You are on page 1of 2

 

Project Name        KAP2E2  Registration No.: 


Revision No.: 
INSPECTION AND TEST PLAN  ITP No.: 
Project No.:  134/15/53/1  Document No.: KAP2E2-MS-ELC-GEN-3778-0 
Subcontractor:  BEC‐MEP  Date:    Signature:   
Contractor:  BEC  Date:    Signature:   
QA/QC Manager:    Date:    Signature:   
Company:  NKY Engineers & Architects  Date:    Signature:   
ATTACHMENT: 13.2  Activity: Installation of Access Control System Date: 
Acceptance  Responsible  Record/  Inspection code 
No.  Activity  Reference Document  Frequency 
Criteria  Person  Forms  BEC  NKY 
1.0 Documents: 
 
Prior to start  CM/QA/QC/H MS 
1.1  Method Statement  MS  Approved MS  R  R 
work  SE  Documents 
Reference Drawing  Approved  Prior to start  Designer, 
1.2  Drawing Plan  Drawing/Plan  R/R  R 
Submittal  Drawing  work  Technical 
2.0 Material Inspection: 
 
Visual inspection of delivered Access  Project Specs Approved  Prior to  Procurement,  Approved 
2.1  Control System, Fittings, &  App Shop Drawing  Material  installation  Construction  Material  H  H 
Accessories  App Material Submittal  Submittal  work  QA/QC  Submittal 

3.0 Installation: Access Control System 
  Project Specs
Inspection for the installation of  App Shop Drawing  Prior to testing 
Approved  Construction,  IR 
3.1  Access Control System and its  App Material Submittal  and  H  W 
Drawing  QA/QC   App Drawing 
Accessories  App Method Statement  commissioning  
 
 
   
               
   
 

INSPECTION AND TEST PLAN: INSTALLATION OF Access Control System– KAP2E2-MS-ELC-GEN-3778-0 

 
 
Project Name        KAP2E2  Registration No.: 
Revision No.: 
INSPECTION AND TEST PLAN  ITP No.: 
Project No.:  134/15/53/1  Document No.: KAP2E2-MS-ELC-GEN-3778-0 
Subcontractor:  BEC‐MEP  Date:    Signature:   
Contractor:  BEC  Date:    Signature:   
QA/QC Manager:    Date:    Signature:   
Company:  NKY Engineers & Architects  Date:    Signature:   
ATTACHMENT: 13.2  Activity: Installation of Access Control System Date: 
Acceptance  Responsible  Record/  Inspection code 
No.  Activity  Reference Document  Frequency 
Criteria  Person  Forms  BEC  NKY 
4.0  Testing and Commissioning 
Project Specs
Testing Results, 
Functional Testing (Coverage &  App Shop Drawing  Prior to System  Construction,  IR, Approved 
4.1  Recommended  S  W 
Quality)‐ Access Control System  App Material Submittal  Commissioning   QA/QC  Drawing 
Value 
App Method Statement 
     
Inspection Codes 
H  Hold Point  Formal approval required from relevant party to proceed to the next stage.
W  Witness Point  Activity to be witnessed by relevant party at their discretion
R  Record  Documentation to be retained by or submitted to relevant party for record.
S  Surveillance  Relevant party will undertake continuous or periodic surveillance of the item/ activity.
R/R  Review and Record  Documentation to be retained by or submitted to relevant party for review and record.
N/A  Not Applicable   
 

Action  Name  Function  Signature  Date 


Prepared    QA/QC Engineer
Reviewed    QA/QC Engineer
Approved    Project Manager
Approved    PMC
 

INSPECTION AND TEST PLAN: INSTALLATION OF Access Control System– KAP2E2-MS-ELC-GEN-3778-0 

 

You might also like