Siasatan Integriti Struktur Di Pusat Perubatan Universiti Kebangsaan Malaysia Draft Inception Report (Revision 0)
Siasatan Integriti Struktur Di Pusat Perubatan Universiti Kebangsaan Malaysia Draft Inception Report (Revision 0)
TABLE OF CONTENTS
CHAPTER 1 INTRODUCTION 1
1.1 Purpose of the Inception Report 1
1.2 Consultant Appointment 1
1.3 Study Objective 1
1.4 Scope of Works 2
i
SIASATAN INTEGRITI STRUKTUR DI PUSAT PERUBATAN UNIVERSITI KEBANGSAAN MALAYSIA
Draft Inception Report (Revision 0)
LIST OF TABLES
Table 2-1 List of Data Required for the Study Before Investigation
Table 2-2 List of Data Required for the Study During Investigation
Table 2-3 List of Buildings involved in the Investigation
Table 4-1 Roles and Responsibilities of Investigation Team
Table 4-2 Work Programme for Each Stage of the Investigation
Table 4-3 Main Deliverables of the Study
Table 5-1 Next Phase of Work
LIST OF FIGURES
Figure 2-1 Site Location of Buildings Within HUKM
Figure 3-1 Combination set square
Figure 3-2 Levelling Equipment
Figure 3-3 Overall Flow Process for the Structural Integrity Investigation Procedures
Figure 4.1 Project Organization Chart
ii