You are on page 1of 1

Project THOMSON HOSPITAL Calcs.

By Azahar

Location DAMANSARA Checked

Date 15-FEB-2020 Page 4 of 21

References Calculations

Span Ratio D/H = 0.25


≤ 1

Zone A Zone B Zone C


Table 13 Net Cp 0.50 1.80 1.10

Windward Wall Size Effect Factor


Diagonal Dimension = 10 m Ca = 0.96

Design Pressure for the Roof Zone A p = 3.47 0.50 x 0.96 = 1.66 kPa

Design Pressure for the Roof Zone B p = 3.47 1.80 x 0.96 = 5.96 kPa

Design Pressure for the Roof Zone C p = 3.47 1.10 x 0.96 = 3.640 kPa
p = q [(CpeCa)]
Roof Uplift = 8.4 1.66 0.8 + 5.96 14 + 3.64 -6.4 / 1000
= 0.52 kPa

You might also like