6774 220
FAX: +971 (0)2 6774 202
PROJECT DESCRIPTION

5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS

OFFICE BUILDING

DRAWING TITLE

COVER SHEET
DRAWING. NO. PART:

G00-00
DRAWN BY: CHECKED BY: STAGE: REVISION:
AG GD DD
VERIFIED BY: APPROVED BY:

DL
PLOT DATE:
15/06/16 O
SCALE:

FILE NAME:
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
PROJECT. NO:

390142 30
Cover Sheet
Construction Drawings Projects
PROJECT NAME AND
LOCATION

1 2 3 4 5 6 7 8 9 1
10 11 12 13 14 BARWA BANK HQ TOWER
B MARINA COM-02, LUSAIL CITY - QATAR

NORTH PIN NO.


123880
69060005
PLANNING NO.
4999 5500 9000 9000 9000 9000 9000 10250 6950 9000 18000 6950 17230 13-2015-00295
1 1 KEY PLAN
AR-303-00 AR-302-00

BASEMENT SETBACK

A B
A A
STORE
EXHAUST CARPARK B5-021
SHAFT EXTRACT FAN
UP TO A1257 ROOM
BASEMENT 4 B5-83 B5-84 B5-020 B5-85 B5-86 B5-87 B5-88 B5-89 B5-90 B5-91 B5-92 B5-93 B5-94 B5-95 -19.000 FFL FFL
-19.000 FFL FFL
-19.100 SSL SSL -19.100 SSL SSL

D C
B5-13 B5-14 B5-15 B5-16 B5-17

12800
17342

B5-18 B5-19

B B5-130 B
1
CARPARK
SUPPLY FAN AR-204-00
ROOM B5-131
B5-034 -19.100 FFL FFL/SSL

STAIR PRESS. STORE


A1278 1 B5-022 GENERAL NOTES :
-19.000 FFL FFL AR-401-00 -THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
-19.100 SSL SSL -19.000 FFL FFL
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
C -19.000 FFL FFL
B5-82 B5-81 B5-80 B5-106 B5-105 B5-104 B5-103 B5-102 B5-101 B5-100 B5-99 B5-98 B5-97 B5-96
-19.100 SSL SSL
C CONSULTANTS.
ST-03

3.50
-19.100 SSL SSL -IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
B5-028 B5-132
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
B5-12 -UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
B5-20 B5-43 B5-44
DRAINAGE FACES AND LEVELS ARE IN METERS.
PUMP ROOM B5-133 -ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
B5-107 B5-014 FM ROOM B5-129
B5-62 CONSTRUCTION SPECIFICATION).
B5-11 B5-21 B5-42 B5-45 ELECT. ROOM B5-011
B5-027 -FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
6500
1 STAIR PRESS. -ALL EXTERNAL FINISHES TO BE WATER PROOF.
13950

STAIRCASE
LOBBY A1282 -FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
B5-029
AR-503-01
-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE

SUPPLY/ EXTRACT
B5-10 B5-22 B5-41 PARKING B5-46 B5-63 B5-79 ST-01A MEP RISER B5-134 SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
B5-001 LOBBY PRESS. AREA ELECT. ROOM 1500
A1281 1 B5-015
B5-010 B5-009 B5-128 -FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
AR-501-01 -DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
-19.100 FFL FFL/SSL WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
B5-09 B5-23 B5-40 B5-47 B5-61 B5-64 B5-78
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
FIRE CORRIDOR
B5-016 B5-127 B5-135 AFFECTING THE WORKS AT JOB SITE

D PARKING
D -FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
B5-08
SHUTTLE -CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
B5-24 B5-39 B5-48 B5-60 B5-65
LOBBY TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO

PUBLIC_HEALTH_RISER
B5-77 RL-4 TL-4 TL-5 STORE B5-126 B5-136
-19.100 FFL FFL/SSL B5-002 B5-008 -19.100 FFL FFL/SSL MANUFACTURING.
FM ROOM
B5-007 -ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
STAIR PRESS.
B5-07 B5-25 B5-38 B5-49 B5-59 B5-66 B5-76 A1283 B5-125 B5-137 FLOATING MACHINE BASE TO ABSORB VIBRATION.
1 RL-3 TL-3 TL-6
-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
AR-301-00 LIFT LOBBY RELATED TO THE SHEET
75542

13000

-19.000 FFL FFL B5-017 ST-02


-19.100 SSL SSL B5-019 1 -ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
B5-06 B5-26 B5-37 B5-50 B5-58 B5-67 B5-75 RL-2 TL-2 TL-7 AR-502-01 B5-124 B5-138 DRAWINGS.
-THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
6550 4950 1250 2700 START MANUFACTURING

LOBBY PRESS.
B5-74 B5-123 B5-139
B5-05 B5-27 B5-36 B5-51 B5-57 B5-68 RL-1 TL-1 TL-8 O FOR DC1 APPROVAL 27 JUN. 2016
ISSUE DESCRIPTION DATE CHECKED QA / QC
6500

E SERVICE LOBBY LIFT LOBBY B5-122 B5-140


E ISSUED FOR DC1 APPROVAL
B5-003 B5-018 -19.000 FFL FFL OWNER
B5-04 B5-28 B5-35 B5-52 B5-56 B5-69 B5-73 -19.100 SSL SSL
P.O. BOX 2778,
MEP RISER DOHA - QATAR

EXTRACT
SUPPLY/
ELECT. ROOM AREA
B5-004 B5-005 FL-1 FL-2 TEL: 8008555
B5-70 B5-121
B5-03 B5-29 B5-34 B5-53 B5-72 B5-141 TEL: (974) 4410 0888
STAIRCASE LOBBY PRESS.
LOBBY A1280 1500 5800 6280 5800
B5-030
www.barwabank.com
13950

B5-71 SUMP PUMP


ROOM
B5-02 B5-30 B5-33 B5-54 ELECT. ROOM B5-006 LEAD CONSULTANT
B5-026 B5-120
B5-108 -19.000 FFL FFL B5-142
MARINA PLAZA, LEVEL 10
-19.100 SSL SSL OFFICE 1004-1006
B5-31 B5-32 B5-55 DUBAI MARINA, DUBAI,
B5-01
ST-04 UAE
B5-031
B5-143 P.O. BOX 112955
3.50

-19.000 FFL FFL 1 B5-161 B5-160 B5-159 B5-109 B5-110 B5-111 B5-112 B5-113 B5-114 B5-115 B5-116 B5-117 B5-118 B5-119 TEL: 971 4382 5200
www.perkinswill.com
F -19.100 SSL SSL
AR-503-01
STORE
F
B5-023 LOCAL CONSULTANT
57 AL-JAZEERA ST.,
STAIR PRESS. -19.000 FFL FFL
CARPARK A1279 -19.100 SSL SSL BIN-MAHMOUD / BEHZAD
SUPPLY FAN BUILDING, 6TH FLOOR
ROOM -19.100 FFL FFL/SSL
B5-144 P.O. BOX 1876, DOHA-QATAR
B5-033
FM TOILETS TEL: (974) 402037 77 / 88 / 99
B5-013 FAX: (974) 40203766
-19.000 FFL FFL www.ehaf.com
-19.100 SSL SSL
G G
B5-145
MEP CONSULTANT
17300

B5-163 B5-162
SUITE 1704, ABDULLA BIN
B5-168 B5-167 B5-166 B5-165 B5-164
DARWISH BUILDING
STORE
B5-024 AL SALAM STREET
CARPARK P.O. BOX 109870
B5-158 B5-157 INTAKE SHAFT SUPPLY FAN B5-156 B5-155 B5-154 B5-153 B5-152 B5-151 B5-150 B5-149 B5-148 B5-147 B5-146
A1250 ABU DHABI, UAE
DOWN FROM ROOM
-19.000 FFL FFL
STORE B5-025 -19.000 FFL FFL TEL: +971 (0)2 6774 220
BASEMENT 4 -19.100
-19.100FFL
SSLFFL
SSL -19.100 SSL SSL
B5-032
-20.600 SSL SSL FAX: +971 (0)2 6774 202
PROJECT DESCRIPTION
H H
5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS

OFFICE BUILDING
10
DRAWING TITLE

1 2 3 4 5 6 7 8 9 11 12 13 14 BASEMENT 5 FLOOR PLAN


DRAWING. NO. PART:

AR-101-00
1 BASEMENT
1 : 200
LEVEL 5 PLAN
DRAWN BY:

AG
CHECKED BY:

GD
STAGE:
DD
REVISION:

VERIFIED BY: APPROVED BY:

DL
PLOT DATE:
15/06/16 O
SCALE: PROJECT. NO:

31
1 : 200
FILE NAME:
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
390142
Bank_mahmoud.fathy.rvt
Construction Drawings Projects
PROJECT NAME AND
LOCATION

BARWA BANK HQ TOWER


1 2 3 4 5 6 7 8 9 10 11 12 13 14 MARINA COM-02, LUSAIL CITY - QATAR

NORTH PIN NO.


113880 69060005
PLANNING NO.
5500 9000 9000 9000
57299 9000 9000 10250 6950 9000
18000
18000 6950 12230 13-2015-00295
KEY PLAN

BASEMENT SETBACK

A A

5500
UP FROM BASEMENT 1
SLOPE 20%

A B
7400

1.200 FFL SL

3095
G-14 G-15 G-16 G-17 G-18

B PLINTH SETBACK B

SLOPE 2%
1
CARPARK EXHAUST
AR-204-00
LOUVERS

6700
7900

G-13
TOWER SETBACK
.

BUILDING LINE ABOVE STAIR PRESS. TERRACE GENERAL NOTES :


A1278
-THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER

246
G-12 DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
C C CONSULTANTS.
VESTIBULE SL-1 -IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
G-038 DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
G-11

7050
-UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
FACES AND LEVELS ARE IN METERS.
CORPORATE
G-10 CONSUMER -ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
BANKING CONSTRUCTION SPECIFICATION).
G-015 STAIR PRESS. -FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
A1282 0.000 FFL FFL
-0.100 SSL SSL -ALL EXTERNAL FINISHES TO BE WATER PROOF.
13950

G-09 -FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.


FIRST FINANCE -UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
SUPPLY/ SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
COMPANY EXTRACT
G-013 FIRE A1286 -FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
G-08

8300
RECEPTION ALARM -DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
G-014 RISER WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS
G-07
AFFECTING THE WORKS AT JOB SITE

D D -FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
0.000 FFL FFL
G-06 -0.100 SSL SSL -CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
0.000 ARCHITECTURALFORFFLENGINEERS
IS EQUIVALENT TOPRIOR
3.08 QNDH LEVEL

200
RL-4 TL-4 TL-5 TESTS/SAMPLES/GURANTEES APPROVAL TO
(FLOOR FINISH BY MANUFACTURING.
G-05 INTERIOR DESIGN
5800 19000 4000 CONSULTANT) -ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
FLOATING MACHINE BASE TO ABSORB VIBRATION.
RL-3 TL-3 TL-6 -FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
0.000 FFL FFL RELATED TO THE SHEET
71500

13000

11400
G-04 -0.100 SSL SSL

STAIR PRESS.
-ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
1 DRAWINGS.

MAIN ENTRY
MAIN RL-2 TL-2 TL-7 SLOPE 2%
1 AR-201-00 -THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
G-03 ENTRY

.
AR-202-00 START MANUFACTURING

LOBBY PRESS.
RL-1 PL-1 TL-8 4650 6700 4650 O FOR DC1 APPROVAL 27 JUN. 2016

200
ISSUE DESCRIPTION DATE CHECKED QA / QC
G-02

E 0.000 FFL FFL


E ISSUED FOR DC1 APPROVAL
G-01 OWNER
-0.100 SSL SSL
P.O. BOX 2778,
5900

-0.100 FFL FFL/SSL DOHA - QATAR

EXTRACT
SUPPLY/
FL-1 FL-2 TEL: 8008555
4500 TEL: (974) 4410 0888
RETAIL 1
G-007 www.barwabank.com
13950

-0.100 FFL FFL/SSL WASTE ROOM


G-008 LEAD CONSULTANT
MARINA PLAZA, LEVEL 10
OFFICE 1004-1006
PSL-1 DUBAI MARINA, DUBAI,
6750

SERVICE LIFT UAE


OUT LOBBY
G-009 PSL-2 P.O. BOX 112955
STAIR TEL: 971 4382 5200
www.perkinswill.com
F PRESS.
OUTDOOR CAFE F
LOCAL CONSULTANT
205

57 AL-JAZEERA ST.,
BIN-MAHMOUD / BEHZAD
IN .

BUILDING, 6TH FLOOR


7900

P.O. BOX 1876, DOHA-QATAR


6700

TEL: (974) 402037 77 / 88 / 99

SLOPE 2%
1
FAX: (974) 40203766
AR-203-00 www.ehaf.com

G G MEP CONSULTANT
G-19 G-20 G-21 G-22 G-23 SUITE 1704, ABDULLA BIN
CAPARK INTAKE
3095

DARWISH BUILDING
LOUVERS
AL SALAM STREET
P.O. BOX 109870
7400

KHAARAMA
DOWN TO BASEMENT 1 ACCESS STAIR -0.100
ABU DHABI, UAE
1.200 FFL SL
SLOPE 20%
G-027 TEL: +971 (0)2 6774 220
5500

FAX: +971 (0)2 6774 202


.

PROJECT DESCRIPTION
H H
5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS

OFFICE BUILDING
1 2 3 4 5 6 7 8 9 10 11 12 13 14
DRAWING TITLE

GROUND FLOOR - LEVEL.00


PLAN
DRAWING. NO. PART:

AR-106-00
DRAWN BY: CHECKED BY: STAGE: REVISION:
AG GD DD

O
1 GROUND PLAN
VERIFIED BY: APPROVED BY: PLOT DATE:
DL 15/06/16

1 : 200 SCALE:
1 : 200
PROJECT. NO:

390142
32
FILE NAME:
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
Construction Drawings Projects

PROJECT NAME AND


LOCATION

BARWA BANK HQ TOWER


8 9 10 11 12 13 MARINA COM-02, LUSAIL CITY - QATAR
42500
NORTH PIN NO.
69060005
800 6950 9000 9000 9000 6950 800
PLANNING NO.
13-2015-00295
9300 23900 9300
16 EQUAL PANELS KEY PLAN
TOWER SETBACK
4550 4750 4750 4550

3650 1100 1100 3650


CW-11

800

800

250 800

1050
C W-01 W-01 C

4550
W-01 BH01

BH01

W-01
9300

8000
4600 7 19800 2600
3650

AR-501-01 GENERAL NOTES :


40900
4750

400 5950 200 700 300 2700 200 900 200 1500 200 2400 200 1550 2200 200 -THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
CONSULTANTS.
13950

BH01 -IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE


BH01 DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
6950 9000 18000 6950
1100

BH01 -UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE

200
400
BH01
FACES AND LEVELS ARE IN METERS.
BF02
FFL/SSL = X -ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
SD19 CONSTRUCTION SPECIFICATION).
800 ST-01A CHW BF02
RISER
T2-019

STAIR PRESS.
PANTRY -FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.

2900

3100
T2-014
SUPPLY/ ELECT. ROOM -ALL EXTERNAL FINISHES TO BE WATER PROOF.

3975
800 250 SUPPLY/
T2-017

4400
BH01 EXTRACT
EXTRACT BH01 -FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
F.A.
BF02 A1286
BF02 RISER
BF02 -UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
1050 FFL = X SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.

400

200
SSL = X - 200 WD04 CW-11 -FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
BF02 SD37 SD10 BF02 BF02 BH01 -DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
7450

FIRE CORRIDOR WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.

1650
BF02 T2-018 SD16

200
BF02

1000 100
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS

1800
2750
1145 SD34 CORRIDOR FFL = X AFFECTING THE WORKS AT JOB SITE
FFL = X T2-015 SSL = X - 200 WD02

900 200
SD36 SD36

1650
BF02 SSL = X - 200 BH01 -FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
D FHC
100 900 900 BF02 900 1000 400 1000 1350 1000 700 D PLEASE REFER TO STRUCTURAL DRAWINGS.
-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE

200

200
200
WD03
W.M TELECOM TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO
SD10 WD02 WD02
T2-024 RISER BH01 MANUFACTURING.
A1302

3350
H.T.
2000
BF02 -ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A
T2-013
SD15 F.T FLOATING MACHINE BASE TO ABSORB VIBRATION.
BH01
OFFICE T2-012 OFFICE -FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
T2-001 T2-001
200

M.T RELATED TO THE SHEET


BH01

4800
SPR T2-011
T2-025 SD15 -ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL
FFL = X FFL = X DRAWINGS.
6150

BH02
1950

SSL = X - 200 BH01 SSL = X - 200


BF02 200 2200 2500 300 2700 300 2500 300 1900 200 -THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
START MANUFACTURING
BF02 DRAINAGE
200

T.E RISER A1305


LOBBY BF02
T2-023
T2-007 ISSUE DESCRIPTION DATE CHECKED QA / QC

300 200
16 EQUAL PANELS

250
1800

CW-11 DRAINAGE BF02 ISSUED FOR DC1 APPROVAL

11300
42500

13000

23900

24900

A1306 FFL = X
9000

SSL = X - 200 950 200 2900 OWNER

13950
200 200

BF02 ST-02
300

T2-021 P.O. BOX 2778,


STAIR PRESS.
BH02 A1283 DOHA - QATAR
BF02
TEL: 8008555
2850

F.T M.T TEL: (974) 4410 0888


200 BH01 T2-002 T2-003 40000 200
www.barwabank.com

5950
FFL = X
SSL = X - 200
200
4750

BH01
BH02 LEAD CONSULTANT
H.T
T2-004 LOBBY PRESS. 7 MARINA PLAZA, LEVEL 10
A1284
2400

FFL/SSL = X
AR-502-01 OFFICE 1004-1006
WD04 WD04
BH01 BF02 DUBAI MARINA, DUBAI,
UAE

300
200

550200

TELECOM SD01 P.O. BOX 112955


CORRIDOR
BF02 BF02
E WD03
BF02
T2-005 RISER
A1301 FIRE LOBBY E TEL: 971 4382 5200
www.perkinswill.com
1650

SD26 BF02 T2-020 BF02


100 1000

WD02 SD36 SD36 BF02


BH01 FFL = X
SD34 LOCAL CONSULTANT

2750
SSL = X - 200 FHC BF02
BF02 FFL = X 57 AL-JAZEERA ST.,
200

900

SD15 SSL = X - 200 BIN-MAHMOUD / BEHZAD


7450

BH01 BF02 SD10 BF01 6550 600200 BUILDING, 6TH FLOOR

745
BF02 200
WD04 P.O. BOX 1876, DOHA-QATAR

300
PANTRY ELECT. ROOM WASTE SD12 TEL: (974) 402037 77 / 88 / 99
T2-006 T2-010
2475

SUPPLY/ T2-009 FAX: (974) 40203766


4200

EXTRACT
BF02 BF01 www.ehaf.com
A1285 BF02

3000
MEP CONSULTANT
1000 200

BF02 SUITE 1704, ABDULLA BIN


DARWISH BUILDING
AL SALAM STREET
400

400
P.O. BOX 109870
1100

BH01 BH01
BH01 SD19
ABU DHABI, UAE
BH01
TEL: +971 (0)2 6774 220
13950

FAX: +971 (0)2 6774 202


450 1800 450 PROJECT DESCRIPTION
4750

3650

2600 200 2200 1550 200 2400 200 2600 200 2700 300 6850 400
5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS

