You are on page 1of 21
aw cover Aa Bee I L I S Sela ale I 4 ane I NOTES / SPECIFICATIONS: RATING : 15-25 kVA 1, ENGINE : CIL X1.7~G1 / X2.5-G1 / X2.5-G2 (RADIATOR COOLED) 2. ALTERNATOR : Make STAMFORD 15 / 20 / 25 kVA, FRAME SIZE: Pl044G / PI144D / PI144E. 3. DG-SET, CONTROL PANEL, BATTERY & FUEL TANK ARE WITHIN THE ACOUSTIC, ON A COMMON BASE. 4, THE DG-SET IS COMPLETE WITH EXHAUST PIPING, SILENCER & RAIN CAP.- 5. CONSTRUCTION DETAILS /SPECIFICATIONS: OUTER BODY = 1.6 mm Thk. (16 SWG) CRCA ~ DOORS = 1.6 mm Thk. (16 SWG) CRCA - SOUND INSULATION — 25mm Thk. PU FOAM, BASE FRAME ISMC 100 CHANNEL - 6. THE ACOUSTIC IS COMPOSITE IN CONSTRUCTION é& IS A FULLY ASSEMBLED INTEGRAL UNIT. 7. THE MANUAL / AMF CONTROL PANEL IS LOCATED AT THE ALTERNATOR END, FACING THE REAR SIDE & A PERSPEX IS PROVIDED FOR VIEWING OF THE METERS AND OTHER INDICATIONS. 8. THE BATTERY IS LOCATED AT THE ALTERNATOR END OF THE ACOUSTIC & IS EASILY MAINTAINABLE. 9. SILENCER — Make ‘CEIL’, Port No. 10118-1 10. THE DG~SET IS PROVIDED WITH AN EXTERNAL ‘EMERGENCY STOP’ PUSH BUTTON. 11. THE ACOUSTIC IS PROVIDED WITH A BULKHEAD LIGHT FITTING FOR INSIDE ILLUMINATION. 12. THE FUEL TANK CAPACITY IS 55 Lts & IS SUB—BASE TYPE. Se 13. THE NOISE LEVEL WILL BE 75 dBA LOG. AVG. AT 1 Mtr, UNDER FREE FIELD CONDITIONS oe aR: Din (MEASURED AS PER 1S0 8528 Part-10) ND.) to 14, FLOOR (INCL.MOVE AROUND) SPACE REQUIRED FOR INSTALLATION :4 M X 2.6 M CHIEF efgieen {etary ABRANSCO MOET § 48. THE ACOUSTIC ENCLOSURE PARTS WILL BE POWDER COATED AFTER PRE-TREATMENT PROCESS THE POWDER COATING SHADE IS 'GENSET GREEN’. THE COMMON BASE FRAME WILL BE EPOXY PAINTED-BLACK SHADE. aaa [GROSS SYSTEM WET WEIGHT + 1100 kg (max) aE We = SE POWERICA DEVELOPMENTS 18 Oe Acoma LED GENERAL SPECIFICATION i. [earme ; tims | forsee |__| Sae_| Standardised Guaranteed Technical Particulars for ama ar] PIS eon [at Diesel Generator Set eee [arson (ornce) [sa [ai oF ‘STDIGTP-DWG/Approval No. 271 / Revision Mo. 0 a 8 Prepared & Approved during October - 2011 Yous _POWERICA LIMITED ay oer om as =e | 4 g § ef el ae [ar ae 2: Fy ae oo APPROVED POH TURNKEY PROJECTS ALTERNATOR END LEFT SIDE VIEW a g HO, \16 (oo ul Cie Ti 75 TO 25 KVA — RADIATOR COOLED PME CHIEF ENGINEER / CONSTRUCTION-T— : COMPOSITE ACOUSTIC DG SET. 7 pseParickars govsddevo.o aie | Scote MIS: Standardised Drawing for Diesel Generator Set Ret STD/GTP-DWG/Approval No. 23:1 / Revision Mo. 0 (STICKERS) | Sheet_| 02 OF 04 Prepared & Approved during October - 2011 POWERICA Lil LIMITED ¥ 5 3h 7 tomes : roe. a sorsiperoos: a 4. ALOMENSDNS EH ne USES FECFED OTR G | Sora feestnn PLAN VIEW ue 0 wenn