You are on page 1of 1
con the powerplant and APU, In the May 2018 MPD there are 563, Systems inspection tasks, Inspections cover 34 chapters of the ATA aircraft documentation number system, and are divided into over 80 different FFEFC and calendar groupings. All, apart from three groupings covering nine tasks, have the same initial threshold and repeat intervals. The exceptions are 2YE with a TYE repeat interval, 1,000FC with a {600FC repeat interval, and 9,000FH/1,000EC with a 4,SQOFH/I,000FC repeat interval ‘Therefore, these reduced repeat interval system tasks do noe have a large input on later base check inputs. This is summarised as systems and powerplant programme MPD tasks (see rable, page 38) that provide an overview of all systems tasks. Inspection thresholds range from aly’ tasks 10 50,000FC/20YE, All Systems EZAP tasks appear as ATA Chapter 20 tasks, referred to as ‘Standard Practices’. A lange number of tasks in the Systems section that require the greatest access and preparation figures will be Chapter 20 tasks. These include the restoration by cleaning of all EWIS that are installed in the main deck and cargo bays, including utility areas where specified. ‘One method of gaining efficiencies in Kellstrom Aerospace maintenance programmes isto reduce

You might also like