OFFICE BUILDING
8000
9300

W-01 DRAWING TITLE

W-01 TYPICAL TOWER PLAN


4550

BH01 CW-11 BH01


200

(LEVELS 2-7)
F W-01
F DRAWING. NO. PART:
250
800

W-01 AR-110-00
DRAWN BY: CHECKED BY: STAGE: REVISION:
Author Checker DD

8 9 10 11 12 13 VERIFIED BY: APPROVED BY:

Approver
PLOT DATE:
12/07/16
LEVELS 2-7 FLOOR PLAN
1 1 : 100
SCALE:

FILE NAME:
1 : 100
PROJECT. NO:

390142
33
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
1 2 3 4 5 6 7 8 9 10 11 12 13 14

ROOF APEX
+111.80 m

UPPER MECHANICAL LEVEL

10000
+106.80 m
MID T21
+104.25 m
MECHANICAL LEVEL
+101.80 m
MID T20

4900
+99.35 m UNITIZED CURTAIN WALL
TOWER LEVEL 20 LAMINATED GLAZING
+96.90 m SYSTEM (BY FACADE
MAXIMUM ALLOWABLE CONSULTANT)
MID T19 CW-12

4900
+94.45 m BUILDING HEIGHT
+91.800 M
TOWER LEVEL 19
+92.00 m
CW-11 NATURAL STONE CLADDING
W-01 W-01 ON STRUCTURAL STEEL
TOWER LEVEL 18 SUPPORT
+88.00 m
CW-11
W-01 W-01
TOWER LEVEL 17
+84.00 m
CW-11
W-01 W-01 500 MM HIGH GLASS
TOWER LEVEL 16 CUTOUT (BY FACADE
+80.00 m CONSULTANT
CW-11
W-01 W-01
TOWER LEVEL 15
+76.00 m
CW-11
W-01 W-01
TOWER LEVEL 14
+72.00 m

W-01 W-01
TOWER LEVEL 13
+68.00 m
CW-11
W-01 W-01
TOWER LEVEL 12
+64.00 m
CW-11
W-01 W-01
TOWER LEVEL 11
+60.00 m
CW-11

TOTAL BUILDING HEIGHT


W-01 W-01
TOWER LEVEL 10

18 LEVELS AT 4000 MM EACH


+56.00 m
CW-11

76000
W-01 W-01
Construction Drawings Projects

TOWER LEVEL 9
+52.00 m

101800
101800
CW-11
W-01 W-01
PLOT LIMIT

TOWER LEVEL 8

PLINTH SETBACK
PLINTH SETBACK

TOWER SETBACK
TOWER SETBACK
TOWER SETBACK

+48.00 m
CW-11
W-01 W-01

PLOT LIMIT
TOWER LEVEL 7
+44.00 m
CW-11
W-01 W-01
TOWER LEVEL 6
+40.00 m UNITIZED CURTAIN WALL
CW-11 LAMINATED GLAZING SYSTEM
W-01 W-01 (BY FACADE CONSULTANT)
TOWER LEVEL 5
+36.00 m
CW-11
NATURAL STONE CLADDING
W-01 W-01 ON STRUCTURAL STEEL
TOWER LEVEL 4 SUPPORT
+32.00 m
MAXIMUM ALLOWABLE
CW-11
PODIUM HEIGHT W-01 W-01 500 MM HIGH GLASS
TOWER LEVEL 3 +27.000 M CUTOUT (BY FACADE
+28.00 m CONSULTANT
CW-11
W-01 W-01
TOWER LEVEL 2
+24.00 m WOODEN TRELLIS (BY
LANDSCAPE CONSULTANT)
W-01 W-01

CW-09 CW-07

W-01 W-01
PODIUM ROOF DECK GLASS BALUSTRADE
+16.00 m
MID P-2 NATURAL STONE CLADDING
+13.50 m ON STRUCTURAL STEEL
SUPPORT
PODIUM LEVEL 2
10000

+11.00 m
MID P-1 CURTAIN WALL LAMINATED
CW-03 CW-02
+8.50 m GLAZING SYSTEM
PODIUM LEVEL 1
+6.00 m
6000

CW-04

GROUND LEVEL
+0.00 m
FIREMENS ACCES (CLEAR WALL
OPENING)

SOUTH ELEVATION
1 1 : 250
O
ISSUE

SCALE:
UAE

DRAWN BY:

FILE NAME:
VERIFIED BY:
NORTH

OWNER

DRAWING. NO.
LOCATION

TEL: 8008555

DRAWING TITLE
www.ehaf.com
P.O. BOX 2778,
DOHA - QATAR

AM
ABU DHABI, UAE
P.O. BOX 112955

P.O. BOX 109870


OFFICE 1004-1006

TEL: 971 4382 5200

AL SALAM STREET
MEP CONSULTANT
www.barwabank.com

FAX: (974) 40203766


57 AL-JAZEERA ST.,

DARWISH BUILDING
TEL: (974) 4410 0888

LEAD CONSULTANT
PROJECT NAME AND

www.perkinswill.com

LOCAL CONSULTANT

BUILDING, 6TH FLOOR


DUBAI MARINA, DUBAI,

TEL: +971 (0)2 6774 220


FAX: +971 (0)2 6774 202
PROJECT DESCRIPTION
BIN-MAHMOUD / BEHZAD
MARINA PLAZA, LEVEL 10

SUITE 1704, ABDULLA BIN


DESCRIPTION

TEL: (974) 402037 77 / 88 / 99

CHECKED BY:
P.O. BOX 1876, DOHA-QATAR

APPROVED BY:
FOR DC1 APPROVAL
PIN NO.

VISION PANEL

SPANDREL PANEL
KEY PLAN

C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
As indicated
MB
AR
PLANNING NO.

AR-203-00
STAGE:
NATURAL STONE CLADDING

DATE

ISSUED FOR DC1 APPROVAL

PLOT DATE:

PROJECT. NO:
OFFICE BUILDING
27 JUN. 2016
69060005

DD

15/06/16
MARINA COM-02, LUSAIL CITY - QATAR

SOUTH ELEVATION
BARWA BANK HQ TOWER

5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS


13-2015-00295

PART:

390142
O
REVISION:
CHECKED QA / QC

34
1 2 3 4 5 6 7 8 9 10 11 12 13
5500 9000 9000 9000 9000 9000 10250 6950 9000 18000 6950

MECHANICAL BULK
HEAD
+111.800 M
ROOF APEX
DECK LEVEL
+111.70
+111.80 m
MEP MEP
M2-001 M2-001

UPPER MECHANICAL LEVEL


+106.80 m
3 STAR GSAS MEP LMR LMR MEP MEP LANDSCAPED

10000
MID T21
MECHANICAL ZONE

DISPENSATION CAT B CHW M1-020 M1-002 A797 M1-005 M1-004 AREA


+104.25 m TOP OF +101.800 M PUMP ROOM M1-025
M1-012
MECHANICAL LEVEL SLAB
+101.80 m
MID T20

4900
+99.35 m VP OFFICES T.E RISER LOBBY CEO OFFICES
T20-001 T20-024 T20-008 T20-002
TOWER LEVEL 20
+96.90 m
VIP OFFICES

MAXIMUM ALLOWABLE
MID T19 BUILDING HEIGHT VIP OFFICES T.E RISER LOBBY

4900
+94.45 m T19-001 T19-023 T19-007 VIP OFFICES
+91.800 M T19-001
TOWER LEVEL 19
+92.00 m
M.T F.T
UNIT 1 T.E RISER LOBBY A1215 A1214 UNIT 2
A1212 A1230 A1227 A1226
TOWER LEVEL 18
EXECUTIVE OFFICES

+88.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1186 A1204 A1201 A1200
TOWER LEVEL 17
+84.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1160 A1178 A1175 A1174
TOWER LEVEL 16
+80.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1134 A1152 A1149 A1148
TOWER LEVEL 15
+76.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1108 A1126 A1123 A1122
TOWER LEVEL 14
+72.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1082 A1100 A1097 A1096
TOWER LEVEL 13
+68.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1056 A1074 A1071 A1070
THIRD PARTY TENANTS

TOWER LEVEL 12
+64.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1030 A1048 A1045 A1044
TOWER LEVEL 11
+60.00 m
UNIT 1 T.E RISER LOBBY UNIT 2
A1004 A1022 A1019 A1018
TOWER LEVEL 10

18 LEVELS AT 4000 MM EACH


+56.00 m
UNIT 1 T.E RISER LOBBY UNIT 2

76000
A978 A996 A993 A992

TOTAL BUILDING HEIGHT


TOWER LEVEL 9
+52.00 m

101800
UNIT 1 T.E RISER LOBBY UNIT 2
T8-001 T8-024 T8-008 T8-002
TOWER LEVEL 8
+48.00 m
OFFICE T.E RISER LOBBY OFFICE
Construction Drawings Projects

130900
A953 A969 A970 A953
TOWER LEVEL 7
+44.00 m
OFFICE T.E RISER LOBBY OFFICE
A928 A944 A945 A928

120900
TOWER LEVEL 6
+40.00 m
OFFICE T.E RISER LOBBY OFFICE
A903 A919 A920 A903
TOWER LEVEL 5
+36.00 m
OFFICE T.E RISER LOBBY OFFICE
A878 A894 A895 A878
TOWER LEVEL 4
BARWA BANK HEADQUARTERS

+32.00 m
MAXIMUM ALLOWABLE
OFFICE T.E RISER LOBBY OFFICE
PODIUM HEIGHT A853 A869 A870 A853
SETBACK

+27.000 M
PLOT LIMIT

TOWER LEVEL 3

PLOT LIMIT
BASEMENT

+28.00 m
TOWER SETBACK
TOWER SETBACK

OFFICE T.E RISER LOBBY OFFICE

PODIUM SETBACK
PODIUM SETBACK

T2-001 T2-023 T2-007 T2-001

BASEMENT SETBACK
TOWER LEVEL 2
+24.00 m

LIFT LOBBY CAFETERIA


P3-011 P3-002
CAFETERIA

PODIUM DECK
MAJILIS CORRIDOR LOBBY LOUNGE STORE
PODIUM ROOF LANDSCAPE P3-007 P3-006 P3-001 P3-018
PODIUM ROOF DECK
+16.00 m
MEETING ROOM
MID P-2 2 LIFT LOBBY LIFT LOBBY LIFT LOBBY BMS ROOM
5000

+13.50 m MULTI P2-007 P2-001 P2-001 P2-014 P2-022


PURPOSE AREA
PODIUM LEVEL 2 FL-03
+11.00 m
MID P-1
5000

+8.50 m W-02 F&B W-03 LIFT LOBBY LIFT LOBBY BMS ROOM
P1-006 P1-001 P1-012 P1-020
MEETING ROOMS, MOSQUE, GYM

PODIUM LEVEL 1
+6.00 m

G-06
EXTRACT
6000

LANDSCAPE G-08 G-07


4510
MEGABRANCH RETAIL

AREA
GROUND LEVEL
+0.00 m
RETAIL LOBBY SOLID WASTE PARKING
5100

B1-002 RETAIL LOBBY LIFT LOBBY FA ROOM STORAGE B1-001


B1-002 B2-014 B1-019 B1-007
BASEMENT LEVEL 1
-5.10 m PARKING
PARKING (RETAIL)

SHUTTLE STORE
PARKING
3500

LOBBY LIFT LOBBY B2-013 PARKING


B2-001 B3-012 MEP PLANT B2-001
BASEMENT LEVEL 2 B2-002 B2-008
-8.60 m
19100

PARKING LIFT LOBBY


3500

B4-012 PARKING
B3-001 B3-001
BASEMENT LEVEL 3
-12.10 m
3500

PARKING LIFT LOBBY PARKING


B4-001 B5-017 B4-001
BASEMENT LEVEL 4
PARKING (COMMERCIAL)

-15.60 m
PARKING
3500

PARKING
B5-001 B5-001
BASEMENT LEVEL 5
-19.10 m LIFT LIFT LIFT
PIT PIT PIT

SECTION A-A
1 1 : 250
O
ISSUE

SCALE:
UAE

TEL:

DRAWN BY:

FILE NAME:
VERIFIED BY:
NORTH

DRAWINGS.

OWNER

DRAWING. NO.
LOCATION

CONSULTANTS.

MANUFACTURING.

TEL: 8008555

DRAWING TITLE
www.ehaf.com
P.O. BOX 2778,
DOHA - QATAR

AM
ABU DHABI, UAE
P.O. BOX 112955

P.O. BOX 109870


OFFICE 1004-1006
RELATED TO THE SHEET

START MANUFACTURING

971 4382 5200

AL SALAM STREET
MEP CONSULTANT
www.barwabank.com

FAX: (974) 40203766


57 AL-JAZEERA ST.,

DARWISH BUILDING
TEL: (974) 4410 0888

LEAD CONSULTANT
GENERAL NOTES :
PROJECT NAME AND

www.perkinswill.com

LOCAL CONSULTANT

BUILDING, 6TH FLOOR


DUBAI MARINA, DUBAI,

TEL: +971 (0)2 6774 220


FAX: +971 (0)2 6774 202
PROJECT DESCRIPTION
BIN-MAHMOUD / BEHZAD
CONSTRUCTION SPECIFICATION).

MARINA PLAZA, LEVEL 10

SUITE 1704, ABDULLA BIN


DESCRIPTION

TEL: (974) 402037 77 / 88 / 99


FACES AND LEVELS ARE IN METERS.

AFFECTING THE WORKS AT JOB SITE

CHECKED BY:
P.O. BOX 1876, DOHA-QATAR

APPROVED BY:
FOR DC1 APPROVAL
PIN NO.

PLEASE REFER TO STRUCTURAL DRAWINGS.


KEY PLAN

-ALL EXTERNAL FINISHES TO BE WATER PROOF.

C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
Bank_mahmoud.fathy.rvt
As indicated
MB
AR
PLANNING NO.

FLOATING MACHINE BASE TO ABSORB VIBRATION.

AR-301-00
STAGE:
SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND

SECTION A-A
DATE
-FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.

ISSUED FOR DC1 APPROVAL

PLOT DATE:

PROJECT. NO:
OFFICE BUILDING
27 JUN. 2016
69060005

DD

15/06/16
-FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
-ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
MARINA COM-02, LUSAIL CITY - QATAR

TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO


-FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.

WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.


BARWA BANK HQ TOWER

5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS


-THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER

-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE


13-2015-00295

PART:
-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS

390142
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.

-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE

-DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF

O
-THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
-IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE

REVISION:
-UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE

-ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A


-FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,

-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS

-ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL

CHECKED QA / QC

35
Construction Drawings Projects

PROJECT NAME AND


D LOCATION

BARWA BANK HQ TOWER


SLOPED CURTAIN WALL ON
GLASS FRAME ASSEMBLY BY MARINA COM-02, LUSAIL CITY - QATAR
6200
APPROVED MANUFACTURER'S
3100 3100
SPECS & DETAIL NORTH PIN NO.

SLOPE 1.5% SLOPE 1.5%


69060005
PLANNING NO.
13-2015-00295
STAINLESS STEEL CORNER SPLICE
WITH 4 WAY SPIDER BRACKET KEY PLAN
6 SYSTEM BY APPROVED
AR-306-03 MANUFACTURER'S DETAIL

LAMINATED GLASS FIN SUPPORT IN


ELEVATION BY APPROVED MANUFACTURER'S
SPECS & DETAIL

CURTAIN WALL ON LAMINATED


GLASS FIN & SPIDER FRAMING
SYSTEM

STAINLESS STEEL SPLICE WITH 4 WAY


SPIDER BRACKET SYSTEM BY APPROVED
3550

MANUFACTURER'S DETAIL

CENTERLINE
STAINLESS STEEL SPLICE WITH 4 WAY
SPIDER BRACKET SYSTEM BY
APPROVED MANUFACTURER'S DETAIL
CONCRETE SLAB, REFER LAMINATED GLASS FIN SUPPORT IN
TO STRUCTURAL ELEVATION BY APPROVED MANUFACTURER'S
DRAWINGS GENERAL NOTES :
SPECS & DETAIL -THESE DRAWINGS SHOULD BE USED IN COORDINATION WITH ALL OTHER
FINISHED FLOOR, BY SLOPED CURTAIN WALL ON LAMINATED DRAWINGS PRESENTED BY THE ARCHITECT, ENGINEER AND
INTERIOR DESIGNER GLASS FRAME ASSEMBLY BY APPROVED CONSULTANTS.
GLASS RAILING
MANUFACTURER'S SPECS & DETAIL

1200
-IT IS FORBIDDEN TO ANY OF THE CONCERNED PERSONNEL TO MEASURE THE
DRAWING; IN CASE OF NECESSITY, REFER TO THE ARCHITECT OR ENGINEER.
STAINLESS STEEL FIN STAINLESS STEEL CORNER SPLICE
CORRIDOR SHOE BY APPROVED 5 WITH 4 WAY SPIDER BRACKET SYSTEM -UNLESS OTHERWISE NOTED. DIMENSIONS ARE IN MM AND TO THE STRUCTURE
FACES AND LEVELS ARE IN METERS.
P3-006 MANUFACTURER'S AR-306-03 BY APPROVED MANUFACTURER'S
SLOPE 1.5% -ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH QCS (QATAR
DETAIL DETAIL CONSTRUCTION SPECIFICATION).
PODIUM ROOF DECK
-FOR CURTAIN WALL DETAILS REFER TO CURTAIN WALL DRAWINGS.
+16.00 m
6 -ALL EXTERNAL FINISHES TO BE WATER PROOF.
AR-306-03 -FOR LANDSCAPE DETAILS REFER TO LANDSCAPE DRAWINGS.
-UNLESS OTHERWISE SHOWN ON DRAWINGS ALL FLOOR FINISHING SHALL BE
SLOPED MIN 0.05% AND MAX 1.0% TOWARDS FLOOR DRAIN.
-FOR LOCATION OF FLOOR DRAIN REFER TO MECHANICAL DRAWINGS.
-DOOR OPENING SHALL BE LOCATED EITHER MIDWAY IN WALL OR 100MM OFF
WALL END AS SHOWN ON DRAWINGS UNLESS OTHERWISE INDICATED.

Podium Wall Section 12


-THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS

5
2700 2500 AFFECTING THE WORKS AT JOB SITE
5000 -FOR EXACT LOCATION AND DIMENSIONS OF SLAB OPENINGS AND SLAB OPENING,
PLEASE REFER TO STRUCTURAL DRAWINGS.
1 : 25
-CONTRACTOR TO SUBMIT SHOP DRAWINGS DETAILS WITH APPROPRIATE
TESTS/SAMPLES/GURANTEES FOR ENGINEERS APPROVAL PRIOR TO

6 8 F
MANUFACTURING.

