You are on page 1of 1

TALAN, NILO JR N.

QUIZ#2
BSME-5B FEASIBILITY STUDY

1. Cite the twelve study that must be described and calculated for Technical study.
A. THE PRODUCT(S)
B. MANUFACTURING PROCESS
C. PLANT SITE AND PRODUCTION SCHEDULE
D. MACHINERY AND EQUIPMENT
E. PLANT LOCATION
F. PLANT LAYOUT
G. BUILDING AND FACILITIES
H. RAW MATERIALS AND SUPPLIES
I. UTILITIES
J. WASTE DISPOSAL
K. PRODUCTION COST
L. LABOR REQUIREMENTS
2. List down the learning objectives of the technical study.
1. Select the manufacturing process, the machinery capacity and design, the
machinery supplies, the plant location, the plant layout, the structures specification,
and the raw materials and their sources.
2. Determine the quantity and quality of the products to be produced, the labor
needed both skilled and unskilled, the utilities required, the waste disposal method,
and the transportation necessary.
3. Provide estimates of the total project cost and enumerating the major items of
capital cost.
4. List down in detail estimated production and overhead costs that will go into
operating the proposed plant.
5. Take into consideration any major technological development in the industry,
which may affect the commercial or technical soundness of the project.
3. Give the factors to be considered in analyzing the plant location.
- The accessibility to, and availability of, raw material sources.
- The availability of cheap or moderately-priced utilities such as power, water,
or fuel.
- The combined cost of transporting raw materials and fuel to the plant size.
- The proximity to distributing outlets.
- The availability of skilled and unskilled labor.
- Maps and charts of the proposed plant must be included

You might also like