Doc.

No: 058/PDA-000/0000
Rev: 00

GENERAL METHOD STATEMENT


FOR
PILE DRIVING ANALYZER TEST

Disclaimer:
This document is for general purpose only, if there is another specification related to the specify project please noted that those
specification shall be followed. PT. Geotech Efathama does not take responsibility of any use this document without involving and
direct supervising on the project.

Ruko Agung Niaga V Blok G6 No. 6 - 8


Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

I. Pendahuluan I. Introduction
Konstruksi fondasi untuk bangunan gedung The construction of foundation for high-rise
maupun infrastruktur seperti pembangkit buildings and infra-structure buildings such as
listrik, jalan, flyover, underpass, dermaga, power plants, roads, flyover, tunneling road,
tanki maupun bangunan lainnya memerlukan boiler, and many other structural buildings
suatu kontrol terhadap kualitas konstruksi need a good control to its construction quality;
sehingga diperlukan suatu sistem pengujian thus needs a comprehensive testing system
yang komprehensif dan dapat mewakili kondisi which can gives the actual condition for other
aktual tiang produksi. Salah satu sistem production piles. One of the most popular
pengujian fondasi yang populer saat ini adalah foundation testing systems is the Pile Driving
dengan Pile Driving Analyzer (PDA) yang Analyzer (PDA) test which is a nice and simple
merupakan metode pengujian non-destruktif non-destructive method to predict pile
yang mudah dilakukan untuk mengetahui capacity, settlement and load transfer.
kapasitas tiang, penurunan maupun transfer
beban.

Pengujian tiang dengan Pile Driving Analyzer Pile testing with Pile Driving Analyzer –
model PAX/8G (versi terakhir dari by PDI Inc., PAX/8G model (latest version by PDI Inc. –
USA) dapat dilaksanakan pada tiang pondasi USA) can be carried out on deep foundation
dalam, baik tiang bor, pancang beton, baja such as bored pile, concrete and steel driven
ataupun komposit. Dari hasil pengujian PDA pile as well as composite pile. PDA test give
didapat output berupa: output results such as:
1. Daya dukung aksial tekan tiang (friksi 1. Pile axial resistance (friction and end
dan tahanan ujung) bearing)
2. Estimasi penurunan tiang 2. Pile settlement
3. Keutuhan tiang 3. Pile integrity
4. Energi dan transfer beban 4. Energy and load transfer

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

Banyak keuntungan yang diperoleh dari Many PDA output from one pile testing
pengujian PDA di bandingkan dengan performs as a big benefit compare to static
pengujian beban statik. Keuntungan yang load test using dead weight; this benefits for
diperoleh antara lain hemat waktu dan biaya example are time schedule, soil behavior, and
serta dapat mengtahui prilaku tanah. cost.

Dasar teori dalam pengujian PDA adalah teori Basic theory on PDA test was one dimensional
gelombang satu dimensi, dimana gelombang wave propagation, where the input wave was
diberikan dengan menggunakan tumbukan generate by impact hammer with minimum
palu dengan berat minimum 1 – 2% dari weight of 1 – 2% from pile ultimate capacity.
kapasitas ultimate tiang. Rambatan gelombang Input wave then measure by attached strain
kemudian diukur dengan sensor regangan dan gauge and accelerometer at 1.5D from pile
akselerasi yang di pasang 1.5D dari kepala top. Traveling wave on pile will reflect back if
tiang. Rambatan gelombang yang masuk there are soil resistance and pile impedance
kedalam tiang kemudian akan memantul change.
kembali jika terdapat tahanan tanah dan
perubahan imepdansi tiang.

Pengujian PDA merupakan pengujian PDA test was pile dynamic capacity test that
kapasitas dengan cara dinamik yang sudah was admitted also there was many good
diakui dan sudah banyak korelasi yang baik correlation between dynamic and static load
antara hasil uji dinamik dan uji beban statik. test. Moreover, PDA test already standardized
Selain itu uji PDA juga sudah terstandar on ASTM D-4945.
dalam ASTM D-4945.

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

II. Peralatan Pengujian II. Testing Apparatus


1. PDA Model PAX/8G. 1. PDA - PAX/8G.
2. (2-4) strain transducer untuk mengukur 2. (2-4) strain transducer to measure the
regangan pada tiang. strain occur in test pile.
3. (2-4) accelerometer untuk mengukur 3. (2-4) accelerometer to measure the
akselerasi pada tiang. acceleration occur in the test pile.
4. Kabel utama + penghubung 4. Main cable + Connector
5. Charger 5. Charger
6. Peralatan pendukung untuk pemasangan 6. Miscellaneous tools for installing the
instrumentasi ke tiang. instrument to test pile.