4 -ALL MECHANICAL ROOMS/ PUMPS ROOMS/ GENERATOR ROOMS/ ARE TO HAVE A


FLOATING MACHINE BASE TO ABSORB VIBRATION.
-FOR ALL DETAIL REFERENCES REFER TO OVERALL PLANS/ELEVATIONS/SECTIONS
NATURAL STONE CAPPING NATURAL STONE CAPPING RELATED TO THE SHEET

2 -ACCESS PANEL LOCATION AND SIZE TO BE COORDINATED WITH THE MECHANICAL


450 1500 450 DRAWINGS.
AR-306-06 200 250 200 250
CURTAIN WALL, ON -THE CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL BEFORE
ALUMINUM FRAMING START MANUFACTURING
ROOF BUILT -UP
200 100

CW-08
ASSEMBLY
NATURAL STONE CLADDING, NATURAL STONE
300

PODIUM DECK MEZZANINE MECHANICALLY FIXED PODIUM DECK MEZZANINE CLADDING, PODIUM DECK MEZZANINE NATURAL STONE ISSUE DESCRIPTION DATE CHECKED QA / QC
450
+20.00 m +20.00 m MECHANICALLY FIXED +20.00 m CLADDING
200 250 ISSUED FOR DC1 APPROVAL
240

SLOPED CURTAIN WALL ON OWNER


450

455
GLASS FRAME ASSEMBLY

200 50
NATURAL STONE P.O. BOX 2778,
CLADDING, DOHA - QATAR
1100

ALUMINUM LOUVER MECHANICALLY TEL: 8008555


1275

250
860

SUNSCREEN FIXED TEL: (974) 4410 0888


LAMINATED GLASS SPANDREL, ON www.barwabank.com

820
LAMINATED GLASS
850

ALUMINUM FRAMING ASSEMBLY SPANDREL, ON ALUMINUM CONCRETE SLAB,


SUNDRY INSULATION FRAMING ASSEMBLY CONCRETE CROSS REFER TO LEAD CONSULTANT
BRACING, REFER TO STRUCTURAL
STRUCTURAL DRAWINGS MARINA PLAZA, LEVEL 10
DRAWINGS OFFICE 1004-1006
CEILING BY INTERIOR DESIGNER
DUBAI MARINA, DUBAI,

525
200mm UAE
BLOCKWORK P.O. BOX 112955
TEL: 971 4382 5200
www.perkinswill.com

2200
LOCAL CONSULTANT
4000

4000

4000
57 AL-JAZEERA ST.,
CW-10 G-13
BIN-MAHMOUD / BEHZAD
SUNDRY INSULATION BUILDING, 6TH FLOOR
P.O. BOX 1876, DOHA-QATAR
LAMINATED GLASS DOOR, LAMINATED GLASS TEL: (974) 402037 77 / 88 / 99
LAMINATED GLASS CURTAIN
2900

2900

REFER TO SCHEDULE OF DOOR, REFER TO FAX: (974) 40203766


2725

WALL, ON ALUMINUM
2700

DOORS FOR DETAILS SCHEDULE OF DOORS www.ehaf.com


FRAMING ASSEMBLY
FOR DETAILS
MEP CONSULTANT

2200
PODIUM ROOF DECK
+16.00 m SUITE 1704, ABDULLA BIN

100
PODIUM DECK
LANDSCAPE DARWISH BUILDING
MAJILIS AREA AL SALAM STREET

300
P3-007 A579
P.O. BOX 109870
CONCRETE BEAM, ABU DHABI, UAE
REFER TO TEL: +971 (0)2 6774 220
FINISHED FLOOR, REFER STRUCTURAL FAX: +971 (0)2 6774 202
TO LANDSCAPE DRAWINGS DRAWINGS PROJECT DESCRIPTION

PODIUM ROOF DECK PODIUM ROOF DECK PODIUM ROOF DECK


+16.00 m +16.00 m +16.00 m 5 BASEMENTS + GROUND + 2 PODIUM + 20 FLOORS

OFFICE BUILDING

DRAWING TITLE

PODIUM WALL SECTIONS


SHEET 04
DRAWING. NO. PART:

AR-304-04
DRAWN BY: CHECKED BY: STAGE: REVISION:
AM AR DD
VERIFIED BY: APPROVED BY: PLOT DATE:
MB 10/26/16

Podium Wall Section 09 Podium Wall Section 10 Podium Wall Section 10A Podium Wall Section 11
1 2 3 4
SCALE: PROJECT. NO:

36
1 : 25
1 : 25 1 : 25 1 : 25 1 : 25 FILE NAME:
C:\Users\mahmoud.fathy\Documents\390142.000_Barwa
390142
Bank_mahmoud.fathy.rvt
Khrityat Masjid and Majlis

Client : P.E.O.
Location : lusail - Doha - Qatar
Leed Consultant : EHAF
Scope of Work : Working drawings and Coordination as a senior architect
Construction Drawings Projects

PROJECT

KHRITYIAT MAJLIS AND MOSQUE

MOSQUE, MAJLIS,
EID PRAYER AND PARKING

KHRITIAT, UM SLAL, DOHA - QATAR

DESIGN TEAM
MAIN CONSULTANT EHAF CONSULTING
ENGINEERS
STRUCTURAL DESIGNER EHAF CONSULTING
CONSULTANT ENGINEERS

MEP DESIGNER / EHAF CONSULTING


CONSULTANT ENGINEERS
LANDSCAPE DESIGNER EHAF CONSULTING
ENGINEERS

ARCHITECTURE
DETAILED DESIGN PACKAGE

15/10/17

MAIN CONTRACTOR: OWNER: MAIN CONSULTANT:

38
Project’s Cover Sheet
Construction Drawings Projects

PROJECT NAME AND LOCATION

KHRITYIAT MAJLIS AND MOSQUE


KHRITYIAT - UM SLAL
DOHA - QATAR

Kiblah PIN NO. 7118035


PLANING NO. N/2017/0003729
KEY PLAN

B1 B24

BG
4 BG

3 2

4
3
1 1

BA BA

3 2 4

03 02 04 1

AR-201-00 B1 B24

AR-302-00 AR-302-00 AR-302-00


2

B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 B24
145400

REF TO 1 @ AR-102-02

REF TO 1 @ AR-102-03
REF TO 1 @ AR-102-01

REF TO 1 @ AR-102-02
300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 200
6300 50400 13200 49900 6700 10100 7750 1050
1300

1300
BI BI
0.40
8860
6300

6300
F.F.L. 0.50
0.40 F.F.L.
F.F.L.

15300
BH BH
6300

6300
4740

BG BG
1575
3150

3150
BF BF
AR-202-00

AR-202-00
1
4700

4700
39400
2
BE BE
39400

0.60 0.60 0.60 0.60


3200

3200
17925

17800
F.F.L. F.F.L. F.F.L. F.F.L.
BD BD
4700

4700
01 01
AR-301-00
BC BC AR-301-00
3150

3150
BB BB
0.60 0.60 0.60 01 DETAIL DESIGN OCT 2017 AH AD -----
6300

6300
0.60
6300

6300
F.F.L. F.F.L. F.F.L. 00 SCHEMATIC DESIGN JUNE 2017 AH AD -----
F.F.L.
ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC

BA BA ISSUED FOR SCHEMATIC DESIGN


300

300
OWNER

01
6300 47850 2550 13200 AR-201-00 2550 47750 25200
300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 6300 200
145400
MAIN CONSULTANT

57 AL-JAZEERA ST., BIN-


MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL: (+974) 4020 37 77 / 88 /
99 FAX : (+974) 4020 37 66
P.O BOX1876, DOHA, QATAR.
W W W .EHAF.COM
03 02 04
AR-302-00 AR-302-00 AR-302-00
DESIGN AND BUILD CONTRACTOR

PROJECT DESCRIPTION

1 GROUND MASTER FLOOR PLAN MAJLIS BUILDING


AR-102-00
SCALE1 : 250

DRAWING TITLE

GROUND MASTER FLOOR PLAN

DRAWING NO.: PART

AR-102-00
DRAWN BY: CHECKED BY: STAGE: REVISION:

--------- AD. -----


VERIFIED BY: APPROVED BY: PLOT DATE: R01
HH. MI. 15/10/17

1 : 250 @A1
SCALE: PROJECT NO.:

FILE NAME:
327
AR-102-00

39
Construction Drawings Projects

PROJECT NAME AND LOCATION

KHRITYIAT MAJLIS AND MOSQUE


B1 B2 B3 B4 B5 B6 B7 B8 B9

REF TO 2 @ AR-201-01
KHRITYIAT - UM SLAL
DOHA - QATAR

APEX APEX Kiblah PIN NO. 7118035


+10.20 m +10.20 m
9.40 9.40 PLANING NO. N/2017/0003729

0.80
MJ T.O.P GRC TYPE 12 MJ T.O.P

1.30
T.O.P. T.O.P.
+8.90 m +8.90 m KEY PLAN

2.40
1.95
UPPER ROOF PLAN LEVEL S.S.L 7.00 7.00 UPPER ROOF PLAN LEVEL S.S.L
6.85 GRC TYPE 04 GRC TYPE 04
+6.95 m T.O.P. T.O.P. +6.95 m

0.051.03 0.15
1.50 T.O.P.

MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L


0.32
B1 B24

+5.45 m +5.45 m 2
0.05

4
10.20

BG BG

GRC TYPE 05 GRC TYPE 09 GRC TYPE 05 3 2

4
3

GRC TYPE 03 1 1
GLASS
PANEL
4.85

4.85

PAINT
BA BA

3 2 4

1
B1 B24

GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L


+0.60 m +0.60 m
0.60 0.60 0.75
0.15 0.45

PAVEMENT LEVEL F.F.L. F.F.L.


T.O.P. PAVEMENT LEVEL
+0.15 m +0.15 m
0.55

ROAD LEVEL ROAD LEVEL


+0.00 m +0.00 m

1 ELEVATION 01 - PART 01
AR-201-01
SCALE 1 : 100

B8 B9 B10 B11 B12 B13 B14 B15 B16 B17


REF TO 1 @ AR-201-01

REF TO 3 @ AR-201-01
REF TO 01 @ AR-201-00
APEX APEX
GRC TYPE 11 10.20
+10.20 m +10.20 m
T.O.P. PAINT
PAINT GRC TYPE 12 9.40

1.25
MJ T.O.P T.O.P. MJ T.O.P

0.05
+8.90 m +8.90 m

GRC TYPE 02

UPPER ROOF PLAN LEVEL S.S.L 7.00 UPPER ROOF PLAN LEVEL S.S.L
GRC TYPE 04 6.95 GRC TYPE 04
0.65

6.85

0.25
+6.95 m T.O.P. +6.95 m
T.O.P. T.O.P.

0.65
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L
+5.45 m +5.45 m

0.10
10.20
GRC TYPE 05 GRC
7.65

GRC TYPE 03 GRC TYPE 03 GRC TYPE 03 GLASS

3.45
PANEL
5.35

PAINT PAINT PAINT

3.43
4.05
GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L
+0.60 m +0.60 m
0.75 01 DETAIL DESIGN OCT 2017 AH AD -----
0.60 0.60

0.60 0.62
PAVEMENT LEVEL F.F.L.
T.O.P.
F.F.L. PAVEMENT LEVEL 00 SCHEMATIC DESIGN JUNE 2017 AH AD -----

1.20

0.60
+0.15 m +0.15 m
0.45

0.45

ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC


ROAD LEVEL ROAD LEVEL
+0.00 m +0.00 m ISSUED FOR SCHEMATIC DESIGN
0.15

OWNER

2 ELEVATION 01 - PART 02
AR-201-01
SCALE 1 : 100 MAIN CONSULTANT

57 AL-JAZEERA ST., BIN-


MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
B16 B17 B18 B19 B20 B21 B22 B23 B24 TEL: (+974) 4020 37 77 / 88 /
REF TO 01 @ AR-201-00

99 FAX : (+974) 4020 37 66


P.O BOX1876, DOHA, QATAR.
W W W .EHAF.COM

APEX APEX
DESIGN AND BUILD CONTRACTOR
+10.20 m +10.20 m
PAINT PAINT
9.40 -

0.80
MJ T.O.P MJ T.O.P

1.30
T.O.P. ---
+8.90 m +8.90 m

2.42
1.95
UPPER ROOF PLAN LEVEL S.S.L 7.00 PAINT PAINT UPPER ROOF PLAN LEVEL S.S.L
6.85 7.00
0.28

0.28
+6.95 m T.O.P. T.O.P.
+6.95 m PROJECT DESCRIPTION
T.O.P.

0.05 1.16

0.05 1.16
0.65

0.65
MAJLIS BUILDING

1.50
0.32
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L
PT
+5.45 m +5.45 m

0.05

0.05
1.12

10.20
0.32
GRC TYPE 05
GRC TYPE 10
GRC TYPE 03 GLASS
PT
PANEL DRAWING TITLE

ELEVATION 01 - PARTIALS

4.85
PAINT
3.45

3.45
GLASS

5.40

5.40
OPENING
4.65

GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L


+0.60 m +0.60 m
0.60 0.75 0.60
DRAWING NO.: PART

PAVEMENT LEVEL T.O.P. PAVEMENT LEVEL


AR-201-01
F.F.L. F.F.L.
1.20

1.20
+0.15 m +0.15 m

0.45
0.60

0.15
ROAD LEVEL ROAD LEVEL
+0.00 m +0.00 m
DRAWN BY: CHECKED BY: STAGE: REVISION:

--------- AD. -----


VERIFIED BY: APPROVED BY: PLOT DATE: R01
HH. MI. 15/10/17

ELEVATION 01 - PART 03 1 : 100@A1


SCALE: PROJECT NO.:

3
FILE NAME:
327
AR-201-01
SCALE 1 : 100 AR-201-01

40
Construction Drawings Projects

- GRAVEL MULCH / 500*500*50mm PROJECT NAME AND LOCATION


THK. CONCRETE TILES LOOSE LAID AS

B1 B2 B3 B4 B5 B6 SHOWN IN ROOF PLAN


- FILTER LAYER OF GEOTEXTILE.
B7 B8 B9 KHRITYIAT MAJLIS AND MOSQUE
-THERMAL INSULATION.

REF TO 2 @ AR-301-01
APEX - GRAVEL MULCH / 500*500*50mm - FILTER LAYER OF GEOTEXTILE. APEX KHRITYIAT - UM SLAL
+10.20 m THK. CONCRETE TILES LOOSE LAID AS - WATER PROOFING MEMBRANE. +10.20 m
SHOWN IN ROOF PLAN DOHA - QATAR
- SCREED SLOPED TO DRAIN.

0.80
- FILTER LAYER OF GEOTEXTILE.
MJ T.O.P - RC SLAB (REF. TO STRUCTURAL DRW.) GRC MJ T.O.P 7118035

1.30
-THERMAL INSULATION. GRC Kiblah PIN NO.
+8.90 m - FILTER LAYER OF GEOTEXTILE. +8.90 m
- WATER PROOFING MEMBRANE.
- SCREED SLOPED TO DRAIN. PLASTER PLASTER
PLANING NO. N/2017/0003729

2.40

2.45
1.95
- RC SLAB (REF. TO STRUCTURAL DRW.) KEY PLAN
UPPER ROOF PLAN LEVEL S.S.L 7.00 UPPER ROOF PLAN LEVEL S.S.L
GRC 6.95 6.95
+6.95 m T.O.P. +6.95 m
T.O.S. T.O.S.

0.051.03 0.15
5.77
1.50
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L

0.32
T.O.S.
+5.45 m +5.45 m

0.05
10.20

B1 B24

BG
4 BG

3 2

4
4.85

3
1 1

GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L


+0.60 m +0.60 m
BA BA

3 2 4

0.60 0.60 B1 B24

0.63
PAVEMENT LEVEL F.F.L. F.F.L. PAVEMENT LEVEL
+0.15 m +0.15 m
0.45

ROAD LEVEL ROAD LEVEL


+0.00 m +0.00 m

- GRANITE 30mm.
- SCREED SLAB 70mm.
- STRUCTURE SLAB 200mm.
- 12:20mm GEOTETILE PROTECTION LAYER.
- 4mm WATERPROOFING MEMBERANE.
- 100mm SMOUTH PLAIN CONCRETE.
- POLYETHYLENE SHEET 1000 GAUGE.
- COMPACTED SOIL.

1 SECTION 01 - PART 01 - GRAVEL MULCH / 500*500*50mm


AR-301-01
SCALE 1 : 100 THK. CONCRETE TILES LOOSE LAID AS
SHOWN IN ROOF PLAN
- FILTER LAYER OF GEOTEXTILE. - GRAVEL MULCH / 500*500*50mm
-THERMAL INSULATION. THK. CONCRETE TILES LOOSE LAID AS
- FILTER LAYER OF GEOTEXTILE. SHOWN IN ROOF PLAN
B8 B9 B10 B11 - WATER PROOFING MEMBRANE.
B12 B13 - FILTER LAYER OF GEOTEXTILE. B14 B15 B16 B17
REF TO 1 @ AR-301-01

- SCREED SLOPED TO DRAIN. -THERMAL INSULATION.

REF TO 3 @ AR-301-01
APEX - RC SLAB (REF. TO STRUCTURAL DRW.) - FILTER LAYER OF GEOTEXTILE. APEX
10.20 GRC
+10.20 m - WATER PROOFING MEMBRANE. +10.20 m
T.O.P.
- SCREED SLOPED TO DRAIN.
GRC PLASTER GRC - RC SLAB (REF. TO STRUCTURAL DRW.)
MJ T.O.P MJ T.O.P
8.90
+8.90 m +8.90 m
T.O.S.

PLASTER
UPPER ROOF PLAN LEVEL S.S.L
UPPER ROOF PLAN LEVEL S.S.L +6.95 m
+6.95 m

5.95
MJ LOWER ROOF LEVEL S.S.L T.O.S. MJ LOWER ROOF LEVEL S.S.L
+5.45 m +5.45 m

GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L


+0.60 m +0.60 m

0.60 0.60 01 DETAIL DESIGN OCT 2017 AH AD -----


PAVEMENT LEVEL F.F.L. F.F.L. PAVEMENT LEVEL
+0.15 m +0.15 m 00 SCHEMATIC DESIGN JUNE 2017 AH AD -----
ROAD LEVEL ROAD LEVEL ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC

+0.00 m +0.00 m ISSUED FOR SCHEMATIC DESIGN


OWNER
- GRANITE 30mm. - GRANITE 30mm.
- SCREED SLAB 70mm. - SCREED SLAB 70mm.
- STRUCTURE SLAB 200mm. - STRUCTURE SLAB 200mm.
- 12:20mm GEOTETILE PROTECTION LAYER. - 12:20mm GEOTETILE PROTECTION LAYER.