SILENCE q i: NRO HELLO oe Fee q omen | b Paerriow 1 {} . i oe 2 HO} ane oe (5 2 0 Pas we “sa {re i 1 FOR TURNKEY PROJECT; st Tuan sao oat Stem - 4 E eocaeeecemeete aal\olw\,' fummawaron ea atl bee a GINEER | CONSTR ee a : 0 5 i POWERICA DEVELOPMENTS 18 Topostte ae PruooTs SOURAAGENRiLy ravour 's 355 | [oom Tm [paso [—_Jorsoe [orig Wo Sei | M i] ’ F [Standardised Drawing for Diesel Generator Set oud [ jounae | PTS/X2—01 [ret | — y fa ‘STD/GTP-DWG/Approval No. 221 / Revision Mo. | [7 | 108 (6a pu) [sret | OF HL repre & Approved during Oss -2011 aca __ POWERICA LIMITED peace jd ° “4000 — CLEAR INSTALLATION SPACE (LENGTH) 2500 — FOUNDATION LENGTH ie ane oouer ask |? 2200 — ACOUSTIC LENGTH RADIATOR END ALTERNATOR END/ >ANEL END CONTROL PF LEVELLED FOUNDATION | oH | APPROVED FOR TURNKEY PROJECTS rABLE TOP_FINISH) t | z 2 NOTE = MP TRBNCHES ARE NOT REQUIRED TOR CABLE ENTRY. FOUNDATION 15 CONSIDERING WNIMUM SBC = 5 T/SQ¥e 3) re CASTING OF FOUNDATON AT CUSTOMER STE/PRESTES SHOULD Te AE AFTER CONFRIING THE SITE LOCATON & SUITABILITY FOR INSTALLATION ‘O21 © \o Hier ENGINEER | CONSTRUCTION-1 ATRANSCO/VIDYUTH SOUOHA/HYD. Tie 15 TO 25 KVA — RADIATOR COOLED Rie FOUNDATION PLAN LS PosITE ACOUSTIC DG SEF. ce rong nese Tes auuas | PTS/XF2—O1 [fet Thre ons roy) [set a —|_Rapet POWERICA LIMITED sormunn PANEL FOR 15-25 KVA D.G SET TYPE - AMF DESCRIPTION APPROVED FOR TURNKEY PROJECTS NW) al toh | Hier ENG ION APTRANSC AHO. EEE ee ———_TcuENT = POWERICA DEVELOPMENT = ‘UST OF DRAWINGS TBR A CONTROL PEL ar a am ea ‘Standardised Guaranteed Technical Particulars for INSIDE ACOUSTIC ASTER ORG. Ne Prsnrzoy [ine emems | rao Diesel Generator Set 2 sees] Paes lesen ‘STD/GTP-DWG/Approval No. 291 [Revision Mo. Prepared & Approved during October - 2011 rowenta} §=POoWERICA LIMITED H T = T Z i z T z To LOAD KWH MEM eV +H2+KWKVAl pce j SPO a A eme 3 i F AL Fi 4 mains uF Neowin E a . NOTE: 5 1) THE SCHEMATIC WIRING DIAGRAM AS PER THIS SLD APPROVED FOR TURNKEY PROJECTS Ble SHOWN INSIDE THE DRAWING IS SUITABLE le i FOR ‘X’ SERIES ENGINE WITH MULTI FUNCTION METER. Oa e 2) 10 COPPER FLEXIBLE CABLE TO BE USED Oo : #| ) FOR POWER CIRCUIT INSIDE THE PANEL CHIEF ENGINEER 7 CONSTRUCTION-1 i || APTRANSCO/VIDYUTH SOUCHA/HYD. L| a =POWERIGA DEVELOPMENT ewe LE SINGLE LINE DIAGRAM Standardised Drawing for Diesel Generator Set TI5= RVR RUE CONTROL PARE aR OOOARE| DRA. aa Se peeval No, 2)17 Revision Mio | _MSDEACOUSTIE ASTER Ome: ho Pronrzon TE four] PTsOrBACRO‘avawance? [ee Prepared & Approved during October - 2011 Eee eee eee ee eee ie (Fowenies)]§ Powerica Limirep ea) FLENAME-IPTSEZACROTATMENEBE sa = I + —_ L z z 3 [ a L a I z [NOK CONTACTOR, 240V AG WH SUTABLE HO. 4 NE CONTACT. 