PDA 8G
PDA PAX Strain Transducer

Hand Drill
Accelerometer Main Cable + Conncetor

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

Anchor and Bolt


Hand Grinder Drilling guide

Hammer and Wrench Sensor protector

III. Persiapan Pengujian III. Test Preparation


1. Tiang harus terekspos setinggi minimum 2 1. Pile must be exposed minimum 2 x
x Diameter (jika tiang berada di dalam Diameter. (If the pile below the ground,
tanah harus dilakukan penggalian). Pada the excavation is needed). On driven pile
tiang pancang yang memeiliki free- with more than 2D of free standing
standing lebih dari 2D dapat dilakukan height, can be tested directly without
pengujian tanpa perlu menggali atau excavate or cut the pile if using driving
memotong tiang jika menggunakan hammer.
hammer pancang.
2. Kepala tiang harus rata dan dalam kondisi 2. Ensure pile top surface is level with good
beton yang baik. Apabila kondisi kepala concrete quality. If bad pile head was
tiang kurang baik maka bagian yang kurang found then it should be cut and if
baik tersebut harus di potong dan jika necessary, do repair on pile head with

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

diperlukan dapat dilakukan perbaikan non-shrink grout material with same


dengan grouting kepala tiang menggunakan concrete strength or higher than test pile.
material non-shrink grout dengan mutu
yang sama atau lebih tinggi dari mutu beton
tiang uji.
3. jika kapasitas tiang uji sangat besar dapat 3. If pile capacity is very high, it’s
dilakukan perkuatan eksternal tambahan recommended to do external
dengan menggunakan fiberglass reinforced reinforcement using fiberglass reinforced
plastic (FRP) atau casing baja untuk plastic (FRP) or steel casing to prevent
mencegah kepala tiang pecah akibat impak. broken pile head due to hammer impact.

Example for Bored Pile Preparation


OK NOT OK!

Pile head leveling with grout

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

External reinforcement with steel casing

External reinforcement with FRP

4. Jika menggunakan Diesel hammer dan 4. If using Drop hammer (manual hammer)
Drop Hammer, pastikan eksentrisitas posisi or Diesel hammer, ensure the eccentricity
hammer dengan kepala tiang. between pile and hammer.
5. Untuk drop hammer, sebelum meletakkan 5. For drop hammer, before installing
hammer pada tiang, persiapkan hammer on pile, prepare pile cushion on
cushion/peredam pada kepala tiang, dapat top of pile, using multiplex (1 – 3 cm
menggunakan multiplek (setebal 1-3 cm, thick, 5-10 cm may necessary for high

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

atau tebal 5-10 cm diperlukan untuk beban pile capacity), spread and flattened some
besar) dan pasir disebarkan serta diratakan sand if necessary. For diesel hammer,
jika diperlukan. Pada diesel hammer, usually cushion already included in its
umumnya cushion yang digunakan sudah specification depending on hammer type.
terpasang pada hammer sesuai dengan
spesifikasi hammer yang tergantung pada
tipenya.

Figure 1. Pile head excavation and preparation (both bored pile and driven pile)

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

IV. Prosedur Pengujian IV. Prosedur Pengujian


1. Pasang strain transducer dan 1. Attach strain transducer and
accelerometer pada dua sisi tiang dengan accelerometer to the side section of pile
jarak 1.5 diameter (D) dari kepala tiang with 1.5 X Diameter (D) distance from
atau minimum 30 – 50 cm dari dasar pile head or minimum 30 – 50 cm form
tanah. ground.
2. Persiapkan hammer dan peralatan 2. Prepare hammer and other safety
pengaman pendukung. equipment.
3. Pada tiang pancang yang menggunakan 3. On driven pile with diesel or hydraulic
hammer diesel atau hidrolik lakukan hammer, conduct the test with same drop
pengujian dengan tinggi jatuh hammer height at final set and minimum 10 blows.
yang sama saat final set dan minimum 10 While on bored pile with drop hammer,
kali pemukulan. Pada pondasi tiang bor conduct the test with several drop height
dengan hammer drop, lakukan pengujian and progressing to greater drop height to
dengan beberapa tinggi jatuh yang mobilize pile capacity1.
bertahap untuk memobilisasi kapasitas
ultimate tiang1.
4. Kontraktor fondasi wajib memberikan 4. For analyzing and reporting purpose,
denah serta catatan pembuatan tiang contractor shall give pile layout and
(pilling record) guna keperluan laporan pilling record of the test pile.
dan analisa.
5. Selanjutnya data hasil pengujian akan 5. Afterward, test data will be analyzed using
dianalisa menggunakan program CAPWAP program.
CAPWAP.

