Professional Documents
Culture Documents
J component
Domains
– Distributed System
– Telecom
– Cloud Computing / Fog Computing
– Image Processing
– Data Mining / Machine Learning
– Network Computing
– Embedded System
– Smart Grid
– Healthcare
– Any Business Verticle.
– Etc.,
Components
• Aim
• Abstract ( 500-600 words)
• Introduction
( 10 - 12 paragraph – 500-600 words)
• Literature Review
( 10 - 12 paragraph – 500-600 words) with citations
• Proposed Method
(old Algorithm & new Algorithm/ new Algorithms)
Description
• Results
( Comparison in values/ graphs)
• Conclusion
• References (25 -30)
Key Dates
• Title & Team Registration – On or Before
24/07/2020 (Team Size – 1 or 2..)
• Review1 – 12/08/2020
• Review2 – 16/09/2020
• Review3 – 05/10/2020
Review-1
• Aim
• Introduction
( 10 - 12 paragraphs – 500-600 words)
Review-2
• Literature Review
( 10 - 12 paragraphs – 500-600 words) with citations
• Proposed Method
(Business logic/ Algorithm)
Description
• Results
( Comparison in values/ graphs)
Review-3
• Conclusion
• References ( 5-20 )
• &
• Complete document
Real-world Problems
Using machine learning to estimate
risk of cardiovascular death
• MIT researchers have developed a machine learning model
that can estimate, based on the electrical activity of their
heart, a patient’s risk of cardiovascular death.
• Precision Agriculture
Social Network Projects
• Potential topics:
• Analysis on Instagram