2 SECTION 01 - PART 02 - 4mm WATERPROOFING MEMBERANE.


- 100mm SMOUTH PLAIN CONCRETE.
- 4mm WATERPROOFING MEMBERANE.
- 100mm SMOUTH PLAIN CONCRETE.
- POLYETHYLENE SHEET 1000 GAUGE. - POLYETHYLENE SHEET 1000 GAUGE.
AR-301-01
SCALE 1 : 100 - COMPACTED SOIL. - COMPACTED SOIL.
MAIN CONSULTANT

57 AL-JAZEERA ST., BIN-


MAHMOUD / BEHZAD
- GRAVEL MULCH / 500*500*50mm BUILDING, 6th FLOOR
THK. CONCRETE TILES LOOSE LAID AS TEL: (+974) 4020 37 77 / 88 /
99 FAX : (+974) 4020 37 66
SHOWN IN ROOF PLAN
B16 B17 B18 - FILTER LAYER OF GEOTEXTILE. B19 B20 B21 B22 B23 B24
P.O BOX1876, DOHA, QATAR.
W W W .EHAF.COM
REF TO 2 @ AR-301-01

-THERMAL INSULATION.
APEX - FILTER LAYER OF GEOTEXTILE. APEX
+10.20 m - WATER PROOFING MEMBRANE. +10.20 m DESIGN AND BUILD CONTRACTOR
- SCREED SLOPED TO DRAIN.
- RC SLAB (REF. TO STRUCTURAL DRW.) - GRAVEL MULCH / 500*500*50mm

1.25
MJ T.O.P MJ T.O.P

1.30
GRC
+8.90 m THK. CONCRETE TILES LOOSE LAID AS +8.90 m
SHOWN IN ROOF PLAN
- FILTER LAYER OF GEOTEXTILE.
PLASTER
-THERMAL INSULATION.

2.00
1.95
UPPER ROOF PLAN LEVEL S.S.L - FILTER LAYER OF GEOTEXTILE. UPPER ROOF PLAN LEVEL S.S.L
6.95 7.00
+6.95 m - WATER PROOFING MEMBRANE. +6.95 m
T.O.S. T.O.P. PROJECT DESCRIPTION
- SCREED SLOPED TO DRAIN.
- RC SLAB (REF. TO STRUCTURAL DRW.)

1.50

1.50
MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L
+5.45 m
5.45
T.O.S.
+5.45 m MAJLIS BUILDING

10.20
0.65

6.35
DRAWING TITLE

4.85
SECTION 01 - PARTIALS
3.43

GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L

2.50
+0.60 m +0.60 m

0.45
0.60 0.60 DRAWING NO.: PART
0.63

PAVEMENT LEVEL F.F.L. F.F.L. PAVEMENT LEVEL


+0.15 m +0.15 m
AR-301-01

0.60
0.15
ROAD LEVEL ROAD LEVEL
+0.00 m +0.00 m
DRAWN BY: CHECKED BY: STAGE: REVISION:

- GRANITE 30mm. - NONSLIP CERAMIC TILES 300X300mm. --------- AD. -----


- SCREED SLAB 70mm. SCREED SLAB 70mm. VERIFIED BY: APPROVED BY: PLOT DATE: R01
- STRUCTURE SLAB 200mm. - STRUCTURE SLAB 200mm.
- 12:20mm GEOTETILE PROTECTION LAYER.
HH. MI. 15/10/17
- 12:20mm GEOTETILE PROTECTION LAYER.

3 SECTION 01 - PART 03 - 4mm WATERPROOFING MEMBERANE.


- 100mm SMOUTH PLAIN CONCRETE.
- 4mm WATERPROOFING MEMBERANE.
- 100mm SMOUTH PLAIN CONCRETE.
SCALE:
1 : 100@A1
PROJECT NO.:

- POLYETHYLENE SHEET 1000 GAUGE. - POLYETHYLENE SHEET 1000 GAUGE. 327


AR-301-01
SCALE 1 : 100 - COMPACTED SOIL.
FILE NAME:
- COMPACTED SOIL.
AR-301-01

41
Construction Drawings Projects

PROJECT NAME AND LOCATION


B20 B21 B20 B21
KHRITYIAT MAJLIS AND MOSQUE
KHRITYIAT - UM SLAL
WASH SOAP
DISPENSER DOHA - QATAR
LAVATORY

Kiblah PIN NO. 7118035


PLANING NO. N/2017/0003729
0.19 2.42 0.20

0.23
KEY PLAN

0.26
0.26 1.20 0.30 0.18 0.60 0.18
1.80 1.00

0.56

0.63
0.48 0.30 0.62 0.30 0.62 0.30 0.18

0.73

0.26
1.13
TOILET 0.48 0.92 0.92 0.48

0.80
TOILET+WASH TOILET+WASH
RM RM

0.32

0.90

0.90
22 22

BI SECTION
AR-402-03
3
FLEXIBLE
0.140.10 0.73 1.07
BI SECTION
AR-402-03
3

0.10
SPRAY
HOSE

2.35

0.90

2.35
MARBLE

0.23
THRESHOLD

0.24
1.80 TOILET WASH ROOM
23 22
0.56

TOILET+WASH TOILET+WASH

0.90

0.90
RM RM

0.30
START POINT
SECTION SECTION
2
AR-402-02 1.13 2.80 2
AR-402-02

0.80
0.65 0.30 0.90 0.30 0.65 0.18 1.20 1.20 0.18

0.30
0.32

0.73
0.73 1.07
0.140.10

0.26

0.26
0.24
PAPER
HOLDER 0.10

PAPER TOWEL HAND


DISPENSER DRYER
TOILET+WASH TOILET+WASH
RM RM
-SECTION -SECTION
1
AR-402-02 1
AR-402-02

1 TOILET + WASH RM PLAN B21 2 TOILET + WASH RM - FLOORING B20


- GRAVEL MULCH / 500*500*50mm
AR-402-02
SCALE 1 : 25 THK. CONCRETE TILES LOOSE LAID AS UPPER ROOF PLAN LEVEL S.S.L
AR-402-02
SCALE 1 : 25 UPPER ROOF PLAN LEVEL S.S.L
6.95
+6.95 m +6.95 m
BI SHOWN IN ROOF PLAN T.O.P.

- FILTER LAYER OF GEOTEXTILE. - GRAVEL MULCH / 500*500*50mm


-THERMAL INSULATION. THK. CONCRETE TILES LOOSE LAID AS
- FILTER LAYER OF GEOTEXTILE. SHOWN IN ROOF PLAN
- WATER PROOFING MEMBRANE. - FILTER LAYER OF GEOTEXTILE.
- SCREED SLOPED TO DRAIN. -THERMAL INSULATION.
- RC SLAB (REF. TO STRUCTURAL DRW.) - FILTER LAYER OF GEOTEXTILE.
- WATER PROOFING MEMBRANE.
- SCREED SLOPED TO DRAIN.
5.62 - RC SLAB (REF. TO STRUCTURAL DRW.) 5.62
F.F.L. MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L F.F.L. MJ LOWER ROOF LEVEL S.S.L
+5.45 m +5.45 m +5.45 m

01 DETAIL DESIGN OCT 2017 AH AD -----


00 SCHEMATIC DESIGN JUNE 2017 AH AD -----
ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC
MOISTURE MOISTURE MOISTURE MOISTURE
RESISTANT
ISSUED FOR SCHEMATIC DESIGN
RESISTANT RESISTANT RESISTANT
GYPSUM BOARD
OWNER
GYPSUM BOARD GYPSUM BOARD GYPSUM BOARD
(12mm THK.) (12mm THK.) (12mm THK.) (12mm THK.)

CEMENT PLASTER CEMENT PLASTER CEMENT PLASTER CEMENT PLASTER


(20mm) (20mm) (20mm) (20mm)
WASH ROOM TOILET
22 23
CERAMIC TILES CERAMIC TILES CERAMIC TILES CERAMIC TILES MAIN CONSULTANT
(300*300mm) (300*300mm) (300*300mm) (300*300mm)
57 AL-JAZEERA ST., BIN-
MAHMOUD / BEHZAD
BUILDING, 6th FLOOR
TEL: (+974) 4020 37 77 / 88 /
99 FAX : (+974) 4020 37 66
P.O BOX1876, DOHA, QATAR.

(0.3*0.3*9)=2.7
W W W .EHAF.COM

TOILET
23 DESIGN AND BUILD CONTRACTOR
PAPER TOWEL
DISPENSER

HAND DRYER

2.20

2.20
CERAMIC SKIRTING
PAPER HOLDER PAPER HOLDER (300*300*100mm)

PAPER HOLDER PROJECT DESCRIPTION

1.26
1.18

HAND SPRAY HAND SPRAY

MAJLIS BUILDING
CERAMIC SKIRTING
(300*300*100mm) CERAMIC SKIRTING CERAMIC SKIRTING
0.50

0.50

0.50
(300*300*100mm) (300*300*100mm) HAND SPRAY
0.40
0.10 0.20

0.40
0.10 0.20

0.10 0.20

0.10 0.20

0.40
GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN F.F.L
0.60
0.26

0.26

0.60

0.24
+0.60 m +0.60 m +0.60 m +0.60 m
F.F.L. F.F.L.

DRAWING TITLE

TOILET +WASH ROOM


- NONSLIP CERAMIC TILES 300X300mm. - NONSLIP CERAMIC TILES 300X300mm.
- CEMENT SCREED 20mm. - CEMENT SCREED 20mm.
DRAWING NO.: PART
- SCREED SLAB 70mm. - SCREED SLAB 70mm.
- STRUCTURE SLAB 150mm.
- 12:20mm GEOTETILE PROTECTION LAYER.
- STRUCTURE SLAB 150mm.
- 12:20mm GEOTETILE PROTECTION LAYER.
AR-402-02
- 4mm WATERPROOFING MEMBERANE. - 4mm WATERPROOFING MEMBERANE. DRAWN BY: CHECKED BY: STAGE: REVISION:

- 100mm SMOUTH PLAIN CONCRETE. - 100mm SMOUTH PLAIN CONCRETE. --------- AD. -----
- POLYETHYLENE SHEET 1000 GAUGE. - POLYETHYLENE SHEET 1000 GAUGE. VERIFIED BY: APPROVED BY: PLOT DATE: R01
- COMPACTED SOIL. - COMPACTED SOIL. HH. MI. 15/10/17
4 TOILET+WASH RM -SECTION 1 3 TOILET+WASH RM SECTION 2 SCALE:
1 : 25 @A1
PROJECT NO.:

AR-402-02
SCALE 1 : 25 AR-402-02
SCALE 1 : 25 FILE NAME:
327
AR-402-02

42
Construction Drawings Projects

PROJECT NAME AND LOCATION

KHRITYIAT MAJLIS AND MOSQUE


KHRITYIAT - UM SLAL
DOHA - QATAR

Kiblah PIN NO. 7118035


B12 BB
PLANING NO. N/2017/0003729
KEY PLAN

9.40 9.40
T.O.P. T.O.P.

MJ T.O.P
B1 B24

+8.90 m BG
4 BG

3 2

4
3
1 1

- GRAVEL MULCH / 500*500*50mm


THK. CONCRETE TILES LOOSE LAID AS
BA BA

3 2 4
CONCRETE BEAM
SHOWN IN ROOF PLAN 1

- FILTER LAYER OF GEOTEXTILE.


B1 B24

BB
-THERMAL INSULATION.
- FILTER LAYER OF GEOTEXTILE.
- WATER PROOFING MEMBRANE. - GRAVEL MULCH / 500*500*50mm
- SCREED SLOPED TO DRAIN. THK. CONCRETE TILES LOOSE LAID AS
- RC SLAB (REF. TO STRUCTURAL DRW.) SHOWN IN ROOF PLAN
- FILTER LAYER OF GEOTEXTILE.
-THERMAL INSULATION.
- FILTER LAYER OF GEOTEXTILE.
- WATER PROOFING MEMBRANE.
- SCREED SLOPED TO DRAIN.
0.75

- RC SLAB (REF. TO STRUCTURAL


DRW.)
UPPER ROOF PLAN LEVEL S.S.L 7.00 UPPER ROOF PLAN LEVEL S.S.L UPPER ROOF PLAN LEVEL S.S.L
6.95 6.95 6.95 6.95
+6.95 m T.O.P. +6.95 m +6.95 m
T.O.S. T.O.P. T.O.S. T.O.P.

0.28
- GRAVEL MULCH / 500*500*50mm
THK. CONCRETE TILES LOOSE LAID AS SHOWN IN
1.00

ROOF PLAN

1.13

0.65
- FILTER LAYER OF GEOTEXTILE.
-THERMAL INSULATION.

1.27

1.50
- FILTER LAYER OF GEOTEXTILE.
- WATER PROOFING MEMBRANE.
1.57

5.95 - SCREED SLOPED TO DRAIN.


T.O.S.

0.05 0.32 0.05 0.21


- RC SLAB (REF. TO STRUCTURAL DRW.)

MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L MJ LOWER ROOF LEVEL S.S.L
5.45 5.45
+5.45 m +5.45 m +5.45 m
0.55

T.O.S. T.O.S.

0.30
GYPSUM
GYPSUM BOARD
BOARD
THK.12mm
THK.12mm

0.75
CEMENT PLASTER
0.65

+PAINTS
0.55

CEMENT

0.88
PLASTER+PAINTS

GRC ARCH
0.28

GRC ARCH CONCRETE ARCH DECORATIVE


CONCRETE ARCH GRC
ARCH

1.45
STAINED GLASS
1.50

PANEL

1.23
1.22
6.27

6.27

6.80
01 DETAIL DESIGN OCT 2017 AH AD -----

0.40
00 SCHEMATIC DESIGN JUNE 2017 AH AD -----

5.22
5.15

ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC


LOBBY ARCHED WINDOW
DINING ISSUED FOR SCHEMATIC DESIGN
0.20

07 ENTRANCE
02
4.70

OWNER
4.65

W02

0.80

0.80
MAJLIS
DOUBLE HINGED 01
WOODEN DOOR FIXED WINDOW
WITH FRAME SERVICES
1.95
1.73

MAIN CONSULTANT
W01 D03
2.55

57 AL-JAZEERA ST., BIN-

1.20
TOILET MAHMOUD / BEHZAD
09 BUILDING, 6th FLOOR
TEL: (+974) 4020 37 77 / 88 /
99 FAX : (+974) 4020 37 66

1.80
P.O BOX1876, DOHA, QATAR.
W W W .EHAF.COM

LINTEL DESIGN AND BUILD CONTRACTOR


0.63

0.60

0.60
-INTERLOCK
GROUND FLOOR PLAN F.F.L 0.60 0.60 GROUND FLOOR PLAN F.F.L PAVEMENT TILES. GROUND FLOOR PLAN F.F.L
0.60 0.60 0.60
+0.60 m F.F.L. F.F.L. +0.60 m -CLEAN SAND. +0.60 m
F.F.L. F.F.L. F.F.L.

0.15 0.15 0.15


0.45
PAVEMENT LEVEL PAVEMENT LEVEL PAVEMENT LEVEL PROJECT DESCRIPTION
0.15
+0.15 m +0.15 m +0.15 m
ROAD LEVEL ROAD LEVEL F.F.L. ROAD LEVEL
- TILES AS PER FINISHES SCHEDULE
- TILES AS PER FINISHES SCHEDULE +0.00 m +0.00 m +0.00 m
MAJLIS BUILDING
- SCREED SLAB 70mm.
- SCREED SLAB 70mm.
- STRUCTURE SLAB150mm.
- STRUCTURE SLAB 150mm. - 12:20mm GEOTETILE PROTECTION LAYER.
- 12:20mm GEOTETILE PROTECTION LAYER.
- 4mm WATERPROOFING MEMBERANE.
- 4mm WATERPROOFING MEMBERANE. - 100mm SMOUTH PLAIN CONCRETE.
- 100mm SMOUTH PLAIN CONCRETE. - POLYETHYLENE SHEET 1000 GAUGE.
- POLYETHYLENE SHEET 1000 GAUGE.
- COMPACTED SOIL. - NONSLIP CERAMIC TILES 300X300mm.
- COMPACTED SOIL.
- CEMENT SCREED 20mm.
- SCREED SLAB 70mm. DRAWING TITLE
- 12:20mm GEOTETILE PROTECTION LAYER.
- 4mm WATERPROOFING MEMBERANE. WALL SECTION 3&4&5
- 100mm SMOUTH PLAIN CONCRETE.
- POLYETHYLENE SHEET 1000 GAUGE.
- COMPACTED SOIL.
DRAWING NO.: PART

1 WALL SECTION-03 2 WALL SECTION-04 3 WS05 AR-304-00


AR-304-00
SCALE 1 : 25 AR-304-00
SCALE 1 : 25 AR-304-00
SCALE 1 : 25 DRAWN BY: CHECKED BY: STAGE: REVISION:

--------- AD. -----


VERIFIED BY: APPROVED BY: PLOT DATE: R01
HH. MI. 15/10/17

1 : 25 @A1
SCALE: PROJECT NO.:

FILE NAME:
327
AR-304-00

43
Construction Drawings Projects

TOILETS , JANITOR , LOCKERS


D01 MAIN ENTRANCE D02 ENTRANCES D03 MAJLIS & DINING D04 LOBBY & CORRIDOR D05 TOILETS , ABLUTION & WASHING ROOM D06 RECEIVING AREA D07 D08 TOILETS PROJECT NAME AND LOCATION
&GARBAGE ROOM
2.55

2.60
STRUC. OPEN.
KHRITYIAT MAJLIS AND MOSQUE
STRUC. OPEN. KHRITYIAT - UM SLAL
DOHA - QATAR

1.40
2.55 Kiblah PIN NO. 7118035
STRUC. OPEN.
2.00 1.50 2.50 1.00 0.80
STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN.
PLANING NO. N/2017/0003729
KEY PLAN
3.50

2.55

2.55

2.20

2.20

2.20

2.20

2.20
HANDLE H.

HANDLE H.

HANDLE H.

HANDLE H.

HANDLE H.

HANDLE H.
B1 B24
1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00
2

BG
4 BG

3 2

4
3
1 1

BA BA

3 2 4

1
B1 B24

OUT IN OUT OUT IN IN IN IN

IN OUT IN IN OUT OUT OUT OUT


2.60 2.55 2.55 2.00 1.50 2.50 1.00 0.80
STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN.

WOODEN HINGED DOUBLE WOODEN HINGED DOUBLE HINGED DOUBLE WITH UPPER FRAME WOODEN HINGED DOUBLE WOODEN HINGED DOUBLE WOODEN HINGED DOUBLE WOODEN HINGED SINGLE WOODEN HINGED SINGLE
DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING
SWING @90° SWING @90° SWING @90° SWING @90° SWING @90° SWING @90° SWING @90° SWING @90°

STRUCTURAL OPENING 2600 X 3500mm STRUCTURAL OPENING 2550 X 2550mm STRUCTURAL OPENING 2550 X 2550mm STRUCTURAL OPENING 2000 X 2200mm STRUCTURAL OPENING 1500 X 2200mm STRUCTURAL OPENING 2500 X 2200mm STRUCTURAL OPENING 1000 X 2200mm STRUCTURAL OPENING 800 X 2200mm

FIRE RATING 1.0 HR FIRE RATING 1.0 HR FIRE RATING 1.0 HR FIRE RATING - FIRE RATING - FIRE RATING - FIRE RATING - FIRE RATING -

QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY -

NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER

D09 FOOD PREPARATION D10 TX ROOM & LVP ROOM D11 MV. ROOM D12 FM 200 ROOM D13 MV. ROOM D14 STORE, ELEC. ROOM & LC. ROOM D15 LOADING DOCK

2.50
STRUC. OPEN.

2.50 2.40 1.50 0.90 1.10 1.00


STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN.
2.20

2.20

2.20

2.20

2.20

2.20

2.20
HANDLE H.

HANDLE H.