12 De INDICKTING LAMPS YT LED {MoV AC INDICATNG LAMPS WITH LED SEaurTON mr Ts ‘BILL OF MATERIALS FOR 15-25 KVA AME D.G PANEL. ee a eRe POWER CONTACTO. COL. VOLTAGE 240V At, 240 + 286 AUX CONTAETS —* shin. toe : 7 « 1 pa, oh, (0) wes CREA NEE Sur [Be : 47 0 0) NE RE owes eorex sor cam) | avecacevae | oun SERS me | eae Li ‘CURRENT TRANSFORNER, CTR~100/5A, ACO-CL—1, SVA ncon/Pr/NEWTEX | BPL=TAP WOUND | er nL RAY TP FE mean fan [aga |aase jaan | || onoerocescon BASED (AUF UT) SPH, AV AC SENSING FOR WANS & 2h, 4SBV AC EASING FOR AL AUK VOATE BERNA! BeAa, | | Le yf oan a OT 83 IE IO, | ws yO osm Ps ne ese MY ane acevo | er dau, ane ot. +E COTS AEA AE on soavgoe | er es a etre yom |ERRBAR | | | i | PUSH BUTTONS WM ELEMENTS, SSTAYPUT TYPE PUSH DUTTON WITH ELEMENTS [T0 BE SUPPLIED (LOOSE) & MOUNTED ON ACOUSTCL 0A, 2 POLE CONTROL SUPPLY ON/OFF S¥TCH 1 1 POLE WAIATURE CRCUTT BREAKER. ce cunt) ‘LASS FUSE FITING WTH 2A GLASS FUSE LARS DRAAOUT TPE. OA, NEUTRAL LN (ISCONNECTABLE TYPE) coru ive on DELAY/ATERVAL, 13050 nr WITH UNVERSAL COR, VOLTAGE 12-240V-NC/06 WTH 2 C/0 CONTACTS) SELEC/CAPL o8/——— brooe 4007) WTA TERMINALS (PCD CARD) pppROvED FOR TANKEY PAQJECTS : Ly i AES CHIEF ENGINEER | SONSTRUCTION-1 UPRANSCOIVIOYUTH SOUOHA/HYO. | WERICA DEVELOPMENT Dw-TCE: ‘BILL OF MATERIALS Re SF [Standardised Drawing for Diesel Generator Set ERR RAE CONTROL PARED a S| —_ oN see DETS 4 ‘STD/GTP-DWG/Approval No. 291 [Revision Mo. 0 (BE AODUSTIC AS PER ORG. n= PTENTZOn] [owls [pinwe] prenrancooraranusen [Sets oF] | Prepared & Approved during October - 2011 eorenneee| : ait (omen) Powerica Laren = z ener AEAAGLIYATMPAIIEA JANES i NOMN DESCRIPTION u EE eu 1 350V AO-/P le 12V DG, TOR 0/P BATTERY CHARGER UNIT (SMPS BASED) WITH ALTOUATIC FLOAT & BOOST CHANGEOVER FACILITY L{ |x | |aice re ve vata ot sec-acns tem host meeet & | | Atte te ob weemene ocak acceare seem Ram oT HEEL EEC al ee seeaecnt aa le] fer [+ Jens nae smunse orca este (care) we | [fou nem une oasomecran ret Set wo ft 1 Patt a | Pesan pmuaien Lue at te 1 fof fame fs | stem ice mr siienn ee ARR & WER me ot sone moeRs oR renee | oe ae em | 3 | coma mnruen sooreone i rae | | aseanat pro we en roe ELL [me] | marinas tv en ea occ RA Pro sf el APPROVED FOR TURNKEY PROJECTS i o Hp AW) Lo |x : uy A-TRANSCO/MOYUTH SOUDHA/HYO eH [| a POWERIGR DEVELOPMENT WET _ ‘Standardised Drawing for Diesel Generator Set ‘15 -25RVA ANF CONTROL PANEL RN TADHAT] OTe BRAWNGNO, SCALE | NTS Preped Ae eeeat No 2H [Revision Mo,)| SSSA FER erro (Se Beal vranranccorsiamnaia PS ar