WEEKLY HSE Statistics Reporting WEEK No :014

Date: 04th March 2021 Week Start Date: 26/02/2021 Week End Date 04/03/2021

Khobar To Dammam/Jamiah
A Project Name*
WTS Project
B Contractor Name* SSEM
C Reporting Week * 04/March /2021
1 Number of Workers: 161
2 Number of Man hours: 7728
3 Cumulative Safe Man hours 72720
4 Number of Weekly Safe Working Days 06
5 Cumulative Number of Weekly Safe Working Days 159
6 Number of Lost Time Accidents: 00
7 Number of Non-Lost Time Accidents: 00
8 Number of Fires: 00
9 Number of Total Lost Days: 00
10 Number of Safety Observation Records: (SWCC) 00
11 Cumulative Safety Observation Records: (SWCC) 00
12 Number of Safety Observation Records: (FICHTNER) 00
13 Cumulative Safety Observation Records: (FICHTNER) 11
14 Number of Internal Safety observations reports: (SSEM) 01
15 Number of cumulative internal safety observations Reports: (SSEM) 07
16 Number of Toolbox Talk Conducted 02
17 Cumulative Toolbox Talk Conducted 19
18 Number of Induction training conducted 06
19 Cumulative Induction Training conducted 161
20 Number of Internal/External Trainings 1
21 Cumulative number of Internal/External Trainings 2
22 Number of Incentives, awards recognition. 0
23 Cumulative Incentives, awards recognition. 0
24 Number of Fire drill conducted. 0
25 Cumulative Number of Fire drill conducted. 0
26 First aid case. 0
27 Cumulative First aid cases. 2
28 Cumulative Number of Fire Incident. 0
29 Number of Recordable Injuries. 0
30 Cumulative number of Recordable Injuries. 0
31 Safety Walk Through at PS this week 02
32 Cumulative Safety Walk Through at PS 11
33 Safety Walk Through at Jamiah this week 02
34 Cumulative Safety Walk Through at Jamiah 08
35 Safety Walk Through at Pipeline this week 01
36 Cumulative Safety Walk Through at Pipeline 04