HANDLE H.

HANDLE H.

HANDLE H.

HANDLE H.
1.00

1.00

1.00

1.00

0.90

0.90
01 DETAIL DESIGN OCT 2017 AH AD -----
00 SCHEMATIC DESIGN JUNE 2017 AH AD -----
ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC

ISSUED FOR SCHEMATIC DESIGN


OWNER
IN OUT OUT OUT OUT OUT OUT

OUT IN IN IN IN IN IN
2.40 1.50 0.90 1.10 1.00
STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN.

2.50
STRUC. OPEN.
2.50 MAIN CONSULTANT
STRUC. OPEN.
57 AL-JAZEERA ST., BIN-
WOOD DOUBLE WITH VISION PANEL METAL HINGED DOUBLE LOUVERED METAL HINGED DOUBLE WITH LOUVERS STEEL DOUBLE LOUVERED DOOR METAL HINGED SINGLE METAL HINGED SINGLE OVERHEAD ROLLING DOOR MAHMOUD / BEHZAD
DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING DOOR TYPE OPENING BUILDING, 6th FLOOR
TEL: (+974) 4020 37 77 / 88 /
SWING @90° SWING @90° SWING @90° SWING @90° SWING @90° SWING @90° ROLL UP
99 FAX : (+974) 4020 37 66
P.O BOX1876, DOHA, QATAR.
STRUCTURAL OPENING 2500 X 2200mm STRUCTURAL OPENING 2400 X 2200mm STRUCTURAL OPENING 1500 X 2200mm STRUCTURAL OPENING 900 X 2200mm STRUCTURAL OPENING 1100 X 2200mm STRUCTURAL OPENING 1000 X 2200mm STRUCTURAL OPENING 2500 X 2200mm W W W .EHAF.COM

Door Types
FIRE RATING 0.75 HR FIRE RATING 3.0 HR FIRE RATING 3.0 HR FIRE RATING 3.0 HR FIRE RATING 3.0 HR FIRE RATING 1.5 HR FIRE RATING -

QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY - QUANTITY - DESIGN AND BUILD CONTRACTOR

NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER NOTES AS PER SUPPLIER SCALE 1 : 50

W01 MAJLIS & DINING W02 TOILETS SLV1 TX ROOM SLV2 MV ROOM

2.50
STRUC. OPEN. 1.50
STRUC. OPEN. PROJECT DESCRIPTION
0.50

MAJLIS BUILDING
1.23

0.60
STRUC. OPEN.
0.50
STRUC. OPEN.
0.20

0.80
3.15

F
DRAWING TITLE

DOORS & WINDOWS SCHEDULE


3.00
1.73

2.20
SILL HT.
1.80

DRAWING NO.: PART

AR-601-00
SILL HT.
0.60

DRAWN BY: CHECKED BY: STAGE: REVISION:


0.10 0.70 0.10 0.70 0.10 0.70 0.10
--------- AD. -----
VERIFIED BY: APPROVED BY: R01
Window & Louvers Types
PLOT DATE:

2.50 0.60 0.50 1.50 HH. MI. 15/10/17


STRUC. OPEN. STRUC. OPEN. STRUC. OPEN. STRUC. OPEN.
1 : 50 @A1
SCALE: PROJECT NO.:
SCALE 1 : 50
WINDOW TYPE ALUMINIUM DOUBLE GLAZED STAINED WINDOW TYPE ALUMINIUM FIXED SINGLE LOUVER TYPE STEEL VERTICAL SAND TRAP LOUVER LOUVER TYPE STEEL HORIZONTAL SAND TRAP LOUVER FILE NAME:
327

44
STRUCTURAL OPENING 2500 X 3150mm STRUCTURAL OPENING 600 X 800mm STRUCTURAL OPENING 500 X 2200mm STRUCTURAL OPENING 1500 X 500mm AR-601-00
Construction Drawings Projects

236 VARIES 239


PROJECT NAME AND LOCATION

1% SLOPE 1% SLOPE 1% SLOPE


WATER PROOFING
MEMBRANE KHRITYIAT MAJLIS AND MOSQUE

7

2

:
VARIES WATER PROOFING
MEMBRANE PRE-CAST SLAB KHRITYIAT - UM SLAL
20MM THK. COVER REF TO STRUC.
MARINE PLY DRAWINGS DOHA - QATAR
BASE & EQUIPMENT
DRIP MOLD
1000 GAUGE PADDING
Kiblah
Kiblah PIN NO. 7118035

MIN. 500mm
POLYETHYLENE SHEET (TO MEP SPEC'S)
SPRING SHOCK BLOCK WORK CONCRETE LINTEL
SEALANT WITH ABSORBER
BACKING ROD
MACHINE / EQUIPMENT
25MM THK. CORK
DENSITY= 48 KG/m³ FIRE STOP SEALANT
FIRE STOP SEALANT
(AS REQUIRED)
PLANING NO. N/2017/0003729
(REFER TO MEP (AS REQUIRED)
REQUIREMENTS) KEY PLAN
REFRIGERANT PIPE
ALUMINUM 150 VARIES REFER TO MACHINE SPEC'S VARIES 150 50 GRAVEL MULCH

`50
WITH INSULATION
FLASHING DUCT INSULATION

REF TO MECH. DWG


(TO MEP DRAWINGS)

CONC. UPSTAND FOR FIRE STOP SEALANT


MEP EQUIPMENT (AS REQUIRED)
1% SLOPE 500x500x50 THK. CONCRETE
TILES LOOSE LAID
GROUT
MEP DUCT / AC
50 55 20 50

SAND LAYER FIRE STOP SEALANT


(AS REQUIRED) LOOSE GRAVEL MULCH

`50
THERMAL INSULATION BLOCK WORK
WATER PROOFING

MIN. 500mm
MEMBRANE GALVANIZED SHEET
FLASHING
100

FILTER GEOTEXTILE
ROOF SSL
SEPARATION LAYER
(100g/m²)
LIGHT WEIGHT

50 50
CONCRETE TO LEVEL 50mm EXTRUDED
POLYSTYRENE
CONCRETE SLAB THERMAL INSULATION
(REFER TO STRUCTURAL)

0.10
ROOF SSL

NOTES:
5MM THK. MINERALIZED NOTE:-
THE ABOVE DETAIL EXPLAINS THE SYSTEM INDICATIVELY. THE CONTRACTOR SHALL WATER PROOFING
CO-ORDINATE WITH SPECIALIZED SUB-CONTRACTOR AND SUBMIT DETAILED MEMBRANE
150 SLAB OPENING 150
CALCULATIONS TO ENSURE THAT THE SPACING OF NEOPRENE MOUNTS IS
LIGHT WEIGHT
• 200 mm WIDE STRIP OF MEMBRANE OVER ALL
ADEQUATE FOR THE LOADING AND THAT THE ACOUSTICAL LINING IS ADEQUATE TO
ACHIEVE DESIRED TOTAL SOUND REDUCTION. PLAIN CONCRETE VERTICAL AND HORIZONTAL JOINTS
CEMENT TO LEVEL
ALL AS PER MANUFACTURER'S RECOMMENDATION AND ENGINEER'S APPROVAL
• A MIN. OF 200 OVERLAPPING AT MEMBRANE
JOINTS
STRUCTURAL SLAB
• USE A REINFORCING MEMBRANE STRIP AT
HORIZONTAL AND VERTICAL JOINTS

1 MACHINE BASE FLOATING FLOOR TILES 2 TYP. ROOF OPENING PIPE/HVAC PENETRATION • ROOF U-VALUE 0.15 w/m2K

SCALE 1 : 10 SCALE 1 : 10
AR-904-00 AR-904-00 ROOF DRAIN

WATER PROOFING LOOSE GRAVEL MULCH


MEMBRANE
FILTER GEOTEXTILE
LIGHT WEIGHT SEPARATION LAYER
PLAIN CONCRETE TO
LEVEL 50MM EXTRUDED
CONCRETE SLAB POLYSTYRENE
(REFER TO STRUCTURAL) THERMAL INSULATION
FILTER LAYER OF GEOTEXTILE

WATER PROOFING MEMBRANE


WATER PROOFING
MEMBRANE
SCREED SLOPED TO DRAIN
LIGHT WEIGHT
PVC TILE PAD PLAIN CONCRETE TO
R.C. SLAB (REF. STRUCTURAL DRAWINGS ) LEVEL LOOSE GRAVEL MULCH
GRAVEL MULCH / 500x500x50mm THK.
CONCRETE TILES LOOSE LAID AS SHOWN IN CONCRETE SLAB
ROOF PLAN (REFER TO STRUCTURAL) FILTER GEOTEXTILE
SEPARATION LAYER
FILTER LAYER OF GEOTEXTILE

50
THERMAL INSULATION
THERMAL INSULATION
0.05

100
50

ROOF SSL
0.05

50

0.20

VARIES
01 DETAIL DESIGN OCT 2017 AH AD -----
MIN OVERLAPPING
0.10

100

00 SCHEMATIC DESIGN JUNE 2017 AH AD -----


ROOF SSL ROOF SSL
ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC

ISSUED FOR SCHEMATIC DESIGN


200 OWNER
OVERLAPPING

5 TYP. ROOF FLOOR DRAIN


AR-904-00
SCALE 1 : 5
3 CONCRETE TILE TYP. DETAIL 4 GRAVEL MULCH TYP. DETAIL
STAINLESS STEEL
AR-904-00
SCALE 1 : 5 AR-904-00
SCALE 1 : 5 JUBILEE CLIP
MAIN CONSULTANT
CONCRETE CANT FILLER
GRAVEL MULCH 57 AL-JAZEERA ST., BIN-
MAHMOUD / BEHZAD
WATER PROOFING MEMBRANE BUILDING, 6th FLOOR
TEL: (+974) 4020 37 77 / 88 /
FILTER GEOTEXTILE SEPARATION LAYER 99 FAX : (+974) 4020 37 66

50 50
P.O BOX1876, DOHA, QATAR.
50MM EXTRUDED POLYSTYRENE
W W W .EHAF.COM
THERMAL INSULATION
LIGHT WEIGHT
PLAIN CONCRETE TO LEVEL

100
ROOF SSL DESIGN AND BUILD CONTRACTOR
BASE & EQUIPMENT CONCRETE WALL
PADDING
(TO MEP SPEC'S) CONCRETE SLAB
ROOF EQUIPMENT
(REFER TO MEP (REFER TO STRUCTURAL)
ISOLATOR FOR SHOCK LOOSE GRAVEL MULCH
REQUIREMENTS) PLASTER ON PAINT
ABSORBER
FINISH
10MM THK. NEOPRENE FILTER GEOTEXTILE
RUBBER PAD SEPARATION LAYER
50mm EXTRUDED POLYSTYRENE SEALANT
PRE-CAST CONC. UPSTAND FOR GALVANIZED SHEET THERMAL INSULATION (AS REQ'D SPECS)
MEP EQUIPMENT FLASHING PROJECT DESCRIPTION
TYP. ROOF PENETRATION DETAIL
GRAVEL MULCH
4MM WATER PROOFING
8
HT. VARIES

50

BACKING ROD

MAJLIS & MOSQUE


MEMBRANE
500x500x50 THK. CONCRETE
TILES LOOSE LAID ALUMINUM FLASHING WITH
AR-904-00
SCALE 1 : 10
BUILDINGS
50

GROUT SUNKEN S/S SCREW TO PIPE


WATER PROOFING WALL @ 30MM C/C (TO MEP REQ'MTS)
MEMBRANE
50 55 20 50

METAL PLASTER STAINLESS STEEL CONCRETE CANT FILLER


LIGHT WEIGHT STOPPER JUBILEE CLIP
SAND LAYER PLAIN CONCRETE TO LEVEL GRAVEL MULCH
100

50mm EXTRUDED POLYSTYRENE


20x20MM REGLET CONCRETE UPSTAND WATER PROOFING MEMBRANE DRAWING TITLE
ROOF SSL (TO STRUCTURAL)
TYPICAL WATER PROOFING &
THERMAL INSULATION FILTER GEOTEXTILE
5MM WATER SEPARATION LAYER
100

ROOF DETAILS

50 50
ROOF SSL PROOFING
CONCRETE CANT FILLER MEMBRANE
THERMAL INSULATION

CONCRETE SLAB LIGHT WEIGHT


LIGHT WEIGHT PLAIN CONCRETE TO LEVEL DRAWING NO.: PART

100
FIXATION DETAIL
(REFER TO STRUCTURAL)
PLAIN CONCRETE TO LEVEL ROOF SSL

CONCRETE SLAB
(REFER TO STRUCTURAL)
AR-904-00
CONCRETE SLAB
(REFER TO STRUCTURAL) DRAWN BY: CHECKED BY: STAGE: REVISION:

--------- AD. -----


VERIFIED BY: APPROVED BY: PLOT DATE: R01
6 TYP. ROOF CONCRETE BASE FOR MEP EQUP'MT 7 ROOF CORNER WATER PROOFING & FLUSHING DETAIL 9 TYP. ROOF PENETRATION (UPSTAND) HH. MI. 15/10/17

As @A1
SCALE: PROJECT NO.:

AR-904-00
SCALE 1 : 10 AR-904-00
SCALE 1 : 5 AR-904-00
SCALE 1 : 10 indicated 327
FILE NAME:

AR-904-00

45
Tactic Village for Combat Operations

Client : Ministry of interior


Location : Cairo - Alexandria Desert road - Egypt
Leed Consultant : EHAF
Scope of Work : Design Development - Value Engineering -
Developing Working Drawings - Coordination - Respond to RFIs.
Construction Drawings Projects
PROJECT

DRAWING KEY: NORTH

NOTES:

REVISIONS:
NO DATE MODIFICATIONS
R0 DEC. 2014 ISSUED FOR TENDER

R1 FEB. 2015 ISSUED FOR TENDER

ACTION TARGET OWNER:

00
77

MAIN CONSULTANT:
00
77

ACTION TARGET

DRAWING TITLE:

FEB. 2015 FEB. 2015 1023.1

1:1000 A0 R1

00.A.0100.01

47
Construction Drawings Projects

Aerial Shot For the Complex


48
Construction Drawings Projects
PROJECT

A B C D E F G H J K L M 03 N P Q R S T U DRAWING KEY: NORTH


A0300.00 02
A0400.00

87950

2500 6000 6000 6000 6000 4000 250 7200 4800 3000 3000 6000 6000 6000 3000 3000 7500 7500

2500 1350 1400 1000 1400 2000 1400 1000 1400 2000 1400 1000 1400 2000 1400 1000 1400 1650 4050 2200 3000 3000 3000 2000 1400 1000 1400 1000 18200 500 1900 1000 1400 2600 4500 3000 4500 1600

W03 W03 W03 W03 W03 W03 W03 W03


01 01
BL01
11800 11800
2400

+0.30 D07
-1.20
D08
F.F.L F.F.L
+2.10 2450 1350 1350 1350 1350 1350 6150
4000

4000
F.F.L
1350

W03 650 650 650 650 650 650 650 650 650 650 650
W01 W01 W02 W02 W02 W06 W06
02 D02 02
1000

NOTES:

800
09 D08
11800 5800
9800

A0800.00 5800 14800


0-12
1400

0-11

3000
W03
D02
0-20
0-16
0-09

11600
03

4000
1000

W05
03 A0400.00 03
6000

4600
+2.90 W06
F.F.L
+0.30
1400

15800

15800
W03
1650 1001000 50 1000 F.F.L

8800

8800

3000
9000 2800 0-18 0-14 2000

4400
+2.10
04 F.F.L 04
2950

11800

1400
0-10

3600
0-13
15200 5800

3000
D08
1400

W03 D04
0-15
05 0-17 05
6000

4600
1200 2500 D10 W06
1000

18800
D02

4200
0-31

3000
8600

D02
2100

11800
D06
06 06

1950
D03
1400

W08 D03 D03


0-38 2800 23400 2800 14800

1700
02
D04 200 2000 1900 3000 3100 3000 3100 3000 1900 2000 200
3000

3000
1150 450

A0500.00
0-19
0-21 D02
D04
07 07
600
1100

4500
3000
11300 2800 11600 W06
+0.30
CW2 F.F.L
04 02
4000

4000
3000
2500

A0300.00 A0300.00
ST-01 D03 D03 0-08
0-30
D02

2100

1600
08 08
1000

1000

14800
0.00 +0.30
F.F.L F.F.L 11400

3000
50200

50200
11800

11400

17400
4000

4000
3000

3000

3800

3800
D01 0-22 W01
01 0-23
A0400.00

09 09

1000
1000

1000

+0.30
0-33

2100
D04 F.F.L
D02
ST-02 D03
2500

3000
D02
4000

4000
3000

W01

+0.30
F.F.L
0-29

3000
REVISIONS:
1100

10 10
600

1350
200

900 4600 6700 NO DATE MODIFICATIONS


D04
1600

0-04 0-05
9800

R0 DEC.2014 ISSUED FOR TENDER

750
W05
05
3000

3000
D03 0-37 0-07
R1 FEB.2015 ISSUED FOR TENDER

1700
A0500.00

1150
D04 2100

1100
0-34 D04
1400

W03 D03 D03


11 D03
D05
11

750
W05

900
07
1050

4300
D04
A0500.00 0-03
2800 5550 6050 0-06

900
3100
0-32
8800

2800

3000
D04 D04
4800
1400

0-24 3200 2700


W05

3750
ST-03 0-40

1150
D04 D04
0-27
12 12
650
6000

D04 D04
6000

D08 D04

+0.30 17800
1400

W03 20800
F.F.L
0-35

3000
0-36 D02 D02
0-39 01
8800 A0800.00
17800

3000
13 W04 13 OWNER:
6050
2950

9000 2800
3000

8800

3000
8750

800
D02 D02
0-02 0-01 0-28
15800
1400

W03 3600

14 0-26 14

3000
12800
1000

W04
W07
0-25
3000

3000
W03 D02 D02
1400

W03
9800

9600

15 15 MAIN CONSULTANT:
1000

3200
W03 W04 W04 W04 W04 W04 W04 W04
1400

W03
4000

4000
2350

11800 11800

2000
16 16
D01 D01
W03 W03 W03 W03 W03 W03 W03 W03 CW1

+0.30 DRAWING TITLE:


F.F.L

400 4000 9150 4000 400


2500 6000 6000 6000 6000 4000 250 7200 4800 3000 3000 6000 6000 6000 3000 3000 7500 7500

85450
-0.87
F.F.L
A B C D E F G H J K L M 01 N P Q R S T U
A0300.00

01 SCALE 1:100

FEB. 2015 FEB. 2015 1023.1

1:100 A0 R1

01.A.0200.00
49
Construction Drawings Projects
PROJECT

A B C D F G H J K L M N O P Q R S T U

1.00
DRAWING KEY: NORTH
+11.20

500
1.00
ROOF T.O.P

500


1500
+9.70

2731
3.00 ROOF T.O.S
3.00

500 1000
1.00

1500
8.20 +8.50
500

500

500
1000

4400
ROOF T.O.S ROOF T.O.S
2.00 2.00

2000
1450

1600
2360
3.00 1.00 1.00

2500
500
+5.70
3900

2000
FIRST T.O.S

680

2400

2200

2200
3.00 3.00

1700
3.00
3.00

2000

12070
BL01

3700
4.30 1.00 1.00
9200

FIRST F.F.L

800 200
8700

1000
3320
1.00 1.00

2000
1500
1.00

6000
8120

5400
4000

4000
2400

2400
680

5570
3870
3500

4570
3839
0.30 +0.30
GROUND F.F.L GROUND F.F.L NOTES:

2530
300

1670

1670
-0.87

1170

1170

1170
700
G.L.