Prepared & Approved during, - eta rnT NEE z ; EQ Powsrica Lnarep m : = (ei Saobannas sso) uses —— [ene . ae oS — he : Se ee | > aloe | [ies —— there i sega terol tare | Rox _ [EVIE FHAET/oTeP aE OTC lear | i 4 12! wil be treated with saven tank process Fuk | m0n.06 Ten GRATTUF PHPHG Acne aD H it eames ae = waoeee i H oa se ae a 1b Es o | | i - ‘De RUPPLY GR/OTF ' 4 6 2 AR. EE a Pemerienret 7 a a er | a lov urmen carmr |e com in 4 utp teenie nec ar pep : i La La fre ee cao [em : al 8. Al nterconnocting | ce [ar [ecm Ve i le | Saabs cmp eee ae Ll 1g 9. Hardware shall be reste for ants. SHS EH Oe L| i 10, cout Tem Geneon ee oars rom ; a Fone APPROVED FOR TURNKEY PROJECTS epee \ i 3 ew tr 8 ey cata th 2.900 frmel — [af rs ad | i ‘Cflenble green or green yellow vie. -s)) wols\\ Be fat wr os sre | CHIEF ENGINEER //CONSTRUCTION-1 L L| A2TRANSCO/VIDYUTH SOUOHA/HYO. i H POWERICA DEVELOPMENT GENERAL NOTES & LEGENDS ‘Standardised Drawing for Diesel Generator Set_ “R= RRRVA RUF CONTROL PARE ak aia STD/GTP-DWG/Approval No, 221 /Revision Mog. | MSBEACOUSTICAS Pex On o-Pranr20n a Prepared & Approved during October -2011 rene] FTERFaNCRa ae sie = z SAe19=9) muons PISXFEAC Of 41 FNAB) ams I = = I i I = a I ee rH .|—_ == al. a alla mourns Pate ii fT" rawr none 4 ar eryirirsy) be provided on both eof prt wh Rte (2 H ew) Pee | [Poa inanatatetobe ane dgmaiyn tebe VIEWING wiNDoW ~ kee] GD foe MeGuSTIc Sooxa0 Hi, e [CULOUT-SIZE_OF_INSTRUMENTS:= |] a 8 HNSTRUMENIS. |~ DIMENSIONS ei Receeeee? tie Lala : ee tg [isaewse i r ‘ut 26xen Ba BEA 93 x W190. Ly i See : ESKAL 98 = ie B rae 2 Ts reste 2 ft bps : > | EamaNGLe sie ey 3 ‘0xa0x2 \ = au ERDNT VIEW. SIDE _VIEW. Li & i i APPROVED FOR TURNKEY PROJECTS | i Wo s\stoay it Hy 914 HOLE, cuier ENGINEER / CONSTRUCTION u 4 Nos. A-TRANSCO/VIOYUTH SOUOHAsHYD. BL 1 y Wr 4 a " z te alal | ‘cLan PLAT | ' z | Sr | a BASE MOUNTING DETAI GLPLATE DETAL BH ! ‘POWERICA DEVELOPMENT ~~ \ GENERAL ARRANGEMENT DRAWING RZ i ‘Standardised Drawing for Diesel Generator Set 5 <2ERVA RUE CONTROL PANEL Ta scalars] | STDIGTP. DWG/Approval No. 251 /Revision Mo. | NSBEACoUSTICAS PeRDRS. Now PrenenOtL Se Prepared & Approved during October ces eeeeee SEES ae (ewes) Powsrica Limrrep i z z ie To AWE UNIT Csr 755) Ga ae es Bolas spemanatiaeatis cxcth e i "Seu 2 -Ge7®) APPROVED FOR TURNKEY PROJECTS Wars at! CHIEF ENGINEER / CONSTRUCTION-1 APTRANSCO/VIDYUTH SOUOHA/HYD. ‘POWERICA DEVELOPMENT ‘Standardised Drawing for Diesel Generator Set, TE FERYR ANE CONTTOL PANEL POWER CIRCUIT DIAGRAM RZ sare | GRAN. Su [a pias prererzncootaturnneee [Sie IRSBE ROOUSTIC AS PER ORG. No