Retail Out let

A B C D
Agra 55 30 40 50
Demand Centre Allahabad 35 30 100 45
Kolkata 40 60 95 35
25 10 20 30

Total Cost 3600

Optimal distribution
Retail Outlet
Plants A B C D E
Agra 0 10 20 0 10
Allahabad 20 0 0 0 0
Kolkata 5 0 0 30 5
Conditions 25 10 20 30 15
Relation = = = = =
Commitment made 25 10 20 30 15
Out let Availability
E
40 40
60 20
30 40
15

istribution

Productions Relation Units


40 = 40
20 = 20
40 = 40
Steel Mills
A B C D
a 50 60 100 50
Ports b 80 40 70 50
c 90 70 30 50
10000 18000 22000 24000

Cost of shipping
Steel Mills
A B C D
a 2.5 3 5 2.5
Ports b 4 2 3.5 2.5
c 4.5 3.5 1.5 2.5
10000 18000 22000 24000

Total Cost/km 0.05

Total Cost of shipping 166000

Optimal distribution
Steel Mills
Plants A B C D Productions
a 10000 0 0 10000 20000
b 0 18000 6000 14000 38000
c 0 0 16000 0 16000
Conditions 10000 18000 22000 24000
Relation = = = =
Commitment made 10000 18000 22000 24000
Availability

20000
38000
16000

Availability

20000
38000
16000

Relation Units
= 20000
= 38000
= 16000
Herione
Hero Mathuri Sridevi Hema Maline Sridevi
Amitabh 195 185 180 194
Dharmendra 190 188 182 181
Jitendra 181 184 179 184
Mithun 194 184 179 183