1
ASTM D4945 – Chapter 6.11 Testing Cast in-Place Deep Foundation
GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

V. Batasan Pengujian V. Testing Limitation


1. Hasil CASE Method (RMX) hanya valid 1. CASE Method (RMX) result only valid for
untuk tiang silindris atau relative seragam cylindrical and relatively uniform pile
(tiang pancang) (driven pile)
2. Integritas tiang (BTA) tidak sepenuhnya 2. Pile integrity (BTA) not fully accurate,
akurat, terkadang muncul false BTA false BTA might appear due to; low
akibat; energi yang rendah, tahanan tanah energy, high soil resistance, noise caused
yang sangat besar, noise akibat pemukulan by hammer blow or bad pile head.
atau kondisi kepala tiang yang kurang
baik.
3. Untuk tiang kapasitas besar, diperlukan 3. For big pile capacity, need big hammer
hammer besar dengan kapasitas crane and big crane capacity.
yang besar.
4. Hasil tergantung pada perfoma saat 4. Result depends on performance during the
pengujian (jika kepala tiang rusak, test (if pile head broken, most data can’t
kebanyakan data tidak dapat digunakan be use for CAPWAP analysis).
untuk analisa CAPWAP).
5. “Garbage in garbage out” 5. Garbage in garbage out.

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

Appendix A
Contoh Analisa CAPWAP
Example of CAPWAP Analysis

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

Appendix B
Spesifikasi Alat
Equipment Specification

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

Appendix C
Dokumentasi dan Refrensi Proyek
Documentation and Project References

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

No. Project Name Client Location Year


1. Bogor Outer Ring Road IIB PT. Bauer Pratama Indonesia Bogor 2017
2. LRT Cibubur – Dukuh Atas PT. Adhi Karya Jakata 2017
3. Rusunami Wisma Atlet PT. PP Jakarta 2017
4. Jalan Tol Semarang - Solo PT. Waskita Karya Salatiga 2017-2018
5. Jalan Tol Batang - Semarang PT. Waskita Karya Kendal 2017-2018
LRT Lintas Cawang – Bekasi
6. PT. Adhi Karya Jakarta 2017-2019
Timur
7. Jembatan Tol Kapal Betung PT. Waskita Karya Palembang 2017-2019
8. LRT Lintas Pelayanan 2 PT. Adhi Karya Jakarta 2017-2019
9. Southgate Tanjung Barat PT. Indonesia Pondasi Raya Jakarta 2017-2018
Jalan Layang Toll Jakarta – PT. Waskita Karya & Jakarta,
10. 2017-2019
Cikampek Elevated II PT. Acset Indonusa Bekasi
Lontar Extension CFSPP 1 X
11. PT. Satyamitra Surya Perkasa Lontar 2017-2018
315 MW
Jalan Tol Cengkareng – Batu
12. PT. Wijaya Karya Jakarta 2017-2018
Ceper - Kunciran
Main Road Phase 2 &
13. Jembatan 5 Kota Baru PT. Mega Sukma Padalarang 2018
Parahyangan
Jalan Bebas Hambatan Ruas
14. Pematang Panggang – Kayu PT. Waskita Karya Lampung 2018
Agung
15. Transpark Cibubur PT. Wika Gedung Cibubur 2018
16. Transpark Bekasi PT. Tripondasi Manunggal Bekasi 2018
Pembangunan 6 Ruas Tol
17. PT. Indonesia Pondasi Raya Jakarta 2018
Dalam – Kota Jakarta
18. DCI MM 2100 Indonesia JK-3 PT. Caturpile Perkasa Cibitung 2018

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 
Ruko Agung Niaga V Blok G6 No. 6 - 8
Sunter – Jakarta Utara, Indonesia - 14350
Telp. +62-21-29384721/22  Fax. +62-21-29384720
www.geotech-indonesia.com

No. Project Name Client Location Year


19. PLTGU Jawa 1 CCPP IPP Samsung C&T Corporation Cilamaya 2018-2019
Tol Koneksi Becakayu – Tol
20. PT. Waskita Karya Jakarta 2019
Wiyoto Wiyono
21. Tol Becakayu 2A Ujung PT. Waskita Karya Bekasi 2019
Pembangunan Infrastruktur
22. PT. PP Yogyakarta 2019
Bandara Baru Kulonprogo
23. Flyover Martadinata Bogor PT. Pakubumi Semesta Bogor 2019
24. Simpang Susun Sentul Selatan PT. PP Sentul 2019
Pembangunan Jalan Tol Ruas
25. PT. Adhi Karya Aceh 2018
Sigli Banda Aceh
Pembangunan Jalan Tol
26. PT. Berdikari Fondasi Perkasa Tangerang 2019
Serpong - Balaraja
27. LRT DEPO PT. Adhi Karya Jakarta 2019
28. Cirebon 2,1 x 1000 MW CFPP PT. Indonesia Fondasi Raya Cirebon 2019
29. Maritime Tower PT. PP Jakarta 2019
30. Dili Port & Bidau Bridge Carya Timor Leste, Lda Timor Leste 2018 - 2019
30. Tangguh Expansion CSTS Papua 2018 - 2020

GEOTECHNICAL INSTRUMENTATION:
 INCLINOMETER  PIEZOMETER  WATER STAND PIPE  OBSERVATION WELL  SETTLEMENT GAUGES 

FOUNDATION TESTING:
 STATIC LOAD TEST (INSTRUMENTED WITH VWSG) 

ENVIRONMENT MONITORING:
 VIBRATION MONITORING  NOISE MONITORING  DUST MONITORING  TILTMETER  CRACKMETER 