PISIXF201 wal No. 22 / Revision Mo. 0 ‘SONI NS RRL TRS ee apse pre ee HET) SA Pow crt Guys} sa BLE mi i = oA al c tne | Fro cr2 = Gn 7) Ten 12 <1 435 Ac Feo EL ‘ims ent [ea Gaze £38 7 Siandardised Drawing for Diesel Generator Set ‘APPROVED FOR TURNKEY PROJECTS AY -allto| ro CHIEF ENGINEER } CONSTRUCTION~-1 A2TRANSCO/VIDYUTH SOUDHA/HYD. ‘POWERICA DEVELOPMENT DWOTTLE: METERING WIRING DIAGRAM \ “15 -2ERVR ANE CONTROL PANEL ‘STD/GTP-DWG/Ay Prepared & Approved during October - 2011 No. 291 / Revision Mo, INSIDE AGOUSTIC AS PER DRG. No- PTEOEZO1| jes [ouetae | prsxr2ince01-4t MEMBER? 3H (Fowenes) Powerica Luwrep oid a wer i =| a} eae il) & J>BPE we Ee , HU : L 4 | ; Bn | A “la ral a se 8 * “ ov FOR TURNKEY PROJECTS : eae woes | eH CHIEF ENGINEER / CONBTRUCTION-1 [__ A -TRANS2QIVIOYUTH SOUDHA/HYD. || TPOWERICA DEVELOPMENT “ie! DG, & wan PORER CONTACTO HF | Siandardised Drawing Tor Diesel Generator Set “ASIN RIF COTROT ARE a er eqresanine Zameen cnet |? ‘STD/GTP-DWG/Approval No. 221 [Revision Mo. INSIDE ACOUSTIC AS PER ORG, No: PTSINF2.04) er fas pisses] poe sen re Fes lovee pranrancoorararnace [Efe Prepared & Approved during October - 2011 (Fewenes) Powsrica Limmrep snr pene PAPEL AT ENE) AYER e I z apr 79 JOFEIBUEG) [OSOICT Joy AUTABIC| PaS|PIMPUEIS EAN aNVd TORINOO SUNY VASIS INERAOTZANG vonIMod: I ‘@SLd “ON ONG Had Sy ONROOY SST - feanaateennnstatee remem get SNVELEY Sal aay] ‘orl 3H Toe enka nd WVEDYIG LOUD aH Bear ozOWre nse “SRSA GaUIAI'T VoriaMog (Fauiinca) a Tuomi SNOO (UB3NIONA A3IHO GaH/vHoNOS HiNKOW/o: Nol you iol ( S13OUd ATYNUAL OI CIADHdCY SEN] V8 zu oo [Se apg as oe ean ore > ez [ez] we] oz[er[er] [sr] st] ex]ar[ mor] 6 B 7 (zyag) LINN ay aasva YOSS390ud OHOIN [Swen tot Serer ve [ee]ee [ie] oe ee]ee] alee] [ve lseecr tor ove [ee [ce | o€ | se 3 & fan, ar i 2 Pas ra il ea) ei | Ble ket 62 S 67 co kn peas le} i i i or oe ee ne es GB 1 J a su Fe tag se L i Sa ae Af WRT atog wo I gage || APPROVED FOR TURWKEY PROJECTS in eR. wane i Dal. nol CHIEF ENGINEER / CONSTRUCTIONS o ‘POWERICA DEVELOPREND*NS “O"7i0Y[0WS. OBOHWAMURCIATION WIRING DIAGRAM Siandasdised Drawing for Diesel Generator Set THEIR RF COWTROL PANEL Sa ROT TIN] — sro aan STDIGTP-DWG/Approval No. 221 /Revision Mo.Q| _SBEASSUSHCAS Fev ONS in rene2oy [anc faa [ol pape carne Prepared & Approved during October - 2011 wer (Geen) Powerica Laren Sane a T ca sar f A 4 z (PTS) FLENAME: PTEXF2AG2O1-4-MFMLEEA2] aves | d Ce i i ie BATTERY CHARGER UNIT i 12V/10A-DC | il H Tels) Sse? [| 3 848 ; le dag ald fe | as i sare r ce oo rH ; ww E } ed I : LS | te 4 BH ema | 4 e B® GD To ENN Hl Sanne fi F| 1 gen E dogs