No URAIAN PEKERJAAN UNIT VOLUME PEK HARGA/ UNIT JUMLAH HARGA BOBOT MINGGU 1 MINGGU 2 MINGGU3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 KET
2-7 ,MARET 9-14 MARET 16-21MARET 23-28MARET 30MARET-4APRIL 6-11APRIL 13-15APRIL
I Pek. Instalasi listrik lantai I
1 Pek. Pems armature 4x36 W bh 120 IDR 245,000.0 IDR 29,400,000.00 9.635% 3.212% 3.212% 3.212% 100%
2 Pek. Pems armature 2x36 W bh 30 IDR 175,000.0 IDR 5,250,000.00 1.720% 1.720%
3 Pek. Pems lamp DL 18 W bh 12 IDR 60,000.00 IDR 720,000.00 0.236% 0.236%
4 Pek. Titik instalasi Lampu ttk 162 IDR 125,000.0 IDR 20,250,000.00 6.636% 3.318% 3.318%
5 Pek Titik inst kotak kontak ttk 40 IDR 180,000.0 IDR 7,200,000.00 2.359% 2.359%
6 Pek perpanelan PL-A/PP-A pcs 1 IDR 1,200,000 IDR 1,200,000.00 0.393% 0.393%
7 Pek perpanelan SDP I pcs 1 IDR 6,500,000 IDR 6,500,000.00 2.130% 2.130%
TOTAL IDR 20,205,000.0 IDR 305,150,000.00 100.000% 13.369% 9.662% 20.695% 9.697% 24.876% 9.697% 12.004%
TOTAL RENCANA PROGRESS MINGGU KE 13.369% 23.031% 43.726% 53.423% 78.299% 87.996% 100.000% 0%
AKTUAL PROGRESS MINGGU KE
TOTAL AKTUAL PROGRESS MINGGU KE