01 SCALE 1:100

REVISIONS:
U T S R Q P N M L K J H G F E D C B A NO DATE MODIFICATIONS
+12.20
ROOF T.O.P R0 DEC.2014 ISSUED FOR TENDER

R1 FEB.2015 ISSUED FOR TENDER

2000
+11.20
500

3000
ROOF T.O.P

1500
3000

500 1000

1000
1.00
4000

8.50 +8.20
500

500

500

500

500

1000
ROOF T.O.S ROOF T.O.S
3.00

1600
1.00 1.00 2.00 2.00
2000

2050

2360
2500

500

500

500

+ 5.70

3900
750

12200
5200
FIRST T.O.S

680
2400
2700

2900
2200

3.00 3.00
2400

1.00 1.00
+4.30
FIRST T.O.S OWNER:
13500

3250
3.00

3320
1600
9900

6200
5400

7900
3500

3500

4000
750

2800
680
2400
5700
6800

+0.30 +0.30
GROUND F.F.L GROUND F.F.L 0.00

3100

700
G.L.

2860

300
2000

2000

1900
1700

MAIN CONSULTANT:
2600

-2.30

03 SCALE 1:100

DRAWING TITLE:

FEB. 2015 FEB. 2015 1023.1

50
1:100 A0 R1

01.A.0300.00
Construction Drawings Projects

Administration Building Exterior

51
Administration Building Interior
Construction Drawings Projects

PROJECT

A B C 02 D E F G A B C D 02 E F G
BL13.4 BL13.4 BL13.4 13.A.0000.04 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 0.00 BL13.4 13.A.0000.04 BL13.4 BL13.4 BL13.4
G.F.L
33200
33800
100 7150 4400 4900 6350 5500 4700 100
400 7150 4400 4900 6350 5500 4700 400

DRAWING KEY: NORTH


W03 W03
1 1 1

400

400
1

100

100
BL13.4 BL13.4 BL13.4 D07 BL13.4

600
11300 850 3000 850 6100 2800 2300 4500

650
11

1400
D06
A.1000.00
DISH WASHING AREA 1750 D01

2600

3000

1700
D06
BL13.4

2400
32800 L0-21

4600

4600

4600

4600
4400
1000 1000 L0-01
L0-19

650
D04 D04 D04
0.00
G.F.L

4050
4500

7700

7700
W06
2 2

2850
2 BEVERAGE AREA
2
BL13.4 BL13.4 BL13.4 D01 BL13.4

3350
HOT KITCHEN AREA D01
1000 1000 200L0-20 2450 1000 350 1650 1000 150 W06

4500
W06 L0-02
L0-17
D04
3250

3250

3250

3150

3250
D04 D04 CHiaf
D04 L0-03 W06
L0-16 Office O.3
0.30

2050
O.2

1850
L0-18
F.F.L

1000
1450 3450
3 3 3
O.2
W06
3
BL13.4 BL13.4 BL13.4
5650 5500
3000 BL13.4
4500
3550

1050
O.3

VEGETABLE PREP.

POULTRY PREP.
01 Pack Up
+4.50 L0-24 L0-04

3550
01 13.A.0000.04 FISH PREP. MEAT PREP. D08 03
T.O.S L0-23 NOTES:
4850

4850

4750

4750

4750
GARBAGE

4850

4850
03

4800
13.A.0000.04 D04 L0-22 13.A.0000.04

22250

2000
COLD ROOM
22550

21550

1700
21950

21950
13.A.0000.04
L0-14 L0-15

5650 5500
1000 3000
4 4 4 D04 4
D04
BL13.4 BL13.4 BL13.4 D04 O.3
24900
O.3
BL13.4

800

1600
0.30 D04 D04
01 (DRY MIX) 1.00

4750
F.F.L
3150

3150
D01

2950
3150

3150
L0-05

1700
13.A.0000.04
0.00 0.30 7750
(DRY MIX)

O.3
F.F.L 2.00
G.F.L
5 5 5 14750

450
D01 D04 D04
D01
1000 3200
5
BL13.4 BL13.4 BL13.4 1000 1000 1000
4550 1700 2250 BL13.4

650
O.2
3.00
01 0.30

2450
1800
13.A.0000.04 F.F.L 7250
L0-12 L0-08 L0-07
L0-11 750 1600 650

7000
L0-06
COLD FREEZING L0-09 FREEZING 5000 1000
5850

5850
W03

5850

5650

5650

5650

5850
L0-13 ROOM ROOM ROOM
Receiving Area

3550
3150
Vegetables

3000
3000
pre Wash

1350
5550 2800 2800 3000
L0-10 3700 3800 6100
6 6 6 6

100

100

100
400

BL13.4 BL13.4 BL13.4 BL13.4


W06
0.00
G.F.L

400 7150 4400 4900 6350 5500 4700 400


100 7150 4400 4900 6350 5500 4700 100
33800
33200

A B C 04 D E F G A B C 04 D E F G
BL13.4 BL13.4 BL13.4 13.A.0000.04 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 13.A.0000.04 BL13.4 BL13.4 BL13.4 BL13.4
BL13.4

02 SCALE 1:100
01 SCALE 1:100

6 1 A B C D E F G
5 4 3 2 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4
BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 +5.40
ROOF T.O.P
+5.40
ROOF T.O.P +4.50

900
1100

1100
1.00 1.00 ROOF T.O.S
+4.50

900
1100

1100

1.00 ROOF T.O.S

1500
1800
1450

1800

5400
4200
800
5400
4200
800

REVISIONS:

2200
2.00 2.00

1600
+0.30 NO DATE MODIFICATIONS
2200
1600

2.00 GROUND F.F.L


+0.30

400
3.00 3.00

300

300
GROUND F.F.L R1 FEB.2015 ISSUED FOR TENDER
400

300

300

3.00
05 SCALE 1:100

06 SCALE 1:100

1 2 3 4 5 6
A B C D E F G
BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4
+5.40
ROOF T.O.P
+5.40
ROOF T.O.P
+4.50
+4.50
900
1100

1.00 ROOF T.O.S

900
1100
1.00 ROOF T.O.S
900

900
900

5400

1100

5400
4200

OWNER:

4200
2100

2.00

1900
+0.30 2.00
GROUND F.F.L
+0.30
GROUND F.F.L
400

300

3.00

400
3.00

300
04 SCALE 1:100 07 SCALE 1:100

MAIN CONSULTANT:
A B C D E F G
BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4

EHAF
+5.40
ROOF T.O.P
+4.50

900
ROOF T.O.S

CONSULTING ENGINEERS

1800
DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS

5400
4200
4000

4000
5Abd ELRAHMAN HUSSEIN STREET TEL:7601099

2200
+0.30
GROUND F.F.L DRAWING TITLE:

300
03 SCALE 1:100

1 2 3 4 5 6
BL13.4 BL13.4 BL13.4 BL13.4 BL13.4 BL13.4
+5.40
ROOF T.O.P
+4.50

900

900
ROOF T.O.S

1000
1900

5400
1350

4200
4100

4100
2200

1750
+0.30 FEB. 2015 FEB. 2015 1023.1
GROUND F.F.L

300
1-100 A0 R1

03 SCALE 1:100 13.A.0000.04

52
Construction Drawings Projects

PROJECT

PART 1

PART 2
A B C D E 03 F G H H' J K L 01
BL 10 BL 10 BL 10 BL 10 BL 10 A0300.00 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 A0400.00

106700 DRAWING KEY: NORTH


4000 6000 6000 6000 6000 6000 5000 250 4000 2500 5000 5000

01
BL 10 13
A0500.00

1000
3400
02
BL 10

1000

3500
2300

4750
2000 1800 8000
03

1500
13400 3200 18500

1350

1400
BL 10 BL10

900
04 1600 10000 1800 3200 1800 6550 1800 6550 1800
BL 10

1400
3650
ST-03

6400

6400

6400
05 ST-04
BL 10
5800 11600

04
NOTES:

3000
A0300.00 3900

6300
06
BL 10

21300

2300

2300

2300
A01

3400
W05
BL 10
13200 3200
D03

2500

3600
07

4800
BL 10

3400
R-01

7200
08
BL 10

2350
4000 6000 6000 6000 6000 6000 5000 250 4000 2500 5000 5000

101700

PART 1

PART 2
A B C D E 01 F G H H' J K L
BL 10 BL 10 BL 10 BL 10 BL 10 A0300.00 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10

01 SCALE 1:100

REVISIONS:
PART 1

PART 2

L 01 M N P P' Q 02 R 03 S T U V W
BL 10 A0400.00 BL 10 BL 10 BL 10 BL 10 BL 10 A0400.00 BL 10 A0300.00 BL 10 BL 10 BL 10 BL 10 BL 10 NO DATE MODIFICATIONS
R0 DEC.2014 ISSUED FOR TENDER

R1 FEB.2015 ISSUED FOR TENDER


106700

5000 5000 2500 4000 250 5000 6000 6000 6000 6000 6000 4000

01
03 BL 10
A0500.00

1000
3400
02
BL 10

1000
3500

2500

8000 1700 2100


4900

03

1500

1500
18500 3200 13400

1350
1400
BL 10
OWNER:

3700
900
04
9600

2200 6150 1800 6550 1800 3200 1800 10000 1600


BL 10

1400

3650
1400

ST-02
6400

6400

6400
ST-01
05
4500

BL 10
11600 5800

02

3000
A0300.00
MAIN CONSULTANT:

7750
06

EHAF
BL 10

21300
2300

2300

2300
A01

3400
W05
BL 10
13200
D03
CONSULTING ENGINEERS
DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS

3600
07
4800

BL 10 5Abd ELRAHMAN HUSSEIN STREET TEL:7601099

3400
R-02
7200

DRAWING TITLE:
08
BL 10
2350

5000 5000 2500 4000 250 5000 6000 6000 6000 6000 6000 4000

101700
PART 1

PART 2

FEB. 2015 FEB. 2015 1023.1


L M N P P' Q R 01 S T U V W
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 A0300.00 BL 10 BL 10 BL 10 BL 10 BL 10
1/100 A0 R1

02 SCALE 1:100
10.A.0203.00

53
Construction Drawings Projects

PROJECT

W V U T S R Q P' P N M L K J H H' G F E D C B A

PART 1

PART 2
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10

DRAWING KEY: NORTH


08 07 06 05 04 03 02 01
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10

6.00
F F F F F F F F
3300

BL10

8650
2400
2900

5.00

+12.90 01 SCALE 1:200 NOTES:


LEVEL 03 T.O.S
1200

1200

1200

PART 1

PART 2
W V U T S R Q P' P N M L
4000
21650

21650
1950

2000
300 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10
5.00

+8.90

800
LEVEL 02 T.O.S
6400

(DRY MIX) 1
4.00
4450

300 6.00
(DRY MIX) 2
3600

3600
3600

5.00

+5.30 (DRY MIX) 3


LEVEL 01 F.F.L

20X40 CM 4
1600

1600

300

5750
2700

300 300
50 mm 5
5000

5400
6
3000

3000

+0.30 (POLYCARBONATE SHEETS)


GROUND F.F.L
2400

0.00

12750
800

G.L.
300

300

5.00

4200
+12.90
5.00 ROOF T.O.S

6100
+12.00

7000
+11.70
04 SCALE 1:100 ROOF T.O.S

F F F F

2800
5.00

+8.70 +8.70

800
LEVEL 02 T.O.S LEVEL 03 T.O.S

1600
4.00
3.00

3500

3500
3600

1000 300 1000


+5.30
LEVEL 01 F.F.L

2.00

9000

2100

2100
2100
3.00 3.00 3.00

1600
1000 300 1000
5000

REVISIONS:
0.30

3000

3000
3300
GROUND F.F.L NO DATE MODIFICATIONS
0.00 R0 DEC.2014 ISSUED FOR TENDER

1200
01 02 03 04 05 06 07 08 G.L.

300

300
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 R1 FEB.2015 ISSUED FOR TENDER

02 SCALE 1:100
1300

6.00
PART 1

PART 2

L K J H H' G F E D C B A
BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10 BL 10

OWNER:
2450
12750

6.00
10550

3000

5.00

+12.90
LEVEL 03 T.O.S
1200

MAIN CONSULTANT:
4000
2000

EHAF

8750
5.00 3.00
3.00

9950
+8.90 +8.90
800

800

LEVEL 02 T.O.S LEVEL 02 T.O.S


6300
900

4.00
3.00 5.00 CONSULTING ENGINEERS
3700

3800
3600

3600

DR.EZZ ELDIN FAHMY&DR.HUSSEIN ABBAS


2700

5.00 +12.90
13200

ROOF T.O.S 5.00 5Abd ELRAHMAN HUSSEIN STREET TEL:7601099


+5.30 +5.30 +12.00
12150

800

LEVEL 01 F.F.L LEVEL 01 F.F.L +11.70


ROOF T.O.S
DRAWING TITLE:

700
3.00
1600

3.00 F F F F
4100
2700

4000
3.00

1900
1500
2800
5.00
5000

5000

+8.70
5700

1000
5600

800
3000

LEVEL 02 T.O.S
+0.30 0.30
GROUND F.F.L GROUND F.F.L
2400

1600
4.00

-0.30 -0.30 3.00


3500

3500

3500

3600
1100

1000 300 1000


G.L. G.L.
600

600

600

+5.30
LEVEL 01 F.F.L
05 SCALE 1:100
900

2.00
2100

3.00 3.00 3.00

1600
2900

1000 300 1000

5000
3600

800
0.30
3000

GROUND F.F.L

1700
0.00 FEB. 2015 FEB. 2015 1023.1

1200
900

G.L.
300

300
1/100 -1/200 A0 R1
03 SCALE 1:100

10.A.0302.00

54
Construction Drawings Projects

Complex Stage 55
Construction Drawings Projects
PROJECT

DRAWING KEY: NORTH


03
A A.300.00 C D E F G H
18150
5750 2100 2150 2000 2800 2800

0.15
02 G.F.L
A.0500.00
1100 200 3600 200 1000 1100 1000 3650 6300

01 D4
7800

200 1200
UP

1200
5900
W03
ST1
BL05

3850

3850
0.30

4100
GR-01

2000
F.F.L 500 2000 1150 W03

1950

1950
6250
D1 D1

1200 200
200650
02

200

1700
D2

800
W04

1800

2700

2700
02

750
A.0800.00
GR-03
NOTES:

4800
D2

5000

1500

800
W04

5850
2000

2000
W03 GR-02

400 600 400450 1100


450 1100

750
D1 D1
D2

1500

800
W04

800
03

1400

200
650
3000

2350
1800

200
4800

4800
5000

2000
2000

2000
W03 W03

200
800
04

8600

8600

8600
400

400
3050

2800
0.30
F.F.L

2150
17750

200
4600

4600
5000
04

2000
W03

2400

2000
W03 A.300.00

200
400 600 400
19250
450
05

1400

1400
1100

400

400

2400
600
2400

2000
W03
01

24800
5000

4600

4600
A.400.00

24350

2400
W03

2000
3050

1100
06

8600

8600

8600
400

400
800

17750

2400
W03
52200

2000

2000

W03
4600

4600
5000

GR-04
1800

2750
3000

400 600 400


07
1400

1400

1400
800 400

400

600 400

200
200
5500 2500 1750 2500 5500 200 1850 300
300 0.15
D5 G.F.L
05
2000

2000

02 W03
0.30 A.300.00

3200

3200
4800
5200

A.300.00 F.F.L 04
4350

4350

4350

4350
GR-5 A.401.00
03 4000 2000 200 2600 2400 1100 2400 4100 200 2000 200 1000 200 2000 200 1250
REVISIONS:
2000

2000

A.0500.00 200
NO DATE MODIFICATIONS

200
17750 W03 W03 W03 W03 W03

200
200 800
3550 3850 2500 850

400
3650
08 08 R0 DEC.2014 ISSUED FOR TENDER
200

200

1100 200
450

200 1100
700

200 1500 150 2200 2000 450 2150 2000 2150 2000 450 2150 2000 650 550 2000 1050
R1 FEB.2015 ISSUED FOR TENDER
2950
0.30

2750
F.F.L
D3
GR-11
2650

3700
3700

3700
W01 GR-06 3800

2100
25200

5350
ST3

5500
5150

3600

6300
9850 UP 6600

09 09
850

2950
2100
1950

1500
450 800 300 800 350 800 350 800 350 800

1100

W04 D2
1850

1850
1200 200
10 GR-11 10
1100

3450

W04 D2
D1

650
2500
2100

2100
5650
1100

W04 D2
GR-09
11 11
4200

4200

OWNER:

2400
3650

3650

3650
D1
1100

W04 D2 GR-08 W03


2200

06

18150
2050

2050
1750
8050 2200 5200 1400 8600 1400 4200 2150 200
17550

1800
W04
1100

D2 GR-07 A.300.00

600
12 12
200

200

1100
D1
0.30
2100

2100
4200 1400 8600 1400 8600 400 600 400 8600 400 600 400 4200

2500
2300

2300

F.F.L

1100
D4
13 13
5900
5850

-0.85
G.F.L MAIN CONSULTANT:
7800

7800

8200
3350
7950

GR-10
5550

5550
15400 24200 3800

6000
5500

5500
1100

D1
1100

1100

D4
2000 2000 600 400 2150 2000 650 400250 2000 2150 200 200 4000 4600 4600 4600 4800
1050

14 600 ST2 14
800
1000

W03 W03 W03 W03 W03 W03 W03 W03


02
A.0500.00
1200 200 3600 200 1950 2400 900 2400 3350 200 3600 200 1000 200 3600 200 1950 2400 900 2400 4300 2400 4650

2150 4800 3050 2150 2400 2400 2800 2200 5000 5000 5000 5200 3800 DRAWING TITLE:
46250

A` A B D E F` G H H` 01 J K L M N
A.300.00
02 05 03
A.401.00 A.401.00 A.401.00

01 SCALE 1:100

FEB.2015 FEB.2015 1023.1

1/100 A0 R1

56
05.A.0200.00
Construction Drawings Projects

PROJECT
A` A B C D E F G H H` J K L M N

15.80
N M L K J H` 15.80 T.O.P
T.O.P

4.00
15.10
15.10 DRAWING KEY:

700
UPPER ROOF T.O.S
NORTH

700
UPPER ROOF T.O.S

2600

2600
12.50
12.50 13.20 13.20

2600
2.00 T.O.P
13.20

2600
T.O.P T.O.P T.O.P
T.O.P 12.50 12.50
12.50 2.00

700

700
T.O.P T.O.P
T.O.P 11.80

200
11.80

200

700
ROOF T.O.S

200 800

200 800

800
700
ROOF T.O.S

200

1600
1.00

800

10800

3300
1100

1100
3300
8.50
8.50

6800
SECOND F.F.L
SECOND F.F.L

2300

2300
2.00 1.00 1.00 2.00 1.00
1.00
2.00 2.00 2.00 BL05

16700

16700

3400
1100

1100
5.00

3400

10900

10900
GR-03
5.10

200700

300 700
5.00
5.10

450 200
FIRST F.F.L

200
4.00
FIRST F.F.L
5.00 5.00 1.00 5.00
1.00 4.00 2.00
1.00 5.00

1800

1800
1.00

1050
NOTES:

3700

4800
2100

2100

2100
4800
GR-01
1.00 1.00
4.00 4.00
4.00

300

300

1100 300
0.30
0.30 GROUND F.F.L

200

200
GROUND F.F.L

2200
400

400
2000

2000
300

1200
0.00 3.00 3.00 3.00

900

900

900
G.F.L

-1.00 -1.00
G.F.L G.F.L
05 SCALE 1:100 01 SCALE 1:100

(DRY MIX) 1

(DRY MIX) 2

(DRY MIX) 5

14 13 12 11 10 09 08 15.80
T.O.P
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15.80
T.O.P
4.00
15.10
UPPER ROOF T.O.S
15.10

700
UPPER ROOF T.O.S

12.50
1.00 2.00
T.O.P

3300

3300
12.50
13.20

2600
2.00 T.O.P
T.O.P
11.80 12.50 12.50
5.00 5.00 ROOF T.O.S T.O.P T.O.P 5.00
11.80

700
ROOF T.O.S

5.00 5.00 5.00 5.00

4.00

3300
8.50
SECOND F.F.L
4.00 8.50
2.00 2.00 SECOND F.F.L

2.00 2.00 2.00 2.00 2.00 2.00

15650
2.00 1.00 1.00 1.00
1.00

4.00

3400
5.10 2.00

12350

12350

12350
FIRST F.F.L
4.00 5.10
1.00 FIRST F.F.L

1.00

REVISIONS:
NO DATE MODIFICATIONS

4800
1.00 1.00
4.00
1.00 R0 DEC.2014 ISSUED FOR TENDER
0.30 4.00 4.00
GROUND F.F.L R1 FEB.2015 ISSUED FOR TENDER
0.30 3.00 3.00 3.00 0.30
3.00 0.00 GROUND F.F.L GROUND F.F.L

450

150
3.00 G.F.L
0.15
-1.00 G.F.L
G.F.L

06 02 SCALE 1:100
SCALE 1:100

OWNER:
07 06 05 04 03 02 01
H G F E D C A 15.80
T.O.P

15.10

700
UPPER ROOF T.O.S

13.20

3300
12.50

2600
T.O.P 1.00 T.O.P
12.50
T.O.P
4.00
11.80 MAIN CONSULTANT:

700
ROOF T.O.S

5.00 5.00 5.00 5.00 5.00


5.00 5.00

3300
4.00
4.00

8.50
SECOND F.F.L
2.00 2.00 2.00 2.00 1.00
1.00 1.00 1.00 1.00
2.00 2.00

2.00

3400
4.00
4.00

12350

12350
5.10 DRAWING TITLE:
FIRST F.F.L

1.00

4800
4.00 4.00
4.00
3.00 3.00 0.30
GROUND F.F.L 3.00 3.00 0.30
GROUND F.F.L
0.00

150

150
G.F.L 0.15
G.F.L
04 SCALE 1:100
03 SCALE 1:100

FEB.2015 FEB.2015 1023.1

1:100 A0 R1

05.A.0300.00

57
Construction Drawings Projects

A C D 14 13 12 C D PROJECT
A` A

08 63 62 61 60 59 58 57 56 55 54 53
64 65 66 67 68 69 70 71 72 73 74 64 65 66 67 68 69 70 71 72 73 74
1650 3000 5200

675

1500
1700 3100 3000
1700 3000 3100 DRAWING KEY: NORTH
30 x 10

01 SCALE 1:50
+11.80

2000

3700
11

700
T.O.S

3800
600
SCALE 1:50

+11.80
+11.80 10.20 T.O.S
10.20 F.F.L
T.O.S 06
F.F.L SCALE 1:50
03 02 01

1500
-- -- -- 1700 3000 3100

1600
1700 3000 3100

675
10.20
F.F.L 64 65 66 67 68 69 70 71 72 73 74
09 63 62 61 60 59 58 57 56 55 54 53
63 62 61 60 59 58 57 56 55 54 53

A` A C D
14 13 12 A C D BL05
08
42 43 44 45 46 47 48 49 50 51 52
42 43 45 46 47 48 49 50 51 52 63 62 61 60 59 58 57 56 55 54 53
1650 3000 5400 44
675

1500 UP

1600
+6.80 30 x 10 1700 3000 3100
F.F.L 1700 3000 3100 NOTES:

1600
2000

8.50
3700

700

8.50 8.50

3800
F.F.L

3800
600
12 F.F.L F.F.L
SCALE 1:50
02 SCALE 1:50

07
03 6.80 SCALE 1:50
6.80
-- 02 F.F.L
1500

F.F.L
01
--

1600
675

1750 3000 UP --
1700 3000 3100
09 63 62 61 60 59 58 57 56 55 54 53 1700 3000 3100
42 43 44 45 46 47 48 49 50 51 52
63 62 61 60 59 58 57 56 55 54 53

A` A C D
14 13 12 A C D

08
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
41 40 39 38 37 36 35 34 33 32 31
1650 4200
625

16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1500

1600
1700 3000 3100
1700 4200 1900

03
2000

3700

SCALE 1:50
700

2.70 13

3850
5.10 SCALE 1:50
F.F.L

3800
600
F.F.L

03 08 SCALE 1:50
2.70 5.10 5.10
1500

--
02 F.F.L F.F.L F.F.L
01
675

1750 3000 --

1600
--
1700 4201
09 41 40 39 38 37 36 35 34 33 32 31 1700 3000 3100
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
41 40 39 38 37 36 35 34 33 32 31

A` A C D
14 13 12 A C D

08 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
300

1600
UP
1500

2.70 0.30 1699 4201 1900 1700 4200 1900


F.F.L F.F.L

3800

3850
600
2650

3700

700

04 SCALE 1:50
14 SCALE 1:50 0.30 0.30
02 F.F.L 09 SCALE 1:50 F.F.L
14 x 30 01
03 --

1600
--
1500

--
1700 4250 1700 4200 2327 1700 4200 REVISIONS:
350

15 14 13 12 11 10 09 08 07 06 05 04 03 02 01
09 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 NO DATE MODIFICATIONS
R0 DEC.2014 ISSUED FOR TENDER

R1 FEB.2015 ISSUED FOR TENDER


A` A C D 14 13 12 A C D
15.80
T.O.P

15.10 15.10 15.10


700

700

700

700

700

700

700
UPPER ROOF T.O.S UPPER ROOF T.O.S UPPER ROOF T.O.S
140

140

140
2200

3200

3200

2960
3060

3060
4000

4000
OWNER:
4900

4900

4900
1000

+11.90 +11.90 +11.90


+11.80 T.O.S
F.F.L T.O.S T.O.S
ROOF FLOOR

250
1700

1700
2400

900

900
+10.20 10.20 +10.20
F.F.L T.O.S T.O.S
3400

3400

3250
MAIN CONSULTANT:
1700

1700
1000

2500

2500
8.50 8.50 8.50
SECOND F.F.L T.O.S SECOND FLOOR T.O.S SECOND FLOOR
3400

3400

3400

250
350

1700

1700
2400

900

900
6.80 6.80 6.80
F.F.L T.O.S T.O.S
3400

DRAWING TITLE:

3150
3050

1700

1700
1000

5.10 +5.10 5.10


FIRST F.F.L T.O.S FIRST FLOOR T.O.S FIRST FLOOR
3200

3200
350
4100

4100

4100
2400

2400

2400
15 SCALE 1:50
10 SCALE 1:50 SCALE 1:50
05
900

900
2.70 2.70 2.70
F.F.L T.O.S T.O.S
4800

4800
4450
2400

2400

2400

2400

2400

2400

2400

2400
FEB.2015 FEB.2015 1023.1

0.30 0.30
T.O.S T.O.S 1:50 A0 R1

05.A.0500.00

58
Construction Drawings Projects

Officers Accommodation

59
Officers Accommodation
Construction Drawings Projects

A B C D E F ELEV 3 G H J PROJECT
BL11 - A0100.00 A B C D E F S1
G H J
+10.60 m A0402.00 +10.60 m
28930 T.O.P T.O.P

205 3090 4495 3750 3175 1175 4000 4075 3175 1790
3

2500

2500

2500
3090 4400 4440 800 700 800 3115 800 800 800 800 800 3110 800 700 800 585395800395
4

4600

4600
W02 W02 W02 W02 W02 W02 W02 DRAWING KEY: NORTH
01 01

600 1000 600


200

200

1600

1600
1440
3
3600 400 15350 +6.00 m +6.00 m
T.O.S. T.O.S.

800 600

600

640
D03

3175

3175
3075
800
W01

3425

1400

1400
4500
L0-01 +5.00 m +5.00 m

1000

1000
800
2 2 3

10600

10600
T.O.S. T.O.S.

4950

1700
1435
+4.20 m +4.20 m
02 02

2460
1 1

800

800
T.O.S. 3 3 T.O.S.

1650
1800
4

8400 15350 W01

6500
0.00 1

2975

5900

5900

5900
G.F.L. 3

5100

5100
3425

1900
3750

3750
4200
1000

2600

3000

3300
2850
6075

6075
5575

L0-02 L0-08 +0.45 m 4 +0.45 m

1330
+0.30 m +0.30 m

1500
+0.00 m F.F.L F.F.L
F.F.L F.F.L

300150

300150
G.F.L

450

450
L0-09 +0.45

7000
15500

1200
2000
2650

940
F.F.L
+0.45
D01 01
F.F.L SCALE 1:100
01 02 03 04 05 06 07 08 09

R47
03 03 +10.60 m

12025

0
+1.20
T.O.P
BL11

2700
L0-06 F.F.L
01 +0.45 400250 1340
3175

3
3650

2975

F.F.L

4150
BL11 - A0100.00
NOTES:

2500

2500
2690 23600

5100
W01 4

7280

4600

4600
4700
04 04
D02
S4

1600

1600
A0402.00

2200
4500
8955 2025 2735 2000 2490 2000 3675 4
+0.45 +6.00 m
2730

1 3
3175

2000
2955
29100

29100
F.F.L T.O.S.

600

600
+0.45 (DRY MIX) 1
D01

1400
F.F.L +5.00 m

1250

1000

1000
4

10600

10600
T.O.S.

450
05 D01 D01 05 +4.20 m 20X40 CM 2
D01 3

1220 250

250

800

800
T.O.S. 3
4

1800
750
W02
1720

(DRY MIX) 3

2450
3
2500 L0-06 3
ELEV 2 ELEV 4

5900

5900

5900

5900
D04 D04 D04 D04 4

1000
D03 3 (DRY MIX)

4000
BL11 - A0100.00 BL11 - A0100.00
4500

4500
4000

5100

5100
960

W01 5250 2500 12600

3750

3750
3
3
5575
5820

2800

3000
+0.30

2200
F.F.L
3855

+0.45 m
L0-05 +0.30 m
F.F.L
2825

3575 +0.00 m
3140

06 06 F.F.L

300150

300150
400
G.F.L

450
1300 6580

300
1175

1175
+0.30
F.F.L 02
07 07 SCALE 1:100

J H G F E D C B A
1600 120

3800 250 4000 400 3800 400 4000

4600
3800
+10.60 m +10.60 m
1600

11850
T.O.P T.O.P
2825

2825
02
BL11 - A0100.00 0.00 +0.30
G.F.L F.F.L L0-03
1160

4600

4600

1160

3
08 08

2500

2500
400

4100
4
1600

4600

4600
1600

L0-04

1000 600
1600

1600
4350

4350
4000

4250
1200

+0.30
1695

+6.00 m +6.00 m
F.F.L
2445

T.O.S. T.O.S.

800 600
640
12600
+5.00 m +5.00 m

1000

1000
750 2100 6900 2100 750

10600

10600
3
2501000

T.O.S. T.O.S.
09 09 4

3150
+4.20 m +4.20 m
450

450
250

800

800
T.O.S. 3 T.O.S.

3210
0.00
3690 8250 1000 2100 1110 4760 1035 2100 1000325 1185 800 585395 800 395 3
G.F.L
3

6500

5900
805 3090 4495 3750 3175 1175 4000 4075 3175 1790

5100
3750

3750
2600
1900
29530
+0.45 m 4 +0.45 m
+0.30 m +0.30 m
+0.00 m F.F.L F.F.L
F.F.L F.F.L

300150

300150
01

750

750
SCALE 1:100 G.F.L
A B C D E F ELEV 1 G H J
BL11 - A0100.00
03 SCALE 1:100

A B C D ELEV 3 J 09 08 08 06 05 04 03 02 01
+10.60 m +10.60 m
BL11 - A0100.00
T.O.P T.O.P
29530

3
805 3090 4495 3750 3175 1175 4000 4075 3175 1790

2500

2500
REVISIONS:
600 3090 4400 3850 16000 1590 4 NO DATE MODIFICATIONS

4600

4600
ISSUED FOR TENDER

900

900
R0 DEC.2014
01 01

1600
200

200

R1 FEB.2015 ISSUED FOR TENDER


3600 15500 +6.00 m +6.00 m

1300
3
T.O.S. T.O.S.

600
3325

+5.00 m S3 +5.00 m
2925
3175

3175

1000

1000
2100
10600

10600
T.O.S. T.O.S.

1500
1
4500

A0402.00
+4.20 m +4.20 m

800

800
T.O.S. T.O.S.
02 02

1000
3

7200
3 3
3 3

5900

5900

5900
1

3750
3900

4400

2800
5925

+0.45 m 4 +0.45 m
6075

6075

+0.30 m +0.30 m
+5.00 +0.00 m F.F.L F.F.L
F.F.L F.F.L

300150
T.O.S. G.F.L

600
300
2925 9650 2925 1340
OWNER:
04
7000
15500
9650

6500

SCALE 1:100

A B C D E F G H J
+10.60 m
T.O.P
12030

2835 7995
+5.00
01 T.O.S.
21175
3175

2500

2500

2500
3650

BL11 - A0100.00

2500
+4.20
5100

T.O.S.

4600

4600
500 1000 600

1000 400

1000 400
1600

1600
15500 MAIN CONSULTANT:
4500

+6.00 m
+6.00 T.O.S.
3175

500
600

640

640
2925
2955

T.O.S.
29100

29100

1500

1500

1500
+5.00 m

1000

1000
9950
900
10600

10600
880

860
T.O.S.
1250

+4.20 m
05 05

2480
800

800
T.O.S.

500

1650

1500
650

3700
5900

5860
ELEV 2

4250
ELEV 4

1300
4550

3000
3200
4300
4000

BL11 - A0100.00 BL11 - A0100.00


3935
4500

4500

3750

2200
2600
2850
+1.20 m
5820

900
F.F.L
+0.45 m

750
+0.30 m
3855

750
F.F.L

600
+0.00 m F.F.L +0.00 m

300

300

150
DRAWING TITLE:
300150

G.F.L G.F.L

300
1175

1175

8000 3960 3960 3960


07 07 01 SCALE 1:100

A B C D E F G H J
4600
3935

+10.60 m +10.60 m
2825

2825

02 0.00 +0.30 T.O.P T.O.P


BL11 - A0100.00 G.F.L1 G.F.L1

2500

2500
7175

4100
4600

4600
4350

4350

1600

1600
3935

4250

+6.00 m +6.00 m
T.O.S. T.O.S.
800 600

600

640
1400

+5.00 m +5.00 m
1000

800 1000
09 09
10600

10600
2300

2300
T.O.S. T.O.S.
450

450
250

250

+4.20 m +4.20 m

2460
800

T.O.S. T.O.S.
0.00
3690 8250 4250 4675 4250 250 2575 1590

600

600
G.F.L1
1000

5450
805 3090 4495 3750 3175 1175 4000 4075 3175 1790 FEB. 2015 FEB. 2015 1023.1
4800
5100

1900
3750

3750
3900

3150

3150
29530
2850

2900

A0 R1
+0.45 m +0.45 m
+0.30 m +0.30 m

1500
+0.00 m F.F.L F.F.L
F.F.L F.F.L
300150

300150
01 SCALE 1:100 A B C D ELEV 1
J G.F.L
11.A.0100.00
300

60
BL11 - A0100.00
02 SCALE 1:100
Construction Drawings Projects

Mosque Exterior

61
Mosque Interior
Construction Drawings Projects

PROJECT

A A' B' C' D' J

+5.80 +5.80
DRAWING KEY: NORTH
2.00 3.00
T.O.P. T.O.P.

200

200
+4.90 +5.00
4.00 4.00 ROOF T.O.S

700
T.O.P.
+4.30
ROOF T.O.S

2500
3.00

1800

1800

1800
3.00 01
BL12 - A0100.00
ELEV 3

6100
A B C D E F G H J
BL12 - A0100.00
F

2000

2000

2000

2000
F F F F F F F F F F F F F F
-0.30

2500
31700
G.F.L.
+0.30 +0.30

500

300
Ground F.F.L Ground F.F.L 6150 4800 2400 2900 1900 2400 4800 6150

1100
1400

1400

900
600
01 01 BL12
-0.30 3.00 -0.30

1000

1000

1000
G.F.L G.F.L D08 D08 D08

3250
03 SCALE 1:100

1000

1000

1000
2950

2950

2950

3150
L0-06 L0-05 L0-09 D08 D08 D08
L0-13
2850 3050 4550 3950 950 4600

4750
4950

4950
1000

1000

1000
1900 D08 D08 D08 850
D07 900 1400 4450
D07 D09

350
D07
1600 7250 1650 1450 1000 +0.30 7300
D07 F.F.L. L0-10 L0-11

1550
L0-07 D06 D07

1550
L0-08

1650
1550
1500 1000 NOTES:

600
02 02

350
10150
D05 D04
1900
1 2 3 4 D03 2900 2950 L0-04 17700 5550

1600
+0.30 L0-03

1800
ELEV 2 F.F.L.

3700
3600

3250

3600
+5.80 +5.80 BL12 - A0100.00 D01
T.O.P. 3.00 2.00 T.O.P.
L0-02 1450

1500
L0-03 (DRY MIX) 1
200
+5.00

15600
16100

16100
1250
+4.90 D04
900

900
T.O.P. ROOF T.O.S -0.30 350
+4.30 03 G.F.L. D02 03
ROOF T.O.S (DRY MIX) 2
600

600

R7
750 1400 4250 900 400

9
1800

00
L0-12 (DRY MIX) 3

36.3


3.00
1500

36.3
01


3.00 ELEV 4

10600
BL12 - A0100.00

1000

1000
W02 W02 20X40 CM 4
6100

4600

+0.30 BL12 - A0100.00

4100
4100
+0.30
F.F.L.
2000

F.F.L.
F F 3.00 29 °
+0.30
20CM 5
.74
2500

.9 F.F.L.
5° 35

7050
2300

2300
7350

7350
+0.30 20
L0-01 00 00
GROUND F.F.L 19 35.74°

600 600
1400

54

1200
00 50
53
18
00 00

1000

1000
W02 18 W02
-0.30
D01
4900
G.F.L 16
00 D01 00
04 4900 16 W03 W03 1600 600 2650
SCALE 1:100 +0.30 + 0.30

1650
F.F.L. F.F.L.
04 04
W01 W01 W01 W03 L0-14 W01 W01 W01

-0.30
-0.30
G.F.L.
G.F.L.
4 3 2 1
1150 600 600 1150 1150 600 600 1150
600 600 600 600 600 600
31700
2.00 3.00 +5.80
T.O.P. 31450
200 700

+4.90 +5.00
A A' B' C' D' J
900

T.O.P. ROOF T.O.S


+4.30 01 SCALE 1:100 ELEV 1
ROOF T.O.S
BL12 - A0100.00
1800

3.00 3.00
6100
5200

F F
2000

+0.30
GROUND F.F.L
600 600

1400
1200

-0.30
3.00 F.F.L
05 SCALE 1:100

REVISIONS:
J H G F E D C B A
NO DATE MODIFICATIONS
R0 Jan. 2015 Issue For Approval
2.00 +5.80
3.00 T.O.P. R1 FEB.2015 ISSUED FOR TENDER
200 700

+4.90 +5.00
800

T.O.P. ROOF T.O.S


+4.30
ROOF T.O.S

3.00
ELEV 3
A J
BL12 - A0100.00
6100
5300
5200

31700

6150 4800 2400 2900 1900 2400 4800 6150

+0.30 +0.30 +4.90


T.O.P.
GROUND F.F.L GROUND F.F.L 01 01

-0.30 -0.30
06
OWNER:
G.F.L SCALE 1:100 G.F.L

4950

4950
16050
+5.80
A B C D E F G H J T.O.P.
02 02

+5.80

3700

3700
3600

3600
T.O.P.
+5.00
MAIN CONSULTANT:
+4.90
800

900

ROOF T.O.S
1200

T.O.P.