fH [yw + i ; APPROVED FOR TURNKEY PROJECTS i ne 4 i le Fete XK), wil > ‘COMMON BUS. (CHIEF ENGINE! CONSTRUCTION-1 | A Tans 5, u0¥y' 1 SJ OMAPHYO. un 4 ct + POWERICA DEVELOPMENT OWS. THLE: BATTERY CHARGER WIRING DIAGRAM |R-2 ; nak Ez RYA AE SORTROL PAR a Sea Read EE gt Sete a {HSE STE NENG SON ror fae Fitna aamraea tsa | -d & Approved during October - we Prepared & Appro\ we (ame) Powsrica Loarep io 1 i —a sos seem sane 0 ee He = a T 2 I o I = 4 ENGINE SIDE WIRING on eve wie gen] Pt aft Pac anal mle ry 213 243 | 5 BY yarer 6 216 3 al ))a 7 at sale slg | a} 9 219 x10 aclio [it slit al 212 a {32 4, 13 38413 HL] ash ot 4 Lat aie nq SEE : 26 § grips ‘sy fu 4 nd S vir Tew, OIL PR. i aera le + & dagen, WIRE u 7 azure Tp ase HH mf aa sew une og NOTES:— : fof FEED) NR wun ogre 4 lifouad APPROVED FOR TURMKEY PROUECTS Sewer | coLouR WE ul AVale rol, sexu ae i Al comer enciNfféR / CONSTRUCTION. ie A TRANS “GuupYu + Sry78/HYD = POWBRICA DEVELOPMENT aes ENGINE WIRING DIAGRAM ‘Standardised Drawing for Diesel Generator Set 15 25RVA AME CONTROL PANEL ‘BAN [uAGraA [oUOROS DRAWING NO. a ‘STD/GTP-DWG/Approval No. 281 / Revision Mo. 9 ACOUSTIC AS PER DRG. New PTSXF203) [Cia Fics TEASABE) PTSiMFZACZ-O1-4-MEN-BEAZ 4 ‘Prepared & Approved during October - 2011 ereeniee| ree Powerica LIMITED era oO. rere a T TT yee a at = I Zz I 2 1 5 I 4 I a a 7 opens C2 L7 [eS — TESA eat a] eee wanes [Se tet— | Bet rao sumer [B81 2 [A Jro mex sonSPARIBS] Toe oe HL aw reow ype #7 t3 | — | antacans roy C-2—Y3 [21 Jo mx fone frp) ress [ae [ep J aes rege euro (2a LB Re pom 7 | L] | reuse C—-[4 pe — Taare? dae SEE Cfo 1 TER ee ae [ew tT | per] SLRMMAME [eof [et — as. caro am wae pL apnigeny 7 AES 7 fat 3 om i eg SE J ro en as e4oy AC fi 9 TD SA-SWITCH omens ng (whet — 1 Le Frown ms ow [—— Li r in YS Jj vo oem mat @ ep Jame 13} 22 J] 10 meopet 15 jo} ‘s ya[22— 1a sve & mex : LI c APPROVED FOR TURNKEY PROJECTS AD ata No L CHIEF ENGINEER / CONSTRUCTION-1 DoTRANSCOIVIDYUT SOUDHA/H¥D POWERICA DEVELOPMENT he TERMINAL DETAILS Rez ised Drawing for Diesel Generator Set AAAI, a pS oT aR afar Sn Wor Approval No, 2911 Revision Mo. INSIDE ACOUSTIC AS PER ORG. Ne Prsinrao] fone es [ONO] Greperzinczoratanrmncs? feet Ty Sear ‘it = 2011 - Prepared & Approved during October (EERE) Powsraca Lnare E i z Aneto M-BEA2] Ta Siew ashes serovar er a ee seman > r = T 2 I 2 T a I = a ae CONFIGURATION CHART FOR BE42 Bl 10K ale WAINS FAILURE CONTROL Bi anaaneTEn CODA OESERETIN am | aa i TS BERR ENT oo yea te EI TADS FAURE Te a Fa | WANS RESTORE TE spe tL Be 3 | CONTADTORS CHANGEOVER 2) | Gisec_[150sec | —— sla Fr eee oe ee 5S [aver Vance UT ‘sap [-env [sev — [arts i [une He UT ara [-snme Tone [-s LF {gl a tover fe Loar Sppasetaoe pes] L A Fa ge SCN em emn fem t= Fj “GENERATOR PARAMETERS lo ka TEER SOOT BESSA OORT T TROT maT ooror| || pe VTA a sar oe garaa 9 nae VaLTae DEAT es a Fi Tver Vaca Sa sa al lal 8 poe ven Veta BEAT 2 Es ise H & TRE FAERIDEY ite noe] 3 Pat Fie RERUNEY TELAT a 3) esl yp [over Teese : as |S “|e 2 Paver FREDUENEY BELAY a a WANTS CORNY CT 7 on | a ol] AS ae eer se eatery | Bs — ave ST STEN : | 8 Ps Foes CURRENT SHUTDOWN TELAY = Bye ree eisai rma aT oH 8| [pag | ALTERNATOR NUMBER OF POLES cs H | Bsr | conrabran ONARC- TEST WOE raves} 1 fi an [or Sie Chee) or} EE mes iz "PARAMETER Gone A BESSRIPTION Derm — we [ie oman] || F ie BEER ey eee GRANTH Se a er Te ey] seee [sre [= 3 PaesdLay THE er | fee [oso e ENG WAY OF TE wt ee te] 2 ENE COLLIN Th aso-| 0 sat a Stor SOLED Teh GREAT TO ST ag3—[ ieee St aE] g Se a eee eens — Poe ete sry tee 2 SEL MERE SETTING CHARGER ACTERATOD ‘en [-anv— [sao — ars ala Z| ‘CRANK TERMINATION SETTING CGENERATOR_VOCTAGES “co _|_eov —[ sev —| carr aw i SEAR TEDUUTIN SETTING GHERATOR PRESIENGD —| sir [eae [Pome | FS e43F LL EB PRESTR PREALA WRN S| anne esate ers ile} REE HIGH ENGI TERPERATURE PRCA CORRS ess [ear essa | Fe ee eee Te et ‘PURGE TIMING (FOR GAS FUELLED ENGINES a> isec_| 15sec = ry PAE = Re 3 alg 7 Bee BENE APPROVED FOR TURNKEY PROJECTS EY 5 4 Nt Kaho sat 5° 3 CHIEF ENGINEER / CONSTRUCTION-1 Baia |ANSCO/MIDYUF | SOUDHA/HYD. Sakae A. TRANSSO) a) i | Standardised Guaranteed Technical Particulars for Diese] Generator Set — L_ 4 STD/GTP-DWG/Approval No, 291 /RevisionMo.0 | | —_——>-———— amrwannnce| rey & Ay aved during October - 2011 zai La Prep PPFO is [ota eae Wr ay Osea td Bako ts ad a RS See eNeaR pe — a i a ieee z - /A Eh hi eek aegis "ALARAM OPTION > aa arre Se—a| e| 3 Fee AAR SPAS OR OL TERP.AUEI-2— 4 ART Sy | eae] Dose | g FAL 0 STOP RL CONTRO PPT OPER PT] eft a a gail DeGnGY GST Te TESS [=|] || we Ng UEL_ IN THE TANK BELAY > [Wee [Sn |r a Pe sfunv rants Co ene a\ (ese moc Ree Soper oto ali 33 chance var coc Tee a esd 5 ae TEARS ld SN Soe SRE tir | ear me Pat na EL Oe oo eof ‘LB le es OTE ce a Br |i ese] PEREME-TEST-EOATTOT Stef aly tie nea ; oe ee _| Ey Fry | th [9395 | —arF> TUTE eee | [sean . enna or |. onset fu Sef ar gf af fe She 3] 2) | eo aac lem | a H 5| 4 4 wo th Sa CorFY H 5 “| “gala Foe ROTTS RSAC a} (Bg PARAMETER ‘Qrrion | GEVAULT | PARAMETER GODe a nEsoRIPTiON OPWONS | DEFAUIT| Ch *) (6S) 8) Fey ere —f Sanaa ar speerjome ee] i BS “GWE=2)_[ INPUT 27 MODE “eWO/NCD |“CLaNND | COUT~2>_ muTeUT = eo Be 2) Fema | peur