Area A

Water lines that intersect streets of asphalt

No. Lines Pipe profile (m) Width of trench (m) Length of asphalt (m) Area (m²) DROWING No. SHEET
1 A-225-1 to A-225 0.125 0.53 8.73 4.58 LP-HAR-HY-AN-GL-001-C 1
2 A-218 to A-200 0.125 0.53 6.21 3.26 LP-HAR-HY-AN-GL-001-C 2
3 A-218 to A-200 0.125 0.53 17.97 9.43 LP-HAR-HY-AN-GL-001-C 2
4 A-200 to A-054 0.200 0.60 6.51 3.91 LP-HAR-HY-AN-GL-001-C 2
5 A-054 to A-052 0.160 0.56 8.12 4.55 LP-HAR-HY-AN-GL-001-C 2
6 A-052 to A-054 0.160 0.49 12.33 6.04 LP-HAR-HY-AN-GL-001-C 2
7 A-052 to A-220 0.140 0.56 6.65 3.72 LP-HAR-HY-AN-GL-001-C 2
8 A-230 to A-238 0.125 0.53 19.09 10.02 LP-HAR-HY-AN-GL-001-C 2
9 A-230 to A-236 0.063 0.46 12.53 5.80 LP-HAR-HY-AN-GL-001-C 2
10 A-230 to A-236 0.063 0.46 7.10 3.29 LP-HAR-HY-AN-GL-001-C 2
11 A-230 to A-230-2 0.090 0.49 6.45 3.16 LP-HAR-HY-AN-GL-001-C 2
12 A-048 to A-050 0.225 0.63 8.60 5.38 LP-HAR-HY-AN-GL-001-C 2
13 A-050 to A-010 0.160 0.56 6.47 3.62 LP-HAR-HY-AN-GL-001-C 2
14 A-050 to A-010 0.160 0.56 90.33 50.58 LP-HAR-HY-AN-GL-001-C 2
15 A-008 to A-006 0.300 0.70 7.94 5.56 LP-HAR-HY-AN-GL-001-C 2
16 A-012 to A-014 0.225 0.63 20.57 12.86 LP-HAR-HY-AN-GL-001-C 2
17 A-014 to A-116 0.160 0.56 6.00 3.36 LP-HAR-HY-AN-GL-001-C 2
18 A-116 to A-118 0.090 0.51 6.00 3.06 LP-HAR-HY-AN-GL-001-C 4
19 A-116 to A-118 0.090 0.51 5.92 3.02 LP-HAR-HY-AN-GL-001-C 4
20 A-126 to A-124 0.110 0.46 6.00 2.78 LP-HAR-HY-AN-GL-001-C 5
21 A-126 to A-124 0.110 0.51 7.00 3.57 LP-HAR-HY-AN-GL-001-C 5
22 A-100 to A-102 0.180 0.58 8.15 4.73 LP-HAR-HY-AN-GL-001-C 2
23 A-028 to A-245 0.063 0.46 9.92 4.59 LP-HAR-HY-AN-GL-001-C 4
24 A-406 to A-407 0.063 0.46 6.00 2.78 LP-HAR-HY-AN-GL-001-C 4
25 A-304 to A-300 0.160 0.56 6.66 3.73 LP-HAR-HY-AN-GL-001-C 4
26 A-604 to Existing pipe 0.125 0.53 10.04 5.27 LP-HAR-HY-AN-GL-001-C 5
Ʃ 172.65