SIASATAN INTEGRITI STRUKTUR DI PUSAT PERUBATAN UNIVERSITI KEBANGSAAN MALAYSIA

Draft Inception Report (Revision 0)

SIASATAN INTEGRITI STRUKTUR DI PUSAT PERUBATAN UNIVERSITI KEBANGSAAN


MALAYSIA

DRAFT INCEPTION REPORT (REVISION 0)

TABLE OF CONTENTS

CHAPTER 1 INTRODUCTION 1
1.1 Purpose of the Inception Report 1
1.2 Consultant Appointment 1
1.3 Study Objective 1
1.4 Scope of Works 2

CHAPTER 2 DATA COLLECTION 3

CHAPTER 3 APPROACH AND METHODOLOGY 6


3.1 Stage 1 6
3.1.1 Visual Condition Survey 6
3.1.2 Floor Usage Survey 6
3.1.3 Initial Inclination and Level Reading for RE Wall 7
3.2 Stage 2 8
3.2.1 Determination of Type of Distress or Defects 8
3.2.2 Monitoring of RE Wall Inclination and Level Reading 8
3.3 Stage 3 9
3.3.1 Compilation of Acquired Data from Stage 1 and Stage 2 9
3.3.2 Recommendation for Detailed Structural Investigation if necessary 9

CHAPTER 4 PROJECT ORGANIZATION AND WORK PROGRAMME 11


4.1 Organization Chart 11
4.2 Work Programme and Deliverables 13

CHAPTER 5 UPCOMING WORKS 15

i
SIASATAN INTEGRITI STRUKTUR DI PUSAT PERUBATAN UNIVERSITI KEBANGSAAN MALAYSIA
Draft Inception Report (Revision 0)

LIST OF TABLES
Table 2-1 List of Data Required for the Study Before Investigation
Table 2-2 List of Data Required for the Study During Investigation
Table 2-3 List of Buildings involved in the Investigation
Table 4-1 Roles and Responsibilities of Investigation Team
Table 4-2 Work Programme for Each Stage of the Investigation
Table 4-3 Main Deliverables of the Study
Table 5-1 Next Phase of Work

LIST OF FIGURES
Figure 2-1 Site Location of Buildings Within HUKM
Figure 3-1 Combination set square
Figure 3-2 Levelling Equipment
Figure 3-3 Overall Flow Process for the Structural Integrity Investigation Procedures
Figure 4.1 Project Organization Chart