arm —— germ costo ores} — ears ‘= Bae ewe | eur wise ——| anes cpa [T=] — EO bs ela aS BS) lens Saee — TEST i 3 De aes eT | GBeRaTOR SRL OT 3: Bee oe oa | 4 Ss ao [PAT Pm CaP ET | F | OS aN STOP Gh] AA RERUNS fo — ras Sane AT a —[ SLA aa POSTON i SL oer | SLAY rT POST : ' Sens ao FE | avon SNe : 8 Hse aa RE ‘@)— [veo eur Ser H |= @ "REMOTE AUTO MODE. ey XG FORCED CLOSED. EB Rg [See DRE TET eo [ee ten re 3 3 —| ene TOR TERT = — | ov Ley FEET aE] 2 io ee er sae +} : i as ore Lo al Ser = t= | oareaT Ws ae | ER Win SATS H ' S—[tntee Peewee STD eS — ver vaca eT i co [ther Femer STO Va SSO : il ¢ 3 "cay OVER CoRRENT SAUTEOWN [ALTERNATOR FAILURE” SHUTDOW I a & oe OVER CURRENT WARNING a “LOW OIL PRESSURE WARNING I. (| & sls i & ie (| 8 ERE APPROVED FOR TURNKEY PROJECTS |} ofall He 8| 8 [ts fra B 3 CHIEF ENGINEER / CONSTRUCTIONAL 5 geile | * ACTRANSCO/VIDYUT } SOUDHA/HYD. EW i jsial=| 2 ea ‘Standardised Guaranteed Technical Particulars for lees} yy Diesel Generator Set 3 STD/GTP-DWG/Approval No. 294 / Revision Mo. 0 — ree [eerzawseo} | Prepared & Approved during October - 2011 Poo eerereeeeeedt ; > c T a I (AT | i / 4 ee | ag 8 Fee istialela| a RTE a 2 hae eae ee —— Se ald So om ne SS iMag i Hit ToERNTORe WOE S| GLE Re aneToE ae Sige | TENPERATURE SWHGH STOO “38)—[ aon FUEL ALAR i are ae Sar Faroe vast SP rh eee tae one tt re 4 Se are ae ee — HT i Sten re Sra oo aera ee EI oa ee oe oS eae ae ae 2 | | (3 Pet REVERE WARING SUITES aoe Sra : She eee oes oe eer ens —— | ae || ey EMERGENCY STOP SHUTDOWN Cerda 447) PURGE (GAS ENGINE VALVE CONTROL) a Sra a] a] Fes pooree eae er ei ae a 8) | 4 eo | WANTENMREE SERVICE > FI SOT ENGNE HONS STATIS [| 2 4 “2e) | WAINTENANCE” SERVICE 3 TEPID SD PaESONCE OF NOM GOERATER VELT S| 3 EP] ENGINE BELT BREAK” SHUTDOWN, Se _|Fe4e IN OFF MODE (STATUS> 2) |. “ep FA To START SOTO SH [BEA TH MANUAL RODE” CSTATOST 4] -Lae|a| Ea—Paearereaiee So ee ae ee “| 1B) S| Essar niseere car vm | See A aE aT Je] [esl Ca ACAGH FRO MPUT 1 SHUTEEWIUATARING| GSS} | See LSee eRe | 2) AL FROH PUT 2 SHUTDOWN ARINC] “CSN —| AUTDIATIC PERIODE TEST S|) Cae patar ne tours curmvuvmnect oo Aaa a | Peepers Sor sevacena [in 35 | PS (ronsmog] Sot] 995 | To TNS “ON OuG Had Sy USHOSY aaISN ara] easan] avano|AaReAL wa RENAL IO-ZOVEDISLE CaLIAT'T VOItaNOg Teas 22 PEG NOH TNA ENV YOK FLAWED ONOUIES, 5 yg APPROVED FOR TURNKEY PROJECTS Wl (oo (CHIEF ENGINEER / CONSTRUCTION-1 A“TRANSCO/VIDYUF | SOUDHA/HYO, jesel Generator Set Standardised Guaranteed Technical Particulars for STD/GTP-DWG/Approval No. 20 / Revision Mo. Prepared & Approved during October - 2011

You might also like