Development of Advanced Nuclear Power Technologies
Coated Particle,
Dia. 0.9mm
Fuel Spheres,
Dia. 60mm
Uranium Dioxide
Kernel, Dia. 0.5mm
Half Section, 8,000
CP per Fuel Sphere
Industrial VHTR
Demonstration R&D
Gen. III
(HTR-PM) GIF
Self Shut-down
Self Cool-down
EXPERIMENTAL MODULAR REACTORS
Gen. IV
HTR-10 HTTR
8
8
Modular HTGR advanced features
1600
Fuel Surface Temperature [℃]
1400
1200
1000
800
600
0 hr 1 hr
400 24 hr 48 hr
72 hr 96 hr
200
0 200 400 600 800 1000 1200 1400
Z [cm]
Electricity generation,
cogeneration, process heat
4. Commercial application 10
Building a Modular HTGR Test Reactor
11
The HTR-10 Test Reactor
He Blower
Reactor Power Control
10 Rods
MWth
He Pressure MPa 3
Reactor Inlet
250
Temp., ℃
Reactor Outlet
700
Temp., ℃ Connecting
Vessel
13
Key Achievement through HTR-10
Fuel technology
Plant technology including equipment and systems
Safety demonstration
Experience and capacity building
Research and Development
Engineering
Equipment manufacturing
Commissioning
Maintenance and operation
License application
14
HTR-PM
It is logic and strategic to build an industrial
demonstration plant as the follow-up development
step after the success of the HTR-10 test reactor.
A 200MWe modular pebble bed HTGR
demonstration project (HTR-PM) has been initiated
and under implementation.
Since 2006, the project has become one of the
national key projects within the 2020 National
Science & Technologies Development Program of
China.
HTR-PM has been under construction since 2012.
15
HTR-PM Process Design
Plant electrical power, MWe 211
Core diameter, m 3
Core height, m 11
16
Design Verification
Fuel pebbles Steam Generator Main Helium Circulator Fuel Handling System
CRDM Small absorber ball system Spent fuel storage system Main control room
18
Equipment Manufacturing
First of a kind
Almost all components are manufactured in China, except for
graphite and some valves
21
Construction Progress
2015~2016
Metallic internal structure, water cooling panel, DCS, full scope simulator
22
Construction Progress
2017.6, graphite pebbles, 2017.12, RPV upper head
ceramic internals finished
23
Milestones
Construction Commissioning
2012/12/09:FCD 2020/07/25: start
2015/06/30:Reactor building
2015/12:Full scope simulator
2016/03/20:1st RPV installed
2016/08:Start fuel production
2016/09:2nd RPV installed
2016/12:main control room
2017/03: steam turbine installed
2017/06: 1st ceramic internals installed
2017/12: 1st head of RPV installed
2018/06: 2nd ceramic internals installed
2018/10: 1st SG delivered
……
24
Next Steps
Role of HTR-PM
Power generation, as supplement to
PWRs, especially to replace coal-fired
power plant to reduce coal share
Co-generation of steam and electricity
Process heat for e.g. hydrogen
production
Conclusion Remarks