Proposed 125 KLPD Grain based Distillery, 25 KLPD Malt Spirit Plant and 4.
5 MW Co-generation Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
Chapter-VI of Draft EIA / EMP Report
CHAPTER - VI
ENVIRONMENTAL MONITORING PROGRAMME
6.1 INTRODUCTION
Post-project monitoring is essential to keep check on the environmental status of the area. The Project
will be regularly monitoring quality status of the various environmental components. The monitoring
will be carried out on a regular basis as per CPCB norms to:
Know the level of pollution within the plant site and nearby areas
Examine the efficiency of pollution control system adopted at the plant site
To satisfy the statutory and community obligations
6.2 MEASUREMENT METHODOLOGIES
6.2.1 Instruments to be used
The following instruments will be used for monitoring:
1. Respirable Dust Sampler (RDS)
2. Fine Particulate Matter (FPM) Sampler
3. Stack Monitoring Kit
4. Online continuous monitoring device for stack emissions
5. Sound Level Meter
6. Water Level Indicator
Table 6.1
Measurement methodologies
Attributes Measurement method Test procedure
Ambient air environment
PM10 & PM2.5 Gravimetric method -
SO2 EPA Modified West & Geake Absorption in Potassium Tetra
method Chloromercurate followed by Colorimetric
estimation using P-Rosaniline hydrochloride
and Formaldehyde (IS: 5182 Part - II).
NO2 Arsenite modified Jacob & Absorption in dil. NaOH and then estimated
Hochheiser colorimetrically with sulphanilamide and N (I-
Nepthyle) Ethylene diamine dihydrochloride
and Hydrogen Peroxide (CPCB Method).
Stack monitoring
PM Gravimetric method As per CPCB guidelines
SO2 As Per IS-11255 part (2) 1985 Absorption in H2O2, Isopropanol followed by
(Absorbing Solution of H2O2, Colorimetric estimation using Sulphuric acid
Isopropanol Reagent) and Barium Chloride as Per IS-11255 part (2)
1985
NO2 As Per IS-11255 part (7) 2005 Absorption of Sample in NOx flask assembly
with NOx flask assembly. Followed by Colorimetric estimation using
Phenol-di-sulphonic acid and other reagent as
Per IS-11255 part (7) 2005
M/s. Rajasthan Liquors Limited 124
Proposed 125 KLPD Grain based Distillery, 25 KLPD Malt Spirit Plant and 4.5 MW Co-generation Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
Chapter-VI of Draft EIA / EMP Report
Water environment
pH, Turbidity, Colour, Odour, As per IS 10500- Samples for water quality should be collected
Taste, TDS, Total Hardness, and analyzed as per: IS: 2488 (Part 1-5)
Calcium hardness, methods for sampling and testing of
Magnesium hardness, Industrial effluents.
Chloride, Fluoride, Sulphate, Standard methods for examination of water
Nitrates, Alkalinity, Iron, and wastewater analysis published by
Copper, Manganese American Public Health Association.
Noise monitoring
Noise levels at Day & night As per CPCB norms As per CPCB norms
time -Leq dB (A)
6.3 MONITORING FREQUENCY
The frequency of monitoring is different for different components. The monitoring frequency will be
decided as per conditions of EC, CTE and CTO.
Table - 6.2
Frequency for post project monitoring
S. No. Description Frequency of Monitoring
1 Ambient Air Quality As per EC condition
2 Stack Monitoring Continuous monitoring
3 Water Quality Monthly
4 Effluent quality Daily
5 Noise Level Monitoring As per EC condition
6 Soil Quality Yearly
7 Medical checkup of employees Yearly
6.4 MONITORING/ SAMPLING LOCATIONS
The location of the monitoring stations will be selected on the basis of prevailing micro-meteorological
conditions of the area and consultation with SPCB.
Three AAQM stations will be selected (including minimum 1 location in upwind side, more sites in
downwind side / impact zone) to assess ambient air quality of the area. Noise level monitoring will be
carried out on plant boundary and in high noise generating area within the plant site. Water and soil
monitoring locations will be decided on the basis of general slope of the area and drainage pattern.
Locations for the post project monitoring are given in table below:
Table - 6.3
Locations for Post Project Monitoring
S. No. Description Frequency of Monitoring
1 Ambient Air Quality 3-4 locations in and around plant site
2 Stack Monitoring Plant Site
3 Water Quality In and around the plant site
4 Effluent quality ETP outlet
5 Noise Level Monitoring In & around the plant site
M/s. Rajasthan Liquors Limited 125
Proposed 125 KLPD Grain based Distillery, 25 KLPD Malt Spirit Plant and 4.5 MW Co-generation Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
Chapter-VI of Draft EIA / EMP Report
6 Soil Quality Around the plant site
7 Medical checkup of employees Nearby hospitals/dispensary
1.5 DATA ANALYSIS
Monitoring data analysis will be done by MoEFCC approved laboratory as per CPCB guidelines and
timely submitted to concerned authority (specified in Environment Clearance Letter issued by MoEFCC,
New Delhi and Consent issued by UPPCB) on regular basis.
1.6 REPORTING SCHEDULES
Environmental Monitoring Program will be designed considering conditions stipulated in the
Environmental Clearance issued by the MoEFCC, New Delhi and Consent to Establish and Operate
issued by UPPCB. Six monthly compliance reports will be submitted to the concerned regulatory
authorities.
1.7 EMERGENCY PROCEDURES
During an emergency, the main center to look at the scenario is Emergency Control Center. It has
certain hierarchy as per EC conditions which will be well defined and people will be aware of their
responsibilities related to any kind of emergency.
Emergency planning
The complete distillery unit will have a provision of interlocking system where failure of an
equipment or machinery will shutdown the whole process instantly and after rectifying only,
the whole process will be started.
During an emergency, the Emergency Management Staff, including the site controller shall
gather in the ECC.
The ECC shall be equipped with adequate communication systems in the form of telephones
and other equipment in order to respond quickly and inform the whole plant instantly.
The ECC's communication systems will be protected from possible shutdown.
The ECC will have its own emergency lighting arrangement and electric communication
system operation.
There will be automatic fire detectors leading to fire alarms and proper control system.
The hydrant pipeline network will be provided at all danger prone areas.
All emergency valves and switches and emergency handling facilities shall be made easily
accessible.
Detailed description is provided in Chapter VII under the head Emergency Planning and Procedures.
6.8 DETAILED BUDGET
Environmental monitoring budget will be decided by the environmental management cell according to
the requirements of the industry. EMC shall inspect the necessity & availability of the materials,
technologies, services & maintenance works. There will be regular view of records in order to detect
any gaps and appropriate budgetary allocations will be made on the basis of it.
M/s. Rajasthan Liquors Limited 126
Proposed 125 KLPD Grain based Distillery, 25 KLPD Malt Spirit Plant and 4.5 MW Co-generation Power Plant
At Village Chiraura, Tehsil Akbarpur, District Kanpur Dehat (U.P.)
Chapter-VI of Draft EIA / EMP Report
Table 6.4
Environmental monitoring budget (PLEASE PROVIDE BUDGET FOR MONITORING)
S. Attributes Approximate Capital cost Approximate Recurring cost/annum
No. (Crores) (Lakhs)
1. Lab instruments
2. Online monitoring of air and
water
3. Third party investment for
monitoring
4. Others
Total
M/s. Rajasthan Liquors Limited 127