MINIMUM EQUIPMENT REQUIREMENT

Contract ID No. : 21EA0038


Name of Project: Rehabilitation/Reconstruction of Roads with Slips, Slope
Collapse, and Landslide - Secondary Roads, Marinduque
Circumferential Rd - K0075 + 130 - K0075 + 320
Location: Torrijos, Marinduque
Station Limits: K0075 + 130 – K0075 + 320
Duration: 150 C.D.
Approved Budget Cost: Php 42,825,996.30

a. Major Construction Equipment:

No. Name of Equipment Capacity Needed


1 Stake Truck 5 tons 1
Barricade Flasher Light (Battery Operated, Amber
2 Color, w/ lifespan consideration of 6 months)
3 volts 6

3 Bulldozer with Ripper, D6H Series II PSDS/DD 1


4 Payloader 1.50 cu.m. 2
5 Dump Truck 12 cubic yards 4
6 Bar Cutter, Single Phase 1
7 Bar Bender 1
8 Cargo Truck 10 tons, 270 hp 1
4-6 cu. ft. per
9 One-Bagger Concrete Mixer
min
1

10 Concrete Vibrator 1
11 Water Truck / Pump 16,000 L 1
12 Boom Truck 1
13 Chain Block 2
14 Cargo/Service Truck 2-5 MT 1
15 Air Compressor 356-450 cfm 1
16 Hydraulic Telescopic Boom Truck 1
17 Drilling Machine (SIG Mounted) 2
18 Welding Machine 1
19 Generator Set 1401-1500 kW 1
20 Hydroseeding Machine 1
21 Backhoe 0.80 cu.m. 1
22 Plate Compactor 5 hp 1
23 Motorized Road Grader 140hp, G710A 1
10 MT,
24 Vibratory Roller
SD100DC
1

25 Transit Mixer 5 cu.m. 4


22 Concrete Batch Plant 30 cu.m. 1
23 Concrete Screeder 5.5 hp 1
24 4x2 Pickup Type Service Vehicle for the Engineer 1