16100

16100
+4.30
ROOF T.O.S
600

1000

2100
900

900
1300

1300
1750

30.8


36.3
700
6100

6100

ELEV 2


4500

+4.90 +5.00 + 4.30 ELEV 4


3800
4900

BL12 - A0100.00
3450

T.O.P. T.O.S T.O.S


2000

2000

2000
1100

BL12 - A0100.00
2900

2200

+0.30 +0.30
950

35
7350

7350
GROUND F.F.L GROUND F.F.L °
.74 .74
500

500

600 500

° 35

35.74° 52
50 50
-0.30 -0.30 52 DRAWING TITLE:
G.F.L G.F.L

0
75
R7

R7
07

80
SCALE 1:100

0
+4.90
T.O.P.
04 04
5300 5300

1 2 3 4
31450

+5.80
T.O.P.
+5.00
+4.90 A A' B' ELEV 1 C' D' J
800

T.O.P. ROOF T.O.S 02 SCALE 1:100


1500

+4.30 BL12 - A0100.00


ROOF T.O.S
600

3000
1000

2000
950
6100

4500
3850

3450

3450
4600

2000

2000
2900
1900

FEB. 2015 FEB. 2015 1023.1


+0.30
GROUND F.F.L
500

500

A0 R1
-0.30
F.F.L

08 SCALE 1:100
12.A.0100.00

62
Construction Drawings Projects

Gym Exterior

63
Gym Interior
Schlumberger Egypt Workshops Project

Client : Schlumberger Egypt


Location : industrial zone - 6th of October city - Egypt
Leed Consultant : EHAF
Scope of Work : Design Development - Developing Working Drawings - Coordination -
Respond to RFIs.
Construction Drawings Projects

3D Shot for the Complex

65
Construction Drawings Projects

Project’s Layout 66
Construction Drawings Projects

67
Construction Drawings Projects

Aerial Shot For the Complex

68
Construction Drawings Projects

69
Construction Drawings Projects

70
Construction Drawings Projects

71
Construction Drawings Projects

Main Building Exterior


Main Building Interior

WorkShop

Main Building

WorkShop 72
Meeting Room
Construction Drawings Projects

73
Construction Drawings Projects

74
Construction Drawings Projects

WorkShop

75
WorkShop
Construction Drawings Projects

Main Building Interior

76
Main Building Exterior
Construction Drawings Projects

PROJECT:
A B A C D' D E F G ELV 03 H I J K
BL05-A0400.01 BL05-A0300.02 EGYPT INTEGRATION PROJECT
62875

6000 6000 5900 100 6000 2100 4900 1900 3000 2100 12000 12000
LAYOUT
200 175
900 5000 1000 5000 1000 5000 1000 5000 1300 1000 225 4650 380 4390 380 1000 1800 10000 2000 10000 1475
10050
1 1
450

450
650
± 0.00
ROAD LEVEL WASTE OIL STORAGE NEW OIL BULK STORAGE
POLYURETHANE WITH HARDENER,
3750
3300

3100

3298
3750
ANTI-SLIP ANTI-OIL ON CONCRETE RAMP L0-19 L0-20

3423
+ 0.15 + 0.15
F.F.L F.F.L

325
4795 200 4795
2 + 0.15
2
625

145 405 1000 200


F.F.L 2900 3500

600
1360
D
1000

IT HUB

1500

1475
9973
1655
L0-17
+ 0.15 1360 780 1360 750 2050
L0-17 F.F.L

2700
750

800

800
BATTERY STORAGE & CHARGING L0-18B
2900
L0-16
8
MALE TOILET ± 0.00

1000
2045
6100

6100
RAIN LEADER
1800

1800
7

3050
5800

5800

5800
+ 0.15 ROAD LEVEL

1000
6
POLYURETHANE WITH HARDENER, ± 0.00 D
F.F.L 300 5 L0-18 BOLLARDS OF HEIGHT POLYURETHANE WITH HARDENER, RAIN LEADER
BOLLARDS OF HEIGHT BOLLARDS OF HEIGHT ROAD LEVEL FEMALE TOILET L0-16
4 150MM & DIAMETER 150MM

2000
ANTI-SLIP ANTI-OIL ON CONCRETE RAMP ANTI-SLIP ANTI-OIL ON CONCRETE RAMP

300

800

800
W
150MM & DIAMETER 150MM 150MM & DIAMETER 150MM

100
3
L0-18A
L0-15 2
300 700 1050

W
2900 1

1700
+ 0.15 25200 5475

1800
L0-15
26400 KEY PLAN

UP

1700
F.F.L 2800
1500

1500
1390

1100
D D D D D D
L0-01B L0-02B L0-03F L0-03E 205 1000 1595 L0-21F L0-21E
D D D D D

3 3
3
400

400
L0-03D L0-15 ST-02A L0-18 L0-21G

1000
+ 0.15 STAIRCASE A

1800

500
F.F.L
ST-02
700 5000 1000 5000 1000 5000 1000 5000 1300 1000 600 1000 4205 1000 600 1000 1995 1000

1000
26200 10000 D D
L0-14 L0-21D
D
4 2

820
+ 0.15 L0-22
W 100 + 0.15
F.F.L F.F.L
5300

L0-13
1200 420 1000 B B
900 1000 1665 1200 1665

3020

5750
1200
2520
W
100 PANTRY

2700
L0-14

2500
STORES

3950
ELECTRICAL 2000 L0-14

3600
OFS SERVICE PIT

900
L0-22 L0-13
+ 0.15 + 0.15
L0-01 F.H.C 2
F.F.L F.F.L + 0.15 A

1430
D

1250

1250

1200 265 1000 405 1230


900

900
F.F.L
4 - 0.85 4 L0-13 350
4 4
6730 2370
1000

3 3 1
2 2 - 0.85

635

1200 265 1000 205

1200 265 1000 205


1 1
UP

UP

OFFICE 1 OFFICE 2

1200 265 1000


D D
L0-11 L0-12

L0-11 L0-12

3200

3200

3400
GENERAL NOTES:
Slope 1:100

Slope 1:100

W
REW WSV L0-11 + 0.15 + 0.15 W
F.F.L F.F.L L0-12

L0-02 L0-03 4700 4700


5 5

530 530

530 530
1260

1260
40975

D D
TRENCH 20X1X1 TRENCH 20X1X1 L0-10A L0-10B

1800

1800

1800

1800
COVERED WITH DH COVERED WITH DH
CI COVES CI COVES
MECHANICS CLEAN ROOM
ELV 02

4900

5100
+ 0.15 + 0.15
BL05-A0300.01 F.F.L F.F.L L0-10

1070

1070

1070

1070
+ 0.15 ELV 04
F.F.L
W W BL05-A0300.02
SUMP PIT SUMP PIT WIS WORKSHOP
30000

1200

1200150 300 1200

300 1200

1200
L0-10A L0-10B

1*1*1.5 M 1*1*1.5 M
COVERED WITH DH CI COVERED WITH DH CI L0-21
6 6

41041
20000

18000

COVES COVES
650

650
200

30600
1200 150
- 2.73
- 2.73
31000

30600

39000
BOTTOM LEVEL OF SUMP PIT + 0.15
1200

1200
BOTTOM LEVEL OF SUMP PIT W W
L0-09A F.F.L
B
L0-09B
10 TON CRANE B

29000
BL05-A0400.01 9600 7.5M HH BL05-A0400.01
ELECTRONICS LAB
1220

1220

1220

1220
+ 0.15
4900

5100
SLIDING SLIDING NO. DATE MODIFICATIONS
CHECHERED PLATE CHECHERED PLATE
L0-09 F.F.L
+ 0.15
1800

1800

1800

1800
F.F.L
D D
L0-09A L0-09B

7 7
1325 175 1000 200 530

1325 175 1000 200 530


930

930
9600
D
6 NOS HOTDESK D
1200 300 1000 400 1125 375 1000

1000
Slope 1:100

Slope 1:100

L0-08A L0-08B

L0-08
2700

2900
F.H.C 3
F.H.C 1 R0 MAR - 2015 ISSUED FOR CONTRACT
+ 0.15

375
1000

1200 300 1000 400 1125


900

LEVEL OF TRENCH FROM LEVEL OF TRENCH FROM 350 F.F.L 8900 REVISIONS:
350
8 -1.15 TO -1.23 -1.15 TO -1.23
8
300 1200 300 1000 200

300 1200 300 1000 200


1000 1000 OWNER:
- 0.85 D WSV FOREMAN WIS FOREMAN D
- 0.85 L0-06 L0-07

10 TON CRANE L0-06 L0-07


3000

3000

3200
7.5M HH
UP

UP
UP

UP

1 1 + 0.15 + 0.15
F.F.L
1000

2 2 W F.F.L W
3 3 L0-06 4700 4700 L0-07
4 4

9 9
+ 0.15 + 0.15
1630

F.F.L F.F.L
1130

MAIN CONSULTANT:

LUBRICANTS TIRE SHOP


1800

1800

L0-04 L0-05
5300

5250

4550
4950
4750

D
L0-04 + 0.15 + 0.15
26200 F.F.L F.F.L
26275
1820

1171
700 5000 1000 5000 1000 5000 1000 5000 1000 33011330 4700 4700 245 1000 1755 10000 2000 10000
1820

10 2550 1800 350 10 DRAWING TITLE:

MECHANICS SHOP - BL05 -


D
D D L0-21A
L0-03C D
ARCHITECTURAL PLANS GROUND
D D D D L0-05 D
L0-01A L0-02A L0-03A L0-03B L0-21B L0-21C
2000

2000

24100 15300
+ 0.15
22200 5475
FLOOR - OVER ALL
RAIN LEADER F.F.L RAIN LEADER
BOLLARDS OF HEIGHT ± 0.00 BOLLARDS OF HEIGHT BOLLARDS OF HEIGHT
150MM & DIAMETER 150MM 1m X 2.2m EMERGENCY DOOR
ROAD LEVEL 150MM & DIAMETER 150MM 1m X 2.2m EMERGENCY DOOR 150MM & DIAMETER 150MM
+ 0.15 DESIGNED BY:
POLYURETHANE WITH HARDENER, UP
POLYURETHANE WITH HARDENER,
ANTI-SLIP ANTI-OIL ON CONCRETE RAMP F.F.L ± 0.00
1 2 3 4 5 6 7
ROAD LEVEL ANTI-SLIP ANTI-OIL ON CONCRETE RAMP ENG. SHAIMAA FAHMY
STAIR
CHECKED BY:
ST-01
POLYURETHANE WITH HARDENER, POLYURETHANE WITH HARDENER, ENG. NERMINE ELBITAR
+ 0.15 ANTI-SLIP ANTI-OIL ON CONCRETE PLAT FORM ANTI-SLIP ANTI-OIL ON CONCRETE PLAT FORM
F.F.L APPROVED BY:

ENG. SHERIF ELABD


900 5000 1000 5000 1000 5000 1000 5000 1171 1000 7979 1800 795 1000 1755 10000 2000 11475 DATE DRAWN: PLOT DATE: PROJECT NO.

6000 6000 6000 6000 14000 12000 12000 JAN - 2014 MARCH - 2015 1011
SCALE: SIZE: REVISION:
62875
1:100 A1 R0
A B A C D' D E F G ELV 01 H I J GROUND FLOOR PLAN K
BL05-A0400.01 BL05-A0300.01 01 SCALE 1:100
DRAWING NUMBER:

77
BL05-A0200.00
Construction Drawings Projects

PROJECT:

EGYPT INTEGRATION PROJECT

LAYOUT

A B C D' D E F G H I J K

TRANSLUCENT LATERAL TRANSLUCENT LATERAL


TRANSLUCENT LATERAL SKYLIGHT PANELS WITH SKYLIGHT PANELS WITH
SKYLIGHT PANELS HEIGHT OF 1000MM HEIGHT OF 1000MM
01 ROOF SKYLIGHT 02 03 EXPANSION JOINT ROOF SKYLIGHT 01 ROOF SKYLIGHT 03 02 01
+11.85 WITH HEIGHT OF 1000MM +11.85
MID-SPAN LEVEL MID-SPAN LEVEL
1250

150 1250

150 1250

1200 150 1250

1200 150 1250

150 1250

150 1250

1250
+10.60 +10.60

1400

1400
EAVE LEVEL EAVE LEVEL

+9.25
T.O.P

5200
2500

2500

2500

2500

2500
+8.25

3800
T.O.S
300 1000

300 1000

300 1000

300 1000

300 1000
02
11850

11850
STEEL HANDRAIL

6900
KEY PLAN
Painted with epoxy 03
10450

10600
+4.25

900
3
F.F.L

9250
03 03 03

4300

4300
STEEL STAIR
A
Painted with epoxy
RAIN RAIN
03
6500

6500

6500

6500

6500

6500
LEADER LEADER
04 +2.36

900
F.F.L
4 2

70
700
B B
+1.88

70
F.F.L

2200

2200

2200
04 04 04 04

400 960
+0.15 +0.15
F.F.L F.F.L
150

150
GROOVE IN A
±0.00 GROOVE IN BOLLARDS OF HEIGHT GROOVE IN PLASTER GROOVE IN ±0.00
F.F.L 03 PLASTER 75 MM & DIAMETER 150MM 05 PLASTER 05 70X10mm PLASTER 05 F.F.L
70X10mm 70X10mm BOLLARDS OF HEIGHT 70X10mm 1
75 MM & DIAMETER 150MM
To storm water net work To storm water net work
ELEVATION 01
01 SCALE 1:100
GENERAL NOTES:

1 2 3 4 5 6 7 8 9 10
ELEVATION FINISHES

01 CORRUGATED SHEET WITH INSULATION


NO. DATE MODIFICATIONS
CAPPING 02 LATERAL CLADDING OF CORRUGATED
+11.85 +11.85 SHEET 0.5 MM THICKNESS
MID-SPAN LEVEL 01 MID-SPAN LEVEL WASHABLE EMULSION PLASTIC
RAIN GUTTER RAIN GUTTER 03
02 01 02 PAINT ON PLASTER (LIGHT COLOR)
SLOPE 0.5% SLOPE 0.5%
WASHABLE EMULSION PLASTIC
1250

1250
+10.60 +10.60 04
PAINT ON PLASTER (DARK COLOR)
EAVE LEVEL EAVE LEVEL
05 400 MM GRANITE SKIRTING
1350

03 +9.25
T.O.P

+8.25 R0 MAR - 2015 ISSUED FOR CONTRACT


1000

1000

1000

T.O.S
8700
REVISIONS:

OWNER:
4850

RAIN LEADER RAIN LEADER


4000

4000
11850

11850
6900

10450
5900

+4.25 +4.25
F.F.L 03 F.F.L

STEEL HANDRAIL
Painted with epoxy MAIN CONSULTANT:
1200

1200

+2.36
03 03 03 F.F.L

900
02
4250

700

3000
2900

2900

+1.88
03
2200

F.F.L

1905
04 04
1500

+0.15 +0.15
F.F.L F.F.L
DRAWING TITLE:
150
150

150
±0.00
GROOVE IN
PLASTER
GROOVE IN
PLASTER
GROOVE IN
PLASTER STEEL STAIR F.F.L
MECHANICS SHOP - BL05 -
F.F.L 05
To storm water net work
70X10mm 03 05 70X10mm
CMU WALLS 3m HEIGHT 05 70X10mm 03 Painted with epoxy
To storm water net work
±0.00 ARCHITECTURAL ELEVATIONS -
ELEVATION (01) AND (02)
ELEVATION 02
02 SCALE 1:100

DESIGNED BY:

ENG. DOAA ABU BAKR


CHECKED BY:

ENG. NERMINE ELBITAR


APPROVED BY:

ENG. SHERIF ELABD


DATE DRAWN: PLOT DATE: PROJECT NO.
JAN - 2014 MARCH - 2015 1011
SCALE: SIZE: REVISION:
1:100 A1 R0
DRAWING NUMBER:

BL05-A0300.01

78
Construction Drawings Projects

PROJECT:

EGYPT INTEGRATION PROJECT

1 2 3 4 5 6 7 8 9 10 LAYOUT

CAPPING
+11.85 CORRUGATED SHEET +11.85 CORRUGATED SHEET +11.85
MID-SPAN LEVEL 0.5 mm THICKNESS MID-SPAN LEVEL WITH INSULATION MID-SPAN LEVEL
RAIN GUTTER RAIN GUTTER
SLOPE 0.05% SLOPE 0.05%

1250

1250
+10.60 +10.60
EAVE LEVEL EAVE LEVEL

2115
+9.25

4060
04

1850
T.O.P RAIN LEADER

2350
5400

5400

5400

5400

5400
1485
+8.25
T.O.S
LATERAL CLADDING
LATERAL CLADDING
OF CORRUGATED
OF CORRUGATED
SHEET 0.5 MMTHICKNESS
SHEET 0.5 MMTHICKNESS

1340
10 TON CRANE

5000

5000

5000
7.5 M HOOK HEIGHT STEEL HANDRAIL

4500
4000

4000
1200
11850

11850
1200

1200

1200

1200

1200
6900
RAIN LEADER
+4.25 +4.25

900
F.F.L F.F.L
KEY PLAN

2900

2900

2900

2900

2900

2900

1445
1200

1200

1200
STEEL HANDRAIL

1900
CMU WALLS 3
CMU WALLS

700
+1.88

You might also like