Inspection Devices Vernier Caliper Sheave Gauge Level Gauge Laser Distance Meter Metric Tape Test Hammer Flash Light Magnifying Glass Digital Camera Load Cell
Procedures for Technical 1. Check crane documents (Equipment Manuals,
Inspection Previous Inspection Reports, Maintenance and Inspection Records, Operator’s Certification, etc.) 2. Verify that the identification and rated capacity marked on the crane data plate, bridge and/or hook are same with the crane documents provided. 3. Check hooks and latches for deformation, twisting, chemical damage, cracks and wear. (allowable wear ≤10% of the original; allowable throat opening ≤5% of the original) 4. Check condition of sheave and measure sheave size for compatibility with wire rope. Sheave should be properly lubricated. 5. Examine wire rope condition for distortion, general corrosion, broken or cut strands, number and distribution of broken wires, core failure. Check for proper wire rope termination. 6. Check wire rope reeving and excess wire rope while hook is at the lowest point. 7. Thorough visual inspection of hoist motor and lifting mechanism. (motors, gearboxes, bearings, rollers, hoist drums, electrical and control panels) 8. Examine the structure of the crane for damage, cracks, wear, distortion, corrosion, and missing parts including end carriages, bridge girders, trolley, railings, rail sweep, ends stops and bumpers. 9. Check all control mechanisms for proper operation. 10. Operational test including load lifting and lowering, travelling mechanism, safety devices and operational aids. 11. Operational test of equipment lights, controls, Methodology on Technical Inspection TM
brake and travel alarm.
12. Conduct load testing: 12.1 Hoist the test load a distance to assure that the load is supported by the crane and held by the hoist brake. 12.2 Transport the test load by means of the trolley for the full length of the bridge. 12.3 Transport the test load by means of the bridge for the full length of the runway in one direction with the trolley as close as possible to the extreme right-hand end of the crane as practical, and in the other direction with the trolley as close to the left- hand end of the crane as practical. 12.4 Place the test load at the center of the bridge. Lower the test load with the brake(s). Hold the load for 15 minutes to check for hoist brake slippage. 12.5 Measure the deflection of the bridge. (allowable bridge deflection is “Span/600” for single girder and “Span/800” for double girder)