Processing Time
Casting 240 minutes
Grinding 120 minutes
Drilling 200 minutes
Finishing 40 minutes
Total processing 600 minutes
Move and wait times 70 minutes
Total Batch Time 670 minutes

 Processing Time (20 units)


First Unit 30 minutes
Second Unit 42 minutes
Twentieth Unit 258 minutes
Time saved over traditional manufacturing: 670 minutes - 258 minutes = 412 minutes
(processing begins 12 minutes after the first)
(total processing time)
minutes - 258 minutes = 412 minutes