2020
SL. NHDP Name of Project NH No. Length Sanctioned Awarded Cost Date of Start/Appointed Date Date of Award Cumulative Physical
No. Phase/ (Old/ New) (Km) Cost/TPC Rs. Rs. in crore progress %
Scheme in crore
Manipur
Bridge Work
Construction of permanent steel bridge over
1 NH (O) Barak and Makru river 53 2 141 109 2017-04-27 2016-12-02 51.91%
NH (O)
12 (SARDP) Construction of 2-lane Moreh-Bypass 39 3 48 21.51 01.07.2020 27.03.2020 0.00%
Rehabilitation
Short term routine maintenance and
improvement of Imphal-Jiribam road from Km
15 NH (O) 3.00 to Km 75.00 on percentage rate basis 53 51.67 46.76 2017-04-01 2017-04-26 100.00%
2
M&R Rate Contract of Imphal-Jiribam from Km 37 217 2.7 2.11 2019-09-19 2019-07-31 35.00%
3.00 to Km 220.00
Rate Contract Imphal-Moreh Pkg-I (Km
330.00 to Km 350.00) & Pkg-III (Km 395.680
3 M&R 39 49.73 1.24 0.85 2019-06-18 2019-05-23 65.00%
to Km 425.411)
Restoration/Rehabilitation of Churachandpur-
Tipaimukh road from Km 0.00 to Km 185.00
4 M&R on EPC 185 82.00 31.25 31.25 2019-05-15 2019-02-25 36.59%
mode
Restoration and Reconstruction of
Churachandpur-Tipaimukh road from Km
5 M&R 202 77.00 41.58 36.59 2018-09-17 2018-07-16 56.42%
185.00 to Km 262.00 on EPC
mode
Short term improvement & Routine
6 M&R Maintenance Ukhrul- Jessami- Nagaland 150 63.00 19 16.69 2018-08-01 2018-06-19 82.00%
Border
Imphal-Jiribam Pkg-III (Km 145.00 to Km 37 10.09.2018 31.07.2018 85.00%
7 M&R 220.00) 25.00 14 16.35
11 M&R Rate contract of Tolloi Tadubi Km 28 to Km 102A 87.00 2.1 1.48 2019-06-07 2019-05-23 8.78%
115.00
Repair and Maintenance of 35 km (NH-150)
in the State of Manipur from Yaingangpokpi to
12 M&R Finch Corner (Km 488.15 to Km 522.86) on 150 25.00 10.94 8.41 2018-04-19 2018-04-02 89.00%
item rate basis
Restoration/Rehabilitation of Churachandpur-
Tipaimukh road from Km 0.00
(Churachandpur) to Km
13 M&R 185.00 (Bukpi) on NH-150 in the State of 202 - 4.62 4.61 2018-05-07 2018-05-05 100.00%
Manipur on item rate basis
14 M&R Imphal-Jiribam Pkg-I (Km 3.00 to Km 75.00) 37 7.00 11 12.82 02.10.2018 29.08.2018 100.00%
DPR
Final Feasibility
report recevied
on 30.06.2016
Land acquisition has been proceed through direct
M/s CE Testing
1 ADB Ukhrul -Toloi- Tadubi 102A 115 23.11.2015 14.01.2016 05.01.2016 finalized 14.04.2016 31.07.2017 02.08.2016 purchage mode. LA estimates for Ukhrul and Senap
Pvt.Ltd.
Districts sent to HQ for Approval.
2
NK Two laning with paved M/s CE Testing 129A 204 26.10.2017 21.12.2018 15/01/2018 finalized 03.03.2018 13/10/2018 01.04.2018 26/03/2019 DPR work hold up to draft DPR stage
shoulders from Maram- Pvt.Ltd.
Peren Dimapur
3
NK Two laning with paved M/s SM 202 12 28.12.2016 _ _ Not finalized - Final Feasibility 22.07.2018 - Alignment is not finalized
shoulders from Jessami Consultant report on
to Nagaland Border 29.07.2017
A Total 331
Bharatmala
1 BMP Shangshak- Nampisha M/s CE Testing 102A 90 26.10.2017 21.12.2018 15/01/2018 finalized 03.03.2018 27/10/2018 01.04.2018 11/03/2019 10.08.2019
published on
Churachandpur- 26/10/2018 for
3 BMP M/s CE Testing 102B 89 26.10.2017 21.12.2018 15/01/2018 finalized 03.03.2018 12/10/2018 01.04.2018 03.05.2019 Pkg-I
Sinnghat-Tuiavi
M/s SM
4 BMP Moirang-Imphal 150 42 28.12.2016 22.02.2017 02.02.2017 Not finalized 22.07.2017 29.07.2017 22.08.2017 29.12.2017 Greenfiled alignment is not finalized
Consultant
6 Kohima -Imphal M/s Stanley 39 125 14.07.2015 01.01.2016 04.01.2016 finalized 31.03.2016 07.03.2019 31.07.2016 under progress
B Total 736.00
Status Of Pre-Construction Activity
Final DPR
LA FC Utility
3A 3G Stage II Approval Shifting Estimate d
Notification date/ Notification date/ Stage I Approval date/ date/ Area in Ha Estimate (in Cost
Area in Ha Area in Ha Cr) Target Date Actual Date
Area in Ha
1.Not initiated as
payment is
awaited from HQ. MSPDCL:
Land acquisition has been proceed through direct Received: 2.Animal Passage PHED: Yet
purchage mode. LA estimates for Ukhrul and Senapti FC-29.08.2018 WC- Plan pending from 15.09.2016 31.08.2016 1610
to be
Districts sent to HQ for Approval. 07.09.2018 Consultant submitted
DPR work hold up to draft DPR stage Not yet submitted - - 20/06/2018 _ 1624
3402
1. FC application
submitted for package-3
& 4,
remaing application are
pending from consultant.
_ _ 2.WC application is _ _ 20/06/2018 _ 1260
pending form consultant
FC not applicable. WC
proposal is applied but
the proposal is on hold
Greenfiled alignment is not finalized as per direction. _ _ 20.09.2017 Submitted 609
3A notified on 4 FC & 1 WC
29.07.2019 for proposals are applied.
Imphal-East FC is in CF stage and
District and 3A WC is under DFO stage.
uploading for other
Districts are under _ _ _ 20.09.2017 Submitted 2465
progress
10029.50
NH-In Principle
2 laning with paved
shoulder from
Tamenglong in Manipur
to Peren in Nagaland
M/s CE Testing
1 NK via Longdi Pabram 100 26.10.2017 21.12.2018 15/01/2018 finalized 03.03.2018 2018-12-10 01.04.2018 _ DPR upto Feasibility stage
Pvt.Ltd.
C Total 355.00
4899.00
18330.50