Professional Documents
Culture Documents
Laporan Progres Kerjaan
Laporan Progres Kerjaan
NO LUAS
PANJANG LEBAR LUAS (M2) - LUAS (M2)
STA JULMAH KESELURUHA
(M) (M) PUTUS-PUTUS SOLID
N (M2)
0 - 1,000.00
14/3/2020
CENTER LINE
1000 - 2,000.00
CENTER LINE
SUB TOTAL
0.00
2000 - 1000
14/3/2020
CENTER LINE
1000 - 1000
CENTER LINE
SUB TOTAL
0.00
1000 - 1000
14/3/2020
CENTER LINE
1000 - 1000
CENTER LINE
SUB TOTAL
0.00
1000 - 1000
14/3/2020
CENTER LINE
SOLID
NO STA 1 2 3 4 5
PANJANG
1 -
2 -
3 -
4 -
5 -
DROPING BAHAN
SATUAN Realisasi Non Realisasi
Kg Kg Kg
Kg Kg Kg
Ls Ls Ls
Liter Liter Liter
HARI
Volume
NO Item Pekerjaan pekerjaa Satua STA 1 2 3 4
n n
Volume (M
Volume (M2)