PURPOSE
2. SCOPE
3. RESPONSIBILITIES
The head of Maintenance, G.M (Facilities) is over all responsible to monitor the
activities of maintenance department and to ensure the maintenance of all the
equipment machines
4. PROCEDURE
I. COMPLAIN SYSTEM:
Daily Rounds:
All the supervisors of relevant section of maintenance/ engineering department
perform a daily round to check the respective areas, equipment / machines. The
daily visits/ rounds complain are lodged in the Daily floor Round – RM 005. The
complaint is also entered in the CMS.
Complain received:
If during operation, any equipment/machine stops functioning or problems are
faced, the department in charge or machine operator calls the maintenance
personnel. Complaint is reported in four different forms, through complaints form,
on daily round, on call & C.M.S.
Complain record:
On receiving the complaint form, complaint is entered in C.M.S i.e. Complain
Maintenance System & Complaint Log Book. The maintenance Supervisor send
technician to attend the equipment/machine for the rectification of the fault.