158

Total number of tanneries

152
Number of tanneries operating now

Number of tanneries processing raw hides/skins to semi


9
finished stage
143
Number of tanneries processing raw hides to finished
leather
Buffalo & cow calf hides, goat &
Raw material processed
sheep skins
Total production capacity of tanneries, as per design of
55,000 kg/day
CETP
47,000 kg/day
Current production in the cluster

9
Number of tanneries doing chrome tanning

Number of tanneries processing wet blue leather 12


131
Number of tanneries processing vegetable tanned
leather
Approximate ratio of effluent from raw tanning:
10:90
finishing effluent
3
3000 m /day
Designed flow rate to the CETP

3
2600 m /day
Current flow rate to the CETP

Commissioning date of the CETP February 1995


0.8 hectares
Total area covered by the CETP

23 km
Total length of effluent conveyance pipeline

7
Number of pumping stations

Total project cost in Indian rupees 97 million